This document provides details for a federal contract opportunity issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The solicitation seeks construction services to build women's health facilities across three floors at a VA medical center, as outlined in the attached one hundred percent specifications. Offerors should respond to solicitation number 36C24123B0002 by the unspecified deadline to be considered for the award, which is also not provided. Relevant construction requirements and pricing terms are detailed in the one hundred percent specifications file.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bedford VA Medical Center Renovate Bldg.12 for Women’s Clinic Design
Bedford, MA Project #518-21-103
12-01-21
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 05-21
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20
01 32 16.16 Network Analysis Schedules (Design-Build Only) 03-20
01 33 23 Shop Drawings, Product Data, and Samples 06-21
01 35 26 Safety Requirements 07-20
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 45 29 Testing Laboratory Services 11-18
01 57 19 Temporary Environmental Controls 01-21
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 01-21
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-21
04 05 13 Masonry Mortaring 10-17
04 05 16 Masonry Grouting 01-21
04 20 00 Unit Masonry 08-17
04 72 00 Cast Stone Masonry 02-15
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
05 50 00 Metal Fabrications 08-18
05 51 00 Metal Stairs 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
06 20 00 Finish Carpentry 01-21
12-01-21
00 01 10-2
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 Bituminous Dampproofing 01-21
07 21 13 Thermal Insulation 01-21
07 21 23 Loose-Fill Insulation 01-21
07 22 00 Roof and Deck Insulation 01-21
07 31 13 Asphalt Shingles 02-21
07 54 23 TPO Roofing 01-21
07 60 00 Flashing and Sheet Metal 01-21
07 71 00 Roof Specialties 01-21
07 81 00 Applied Fireproofing 10-17
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 10-17
07 95 13 Expansion Joint Cover Assemblies 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 14 00 Interior Wood Doors 01-21
08 31 13 Access Doors and Frames 01-21
08 34 53 Security Doors and Frames 01-21
08 56 53 Blast Resistant Windows 01-21
08 71 00 Door Hardware 06-22
08 71 13.11 Low Energy Power Assist Door Operations 01-21
08 80 00 Glazing 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 51 00 Acoustical Ceilings 12-18
DIVISION 10 – SPECIALTIES
10 13 00 Directories 01-21
10 14 00 Signage 01-21
10 21 23 Cubicle Curtain Tracks 01-21
10 25 13 Patient Bed Service Walls 01-20
10 26 00 Wall and Door Protection 01-21
10 28 00 Toilet, Bath, and Laundry Accessories 01-21
10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT
11 73 00 Ceiling Mounted Patient Lift System 08-20
DIVISION 12 – FURNISHINGS
12 36 00 Countertops 12-18
12-01-21
00 01 10-3
DIVISION 13 - SPECIAL CONSTRUCTION
Not Applicable
DIVISION 14– CONVEYING EQUIPEMENT
14 24 00 New Hydraulic Elevator 08-20
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20
22 05 12 General Motor Requirements for Plumbing Equipment 09-20
22 05 19 Meters and Gages for Plumbing Piping 09-20
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 08 00 Commissioning of Plumbing Systems 11-16
22 11 00 Facility Water Distribution 05-21
22 11 23 Domestic Water Pumps 09-15
22 13 00 Facility Sanitary and Vent Piping 09-20
22 13 23 Sanitary Waste Interceptors 09-20
22 14 29 Sump Pumps 09-15
22 31 11 Water Softeners 09-15
22 35 00 Domestic Water Heat Exchangers 09-20
22 40 00 Plumbing Fixtures 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
02-20
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 08 00 Commissioning of HVAC Systems 02-20
23 09 23 Direct-Digital Control System for HVAC 09-11
23 21 13 Hydronic Piping 02-20
23 21 23 Hydronic Pumps 02-20
23 22 13 Steam and Condensate Heating Piping 02-20
23 22 23 Steam Condensate Pumps 04-20
23 23 00 Refrigerant Piping 02-20
23 25 00 HVAC Water Treatment 02-20
23 31 00 HVAC Ducts and Casings 02-20
23 34 00 HVAC Fans 02-20
23 37 00 Air Outlets and Inlets 02-20
23 40 00 HVAC Air Cleaning Devices 03-20
23 64 00 Packaged Water Chillers 03-20
12-01-21
00 01 10-4
SECTION NO. DIVISION AND SECTION TITLES DATE
23 73 00 Indoor Central-Station Air-Handling Units 03-20
23 81 23 Computer-Room Air-Conditioners 03-20
23 82 00 Convection Heating and Cooling Units 03-20
23 82 16 Air Coils 03-20
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 13 Medium-Voltage Cables 01-17
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 05 41 Underground Electrical Construction 01-17
26 09 23 Lighting Controls 01-18
26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 01-18
26 23 00 Low-Voltage Switchgear 01-17
26 24 13 Distribution Switchboards 01-18
26 24 16 Panelboards 01-18
26 27 26 Wiring Devices 01-18
26 29 11 Motor Controllers 01-18
26 29 21 Enclosed Switches and Circuit Breakers 01-17
26 32 13 Engine Generators 01-18
26 36 23 Automatic Transfer Switches 01-17
26 43 13 Surge Protective Devices 01-17
26 51 00 Interior Lighting 01-18
26 56 00 Exterior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 10 00 Control, Communication and Signal Wiring 06-15
27 11 00 Communications Equipment Room Fittings 06-15
27 15 00 Communications Structured Cabling 01-16
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 13 00 Physical Access Control System 10-11
12-01-21
00 01 10-5
SECTION NO. DIVISION AND SECTION TITLES DATE
28 23 00 Video Surveillance 09-11
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 12 16 Asphalt Paving 09-15
32 17 23 Pavement Markings 08-16
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 12-17
33 40 00 Storm Sewer Utilities 12-17
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation
11-01-21
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI001 COVER SHEET
GI002 DRAWING INDEX, LEGENDS, AND ABBREVIATIONS
GI003 MOUNTING HEIGHTS, EXTERIOR WALL AND ROOF TYPES
GI101 CODE COMPLIANCE SUMMARY
GI102 GROUND AND FIRST FLOOR CODE COMPLIANT PLANS
GI103 SECOND FLOOR AND ATTIC CODE COMPLIANT PLANS
CIVIL
C001 CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES
CD101 CIVIL DEMOLITION PLAN
CS101 CIVIL SITE PLAN
CS102 CIVIL EROSION CONTROL AND STAGING PLAN
C501 CIVIL SITE DETAILS
STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES
S-002 STRUCTURAL GENERAL NOTES
S-003 LIGHT GAGE FRAMING DETAILS
S-004 EQUIPMENT BRACING AND ANCHORAGE DETAILS
S-005 GENERAL STRUCTURAL DETAILS
S-006 GENERAL STRUCTURAL DETAILS
SF100 GROUND LEVEL FOUNDATION PLAN
SF101 FIRST FLOOR FRAMING PLAN
SF102 SECOND FLOOR FRAMING PLAN
SF103 ROOF LEVEL FRAMING PLAN
SF104 UPPER ROOF FRAMING PLAN
S-301 STRUCTURAL DETAILS
S-302 STRUCTURAL DETAILS
S-501 STRUCTURAL DETAILS
S-502 STRUCTURAL DETAILS
ARCHITECTURAL
AD100 GROUND FLOOR DEMOLITION PLAN
AD101 FIRST FLOOR DEMOLITION PLAN
AD102 SECOND FLOOR DEMOLITION PLAN
AE100 GROUND FLOOR PLAN
AE101 FIRST FLOOR PLAN
AE102 SECOND FLOOR PLAN
AE103 ATTIC FLOOR PLAN
AE120 GROUND FLOOR REFLECTED CEILING PLAN
AE121 FIRST FLOOR REFLECTED CEILING PLAN
AE122 SECOND FLOOR REFLECTED CEILING PLAN
AE131 ROOF PLAN
AE201 EXTERIOR ELEVATIONS REPAIR & UPGRADES
AE211 INTERIOR ELEVATIONS
00 01 15 - 2
AE301 BUILDING SECTIONS
AE310 WALL SECTIONS
AE401 ENLARGED PLANS
AE402 ENLARGED PLANS
AE403 ELEVATOR PLANS, SECTIONS AND DETAILS
AE404 ENLARGED STAIR PLANS
AE405 ENLARGED STAIR SECTIONS
AE501 DETAILS - BUILDING
AE502 DETAILS
AE511 DETAILS
AE531 DETAILS - STAIR AND ELEVATOR
AE601 SCHEDULE - DOOR
AE700 BASEMENT EQUIPMENT PLAN
AE700A ENLARGED EQUIPMENT PLANS
AE700B ENLARGED EQUIPMENT PLANS
AE701 FIRST FLOOR EQUIPMENT PLANS
AE701A ENLARGED EQUIPMENT PLANS
AE701B ENLARGED EQUIPMENT PLANS
AE701C ENLARGED EQUIPMENT PLANS
AE702 SECOND FLOOR EQUIPMENT PLAN
AE702A ENLARGED EQUIPMENT PLANS
AE702B ENLARGED EQUIPMENT PLANS
AE702C ENLARGED EQUIPMENT PLANS
AE703 EQUIPMENT SCHEDULE
ARCHITECTURAL INTERIORS
ID001 FINISH SCHEDULE
ID100 GROUND FLOOR FINISH PLAN
ID101 FIRST FLOOR FINISH PLAN
ID102 SECOND FLOOR FINISH PLAN
ID103 SCHEDULE - ROOM SIGNAGE
ID104 SCHEDULE - ROOM SIGNAGE
ID105 INTERIOR ELEVATIONS
FIRE ALARM
FA001 FIRE ALARM LEGEND, GENERAL NOTES AND ABBREVIATIONS
FA100A BUILDING 12 GROUND FLOOR - AREA A FIRE ALARM PLAN
FA100B BUILDING 12 GROUND FLOOR - AREA B FIRE ALARM PLAN
FA101A BUILDING 12 FIRST FLOOR - AREA A FIRE ALARM PLAN
FA101B BUILDING 12 FIRST FLOOR - AREA B FIRE ALARM PLAN
FA102A BUILDING 12 SECOND FLOOR - AREA A FIRE ALARM PLAN
FA102B BUILDING 12 SECOND FLOOR - AREA B FIRE ALARM PLAN
FA501 FIRE ALARM RISER DIAGRAM
FIRE PROTECTION
FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES
FS100 FIRE PROTECTION SITE PLAN
FX100 FIRE PROTECTION PLAN GROUND FLOOR
FX101 FIRE PROTECTION PLAN FIRST FLOOR
FX102 FIRE PROTECTION PLAN SECOND FLOOR
FX103 FIRE PROTECTION PLAN ATTIC FLOOR
FX501 FIRE PROTECTION DETAILS
PLUMBING
P001 PLUMBING LEGEND AND ABBREVIATIONS
P-501 PLUMBING DETAILS
00 01 15 - 3
P-502 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
PD100 PLUMBING DEMOLITION PLANS
PD101 PLUMBING DEMOLITION PLANS
PU100 PLUMBING UNDERSLAB PLANS
P-100 PLUMBING GROUND LEVEL PLANS
P-101 PLUMBING FIRST FLOOR PLANS
P-102 PLUMBING SECOND FLOOR PLANS
MECHANICAL
M-001 MECHANICAL LEGEND AND ABBREVIATIONS
M-002 MECHANICAL GENERAL NOTES
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-603 MECHANICAL SCHEDULES
M-604 MECHANICAL SCHEDULES
M-650 MECHANICAL CONTROLS LEGEND
M-651 MECHANICAL SEQUENCE OF OPERATIONS
M-652 MECHANICAL SEQUENCE OF OPERATIONS
M-653 MECHANICAL SEQUENCE OF OPERATIONS
M-654 MECHANICAL SEQUENCE OF OPERATIONS
MD100 HVAC GROUND FLOOR DEMOLITION PLAN
MD101 HVAC FIRST AND SECOND FLOOR DEMOLITION PLANS
MH100 HVAC GROUND FLOOR PLANS
MH101 HVAC FIRST FLOOR PLANS
MH102 HVAC SECOND FLOOR PLANS
MH103 HVAC ATTIC PLAN
ELECTRICAL
E-001 ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS
E-002 ELECTRICAL DRAWING INDEX
E-500 ELECTRICAL DETAILS
E-900 EXISTING PANEL PHOTOGRAPHS
E-901 EXISTING ELECTRICAL PHOTOGRAPHS
E-902 EXISTING ELECTRICAL PHOTOGRAPHS
E-903 EXISTING ELECTRICAL PHOTOGRAPHS, UTILITY TRANSFORMER AND
ELECTRICAL SERVICE
E-904 EXISTING FIRE ALARM PHOTOGRAPHS
ED100A BUILDING 12 GROUND FLOOR - AREA A DEMO PLAN
ED100B BUILDING 12 GROUND FLOOR - AREA B DEMO PLAN
ED101A BUILDING 12 FIRST FLOOR - AREA A DEMO PLAN
ED101B BUILDING 12 FIRST FLOOR - AREA B DEMO PLAN
ED102A BUILDING 12 SECOND FLOOR - AREA A DEMO PLAN
ED102B BUILDING 12 SECOND FLOOR - AREA B DEMO PLAN
EL100A BUILDING 12 GROUND FLOOR - AREA A LIGHTING PLAN
EL100B BUILDING 12 GROUND FLOOR - AREA B LIGHTING PLAN
EL101A BUILDING 12 FIRST FLOOR - AREA A LIGHTING PLAN
EL101B BUILDING 12 FIRST FLOOR - AREA B LIGHTING PLAN
EL102A BUILDING 12 SECOND FLOOR - AREA A LIGHTING PLAN
EL102B BUILDING 12 SECOND FLOOR - AREA B LIGHTING PLAN
EL103 BUILDING 12 - ATTIC ELECTRICAL LIGHTING PLAN
EL501 LIGHT FIXTURE SCHEDULE
00 01 15 - 4
EL502 ELECTRICAL LIGHTING DETAILS
EL503 ELEVATION PLAN - ALL OUTDOOR LIGHTING
EL504 LIGHT FIXTURE CUT SHEETS
EL505 TIMECLOCK AND LIGHTING CONTACTOR WIRING DIAGRAM
EM100A BUILDING 12 GROUND FLOOR - AREA A ELECTRICAL POWER PLAN
EQUIPMENT
EM100B BUILDING 12 GROUND FLOOR - AREA B ELECTRICAL POWER PLAN
EQUIPMENT
EM101A BUILDING 12 FIRST FLOOR - AREA A ELECTRICAL POWER PLAN
EQUIPMENT
EM101B BUILDING 12 FIRST FLOOR - AREA B ELECTRICAL POWER PLAN
EQUIPMENT
EM102A BUILDING 12 SECOND FLOOR - AREA A ELECTRICAL POWER PLAN
EQUIPMENT
EM102B BUILDING 12 SECOND FLOOR - AREA B ELECTRICAL POWER PLAN
EQUIPMENT
EM103 BUILDING 12 ATTIC - ELECTRICAL POWER PLAN EQUIPMENT
EM601 MOTOR AND EQUIPMENT SCHEDULES
EM602 MOTOR AND EQUIPMENT SCHEDULES
EP100A BUILDING 12 GROUND FLOOR - AREA A ELECTRICAL POWER PLAN
EP100B BUILDING 12 GROUND FLOOR - AREA B ELECTRICAL POWER PLAN
EP101A.1 BUILDING 12 FIRST FLOOR - AREA A ENLARGED POWER PLAN
EP101A BUILDING 12 FIRST FLOOR - AREA A ELECTRICAL POWER PLAN
EP101B BUILDING 12 FIRST FLOOR - AREA B ELECTRICAL POWER PLAN
EP102A.1 BUILDING 12 SECOND FLOOR - AREA ENLARGED POWER PLAN
EP102 A BUILDING 12 SECOND FLOOR - AREA A ELECTRICAL POWER PLAN
EP102 B BUILDING 12 SECOND FLOOR - AREA B ELECTRICAL POWER PLAN
EP501 NORMAL POWER - ONE LINE DIAGRAM
EP502 EMERGENCY POWER - ONE LINE DIAGRAM
EP503 ELECTRICAL DETAILS
EP504 ELECTRICAL DETAILS
EP600 PANEL AND EQUIPMENT SCHEDULES
EP601 PANEL SCHEDULES
EP602 PANEL SCHEDULES
ES100 EXTERIOR ELECTRICAL SITE PLAN
ET100A BUILDING 12 GROUND FLOOR - AREA A TELECOMMUNICATIONS PLAN
ET100B BUILDING 12 GROUND FLOOR - AREA B TELECOMMUNICATIONS PLAN
ET101A BUILDING 12 FIRST FLOOR - AREA A TELECOMMUNICATIONS PLAN
ET101B BUILDING 12 FIRST FLOOR - AREA B TELECOMMUNICATIONS PLAN
ET102A BUILDING 12 SECOND FLOOR - AREA A TELECOMMUNICATIONS PLAN
ET102B BUILDING 12 SECOND FLOOR - AREA B TELECOMMUNICATIONS PLAN
ET501 TELECOMMUNICATIONS DETAILS
ET502 TELECOMMUNICATIONS DETAILS
EY100A BUILDING 12 GROUND FLOOR - AREA A ELECTRICAL SYSTEMS PLAN
EY100B BUILDING 12 GROUND FLOOR - AREA B ELECTRICAL SYSTEMS PLAN
EY101A BUILDING 12 FIRST FLOOR - AREA A ELECTRICAL SYSTEMS PLAN
EY101B BUILDING 12 FIRST FLOOR - AREA B ELECTRICAL SYSTEMS PLAN
EY102A BUILDING 12 SECOND FLOOR - AREA A ELECTRICAL SYSTEMS PLAN
EY102B BUILDING 12 SECOND FLOOR - AREA B ELECTRICAL SYSTEMS PLAN
EY501 NURSE CALL RISER DIAGRAM
EY502 CAMERA MATRIX SCHEDULE AND CAMERA DETAILS
EY503 SECURITY WIRING DETAILS (CARD READER)
EY504 SECURITY WIRING DETAILS (CARD READER)
EY505 SECURITY WIRING DETAILS (CARD READER)
EY506 SECURITY WIRING DETAILS (CARD READER)
00 01 15 - 5
12.EY102 BUILDING 12 SECOND FLOOR ELECTRICAL SYSTEMS PLAN
- - - END - - -
11-01-21
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for
Project No. 518-21-103
Renovate Building 12 for Women’s Health Clinic as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer.
C. Offices of Paradigm Engineers and Constructors, as
Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection.
Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
11-01-21
01 00 00 -2
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: BASE BID Work includes general construction, alterations, walks, necessary removal of existing construction and certain other items to renovate Building 12 for
Women’s health services.
B. ALTERNATE NO.1: BASE BID except delete the emergency generator and all associated construction relating to this element
(demolition and new construction).
D. C. ALTERNATE NO.2: In addition to ALTERNATE 1 delete the requirement for the new elevator shaft to be clad in brick masonry. Contractor shall utilize an insulated metal panel system in lieu of brick cladding. ALTERNATE NO. 3: Remove the demolition and new construction relating to the installation and elements required to obtain a N+1 (redundancy) systems.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at
Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice
11-01-21
01 00 00 -3 is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the
Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall install all permanent cores at completion of the work. See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting
Officer upon request.
11-01-21
01 00 00 -4
4. These security documents shall not be removed or transmitted from the project site without the written approval of
Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the
VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted
24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of permits shall be issued for General
Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility
Manager.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
11-01-21
01 00 00 -5
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the
Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the
Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the
Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
1. Do not store materials and equipment in other than assigned areas.
11-01-21
01 00 00 -6
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by
Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to
Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
All such actions shall be coordinated with the COR or Utility
Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
I. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the
Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor
11-01-21
01 00 00 -7 shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor, as follows:
J. Building 12 will be vacated by Government in accordance with above phasing beginning immediately after date of receipt of
Notice to Proceed and turned over to Contractor.
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical
Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by
Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Immediate areas of alterations not mentioned in preceding
Subparagraph 1 will be temporarily vacated while alterations are performed.
K. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m
(seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum
375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.
11-01-21
01 00 00 -8
L. When a building and/or construction site is turned over to
Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C
(40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company
(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
M. Utilities Services: Maintain existing utility services for
Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR
[Chief Engineer] [Chief of Facilities Management]. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical
Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR
ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS
FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.
11-01-21
01 00 00 -9
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical
Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
N. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged-in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
O. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
11-01-21
01 00 00 -10
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
P. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply
Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by
Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, 11-01-21
01 00 00 -11 under provisions of clause entitled "DIFFERING SITE CONDITIONS"
(FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by
Contractor to such flooring and other surfaces, despite protection measures; and will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled, and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain
11-01-21
01 00 00 -12 property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
a) Copies of the following listed CFR titles may be obtained from the Government Printing Office:
40 CFR 261 ...... Identification and Listing of Hazardous
Waste
40 CFR 262 ...... Standards Applicable to Generators of
Hazardous Waste
40 CFR 263 ...... Standards Applicable to Transporters of
Hazardous Waste
40 CFR 761 ...... PCB Manufacturing, Processing, Distribution in Commerce, and use Prohibitions
49 CFR 172 ...... Hazardous Material tables and Hazardous
Material Communications Regulations
49 CFR 173 ...... Shippers - General Requirements for
Shipments and Packaging
49 CRR 173 ...... Subpart A General
49 CFR 173 ...... Subpart B Preparation of Hazardous Material for Transportation
49 CFR 173 ...... Subpart J Other Regulated Material;
Definitions and Preparation
TSCA ............ Compliance Program Policy Nos. 6-PCB-6 and
6-PCB-7
01 00 00 -13
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (FAR 52.236-9)
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The
Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work
11-01-21
01 00 00 -14 without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems
(including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"
(FAR 52.236-2).
1.11 PHYSICAL DATA – SOIL CONDITIONS
A. Upon proper application to Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.
1.12 PROFESSIONAL SURVEYING SERVICES
A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the
Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular
11-01-21
01 00 00 -15 employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
1.13 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work.
The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the
Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through
Contractor's negligence before their removal is authorized, the
Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the
Contractor.
(FAR 52.236-17)
B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, roads and parking lots are in accordance with lines and elevations shown on contract drawings.
C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark
(through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, 11-01-21
01 00 00 -16 exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:
1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.
D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings. Furnish such certification to the COR before any major items of concrete work are placed. In addition, Contractor shall also furnish to the COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.
1. Lines of each building and/or addition.
2. Elevations of bottoms of footings and tops of floors of each building and/or addition.
3. Lines and elevations of sewers and of all outside distribution systems.
4. Lines of elevations of all swales and interment areas.
5. Lines and elevations of roads, streets and parking lots.
E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.
F. Upon completion of the work, the Contractor shall furnish the COR one electronic copy and reproducible drawings at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work, including burial monuments and fifty foot stationing along new road centerlines. These
11-01-21
01 00 00 -17 drawings shall bear the seal of the registered land surveyor or registered civil engineer.
G. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article "Professional Surveying Services".
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR
[Chief Engineer][Chief of Facilities Management] within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.15 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of
Construction at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan.
Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved.
Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior
11-01-21
01 00 00 -18 to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
h. Starting point and duration of warranty period.
11-01-21
01 00 00 -19
i. Summary of maintenance procedures required to continue the warranty in force.
j. Cross-reference to specific pertinent Operation and
Maintenance manuals.
k. Organizations, names and phone numbers of persons to call for warranty service.
l. Typical response time and repair time expected for various warranted equipment.
5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.
6. Procedure and status of tagging of all equipment covered by extended warranties.
7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
1. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period in the event the Contractor fails to commence and diligently pursue any construction warranty work required, the
Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the
Government while performing the work, including, but not limited to administrative expenses.
2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.
3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the
Contracting Officer to proceed against the Contractor.
B. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall
11-01-21
01 00 00 -20 meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section.