QASP_7_7_2015.docx

DOCX document 22 KB Posted

Attached to
10th Street Remedial Action - Phase II, Columbus
Solicitation number
SOL-R7-15-00012
Issued by

About this file

Attachment 6 QASP

View the file

Other files

File Type Posted
Soil_Figures_with_TCLP_Results.pdf PDF
Sol_SOL-R7-15-00012_Amd_000003.pdf PDF
Total_and_TCLP_VOCs_in_Soil_Data_Tables.pdf PDF
CommentResponses_07282015_LS.docx DOCX document
Total_and_TCLP_VOCs_in_Soil_Data_Tables.pdf PDF
Soil_Figures_with_TCLP_Results.pdf PDF
Sol_SOL-R7-15-00012_Amd_000003.pdf PDF
CommentResponses_07282015_LS.docx DOCX document
Soil_Figures_with_TCLP_Results.pdf PDF
Sol_SOL-R7-15-00012_Amd_000003.pdf PDF
Total_and_TCLP_VOCs_in_Soil_Data_Tables.pdf PDF
CommentResponses_07282015_LS.docx DOCX document
Soil_Figures_with_TCLP_Results.pdf PDF
Total_and_TCLP_VOCs_in_Soil_Data_Tables.pdf PDF
Sol_SOL-R7-15-00012_Amd_000003.pdf PDF
CommentResponses_07282015_LS.docx DOCX document
Sol_SOL-R7-15-00012_Amd_000002.pdf PDF
Revisedsol7_10_15.pdf PDF
10ST_REVSPECS_AC_072015_without_attachments.pdf PDF
Price_Schedule_10th_St_RA_Phase_II_Updated_8_July__Need_Landfill_diversion_incentive_included.docx DOCX document
Plan_View_Contamination_Maps_from_BOD_Report_Dec_2013.pdf PDF
Names.pdf PDF
Sol_SOL-R7-15-00012_Amd_000001.pdf PDF
PWS-9July2015.docx DOCX document
EPA__07-01-2015transcript.pdf PDF
Q AAmendment_1.docx DOCX document
Sol_SOL-R7-15-00012.pdf PDF
DBwage.txt TXT text file
Drawings.pdf PDF
PWS-2June2015_KKC_notes_6_16_15_(3).docx DOCX document
QASP-11June2015_KKC_note_6_16_15.docx DOCX document
Specifications.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Remedial Action at Parkview Well Site OU2

Service

Performance Standard Allowable Deviation

Surveillance Method Amount of Incentive/Disincentive

Task 1: Permits & Arby’s expense
Permits and/or notifications required by local, state, and/or federal requirements are obtained and submittals relayed in a timely manner without impact to schedule.
No deviation is allowed.
COR
None
Task 2: Mobilization
Mobilization/demobilization is accomplished without impact to schedule
No deviation is allowed.
On-site surveillance by COR or designee.
None
Task 3: Building Demolition
All 3 buildings are demolished in accordance with Contract plans & specifications. Furthermore, contractor shall salvage AS/SVE equipment and transport to NDEQ warehouse.
No deviation is allowed
On-site surveillance by COR or designee.
None
Task 4: Excavation
Excavation performed in accordance with contract plans & specifications, including, confirmation sampling, shoring & traffic control implemented approved by professional engineer where necessary.
No deviation is allowed.
On-site surveillance by COR or designee.
None
Task 5: Contaminated Soil Disposal
Contaminated soil is disposed of in accordance with applicable laws and regulations and per contract specifications
No deviation is allowed.
On-site surveillance by COR or designee.
None
Task 6: ChemOX & Backfilling
Backfilling of excavation areas in accordance with contract plans and specifications
No deviation is allowed.
On-site surveillance by COR or designee.
None

Task 7: Restoration

Final site clean-up, grading, gravel, concrete and seeded in accordance with contract drawings & specifications
No deviation is allowed.
COR Review and Approval
None
Task 8: Wells
Monitoring wells are installed as specified in the contract drawings and specifications.
No deviation is allowed.
On-site surveillance by COR or designee.
None
Task 9: ISCO
In situ chemical oxidation injections and groundwater monitoring in accordance with contract plans & specifications.
No deviation is allowed
On-site surveillance by COR or designee.
None

Diesel Emissions Incentive: Additional information is provided in the NOTE below this table.

Diesel chemical and particulate emissions from all on-site diesel-powered equipment are reduced during construction through retrofitting of equipment, or alternatively, by using a selected percentage mixture of alternative fuels, such as bio-diesel, and conventional diesel in conjunction with idle-reduction practices. The following performance standard ranges correspond to varying disincentives for differing fuel mixtures.

> 10% alternative fuel

50% of diesel-powered equipment is retrofitted with emission control devices, or alternatively, 100% of diesel-powered equipment will utilize an alternative fuel such as bio-diesel,>10%. Idle-reduction practices will be utilized for all diesel equipment.
On-site surveillance by COR or designee and review of monthly Diesel Emissions Report.
An amount of $10,000 will be awarded if 100% of on-site diesel-powered equipment use at least 10% alternative fuel of the total combined fuel requirements. Or 50% of diesel-powered equipment is retrofitted with emission control devices.

Commitment to Local Community Incentive See NOTE

· Expenditures of 50% or greater than the project price

· Expenditures of 35% or greater than the project price

No deviation is allowed.
EPA review of documentation supporting hiring and purchases made in performance of the contract.
An amount of $50,000 will be awarded if expenditures of 50% or greater are Local.

An amount of $20,000 will be awarded if expenditures of 35% or greater are Local.

Construction & Demolition Waste Management
· Divert waste from landfill by finding one or more acceptable alternatives for end uses of the waste: recycling, reuse on site, resale, donation for use on another site. Contractor to propose alternative waste activities.

· Percentages are based on weight.

50% and 75% are the metrics. No other deviation is allowed.

EPA review of documentation via weight tickets and documentation of waste alternative actions.
An amount of $5,000 will be awarded if 50% of waste is diverted from landfill

An amount of $15,000 will be awarded if 75% of waste is diverted from landfill

Additional Diesel Emissions Incentive Information: The contractor shall identify all equipment and vehicles that will use clean or alternative fuels, such as bio-diesel, and report the amount of fuel usage on a monthly basis in the Diesel Emissions Report. The addition or deletion of diesel equipment shall also be included in the ongoing monthly submittals of the Diesel Emissions Report. The contractor shall also reduce emissions from construction equipment during idling. All diesel combustion engines on construction equipment not in active use and on trucks that are idling while waiting to load or unload material shall be turned off if the idling time period exceeds five minutes.

Local Community Incentive: This incentive can be earned by hiring and buying goods and services within the area identified by EPA as the “local” impacted community. EPA encourages the contractor to hire and buy locally.

The following are eligible expenditures towards earning the Commitment to Local Community incentive:

- Subcontracts awarded to small-business firms headquartered or located in the impacted community (within the following four counties in Nebraska: Platte, Colfax, Polk, Butler and in addition, 50 cents on the dollar credit will be granted for purchases and hiring from the state of Nebraska)

- Hiring laborers who are residents of the impacted local region

- Miscellaneous other goods and services purchased from small business vendors who are located within the impacted region

Construction and Waste Management: EPA encourages reducing waste from landfills. There are several methods to reduce waste to landfill. Contractor shall submit their plan for accomplishing this incentive. Note: soil and water is not included in this incentive. It is only construction and demolition related waste. The percentages are based on weight.