Attachment 7 Revised Pricing Schedule

View the file

Other files

File Type Posted
Soil_Figures_with_TCLP_Results.pdf PDF
Sol_SOL-R7-15-00012_Amd_000003.pdf PDF
Total_and_TCLP_VOCs_in_Soil_Data_Tables.pdf PDF
CommentResponses_07282015_LS.docx DOCX document
Total_and_TCLP_VOCs_in_Soil_Data_Tables.pdf PDF
Soil_Figures_with_TCLP_Results.pdf PDF
Sol_SOL-R7-15-00012_Amd_000003.pdf PDF
CommentResponses_07282015_LS.docx DOCX document
Soil_Figures_with_TCLP_Results.pdf PDF
Sol_SOL-R7-15-00012_Amd_000003.pdf PDF
Total_and_TCLP_VOCs_in_Soil_Data_Tables.pdf PDF
CommentResponses_07282015_LS.docx DOCX document
Soil_Figures_with_TCLP_Results.pdf PDF
Total_and_TCLP_VOCs_in_Soil_Data_Tables.pdf PDF
Sol_SOL-R7-15-00012_Amd_000003.pdf PDF
CommentResponses_07282015_LS.docx DOCX document
Sol_SOL-R7-15-00012_Amd_000002.pdf PDF
Revisedsol7_10_15.pdf PDF
10ST_REVSPECS_AC_072015_without_attachments.pdf PDF
Plan_View_Contamination_Maps_from_BOD_Report_Dec_2013.pdf PDF
Names.pdf PDF
Sol_SOL-R7-15-00012_Amd_000001.pdf PDF
PWS-9July2015.docx DOCX document
EPA__07-01-2015transcript.pdf PDF
QASP_7_7_2015.docx DOCX document
Q AAmendment_1.docx DOCX document
Sol_SOL-R7-15-00012.pdf PDF
DBwage.txt TXT text file
Drawings.pdf PDF
PWS-2June2015_KKC_notes_6_16_15_(3).docx DOCX document
QASP-11June2015_KKC_note_6_16_15.docx DOCX document
Specifications.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) Price Schedule – 10th Street Remedial Action – Phase II

EST’DFIXED
CLINDESCRIPTIONQUANTITYUNITUNIT PRICETOTAL

Building Demolition for the following sites:

0001 Jackson 1 LS $____________

0002 Liberty 1 LS $____________

0003 Prestige (OHM) 1 LS $____________

Excavation including but not limited to shoring and sampling for the following sites:

0004 Jackson 7,540 CuYd $__________ $____________

0005 Liberty 2,790 CuYd $___________ $____________

0006 Prestige (OHM) 1,980 CuYd $___________ $____________

Off-site disposal (Haz Waste to be delivered to Kimball, NE) of contaminated soils for the following sites:

0007 Jackson 360 TON $___________ $____________

0008 Liberty 70 TON $___________ $____________

0009 Prestige (OHM) 320 TON $___________ $____________

Non Hazardous, Special Waste (Local Landfill):

0010 Jackson 9,830 TON $___________ $_____________

0011 Liberty 3,700 TON $___________ $_____________

0012 Prestige (OHM) 2,370 TON $___________ $_____________

Chemical Oxidant Backfill:

0013 Jackson 1 LS $_____________

0014 Liberty 1 LS $_____________

0015 Prestige 1 LS $_____________

Backfill:

0016 Jackson 7,540 CuYd $___________ $_____________

0017 Liberty 2,790 CuYd $___________ $_____________

0018 Prestige (OHM) 1,980 CuYd $___________ $_____________

Restoration of Disturbed areas including but not limited to:

0019 Jackson 1 LS $___________ $_____________

0020 Liberty 1 LS $___________ $_____________

0021 Prestige (OHM) 1 LS $___________ $_____________

Monitoring well installations

0022 Per specifications 20 EA $___________ $_____________

In Situ Chemical Oxidation (ISCO) Injections:

0023 Jackson 1 LS $___________ $_____________

0024 Liberty 1 LS $___________ $_____________

0025 Prestige (OHM) 1 LS $___________ $_____________

Option Items:

0026 Groundwater Monitoring/ 1 LS $___________ $_____________ Sampling at OHM. This may be exercised up to four times at 3 monthly intervals.

0027 Round of DPT injections at 1 LS $___________ $_____________ OHM. This may be exercised be twice at 6 monthly intervals.

TOTAL WITHOUT INCENTIVE CLINS: $______________

0028 Diesel Emissions Incentive (SEE QASP) $ 10,000.00

0029 Maximum Local Community Incentive (SEE QASP)

For local expenditures greater than 50% $ 50,000.00

(For local expenditures greater than 35% but less than 50% = $20,000)

0030 Construction & Demolition Waste Management Incentive (SEE QASP)

For waste management weight percentages greater than 75% $ 15,000.00

(For weigh percentages greater than 50% but less than 75% = $5,000)

TOTAL WITH INCENTIVE CLINS: $_____________

(1) Prices proposed include any/all labor, equipment, and materials necessary to perform the service described in the PWS. Both the pricing and the Project Management Plan shall be based on the performance of the units of measure itemized in this schedule.

(2) Prices proposed shall include all premiums for bonding. No separate and distinct reimbursement for bond premiums will be made.

(3) The number specified under the Estimated Quantity column represents the maximum estimated quantity for that CLIN. Quantities are estimated and not guaranteed.

(4) All tasks have been determined to be on-site. Consequently, for purposes of pricing and payment, Davis Bacon Wages apply to all employees and subcontractors (except for supervisory) INCLUDING ALL TRUCK DRIVERS (unless truck driver is a true owner-operator).

(5) See QASP (Attachment 4) for additional information regarding Incentives.

(6) Contractors shall include pricing for Incentives when totaling their offers.