Q AAmendment_1.docx

DOCX document 14 KB Posted

Attached to
10th Street Remedial Action - Phase II, Columbus
Solicitation number
SOL-R7-15-00012
Issued by

About this file

Attachment 10 Q A for Amend.1

View the file

Other files

File Type Posted
Soil_Figures_with_TCLP_Results.pdf PDF
Sol_SOL-R7-15-00012_Amd_000003.pdf PDF
Total_and_TCLP_VOCs_in_Soil_Data_Tables.pdf PDF
CommentResponses_07282015_LS.docx DOCX document
Total_and_TCLP_VOCs_in_Soil_Data_Tables.pdf PDF
Soil_Figures_with_TCLP_Results.pdf PDF
Sol_SOL-R7-15-00012_Amd_000003.pdf PDF
CommentResponses_07282015_LS.docx DOCX document
Soil_Figures_with_TCLP_Results.pdf PDF
Sol_SOL-R7-15-00012_Amd_000003.pdf PDF
Total_and_TCLP_VOCs_in_Soil_Data_Tables.pdf PDF
CommentResponses_07282015_LS.docx DOCX document
Soil_Figures_with_TCLP_Results.pdf PDF
Total_and_TCLP_VOCs_in_Soil_Data_Tables.pdf PDF
Sol_SOL-R7-15-00012_Amd_000003.pdf PDF
CommentResponses_07282015_LS.docx DOCX document
Sol_SOL-R7-15-00012_Amd_000002.pdf PDF
Revisedsol7_10_15.pdf PDF
10ST_REVSPECS_AC_072015_without_attachments.pdf PDF
Price_Schedule_10th_St_RA_Phase_II_Updated_8_July__Need_Landfill_diversion_incentive_included.docx DOCX document
Plan_View_Contamination_Maps_from_BOD_Report_Dec_2013.pdf PDF
Names.pdf PDF
Sol_SOL-R7-15-00012_Amd_000001.pdf PDF
PWS-9July2015.docx DOCX document
EPA__07-01-2015transcript.pdf PDF
QASP_7_7_2015.docx DOCX document
Sol_SOL-R7-15-00012.pdf PDF
DBwage.txt TXT text file
Drawings.pdf PDF
PWS-2June2015_KKC_notes_6_16_15_(3).docx DOCX document
QASP-11June2015_KKC_note_6_16_15.docx DOCX document
Specifications.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions to be answered for Amendment 1

1) Q: Our business has a new green technology that is USDA BioPreferred and is on the EPA, NCP subpart “J” NPL, B-71 as a bioremediation agent A.C.T. Terra Firma is changing bio-remediation with a shorter remediation time 7 to 28 days and it cool weather capability as low as -90Fahrenheit. Each of these conferences call for excavation and disposal. A: Contractor shall submit plan of operations for Government approval.

a) Q: Is there any chance of using in-situ bio-remediation on these two or any of your other projects? A: See previous answer on Preproposal Conference Transcript.

b) Q: Or how about an off site cleanup of 28 days non-detectable results being achieved? A: See previous answer on Preproposal Conference Transcript.

2) Q: Explain dewatering process? A: This is an optional method a contractor could use. It is not listed in the requirements.

3) Q: Can we NDEQ remediation trailer? A: The NDEQ trailer is NOT available for Contractor use.