Solicitation N4008023R2185 NAVFAC Washington IDIQ JOC.pdf
PDF 582 KB Posted
- Attached to
- Solicitation N4008023R2185 IDIQ JOC
- Solicitation number
- N4008023R2185
About this file
This document is a solicitation for an Indefinite Delivery Indefinite Quantity Job Order Contract to provide general construction and repair services at various locations in the Washington D.C. metropolitan area, Maryland, and Virginia for the Naval Facilities Engineering Command. The contractor shall perform work on a task order basis providing all labor, materials, equipment, and incidentals for quality design-build and design-bid-build services. The contract type is firm-fixed-price, and the period of performance is a two-year base period with a three-year option. The total contract value shall not exceed $100 million. Offerors must submit separate price proposals for primary locations in the blue contract areas and gold contract areas to be considered for the separate blue and gold contract awards. The closing date for proposals is March 18, 2024.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC WASHINGTON INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) JOB ORDER CONTRACT (JOC)
NAVFAC WASHINGTON IDIQ JOC
The Naval Facilities Engineering System Command (NAVFAC) Washington, Washington Navy Yard DC requires an eligible 8(a) construction contractor to perform various general construction and repair services, to include minor construction and alteration, at predetermined unit prices and bid price coefficients for projects primarily w ithin the NAVFAC Washington Area of Responsibility to include the metropolitan Washington DC, Maryland and Virginia locations. Work may be executed through any NAVFAC location w ith the Continental United States.
This JOC provides for aw ard of individual “Task Orders” for procurement and administration at various NAVFAC Washinton activities w here the contractor shall provide all material, labor, equipment and incidentals to provide quality design-build or design-bid-build services.
FRANK DECKER 202-330-9020
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
13-Feb-2024
(RFP)
(IFB)
X
CALL:
FY24 JOB ORDER CONTRACT
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, X negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVAL FACILITIES ENGINEERING SYS COMMAND
1314 HARWOOD STREET SE
WASHINGTON DC 20374
N40080
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
1731579_1789591
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: (202) 685-3192 TEL: FAX:
N4008023R2185 71
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N4008023R2185
Section 00 01 10 - Table of Contents
A. Proposal Documents
Section 00 01 10 - Table of Contents;
Section 00 10 00 - Solicitation Section 00 21 00 - Instructions Section 00 45 00 – Representations and Certifications Section 00 70 00 - Conditions of the Contract Section 00 73 00 - Supplementary Conditions;
Section 01 00 00 - General Requirements
B. Standard Form (SF) 1442 Attachments and Exhibits
Attachment: Pre-Proposal Inquiry (PPI) Form Attachment: JOC Specification GENERAL REQUIREMENTS _Regional General Construction JOC Attachment: JOC Specification 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS Attachment: JOC Specification 31 23.13 20 eCMS
Attachment: Construction & Design Experience Project Data Sheet Attachment: Past Performance Questionnaire (PPQ) Attachment: Price Proposal Schedule
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 100,000,000 Each IDIQ JOC Base Ordering Period
FFP
Base Ordering Period: NAVFAC WASHINGTON INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) JOB ORDER CONTRACT (JOC) for various general construction and repair services, to include minor construction and alteration, at predetermined unit prices and bid price coefficients For projects primarily within the NAVFAC Washington Area of Responsibility. The contractor shall provide all material, labor, equipment and incidentals to provide quality design-build and or design-bid-build services to Field Sites.
FOB: Destination
PSC CD: Y1JZ
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0002 UNDEFINED Each OPTION IDIQ JOC Option Ordering Period
FFP
Option Ordering Period: INAVFAC WASHINGTON INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) JOB ORDER CONTRACT (JOC) for various general construction and repair services, to include minor construction and alteration, at predetermined unit prices and bid price coefficients For projects primarily within the NAVFAC Washington Area of Responsibility. The contractor shall provide all material, labor, equipment and incidentals to provide quality design-build and or design-bid-build services to Field Sites.
PSC CD: Y1JZ
MAX
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 30-SEP-2024 TO
29-SEP-2026
N/A N/A
0002 POP 30-SEP-2026 TO
29-SEP-2029
N/A N/A
GENERAL OVERVIEW OF THE JOC
1 GENERAL INTENTION
1.1 The intent of this solicitation is to award two (2) single-award Firm-Fixed Price (FFP), Design-Build (DB) / Design-Bid-Build (DBB) Indefinite-Delivery/Indefinite Quantity (IDIQ) Job Order Contracts (JOC), to support Naval Facilities Engineering Systems Command (NAVFAC) Washington’s area of responsibility (AOR)
1.2 The 2 IDIQ JOC contracts are designated as BLUE JOC and GOLD JOC.
1.3 The BLUE JOC and GOLD JOC shall include specific Primary and Secondary NAVFAC AOR locations as follows:
BLUE JOC Primary locations:
Waldorf Naval Air Station, Patuxent River, MD; Annapolis Naval Academy, Annapolis, MD; Waldorf Naval Support Facility, Indian Head, MD Fredericksburg Naval Support Facility, Dahlgren, VA.
BLUE JOC Secondary Locations Naval Support Activity, Washington, DC; Silver Spring Naval Support Activity, Bethesda MD;
Fredericksburg ROICC, Quantico, and other NAVFAC Washington AOR locations as required.
GOLD JOC Primary locations:
Naval Support Activity, Washington, DC; Silver Spring Naval Support Activity, Bethesda MD;
Fredericksburg ROICC, Quantico.
GOLD JOC Secondary Locations:
Waldorf Naval Air Station, Patuxent River, MD; Annapolis Naval Academy, Annapolis, MD; Waldorf Naval Support Facility, Indian Head, MD Fredericksburg Naval Support Facility, Dahlgren, VA; and other NAVFAC Washington AOR locations as required.
1.4 The Government intent is for work to be performed which shall include; however is not limited to various general construction and repair services, to include minor construction and alteration, at predetermined unit prices and bid price coefficients to be applied to R.S. Means.
1.5 The basic contract will contain two Contract Line Item Number (CLIN) as follows:
CLIN 0001: Base Ordering Period – (2 years) CLIN 0002: Option Ordering Period - (3 years)
1.6 The completion date for the basic ordering period is two (2) years from date of award, upon which a three-year option ordering period may be exercised. The total contract period of performance is intended not to exceed five (5) years; or upon reaching the Not-To-Exceed (NTE) amount of $100 Million ($100M), whichever comes first.
1.7 The resulting two (2) single award contracts will each have $100M Not-To-Exceed capacity under CLIN 0001.
1.8 Upon completion of the Base Ordering Period, any unused capacity amount shall be provided or “rolled over” to the Option Ordering Period under CLIN 0002.
1.9 The minimum guarantee is $5,000.00 to each successful offeror over the full term of the contract, including the option ordering period. The Government intends for the Contracting Officer will issue a unilateral no-cost cancellation for the minimum guarantee Task Order if/when the Contractor receives a Task Order that is equal to or exceeds the amount of the minimum guarantee.
1.10 It is the intention of this procurement to be solicited as a competitive 8(a) under NAICS 236220.
1.11 The resulting two (2) contracts shall provide for award of individual firm fixed price task orders, for the accomplishment of various maintenance, repair, alteration, and minor new construction projects to Government facilities within the NAVFAC Washington Area of Responsibility around Maryland, Virginia, and the District of Columbia as specified above.
2 MINIMUM/MAXIMUM TASK ORDER VALUE
The task order range is between $2,000.00 and $4,000,000.00 as outlined in FAR 52.216-19, but may be Other amounts by mutual agreement of the Government and contractor.
Section 00 21 00 - Instructions
INSTRUCTIONS
INSTRUCTIONS TO OFFERORS
1. SOLICITATION AND AMENDMENTS: The solicitation and subsequent amendments will be issued via the Solicitation Module in the Procurement Integrated Enterprise Environment (PIEE). Similarly, Offeror(s) shall utilize this module when submitting proposals.
2. OFFERS
Offers shall be submitted as specified in FAR Clause 53.215-1, “Instructions to Offerors”. Proposals must be secured and marked as follows:
2.1 Offer for:
SOLICITATION NUMBER N40080-23-R-2185, NAVFAC WASHINGTON INDEFINITE DELIVERY
INDEFINITE QUANTITY (IDIQ) JOB ORDER CONTRACT (JOC)
2.4 Offers must be signed by an authorized officer of the firm; or if signed by other than such authorized, certification of such authority to sign or negotiate for the firm must be forwarded with the offer.
2.5 Offerors must complete Blocks 14 through 16 of the Standard Form 1442, and prices on the Price Schedule.
Representation and Certifications must be done in accordance with the FAR Clause 53.204-8, of the Solicitation.
2.6 OFFERORS SHALL SUBMIT ELECTRONIC ORIGINAL OF THEIR PROPOSAL.
2.7 PROPOSALS SHALL BE SUBMITTED WITH TABS FOR THE FOLLOWING SECTIONS:
SECTION MAXIMUM PAGES
SF 1442 (Solicitation, Offer and Award) As Required Section Services and Prices As Required Section Representation and Certifications As Required
Section Factor 1, Technical Approach (Under Tab 1) Section Factor 2, Experience (Under Tab 2) Section Factor 3, Safety, (Under Tab 3) Section Past Performance, (Under Tab 4)
2.8. PROPOSAL SUBMISSION
All proposals (with all required supporting documentation) shall be electronically submitted through the Department of Defense (DoD) Solicitation Module in the Procurement Integrated Enterprise Environment (PIEE) so that they are received by the date and time specified in Block 8 of the Standard Form (SF) 1443. Email or hard copy proposals will not be accepted.
3. PRE-PROPOSAL CONFERENCE:
3.1 A Pre-Proposal Conference for Solicitation No. N40080-23-R-2185 is scheduled for Friday 23 February 2024, on the Washington Navy Yard, at Building 22, Large Conference Room, from 9:00AM – 1:00PM EST.
3.2 In order to make the conference as productive as possible, An RSVP of all prospective offerors, NTE two (2) people is required. Offerors are requested to submit all Inquiries, Comments, Suggestions, and Concerns on the Pre- Proposal Inquiry (PPI) forms no later than seven (7) calendar days prior to the pre-proposal conference. PPI forms shall be forwarded to Contract Specialist Frank G. Decker frank.g.decker.civ@us.navy.mil and shamarian.n.plummer.civ@us.navy.mil. The cut-off date for all final PPI Comments, Suggestions, and Concerns is close of business 29 February 2024 at 2:00PM, EST.
3.3 Failure of a prospective Offeror to submit any questions or to attend the conference will be construed to mean that the Offeror fully understands all requirements of the solicitation. Prospective offerors are advised that the pre-proposal conference will be held solely for the purpose of explaining the concepts involved in the project and the specifications, terms, and conditions of this solicitation.
3.4 No minutes of this meeting will be issued. All prospective offerors are advised that this solicitation will remain unchanged unless it is amended in writing. However, if an amendment is issued, normal procedures relating to the acknowledgment and receipt of any such amendment as described in Contract Clause “Amendment to Solicitations” of this section shall be applicable.
4. PRE-PROPOSAL INQUIRIES
All inquiries shall be referred to the Contract Specialist Frank G. Decker frank.g.decker.civ@us.navy.mil and shamarian.n.plummer.civ@us.navy.mil. The Government does not intend to respond to inquiries submitted less than 10 calendar days before the proposal closing date and time. Failure of a prospective Offeror to submit any questions will be construed to mean that the Offeror fully understands the requirement of the solicitation.
5. PROPOSAL DUE DATE
Proposals are due on Monday, 18 March 2024 at 2:00PM, EST. Proposals received by the designated POC after the due date and time will not be considered.
6. INCORPORATION OF TECHNICAL PROPOSAL
The Contractor’s technical proposal, including revisions and amendments, made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels and trade background set forth in the technical proposal.
In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (i) the contract (excluding the technical proposal), and then (ii) the technical proposal.
7. JOINT VENTURE OFFERORS:
Joint Venture Agreements must be received by the SBA prior to proposal due date and approved before award of a resulting contract. If your firm is contemplating a joint venture on this procurement, advise your firm’s assigned Business Opportunity Specialist (BOS) as soon as possible. It is also recommended that the agreement be submitted as soon as practicable to ensure compliance with established regulations. Joint Venture Agreement after it has been submitted. Each agreement shall demonstrate the relationship between the firms and identify contractual relations and authorities of each firm/joint venture. Joint Venture Agreements shall be signed by all Joint Venture Parties.
Joint Venture Agreements that are not signed be all Joint Venture Parties shall be considered as a deficiency.
8. SUBCONTRACTING INFORMATION:
For information regarding the SBA Mentor Protégé Program see http://www.sba.gov. For information regarding the Department of Defense (DOD) Funded Mentor Protégé Program see http://www.acq.osd.mil/ssadbu/mentorprotege/info. As part of the outreach program it is recommended that your company/firm consider using the Small Business Administration’s (SBA) Pronet database as a source of small businesses. Pronet is a free internet database of information on more than 171,000 small businesses, small disadvantaged businesses, women owned small businesses and HUBZone small businesses. As of October 1, 1999, Small Disadvantaged subcontractors must receive formal certification by the SBA. Pronet is available on the SBA’s web page: http://www.sba.gov. Information on the DOD’s Women Owned Small Business Program is available at http://www.acq.osd.mil/sadbu/wosb.
9. INCURRED EXPENSES
The government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.
10. FEDERAL CONTRACTOR PROGRAM
In accordance with Federal Acquisition Regulation (FAR) 23.1303, any contractor or subcontractor with a contract of $150,000 or more with the Federal Government must take affirmative action to hire and promote qualified targeted veterans which includes, special disabled veterans, veterans of the Vietnam-era, recently separated veterans, and any other veterans who served on active duty during a war or in a campaign or expedition for which a campaign badge has been authorized.
11. RESPONSIBILITY DETERMINATION/PRE-AWARD SURVEY
11.1 FAR 9.103 requires the Contracting Officer to make an affirmative determination of responsibility prior to making an award. The general standards for responsibility are outlined in FAR 9.104 and include having adequate performance schedule, having a satisfactory performance record, having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them, having the necessary production, construction, and technical equipment and facilities, or the ability to obtain them, and being otherwise eligible to receive an award under applicable laws and regulations. The pre-award survey is not a part of the technical evaluation.
11.2 The Government may conduct a pre-award survey of Offerors to determine whether such Offeror is qualified and capable of performing the contract. The pre-award survey may involve examination of the Offeror's financial and technical status and understanding of the contract requirements.
11.3 Requested information shall be forwarded within three (3) business days upon request or as indicated on the letter from the Contracting Officer. Failure to provide requested information may result in rejection of the proposal.
11.4 The following are examples of the information that, upon request, the Offeror shall be required to provide in writing to the pre-award survey team.
1. Identification of the Contractor's personnel and management to be used on this contract.
2. The Contractor's technical and management plans for performing required services.
3. Description of Contractor's facilities and equipment.
4. Summary of the Contractor's experience in performing work of the type required by this specification.
5. Current financial statements and data.
6. Other work presently under contract.
7. Prior contracts for similar work, and the names and addresses of individuals with the organization issuing the contract who may be contacted for information concerning the Contractor's performance.
8. Contractor Quality Control plan for this contract.
12. NOTICE OF NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SPECIAL
PUBLICATION (SP) 800-171 DOD ASSESSMENT REQUIREMENTS
The following provision and clause are applicable to this acquisition-- DFARS 252.204-7019 (Notice of NIST SP 800-171 DoD Assessment Requirements) and 252.204-7020 (NIST SP 800-171 DoD Assessment Requirements).
As prescribed by DFARS provision 252.204-7019, if the offeror is required to implement NIST SP 800-
171, the offeror must have a current (not older than three years unless a lesser time is specified in the solicitation) NIST SP 800-171 DoD Assessment for each covered contractor information system that is relevant to the offer, contract, task order, or delivery order, in order to be considered for award. It also requires the contractor to post summary level scores of their NIST SP 800-171 Assessments in the Supplier Performance Risk System (SPRS) database.
For this solicitation, a minimum Confidence Level assessment of “Basic” as identified in the NIST SP 800-171 Assessment Report within the SPRS is required to be considered for award.
The Basic, Medium and High NIST SP 800-171 DoD Assessments are described in the NIST SP 800-171 DoD Assessment Methodology located at:
https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_implementation_of_NIST_SP_ 800-171.html
Guidance regarding the NIST SP 800-171 DoD Assessments can be found at https://www.sprs.csd.disa.mil/.
Offerors are encouraged to seek guidance from their own legal or cyber-security compliance advisors for advice concerning the NIST SP 800-171 DoD Assessment requirements.
NOTE: The Government will not extend or delay the procurement for pending Contractor NIST SP 800-171 assessments.
EVALUATION
A. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract(s); to negotiate with offerors in the competitive range; and to award the contract(s) to the offeror(s) submitting the proposal(s) determined to represent the best value— the proposal(s) most advantageous to the Government, cost/price and other factors considered.
2. As stated in the solicitation, the Government intends to evaluate proposals and award two (2) single-award contracts without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
4. As stated in the solicitation, all technical factors when combined are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined are approximately equal to price.
5. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. An Unacceptable rating in any of the non-cost/price factors will result in an overall rating of “Unacceptable” for the non-cost/price factors, unless corrected through discussions. Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal.
The evaluation report must document the evaluation board’s assessment of the identified weakness(s) and the associated risk to successful contract performance resulting from the weakness(s). This assessment must provide the rationale for proceeding to award without discussions.
B. EVALUATION FACTORS FOR AWARD
1. Evaluation Factors:
The solicitation requires the evaluation of price and the following non- cost/price factors:
FACTOR 1– Technical Approach FACTOR 2 – Experience FACTOR 3 – Safety FACTOR 4 – Past Performance
The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. Instructions to Offerors
2.1 FAR Part 9.6 defines Contractor team arrangements. Contractor team arrangement, as used in this subpart, means an arrangement in which -- (1) Two or more companies form a partnership or joint venture to act as a potential prime Contractor; or (2) A potential prime Contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program.
2.2 If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate how the affiliate/subsidiary/parent/LLC/LTD member companies will have involvement in the performance of the contract in order for the experience information of the affiliate/subsidiary/parent/LLC/LTD member companies to be considered. The proposal shall state specific commitments of technical resources (e.g., personnel, management, equipment that the affiliate/subsidiary/parent/LLC/LTD member companies shall commit to the performance of this contract). In particular, the proposal shall clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the Offeror in the performance of the contract. Vague commitments to support are likely insufficient;
rather, they must demonstrate intent/manner of actual performance on the contract action being solicited.
2.3 The Offeror shall submit a signed copy of partnership agreement, teaming agreement, or letter of commitment for each member of the Offeror’s team (e.g., partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.) whose projects are submitted to demonstrate Construction or Design Experience. The Government will not consider any project submitted for Factor 2 if it was performed by a firm other than the Offeror and there is no supporting partnership agreement, teaming agreement, or letter of commitment demonstrating the necessary level of meaningful involvement. Note: See specific restrictions on the use of subcontractor experience under Factor 2.
3. Relative Importance:
3.1 The relative order of importance for evaluation factors is as follows: Factor 1 – Technical Approach will only be rated Acceptable or Unacceptable. If an Offeror is rated Unacceptable in Factor 1, then they will not be eligible for award unless corrected during discussions. In making the best value award decision, the Government will consider Factor 2 – Experience, Factor 3 – Safety, Factor 4 - Past Performance, and price. The relative order of importance of the non-cost/price evaluation factors is that technical Factors 2 – Experience and 3 – Safety are equal to each other and when combined are equal importance to the performance assessment (Factor 4 – Past Performance). The combined non-cost/price factors are approximately equal to price.
3.2 The importance of price will increase if the Offerors’ non-cost/price proposals are rated essentially equal or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government.
Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
4. Basis of Evaluation, Best Value Determination
4.1 The Government intends to conduct two (2) separate best value determinations to determine the proposals most advantageous to the Government, cost/price and other factors considered. For this solicitation, the Government will use the following strategy to determine the best value proposals which will result in two distinct awards:
(a) Offerors shall submit two (2) clearly marked price proposals. Price Proposal 1 – Consisting of Blue Locations, and Price Proposal 2 – Consisting of Gold Locations.
Offerors submitting only one price proposal (i.e. for either location) will be considered non-responsive and will not be considered for award.
(b) Offerors shall submit only one (1) non-price/cost proposal. The assigned ratings for each non-price/cost factor, as well as the overall technical rating, will be used to conduct the best value determination for each award (blue and gold).
(c) The Government will make two separate best value determinations based on the proposals received as outlined above:
4.2 Best value determination #1 – will be based on evaluated non-price/cost proposal ratings (a) and price proposal 1 for Blue locations using the relative order of importance as described in paragraph 2 above.
Best value determination #2 – will be based on evaluated non-price/cost proposal ratings and price proposal 2 for Gold locations using the relative order of importance as described in paragraph 2 above.
4.3 The Government intends to award two (2) single award JOCs as a result of this solicitation. The awards shall be made to the offeror(s) representing the best value to the Government as a result of the independent best value determinations described above. Awards may be made to a single offeror if the both best value determinations determine it to be in the best interest of the government, with both price and non-price/cost factors considered.
5. Basis of Evaluation and Submittal Requirements for Each Factor
(a) Price
(1) Solicitation Submittal Requirements:
a. Given a Government Estimated Volume of Work (EVW), Offerors shall submit their Price proposal / Price Schedule with consideration for EACH location
i. (Blue-N4008023R2185: Naval Facilities Engineering Systems Command (NAVFAC) Washington’s area of responsibility (AOR), primarily at locations at Waldorf Naval Air Station, Patuxent River, MD; Annapolis Naval Academy, Annapolis, MD; Waldorf Naval Support Facility, Indian Head, MD Fredericksburg Naval Support Facility, Dahlgren, VA; and other NAVFAC Washington AOR locations as required)
ii. Gold-N4008023R0037: Naval Facilities Engineering Systems Command (NAVFAC) Washington’s area of responsibility (AOR), primarily at locations at Naval Support Activity, Washington, DC; Silver Spring Naval Support Activity, Bethesda MD; Fredericksburg ROICC, Quantico, and other NAVFAC Washington AOR locations as required.)
b. Contract Line Items (CLINS) Pricing for the Base Year, and all Option Years (see Section Services and Prices) as follows:
CLIN 0001 – Base Ordering Period: (30 September 2024 – 29 September 2026) CLIN 0002 - Option Ordering Period: (30 September 2026 – 29 September 2029)
c. Exhibit Line Items (ELINS) Pricing for each ordering period are as follows:
i. ELIN (A, B, C, D, E) 0001 - Pre-Price line item; primary locations ELIN (A, B, C, D, E) 0002 - Non Pre- Price line item; primary locations ELIN (A, B, C, D, E) 0003 - Other than Regular Working Hours (OTR);
primary locations
ii. ELIN (A, B, C, D, E) 0004 – Escorts; primary locations
iii. ELIN (A, B, C, D, E) 0005 - Pre-Price line item; secondary locations ELIN (A, B, C, D, E) 0006 - Non Pre-Price line item; secondary locations ELIN (A, B, C, D, E) 0007 - Other than Regular Working Hours
(OTR);
secondary locations
iv. ELIN (A, B, C, D, E) 0008 – Escorts; secondary locations
d. COEFFICIENTS for each ELINs: The Offeror shall propose the Coefficient (Coef) for each CLIN ELIN as follows:
i. The ELINs (0001, 0002, 0005, and 0006), shall be the respective coefficients for Pre-Priced and Non Pre-Price line items and shall not be lesser than 1.00 (i.e., 1.063).
Note: a coefficient of 1.00 indicates that the Government will award future orders at cost as priced in the most current RS Means.
ii. The ELINs (0003, 0004, 0007, and 0008) shall be the respective coefficients for Other than Regular Working Hours (OTR) and Escort line items, and shall NOT be less than 0.000
Note: a coefficient of 0.00 indicates that work performed during non-working hours and requiring escorts is not subject to any additional cost to Government for all future orders.
iii. All proposed coefficients shall have only three (3) decimal places (i.e., 1.063, 0.936)
iv. The Offeror shall provide each ELIN $ amount as $ = ((EVW x Coef) +
EVW)
v. The Offeror shall provide each CLIN $ Total Value as $ = the sum of all ELIN $ amounts.
vi. The Contractor shall provide the Total Proposed Price as $ = the Sum of all CLIN $ amounts (Base Years + Option Years)
Sample: Blue
PRICE SCHEDULE – Blue JOC Base Period (Ordering Period 1)
ELIN
No.
ELIN Description EVW
(USG
COEFFICIENT
(Ktr (fill-in)
Calculated Amount (fill-in)
Given)
A0001 Pre-priced line items Primary Location
$10,000,000.00 (> 1.00) $ = (EVW x Coef) + EVW)
A0002 Non-pre-priced items Primary Location
$3,000,000.00 (> 1.00) $ = (EVW x Coef) + EVW)
A0003 MULTIPLI
ER OTR
Primary Location
$800,000.00 (> 0.00) $ = ((EVW x Coef) + EVW)
A0004 MULTIPLIER
Escort Primary Location
$800,000.00 (> 0.00) $ = ((EVW x Coef) + EVW)
A0005 Pre-priced line items Secondary Location
$4,000,000.00 (> 1.00) $ = (EVW x Coef) + EVW
A0006 Non-pre-priced items Secondary Location
$1,000,000.00 (> 1.00) $ = (EVW x Coef) + EVW)
A0007 MULTIPLIER OTR
Secondary Location
$200,000.00 (> 0.00) $ = ((EVW x Coef) + EVW)
A0008 MULTIPLIER
Escort Secondary Location
$200,000.00 (> 0.00) $ = ((EVW x Coef) + EVW)
Subtotal for Base Period; Ordering Period 1 $ = (Sum of ELIN $ amounts)
(2) Basis of Evaluation:
a. The Government will evaluate price based on the total price. Total price consists of the basic years and all option years (see Section B of the solicitation).
b. The Government intends to evaluate all options and has included the provision FAR 53.217- 5, Evaluation of Options (JUL 1990) in Section 00 70 00 “Conditions Of The Contract”, of the solicitation.
c. In accordance with FAR 53.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
Comparison of proposed prices received in response to the SOLICITATION.
Comparison of proposed prices with the IGCE.
Comparison of proposed prices with available historical information.
Comparison of market survey results.
(b) Non-cost/price Factors:
Factor 1 – Technical Approach:
(1) Solicitation Submittal Requirements:
The composition and management of the firms proposed as the design-build (DB) team for this contract will be evaluated in this factor.
The Offeror shall submit the following information:
a. Provide a simple organizational chart that clearly identifies the lines of authority between the proposed primary construction firms and primary design firms for this contract. Include a brief description of the role and responsibility of each entity not to exceed (1) one single-sided page. If the experience of an entity is being claimed in Factor 2, that entity must be named in the organizational chart.
b. In addition, the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, approved mentor protégé agreement (MPA), or letter of commitment signed by each member of the Offeror’s team identified above (e.g., joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.). Letters of commitment for the Designer of Record shall be addressed from the Designer of Record to the Offeror. The Designer of Record’s letter of commitment shall be signed by the Designer of Record’s signing authority.
(2) Basis of Evaluation:
The assessment of the Offeror’s technical approach will be used as a means to review the organizational structure and roles and responsibilities proposed by the Offeror. This factor will be rated on an Acceptable or Unacceptable basis.
Factor 2 – Experience:
In the context of this solicitation “Construction” is:
a. The erection, installation or assembly of a new real property facility requiring multiple-disciplines (e.g. structural, mechanical and civil) or tailored design or engineering efforts and/or
b. The addition, expansion, extension, alteration, conversion or replacement of a real property facility requiring multiple disciplines or tailored design or engineering efforts.
(1) Solicitation Submittal Requirements:
The Offeror shall submit the following information:
(1) Construction Experience:
Submit a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. (Note: Any projects submitted in excess of five (5) for Construction Experience will not be considered.)
For purposes of this evaluation, a relevant project is defined as follows:
a. Size: Construction project task orders with a final contract value of $100,000. To $4,000,000. Projects submitted above or below this stated dollar range will not be considered relevant;
b. Scope/Complexity: Projects that include new building construction or building renovation/alteration (interior or exterior) involving multiple (at least 2) building systems and infrastructures (e.g. architectural, HVAC, electrical, plumbing, and fire protection)
c. Construction projects completed within the past five (5) years of the date of issuance of this RFP and Completed to the point of Beneficial Occupancy
In aggregate, the submitted relevant project experience shall demonstrate the following:
a. Experience as the Prime Contractor on all of the submitted construction projects;
b. At least one (1) relevant design-bid-build (DBB), construction project;
c. At least one (1) relevant design-build (DB), construction project.
d. At least one (1) relevant construction project shall have a final construction cost of at least $1,000,000.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;
instead Offerors shall submit the work performed under a task order as a project.
The attached Construction & Design Experience Project Data Sheet (Attachment) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods). In addition, the description shall also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through a Sustainable Third Party Certification program.
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. If a project was performed by a JV, and not all partners from that JV are on the JV proposed for this contract, the offeror shall clearly demonstrate what portion of the work was performed by the JV member offering on this contract and shall not include work performed by the JV as a whole. The JV member proposed for this contract shall specifically address field work performed by that JV member including field staffing and direct field work oversight. The JV member proposed for this contract shall also address home office management performed by that JV member including the number/percentage of employees provided for the overall contract by the JV members as well as the overall percentage of work performed by the JV member. The Offeror shall also submit a SIGNED copy of the Joint Venture agreement indicating the proposed participation of each Joint Venture member. Offerors are still limited to a total of five (5) projects combined.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract. The proposal shall state specific commitments of technical resources (e.g. personnel, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/ parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the Offeror in performance of the contract. The Offeror MAY NOT utilize experience of a subcontractor to demonstrate construction experience under this evaluation factor unless specialized subcontractor experience is stated as acceptable. Failure to submit this information may result in a lower rating.
(2) Design Experience
Submit a maximum of five (5) relevant design projects for the design team that best demonstrates design experience on relevant projects that are similar in size, scope, and complexity to the RFP. (Note: Any projects submitted in excess of five (5) for Design Experience will not be considered.)
For purposes of this evaluation, a relevant project is defined as follows:
a. Size: Construction project task orders with a final contract value of $100,000. To $4,000,000. Projects submitted above or below this stated dollar range will not be considered relevant;
b. Scope/Complexity: Projects that include new building construction or building renovation/alteration (interior or exterior) involving multiple (at least 2) building systems and infrastructures (e.g. architectural, HVAC, electrical, plumbing, and fire protection)
c. Construction projects completed within the past five (5) years of the date of issuance of this RFP and Completed to the point of Beneficial Occupancy
Collectively the submitted relevant project experience shall demonstrate the following:
a. Experience as the Prime Contractor on all of the submitted design for construction projects;
b. At least one (1) relevant design project for a design-bid-build (DBB), construction project;
c. At least one (1) relevant design project for a design-build (DB), construction project.
d. At least one (1) relevant design project shall have an estimated construction cost (ECC) of at least $1,000,000.
A project submitted under design experience will meet the recency requirement if (a) the construction effort was completed within five (5) years immediately preceding the proposal due date, regardless of the design completion date, OR (b) the construction effort is ongoing, but the design completion date was reached within the five (5) years immediately preceding the proposal due date. Each relevant completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet. A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.
The attached Construction & Design Experience Project Data Sheet (Attachment) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page or two
(2) single-sided pages.
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this SOLICITATION (i.e., unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through a Sustainable Third Party Certification program.
For projects that involve a historic building or a building in a historic district, the description should address features detailing how the work was completed in accordance with the "Secretary of the Interior's Standards for the Treatment of Historic Properties
The proposal shall state specific commitments of technical resources (e.g. personnel, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/ parent/LLC/LTD member companies in terms of the work it will either self- perform or manage on behalf of the Offeror in performance of the contract. Failure to submit this information may result in a lower rating.
The Offeror may utilize experience of a design subcontractor to demonstrate design experience. The Offeror must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the involvement for the design subcontractor. Offerors proposing multiple design firms should submit relevant project experience for all design firms. Failure to do so may result in a lower rating. Offerors are still limited to a total of five (5) projects combined.
(2) Basis of Evaluation:
The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the SOLICITATION. The Government will only review five (5) projects for construction and five (5) for design. Any projects submitted in excess of the five (5) for Construction Experience and five (5) for Design Experience will not be considered.
Proposals demonstrating projects where the Offeror and the proposed design firm(s) have previously worked together may be considered more favorably than those that have not worked together.
Proposals demonstrating more design-build experience may be considered more favorably than those that do not have design-build experience.
Proposals demonstrating more project experience with sustainable features may be considered more favorably than those that do not demonstrate experience with sustainable features.
Projects completed by the Offeror may be more favorably considered than those completed by other than the Offeror (i.e. subcontractors).
Projects demonstrating concurrent performance periods may be evaluated more favorably. Offerors who fail to submit experience for all JV member partners may be rated lower.
Factor 3 – Safety
(1) Solicitation Submittal Requirements:
The Offeror shall submit the following information:
The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative as described further below.
This is the start of the file's text. The full file is on GovTribe.