Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx

XLSX spreadsheet 53 KB Posted

Attached to
1800Forward - Construction Manager as Constructor Services for the General Services Administration Building at 1800F Street NW, Washington, DC 20405
Solicitation number
47PB5426R0007
Issued by
Not on record

About this file

This document is a UNIFORMAT II Level 3 Detail Reference Guide developed by the GSA Office of Design and Construction to standardize work breakdown structure (WBS) cost element organization for construction projects. The guide establishes a hierarchical classification system with three levels (L1, L2, L3) for organizing construction costs, beginning with major categories such as Substructure (A), Shell (B), Interiors (C), Services (D), Equipment & Furnishings (E), Special Construction & Demolition (F), Sitework (G), and Indirect Costs (Z). Each category is further subdivided into increasingly specific cost elements with defined units of measure (SF for square feet, CY for cubic yards, EA for each, LF for linear feet, etc.) and quantification methodologies to facilitate consistent cost estimation and project budgeting.

The guide provides detailed classifications for structural components (foundations, basement construction, superstructure), exterior systems (walls, windows, doors, roofing), interior elements (partitions, doors, stairs, finishes), building services (conveying systems, plumbing, HVAC, fire protection, electrical), equipment and furnishings, special construction systems, site work, and indirect cost categories including design contingency submissions at various project phases (feasibility, PDS, concept, design development, 65% CD, 90% CD, 100% CD), general conditions and profit allocations for single and multi-phased projects, escalation to construction mid-point, and contingency reservations. This standardized reference guide is applicable to the 1800F Street GSA Building renovation project, which involves significant structural renovation, tenant improvements, building envelope repairs, and courtyard reactivation requiring comprehensive cost tracking and WBS organization.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIFORMAT II Level 3 Detail

GSA OFFICE OF DESIGN AND CONSTRUCTION
UNIFORMAT II WBS COST ELEMENT ORGANIZATION
UNIFORMAT L1UNIFORMAT L2UNIFORMAT L3E UOMQuantity Definition
ASUBSTRUCTURESFFootprint area at grade
A10FOUNDATIONS
A1010STANDARD FOUNDATIONSSFFootprint area at grade
A1020SPECIAL FOUNDATIONSSFFootprint area at grade
A1030SLAB ON GRADESFFootprint area at grade
A20BASEMENT CONSTRUCTIONCYVolume of excavation
A2010BASEMENT EXCAVATIONCYArea of basement plan measured to outside of enclosing wall and average depth of finished grade to underside of slab on grade
A2020BASEMENT WALLSSFArea of wall
BSHELLSFSum area of supported floors and roof structure
B10SUPERSTRUCTURESFSum area of supported floors and roof structure
B1010FLOOR CONSTRUCTIONSFArea of supported floors
B1020ROOF CONSTRUCTIONSFArea of supported roof
B20EXTERIOR ENCLOSURESFArea of exterior walls
B2010EXTERIOR WALLSSFArea of exterior walls
B2020EXTERIOR WINDOWSSFArea of windows
B2030EXTERIOR DOORSEANumber of doors
B30ROOFINGSFGross area of roof
B3010ROOF COVERINGSSFGross area of roof
CINTERIORSSFGross floor area
C10INTERIOR CONSTRUCTIONSFGross floor area
C1010PARTITIONSSFArea of partitions
C1020INTERIOR DOORSLEFNumber of leaves
C1030FITTINGSSFGross floor area
C20STAIRSFLTNumber of flights
C2010STAIR CONSTRUCTIONFLTNumber of flights
C2020STAIR FINISHESSFArea of finished landings, treads, risers
C30INTERIOR FINISHESSFArea of finishing
C3010WALL FINISHESSFArea of finished walls
C3020FLOOR FINISHESSFArea of finished floors
C3030CEILING FINISHESSFArea of ceilings
DSERVICESEA
D10CONVEYINGSTYNumber of stories
D1010ELEVATORS AND LIFTSSTPNumber of stops
D1020ESCALATORS AND MOVING WALKSLFLength of stairs or walks
D1090OTHER CONVEYING SYSTEMSEA
D20PLUMBINGEANumber of fixtures
D2010PLUMBING FIXTURESEANumber of fixtures
D2020DOMESTIC WATER DISTRIBUTIONEANumber of fixtures
D2030SANITARY WASTEEANumber of fixtures
D2040RAIN WATER DRAINAGESFArea of roof
D2090OTHER PLUMBING SYSTEMSEANumber of special fixtures, etc.
D30HVACMBHTotal MBH capacity
D3010ENERGY SUPPLYMBHTotal power of heating system
D3020HEAT GENERATING SYSTEMSMBHTotal power of heating system
D3030COOLING GENERATING SYSTEMSTONTotal power of cooling capacity
D3040DISTRIBUTION SYSTEMSMBHPower
D3050TERMINAL & PACKAGE UNITSMBHPower
D3060CONTROLS & INSTRUMENTATIONMBHPower
D3070SYSTEMS TESTING & BALANCINGMBHPower
D3090OTHER HVAC SYSTEMS AND EQUIPMENTEANumber of special mechanical systems
D40FIRE PROTECTIONSFGross floor area
D4010FIRE ALARM & DETECTION SYSTEMSSFGross floor area
D4020FIRE SUPPRESSION WATER SUPPLY AND EQUIPMENTLFLength of system
D4030STANDPIPE SYSTEMSEANumber of sprinkler heads
D4040SPRINKLERSEANumber of sprinkler heads
D4050FIRE PROTECTION SPECIALTIESEANumber of extinguishers
D4090OTHER FIRE PROTECTION SYSTEMSEAEach system
D50ELECTRICALAMPGross floor area
D5010ELECTRICAL SERVICE & DISTRIBUTIONAMPGross floor area
D5020LIGHTING & BRANCH WIRINGSFFloor area
D5030COMMUNICATIONS & SECURITYSFFloor area
D5090OTHER ELECTRICAL SERVICESSFGross Floor area
EEQUIPMENT & FURNISHINGSSFGross Floor area
E10EQUIPMENTSFGross Floor area
E1010COMMERCIAL EQUIPMENTSFFloor area
E1020INSTITUTIONAL EQUIPMENTSFFloor area
E1030VEHICULAR EQUIPMENTEAPieces of equipment
E1090OTHER EQUIPMENT
E20FURNISHINGSSFFloor area
E2010FIXED FURNISHINGSSFFloor area
E2020MOVEABLE FURNISHINGS
FSPECIAL CONSTRUCTION & DEMOLITIONSFFloor area
F10SPECIAL CONSTRUCTIONSFFloor area
F1010SPECIAL STRUCTURESSFFloor area
F1020INTEGRATED CONSTRUCTIONSFFloor area
F1030SPECIAL CONSTRUCTION SYSTEMSSFArea of room
F1040SPECIAL FACILITIESSFArea of room
F1050SPECIAL CONTROLS AND INSTRUMENTATIONXX
F20SELECTIVE BUILDING DEMOLITIONLS
F2010BUILDING ELEMENTS DEMOLITIONLS
F2020HAZARDOUS COMPONENTS ABATEMENTLS
GSITEWORKACRTotal area of site
G10BUILDING-RELATED SITEWORK
G1010SITE PREPARATIONSACRTotal area of site
G1020SITE IMPROVEMENTSLS
G1030SITE CIVIL/MECHANICAL UTILITIESEAEach utility
G1040SITE ELECTRICAL UTILITIESEASystems total
G20NON-BUILDING-RELATED SITEWORK
G2010SITE PREPARATIONSACRTotal area of site
G2020SITE IMPROVEMENTSLS
G2030SITE CIVIL/MECHANICAL UTILITIESEAEach utility
G2040SITE ELECTRICAL UTILITIESEASystems total
G30OTHER SITE CONSTRUCTIONLS
G3010SERVICE AND PEDESTRIAN TUNNELS
G3020OTHER SITE CONSTRUCTIONXX
ZINDIRECT COSTS
Z10DESIGN CONTINGENCY
Z1010FEASIBILITY STUDY SUBMISSION
Z1020PDS SUBMISSION
Z1030CONCEPT PHASE SUBMISSION
Z1040DESIGN DEVELOPMENT PHASE SUBMISSION
Z105065% CD PHASE SUBMISSION
Z106090% CD PHASE SUBMISSION
Z1070100% CD PHASE SUBMISSION
Z20GENERAL CONDITIONS and PROFIT
Z2010NEW CONSTRUCTION - SINGLE PHASE
Z2020REPAIR AND ALTERATION - SINGLE PHASE
Z2030NEW CONSTRUCTION - MULTI-PHASED
Z2040REPAIR AND ALTERATION - MULTI-PHASED
Z30ESCALATION TO CONSTRUCTION MID-POINT
Z40CONTINGENCY AND RESERVATION
Z4010CONSTRUCTION CONTINGENCY
Z4020RESERVATION
Z50ART-IN-ARCHITECTURE