Solicitation 47PH5226R0003.pdf

PDF 899 KB Posted

Attached to
D. C. Metro Area Multiple Award Indefinite Quantity Indefinite Delivery (IDIQ) Contract for Construction Services
Solicitation number
47PH5226R0003
Issued by
Not on record

About this file

This is a GSA Solicitation for a Construction Contract (D.C. Metro Area Multiple Award Construction IDIQ). The procurement is a total small business set-aside with socioeconomic reserves established under FAR 19, seeking qualified contractors to perform general construction services through an Indefinite Delivery Indefinite Quantity (IDIQ) contract vehicle. The estimated price range for individual task orders is between $350,000 and $10,000,000, with a maximum ordering limit of $500,000,000 for all cumulative task orders over the five-year contract period.

Proposals must be submitted electronically to Contracting Officer Jay Oxenberg (jay.oxenberg@gsa.gov) by 4:00 PM EST on Thursday, October 29, 2026. A pre-proposal conference is scheduled for Tuesday, October 6, 2026, at 10:00 AM via Google Meets, with registration required by October 5 at 3:00 PM. Written questions must be submitted by 4:00 PM on Monday, October 12, 2026. Offerors must submit price proposals (SF 1442 and Excel Price Offer Sheet) and technical proposals separately in PDF format. Technical proposals must include up to five relevant projects completed within the past six years (Attachment B), past performance questionnaires or final CPARS evaluations for each project (Attachment A), evidence of $10,000,000 bonding capacity per project from an acceptable surety, socioeconomic designations (Attachment C), contractor qualification information (GSA Form 527), and representations and certifications via SAM.gov. Contract type is firm-fixed-price. Buy American requirements apply to construction materials, with waivers for certain foreign materials if determined unreasonable in cost or unavailable domestically. All task orders will require performance and payment bonds. Construction wage rate requirements apply, and the solicitation incorporates various FAR and GSAR provisions including those addressing responsibility matters, arms control treaty compliance, diversity and inclusion, and security requirements.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Solicitation No.47PH5226R0003

Construction Contract for: D.C. Metro Area Multiple Award Construction

IDIQ

The Solicitation

Document: DB201A-SB/2MAY 2026 (The Solicitation)

Table of Contents

I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee

G. Receipt of Offers

II. Proposals

A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to be Submitted with Proposal F. Requirements of Joint Venture Offerors

III. General Provisions

A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results

E. Notice Concerning Preparation of Proposals F. Bond Requirements G. Contractor Performance Information H. Safeguarding and Dissemination of Controlled Unclassified Information

(CUI) Building Information

IV. FAR/GSAR Solicitation Provisions FAR 52.209-7 Information Regarding Responsibility Matters (GSA Class Deviation RFO-2025-09) FAR 52.209-13 Violation of Arms Control Treaties or Agreements-Certification (GSA Class Deviation RFO-2025-09)

FAR 52.216-1 Type Of Contract(GSA Class Deviation RFO-2025-16)

FAR 52.219-18 Notification of Competition Limited to Eligible 8(a) Participants (OCT 2022) (Applicable to 8(a) reserves.)

FAR 52.222-5 Construction Wage Rate Requirements-Secondary Site of Work Buy American Requirements Buy American Exceptions FAR 52.233-2 Service of Protest (GSA Class Deviation RFO-2025-33) FAR 52.240-90 Security Prohibitions and Exclusions Representations and Certifications (GSA Class Deviation RFO-2025-09) FAR 52.252-1 Solicitation Provisions Incorporated by Reference GSAR 552.102 Incorporating Provisions and Clauses by Reference GSAR 552.252-5 Authorized Deviations in Provisions (Nov 2021)(DEVIATION

FAR 52.252-5)

Project Labor Agreement GSAR 552.236-74, Evaluation of Options (Mar 2019) GSAR 552.236-77, Government’s Right to Exercise Options (Mar 2019) Certified Cost or Pricing Data

V. Instructions to Offerors and Clauses

A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition (GSA Class Deviation RFO-2025-15)

B. Security Requirements C. 52.222-90 Addressing DEI Discrimination by Federal Contractors D. Additional Clauses

VI. Method Of Award

A. Evaluation of Offers B. Determination of Responsibility C. Price Reasonableness/Price Realism D. Unbalanced Price E. Total Evaluated Price F. Non Price Factors G. Evaluation of Joint Ventures

I. General Information

I.A. The Solicitation and Contract

(1) This Solicitation is a total small business set-aside with socioeconomic reserves in accordance with FAR 19. This Solicitation sets forth requirements for proposals for a Contract as described in the attached Agreement. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offerors, subject to the conditions set forth herein.

(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.

(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.

I.B. List of Solicitation Documents The Solicitation Documents are comprised of:

(1) The Solicitation and any Attachments to the Solicitation

(2) Offeror Representations and Certifications Form (via SAM.gov)

(3) Standard Form (SF) 1442 – Solicitation Offer and Award, and Excel Price Offer Sheet.

(4)The Agreement and any Attachments to the Agreement

I.C. Authorized Representatives

The following individuals are designated as the authorized GSA representatives under this Solicitation:

Authorized Representative Information:

Contracting Officer’s Information

Name: Jay Oxenberg

Email: jay.oxenberg@gsa.gov

I.D. Pre-Proposal Conference

Date: Tuesday, October 6th, 2026 (Registration is required- see below) Time: 10:00AM

Location: Virtual (Google Meets)

Register Here: Registration Link

Registration Deadline: Please register by Monday, October 5th at 3:00PM

Registration is required via the link above. If you are unable to complete the registration via the link above, email the Contracting Officer at jay.oxenberg@gsa.gov by the registration deadline. Statements, clarifications, or remarks made at the virtual pre-proposal conference do not alter the terms and conditions of the solicitation unless formally changed through a written solicitation amendment. The pre-proposal conference will consist of the Contracting Officer presenting a verbal overview of the solicitation using the solicitation documents that are posted to SAM.gov. There will be no separate meeting agenda provided, nor will there be any solicitation amendments to the solicitation that provide any pre-proposal meeting notes, agenda, or presentations, etc. An amendment will be issued following the conference that contains all names, company names, and email addresses of ALL conference registrants. The meeting will not be recorded. The Contracting Officer will utilize the solicitation documents to provide a verbal overview of the solicitation requirements. The virtual conference will not include a question and answer session. Instead, all questions are required to be submitted in writing, addressed to the Contracting Officer at jay.oxenberg@gsa.gov no later than 4:00PM on Monday, October 12, 2026. Any questions received after that date/time may not be considered nor responded to. Government responses to the written questions will be provided via solicitation amendment as soon as possible following the due date for questions.

I.E. Estimated Price Range

The general ordering range is between $350,000.00 and $10,000,000.00.

The Maximum Ordering Limit (MOL) for this contract vehicle is $500,000,000.00, meaning the cumulative total for all task orders awarded to all contractors over the life of the contract (5 Years) is not anticipated to exceed $500,000,000.00. (But see Section

13.1 of The Agreement)

I.F. FAR 52.228-1 Bid Guarantee (SEP 96) (APPLICABLE TO TASK ORDERS) https://docs.google.com/forms/d/1f1ACcivc0lKZ17cuChOKXItoh6YGwQmTRxwAORzwe2I/edit#settings mailto:jay.oxenberg@gsa.gov

FOR THIS SOLICITATION, EVIDENCE OF BONDING CAPACITY OF $10,000,000.00

PER PROJECT IS REQUIRED AT TIME OF PROPOSAL SUBMISSION. (SEE II.D.

Technical Proposal- Factor 3 for required documentation). Offerors are cautioned to carefully review the documentation required for evidence of bonding capacity.

Failure to submit the required documentation will render the proposal unacceptable, and ineligible for award.

A BID GUARANTEE IS NOT REQUIRED FOR THIS SOLICITATION BUT WILL BE

REQUIRED FOR ALL FUTURE TASK ORDERS.

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids;

and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

I.G. Receipt of Offers

(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received electronically by the Contracting Officer no later than 4:00 pm EST on Thursday, October 29, 2026, at jay.oxenberg@gsa.gov

II. Proposals

II.A. Proposal Contents Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:

1. Price Proposal

a. Completed Form 1442

b. Completed Excel Price Offer Sheet

2. Technical Proposal

a. Completed Attachment B for each project

b. Completed Attachment C (Socioeconomic designations)

c. Completed PPQ or Final CPARS for each project

d. Required Evidence of Bonding Capacity

3. Representations and Certifications

4. Completed GSA Form 527 – Contractor’s Qualification and Financial

Information

II.B. Proposal Format Proposals shall be submitted in PDF format via email (jay.oxenberg@gsa.gov) to the Contracting Officer, Jay Oxenberg. The price proposal shall be a separate PDF document from the technical proposal.

II.C. Price Proposal

(1) Contents

The Price Proposal shall consist of the SF 1442 and Excel Price Offer Sheet. The Excel Price Offer Sheet is required to be completed and submitted with the SF1442. Indicate the Total Evaluated Price in Block 17 of the SF 1442, which must be fully executed by the Offeror. The Total Evaluated Price will be autocalculated using the Excel Price Offer Sheet, and will be shown in cell D30. Instructions on using the Excel Price Offer Sheet is provided with the solicitation documents. Offerors are strongly encouraged to read carefully.

(2) Qualifications, Exclusions and Conditions

If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

II.D. Technical Proposal The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.

Factor 1 – Prior Experience on Relevant Projects

This factor will evaluate up to a maximum of five (5) relevant projects that the offeror has either completed or substantially completed within the past six (6) years of the proposal due date. The Government will examine the relevancy, complexity, and breadth of prior experience in performing a sample of projects similar in size and scope to those anticipated under the IDIQ contract. The government would prefer to see five

(5) projects submitted that demonstrate prior experience across the task order value range of the IDIQ ($350K to $10M), and that demonstrate breadth of overall general construction experience. Relevant Projects would be those construction projects with characteristics, including, but not limited to the following.

Projects must meet the following four (4) requirements to be considered minimally relevant for evaluation:

1. A discrete project (can not be an Base IDIQ contract, BPA or any other Master or “Mother” Contract; Task orders performed under IDIQ contracts, BPA’s or master/mother contracts are considered “discrete projects” and are acceptable.)

2. Substantially completed within the past 6 years of the proposal due date

3. *General Construction Services

4. Project Value between $350k and $10M.

Projects that do not meet these four requirements will not be considered or evaluated.

The following favorable characteristics, in no particular order, may be considered strengths and may increase the technical merit and ratings for the submitted projects.

● High degrees of complexity

● Experience working in technically complex environments (including, but not limited to laboratories & SCIF’s, high-security data handling (Data Centers), and critical infrastructure control systems)

● Performance in occupied buildings

● Performance on federally owned or federally leased buildings/locations

● Performance within the defined primary geographic area of the contract

● Performance as the prime contractor

● High Degree of Self-Performance

● Performance of GSA projects

● Experience with design-build projects

● Experience performing a Task Order against an IDIQ Contract

● Breadth of prior experience across the task order value range of the IDIQ ($350K to $10M)

● Breadth of overall general construction experience.

Note that these favorable characteristics may be considered strengths. Individual favorable characteristics may be considered strengths only after assessing the complete picture of the project, and the portfolio of projects submitted as a whole. This approach ensures that individual characteristics are not judged in isolation.

*General Construction Services for this solicitation include but are not limited to office construction and/or renovations/repairs, office space renovations, MEP (Mechanical/Electrical/Plumbing) repairs/modifications/replacement, fire sprinkler systems repairs/modification/replacement, sitework, exterior construction repair and alterations (including facades and roofs), demolition (including abatement of hazardous materials), elevator modernizations, work in technically sensitive environments like laboratories, SCIF’s etc., work in high-security data centers and critical infrastructure control systems, construction work in high security buildings, as well as any other general construction activities.

Factor 1- Submission Requirement:

Using the Attachment B template, the offeror is requested to submit a detailed descriptive listing for up to a maximum of five (5) relevant projects either completed or substantially completed within the last six (6) years of the proposal due date that are similar in nature to the anticipated type of work to be performed under these IDIQ contracts, as described in this solicitation. If more than five (5) projects are submitted, only the first five (5) will be evaluated. For each project submitted, the Attachment B template shall not exceed three (3) pages. If more than three (3) pages are submitted, only the first three (3) pages will be evaluated.

Note: For purposes of evaluation, a “project” is defined as a contract, subcontract, task order, or other contractual vehicle in which the services were provided. A "project" is not an Indefinite Delivery Indefinite Quantity (IDIQ) contract, blanket purchase agreement, or other type of master contract. Offerors may not submit Indefinite Delivery Indefinite Quantity (IDIQ) contracts, blanket purchase agreements, or other types of master contracts for evaluation. They are not considered relevant projects for evaluation purposes, and will not be considered.

For joint ventures, projects may be submitted for the joint venture as an entity or for an individual member of the joint venture; more consideration will be given when a JV performed the project together as the JV. While the Government may consider the prior experience of managers, key personnel or other affiliates playing a significant role in contract performance, the total number of projects submitted is limited as stated above.

The offeror may submit no more than five (5) projects for the prime contractor team as a whole.

The offeror is required to submit sufficient information to allow the Government to assess the level of relevance and characteristics of the project. The detailed description submitted for each project should include, as a minimum, the following information:

1. Project Name/Title:

2. Agency/Client

3. Project Location (Include Building Name, Street Address, City, State, and

County):

4. Contract and/or Task Order#

5. Was the Project Delivery Method Design-Build (Select: YES OR NO)

6. Project start and substantial completion dates:

7. Construction cost at award and the final construction cost at construction final completion:

8. Performed in an Occupied Building (Select: YES OR NO)

9. A detailed description of the project:

10.Would you consider this project low, medium, or high complexity?

Why?(Note: the government makes an independent assessment of complexity)

11.Indicate if the project was performed as a stand alone contract, or as an order under an IDIQ/BPA/MATOC:

12.Describe your role in the project (i.e. prime or subcontractor). If a subcontractor, identify the contract amount your firm performed for the project (This would obviously be a lesser amount than appears under item #5 above):

13.Describe the amount and type of work you performed with in-house forces (self-performed work) and the work that was accomplished by subcontractors:

14.Agency/Client/Owner Contact

Name:

Phone number:

e-mail address:

Secondary contact (if desired)

15.If you are proposing as a joint venture, indicate if this project was completed by the joint venture or not. If not, explain who completed the project. (Reminder- If you are proposing as a joint venture, you are required to provide a copy of the joint venture agreement.

Factor 2 - Past Performance on Relevant Projects

a. This factor will evaluate the quality of an offeror’s performance of projects similar in size, scope and complexity to those described in this solicitation.

b. The Offeror must submit a Past Performance Questionnaire (PPQ)

(included in the solicitation as Attachment A, completed by the applicable client, OR a final project CPARS evaluation, for each project included in its proposal for Factor 1- Prior Experience on Relevant Projects. Completed PPQs should be submitted with the proposal. Ensure correct phone numbers and email addresses are provided for the client point of contact.

Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the Offeror is unable to obtain a completed PPQ from a client for a project before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the project, although the government cannot guarantee we will be able to successfully contact the client/owner. If the client requests, the client may submit a questionnaire directly to the Government's point of contact, via email at jay.oxenberg@gsa.gov prior to proposal closing date. Offerors may resubmit questionnaires previously submitted with other proposals if the same PPQ template was used. Otherwise, offerors must obtain a new PPQ from a client for any submission. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.

c. The past performance of each of the projects submitted under Factor 1 will be evaluated.

d. In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, any relevant past performance information for any projects submitted under Factor 1, and/or any other relevant projects, retrieved through the Contractor Performance Assessment Reporting System (CPARS), including for any team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), previously submitted PPQ information, and any other known sources not provided by the Offeror. While the Government may elect to consider data from a variety of sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. GSA will not maintain a database of PPQs submitted by Offerors.

e. Only Past Performance Questionnaires (PPQ) (included in the solicitation as Attachment A), completed by the applicable client, OR a final CPARS evaluation, for each project included in its proposal, is acceptable. No other past performance documentation (ie. other types of PPQ’s, letters, etc) for the submitted projects will be accepted.

f. The Government has no obligation to ensure that an equal number of references are obtained for each offeror.

Factor 2- Submission Requirement:

The Offeror must submit a completed Past Performance Questionnaire (PPQ) (included in the solicitation as Attachment A), completed by the applicable client, OR a final CPARS evaluation, for each project included in its proposal under Factor 1. There is no page limit for PPQ’s.

Factor 3- Project Bonding Capacity (go/no-go)– This is a go/no-go factor to assess the offeror’s ability to provide an offer guarantee and performance and payment bonds sufficient to cover the maximum estimated value of a single project under this IDIQ contract. For this procurement, the minimum amount to be covered by the bonding capacity is $10 million per project. This is NOT an aggregate amount. Failure to provide evidence of this required bonding capacity at time of proposal will render the proposal unacceptable and it will not be further evaluated.

The offeror must submit a Letter of Bonding Capacity/Bondability from an acceptable surety/bonding company at time of proposal submission. See submission requirement below.

Factor 3 - Submission Requirement:

The offeror must submit a Letter of Bonding Capacity/Bondability endorsed by an acceptable surety/bonding company at the time of proposal submission. For this procurement, the minimum amount to be covered by the bonding is $10 million per project. The documentation submitted shall be either:

1) A signed letter from a corporate surety company listed on the Department of the Treasury’s Bureau of the Fiscal Service website (Circular 570).

2) A signed letter from an authorized broker. The letter must be endorsed by a certified bonding company listed on the Department of the Treasury’s Bureau of the Fiscal Service website (Circular 570).

The Bureau of the Fiscal Service - Surety Bonds provides the list of certified companies at: www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html.

Offerors are reminded to complete and submit a completed and signed Attachment C- Socioeconomic Designations as part of their technical proposal.

II.E. Other Information to Submit with Proposal

(1) Representations and Certifications

Offerors are reminded their SAM registration status must be “Active”, at the time their offer is submitted, to be considered for award (see 52.204-7). Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in System for Award Management (SAM), accessed via System for Award Management.In accordance with FAR 52.204-90 (GSA Class Deviation RFO-2025-04), if an Offeror will not have an active Federal Government contracts registration in SAM when submitting its offer, it shall complete paragraphs (c) and (d) of FAR 52.204-90 and include its responses with its offer. Offerors shall also submit with their proposal, the completed provisions identified in Section IV of this solicitation.

(2) Qualifications of Offerors

Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract.

http://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html https://www.sam.gov/

Offerors shall submit this information on GSA Form 527 – Contractor’s Qualifications and Financial Information. Where applicable, point of contact, including names and telephone numbers, are required for all contracts listed.

II.F. Requirements of Joint Venture Offerors

(1) All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of ownership of each member, and any limitations on liability or authority for each member.

(2) An authorized representative of each member of the joint venture must sign the SF 1442 accompanying an offer regardless of any agency relationship established between the members.

(3) In the case of corporations that are joint venture members, the corporation secretary must certify that the corporation is authorized to participate in the joint venture, either by so certifying in the joint venture agreement, or by submitting a separate certification to the Government. The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.

(4) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.

III. General Provisions

III.A. Availability of Funds Issuance of this Solicitation does not warrant that funds are presently available for award of a Contract. Award of the contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of contract award.

III.B. Requests for Clarification or Interpretation The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers, but do not warrant that all such requests will be answered within 15 calendar days. Prospective Offerors should make such requests not less than 15 calendar days prior to the date set for receipt of offers.

III.C. Notice to Small Business Firms A program for the purpose of assisting qualified small business concerns in obtaining certain bid, payment, or performance bonds that are otherwise not obtainable is available through the Small Business Administration (SBA) (Small Business Administration). For information concerning SBA's surety bond guarantee assistance, contact your SBA District Office.

III.D. Information Concerning the Disclosure of Solicitation Results This acquisition is being conducted under the provisions of FAR Part 15 (GSA Class Deviation RFO-2025-15) as a negotiated procurement. In accordance with FAR 3.104 (GSA Class Deviation RFO-2025-03) and FAR 15(GSA Class Deviation RFO-2025-15),, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will be made available until after award except as provided by FAR 15 (GSA Class Deviation

RFO-2025-15).

III.E. Notice Concerning Preparation of Proposals Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out, that all pricing and other numerical data is accurately calculated, and that all copies of the Offer contain the same information.

III.F. Bond Requirements (APPLICABLE TO TASK ORDERS, but see Factor 3) If a bid guarantee is required to be submitted with your offer, any contract awarded will require a performance bond and payment bond as specified in the Agreement. Offerors who utilize individual sureties should note the requirement for a certified, audited, financial statement for each person acting as an individual surety under clause FAR 52.228-1 Bid Guarantee and the requirements of clause FAR 52.228-11 Individual Surety-Pledge of Assets.

III.G. Contractor Performance Information (1)Evaluating Contractor Performance: The General Services

Administration is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, confidential, information management tool to facilitate the performance evaluation process. CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is Contractor Performance Assessment

Completed CPARS evaluations may then be used by the Federal acquisition community for use in making source selection decisions. CPARS assists acquisition officials by serving as the single source for contractor past performance data.

(2)CPARS Registration: Each award requiring an evaluation must be registered in CPARS. The contractor will receive several http://www.sba.gov/ http://www.sba.gov/ http://www.cpars.gov/ http://www.cpars.gov/ automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract and order number(s) assigned. Contractors will be granted one user account to access all evaluations.

(3)Contractor CPARS Training: Contractors may sign up for CPARS training. A schedule of classes will be posted to the CPARS training site (CPARS Training) and updated as needed.

(4)Contractor Representative (CR) Role: All evaluations will be sent to the Contractor Representative (CR) named on your award. The CR will be able to access CPARS to review and comment on the evaluation. If your CR is not already in the CPARS system, the contracting officer will request the name and email address of the person that will be responsible for the CR role on your award.

Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.

GSA shall provide for review at a level above the contracting officer (i.e., contracting director) to consider any disagreement between GSA and the contractor regarding GSA’s evaluation of the contractor. Based on the review, the individual at a level above the contracting officer will issue the ultimate conclusion on the performance evaluation.

Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.

III.H. Safeguarding and Dissemination of Controlled Unclassified Information (CUI) Building Information Certain information contained in the Solicitation Documents may have been designated as Controlled Unclassified Information (CUI) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the Agreement, as a condition of receipt of such information.

IV. FAR/GSAR Solicitation Provisions

FAR 52.209-7 Information Regarding Responsibility Matters. (NOV 2025) (GSA Class Deviation RFO-2025-09)

(a) Definitions. As used in this provision—

Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals https://www.cpars.gov/cparsweb/lc

Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

Federal contracts and grants with total value greater than $10,000,000 means—

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

(b) The offeror □ has □ does not have current active Federal contracts and grants with total value greater than $10,000,000.

(c) If the offeror checked "has" in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in–

(A) The payment of a monetary fine or penalty of $5,000 or more; or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

(End of Provision)

FAR 52.209-13 Violation of Arms Control Treaties or Agreements-Certification (NOV 2025) (GSA Class Deviation RFO-2025-09)

(a) This provision does not apply to acquisitions at or below the simplified acquisition threshold or to acquisitions of commercial products and commercial services as defined in Federal Acquisition Regulation 2.101.

(b) Certification. [Offeror shall check either (1) or (2).]

__ (1) The Offeror certifies that–

(i) It does not engage and has not engaged in any activity that contributed to or was a significant factor in the President's or Secretary of State's determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international -security-affairs/bureau-of-arms-control-verification-and-compliance/; and

(ii) No entity owned or controlled by the Offeror has engaged in any activity that contributed to or was a significant factor in the President's or Secretary of State's determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international -security-affairs/bureau-of-arms-control-verification-and-compliance/; or

__ (2) The Offeror is providing separate information with its offer in accordance with paragraph (d)(2) of this provision.

(c) Procedures for reviewing the annual unclassified report (see paragraph (b)(1) of this provision). For clarity, references to the report in this section refer to the entirety of the annual unclassified report, including any separate reports that are incorporated by reference into the annual unclassified report.

(1) Check the table of contents of the annual unclassified report and the country section headings of the reports incorporated by reference to identify the foreign countries listed there. Determine whether the Offeror or any person owned or controlled by the Offeror may have engaged in any activity related to one or more of such foreign countries.

(2) If such activity might have occurred, review all findings in the report associated with those foreign countries to determine whether or not each such foreign country was determined to be in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or to be not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. For clarity, in the annual report an explicit certification of non-compliance is equivalent to a determination of violation.

However, the following statements in the annual report are not equivalent to a determination of violation:

(i) An inability to certify compliance.

(ii) An inability to conclude compliance.

(iii) A statement about compliance concerns.

(3) If so, determine whether the Offeror or any person owned or controlled by the Offeror has engaged in any activity that contributed to or is a significant factor in the determination in the report that one or more of these foreign countries is in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. Review the narrative for any such findings reflecting a determination of violation or non-adherence related to those foreign countries in the report, including the finding itself, and to the extent necessary, the conduct giving rise to the compliance or adherence concerns, the analysis of compliance or adherence concerns, and efforts to resolve compliance or adherence concerns.

(4) The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days.

(d) Do not submit an offer unless—

(1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer; or

(2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the President of the United States has

(i) Waived application under 22 U.S.C. 2593e(d) or (e); or

(ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C. 2593e(b).

(e) Remedies. The certification in paragraph (b)(1) of this provision is a material representation of fact upon which reliance was placed when making award. If the Government later determines that the Offeror knowingly submitted a false certification, in addition to other remedies available to the Government, such as suspension or debarment, the Contracting Officer may terminate any contract resulting from the false certification.

(End of provision)

FAR 52.216-1 Type of Contract (NOV 2025) The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

FAR 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work (NOV 2025)(GSA Class Deviation RFO-2025-22)

(a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.

Buy American Requirements

52.225-9 BUY AMERICAN-CONSTRUCTION MATERIALS (RFO-2025-25, 9/30/2025)

(Applies to Task Orders less than $6,683,000)

(a) Definitions. As used in this clause—

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title46-section40102(4)&num=0&edition=prelim

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph

(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the

United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if–

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be

65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States.

Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.(1) This clause implements 41 U.S.C. chapter 83, Buy

American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title41-chapter83&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section1907&num=0&edition=prelim

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: None

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components.

(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph

(b)(3)(i)(A)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of

January 1, 2030.

(B) For domestic construction material that is a critical item or contains critical components.(1) The cost of a particular domestic construction material that is a critical item or contains critical…