Solicitation Amendment 47PH5226R0003_0005_PDF.pdf
PDF 165 KB Posted
- Solicitation number
- 47PH5226R0003
- Issued by
- Not on record
About this file
This is Amendment 005 to Solicitation No. 47PH5226R0003, issued by the PBS OAM Centralized Acquisition Services Division, IDV Branch – Zones 1-4, located at 1900 E Street NW, Washington, DC 20415. The amendment is effective October 8, 2026, and was issued by Contracting Officer Jay Oxenberg. The amendment incorporates Requests for Information (RFIs) and Government Responses addressing clarifications on contract requirements and evaluation criteria.
Key clarifications provided in the amendment address socioeconomic certifications, project relevancy requirements, and evaluation factors. Projects must meet four minimum relevancy requirements: be discrete projects (not master or "mother" contracts, though task orders under such contracts are acceptable), be substantially completed within six years of the proposal due date of October 29, 2026, constitute general construction services, and have a project value between $350,000 and $10 million based on construction cost at award. The solicitation includes both design-build services and traditional design-bid-build (construction-only based on completed designs). Offerors may submit subcontractor or teaming partner projects for Factor 1 Prior Experience evaluation, with more consideration given when teams performed projects together. The Government will evaluate self-performance on a project-by-project basis without fixed quantitative thresholds, assessing the amount and type of work self-performed qualitatively. All socioeconomic designations (8(a), HUBZone, SDVOSB, WOSB) are determined at initial offer submission and verified in the System for Award Management. No requirement exists that projects must involve federally owned buildings; state, county, or municipal projects meeting other requirements are acceptable. Offerors must acknowledge all amendments with their proposals.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PQ1AA
Jay oxenberg, Contracting Officer
Amendment 005, issued against Solicitation No. 47PH5226R0003:
RFI's and Government Responses.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. OFFERORS MUST ACKNOWLEDGE ALL AMENDMENTS
WITH THEIR PROPOSAL.
PQ1AA
PBS OAM Centralized Acquisition Services Division IDV Branch - Zones 1-4 1900 E Street NW Washington, DC 20415 USA
PBS OAM Centralized Acquisition Services Division IDV Branch - Zones 1-4 1900 E Street NW Washington, DC 20415 USA
EQPXABA-26-0050
47PH5226R0003
1 2
10/8/2026
9/25/2026
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
Am en dm en t 0
Q ue st io n
Q ue st io n G ov er nm en t R es po ns e
If an o ffe ro r i s ce rti fie d as
(a
) a nd
SD
VO
SB
b ut it s
H U
BZ
on e ap pl ic at io n is p en di ng
, s ho ul d th e pe nd in g ap pl ic at io n be d is cl os ed in A tta ch m en t C o r e ls ew he re
W ou ld
H U
BZ
on e ap pr ov al a fte r p ro po sa l s ub m is si on b ut be fo re a w ar d qu al ify th e of fe ro r f or th e H
U
BZ
on e re se rv e, o r m us t c er tif ic at io n be in p la ce b y th e pr op os al d ea dl in e?
As s ta te d on p ag e o f t he s ol ic ita tio n, fo r aw ar d se le ct io n pu rp os es , a ll so ci oe co no m ic d es ig na tio ns
(8 (a
H
U
BZ
on e, S D
VO
SB
, W O
SB
re de te rm in ed a t t he ti m e of in iti al o ffe r su bm is si on . O ffe ro rs m us t c om pl et e
At ta ch m en t C
, d ec la rin g al l o f t he ir so ci oe co no m ic s ta tu se s as th e tim e of pr op os al s ub m is si on . D ec la ra tio ns w ill ve rif ie d in th e
Sy st em fo r A w ar d
M an ag em en t (
SA
M
.g ov
Al so , S ee a ns w er to R
FI
Pa ge re qu ire s a pr oj ec t v al ue tw ee n
$3
,0 a nd m illi on fo r m in im um re le va nc e.
W ill a pr oj ec t ex ce ed in g
$1 m illi on b e ex cl ud ed ev if it d em on st ra te s se ve ra l l is te d fa vo ra bl e ch ar ac te ris tic s?
As s ta te d on p ag e an d pa ge of th e so lic ita tio n, P ro je ct s m us t m ee t t he fo llo w in g fo ur
(4 ) r eq ui re m en ts to b e co ns id m in im al ly re le va nt fo r e va lu at io n:
1.
A d is cr et e pr oj ec t ( ca n no t b e an
B as e
ID
IQ
c on tra ct , B
PA
o r a ny o th er M as te r o r
“M ot he r”
C on tra ct
; T as k or de rs p er fo rm un r I D
IQ
c on tra ct s, B
PA
’s o r m as te r/m ot he r c on tra ct s ar e co ns id
“d is cr et e pr oj ec ts ” a nd a re a cc ep ta bl e.
2.
S ub st an tia lly c om pl et ed w ith in th e pa st ye ar s of th e pr op os al d ue d at e
3.
*G en er al C on st ru ct io n
Se rv ic es
4.
P ro je ct V al ue b et w ee n $3 k an d
$1 0M
Pr oj ec ts th at d o no t m ee t t he se ur qu ire m en ts w ill n ot b e co ns id er ed o r ev al ua te d.
T he
G ov er nm en t r es po ns
FI
an d
R
FI
fu rth er c la rif ie s th at th e va lu e is b as ed o n co ns tru ct io n co st a t aw d.
D oe s
G
SA
a nt ic ip at e is su in g ta sk or rs fo r b ot h de si gn -b ui ld w or k an d co ns tru ct io n ba se d on c om pl et go rn m en t-p ro vi de d de si gn s?
F or a ny ta sk o rd er s cu rre nt ly a nt ic ip at ed
, c an
G
SA
in di ca te w he th er d es ig ns co pl et e, in d ev el op m en t, or e xp ec te d to b e pa rt of th e co nt ra ct or
’s s co pe
As in di ca te d on p ag e of th e
Ag re em en t (I.
A.
S co pe
/S ta te m en t o f W or
k) , t he s pe th e co nt ra ct in cl ud es d es ig n-bu ild se rv ic es a s w el l a s tra dt io na l d es ig n-bi d-bu ild (D
BB
th e la tte r m ea ni ng c on st ru ct io n-on ly b as ed o n co m pl et ed d es ig ns . T he no fo rm at io n av ai la bl e to o ffe ro rs ga rd in g an y an tic ip at ed ta sk o rd er s, n st at us o f a ny d es ig ns th at m ay re su lt fu tu re ta sk o rd er s.
R eg ar di ng th e
Fa ct or
P rio r Ex pe rie nc e, c an th e co nt ra ct su bm itt in g pr op os al u bc on tra ct or te am in g pa rtn er (N ot
JV
p ar tn er
) p as t p ro je ct
Pl ea se re fe r t o
.2
-6 S ol ic ita tio n
O ffe rs fr om
S m al l B us in es s
C on ce rn s an d Sm al l B us in es s
Te am in g
Ar ra ng em en ts o r
Jo in t V en tu re s (M ul tip le -A w ar d C on tra s)
(A ug
4)
. A s st at ed o n pa ge of th e so lic ita tio n "F or jo in t v en tu re s, p ro je ct s ay s ub m itt ed fo r t he jo in t v en tu re a tit y or fo r a n in di vi du al m em be r o f t he jo t v en tu re
; m or e co ns id er at io n w gi n w he n a
JV
p er fo rm ed th e pr oj ec t to ge th er a s th e
JV
Th e sa m e ap pl ie y sm al l b us in es s te am in g ar ra ng em en ts
M or e co ns id er at io n w ill be g iv en w he n a te am p er fo rm ed th e pr oj ec t t og et he r a s th e te am
. P le as e al so s ee a ns w er to R
FI
Si nc e m an y co nt ra ct or s w er e af fe by or k di sr up tio ns d ue to C
O
VI
D -1
9, ou ld G
SA
c on si de r a dj us tin g th e
Fa ct or
P rio r E xp er ie nc e on R el ev an t
Pr oj ec ts to e ig ht
(8 ) y ea rs fr om th e pr op os al d ue d at e?
Pr oj ec ts m us t h av e be en c om pl et ed o r su bs ta nt ia lly c om pl et ed w ith in s ix
(6 ) y ea rs e pr op os al d ue d at e.
A s st at ed in th e re sp on se to
R
FI
9, s ub st an tia l c om pl et io n m us t h av e oc cu rre d w ith in s ix (6
) y ea rs o f O ct ob er
9, 6.
T he
G ov er nm en t w ill us e
/2 9/
, e ve n if th e du e da te fo r p ro po sa ls xt en de d.
W ou ld
G
SA
c on si de r i nc re as in g th e va lu e fo r F ac to r 1
P rio r E xp er ie nc on el ev an t P ro je ct s to
M
Se e
R
FI
an d go ve rn m en t r es po ns e.
T ra ng e re m ai ns u nc ha ng
W ou ld th e
G ov er nm en t c on si r a oj ec t v al ue d at
M
(e
.g
$1 5M le va nt p ro je ct if it w as c om pl et r G
SA
Se e
R
FI
an d go ve rn m en t r es po ns e.
T e re m ai ns u nc ha ng ed
W ou ld c om pa ni es th at c ur re nt ly h ol d
Fa ci lit y C le ar an ce b e vi ew ed m or e fa vo ra bl y?
Th e
G ov er nm en t i s no t e va lu at in g or ta ki c on si de ra tio n an y
"F ac ilit y
C le ar an ce or th e st at us a ny c om pa ny o r e m pl oy ee cu rit y cl ea ra nc es a s pa rt of th e ev al ua to n fa ct or s.
C ou ld th e
G ov er nm en t p le as e co nf irm at a q ua lif yi ng re le va nt p ro je ct ay s ta nd -a lo ne c on st ru ct io n co nt
(in cl ud in g a si ng le -a w ar d co nt ra ct do es n ot n ee d to h av e be en p er fo rm un r a n
ID
IQ
, B
PA
, M
AT
O
C , o r o as te r c on tra ct , p ro vi de d th e pr oj ec t m ee ts a ll ot he r s ta te d re qu ire m en ts fo r re le va nc y, s ub st an tia l c om pl et io n, ge ne ra l c on st ru ct io n se rv ic es
, a ec t v al ue
Th er e is n o re qu ire m en t i n th e so lic ita tio n th at p ro je ct s m us t h av e be en p er fo rm ed a t fe de ra lly o w ne d bu ild in gs in o rd er to b e re le va nt
. A ls o, s ee re sp on se to
R
FI
C ou ld th e
G ov er nm en t c la rif y ho ec t w ou ld b e ev al ua te on st ra tin g a
“H ig h D eg re e of
S el f- Pe rfo rm an ce
Is th er e a sp ec ifi c pe rc en ta ge , d ol la r v al ue , l ab or
-h ou r th re sh ol d, o r o th er m ea su re th at w us
, o r w ill th e G ov er nm en t e va lu at e th e am ou nt a nd ty pe o f w or k se lf-pe rfo rm ed o n a pr oj ec t-b y-pr oj ec t ba si s?
Th e
G ov er nm en t w ill ev al ua te th e am ou nt ty pe o f w or k se lf-pe rfo rm ed o n a pr oj ec t-by -p ro je ct b as is
, a nd fo r t he p or tfo lio o f pr oj ec ts s ub m itt ed
. T he re is n o si ng le , f ix qu tit at iv e pe rc en ta ge
, d ol la r v al ue
, o r la bo r-h ou r t hr es ho ld re qu ire d to o bj ec tiv el y de m on st ra te a “H ig h
D eg re e of S el f-
Pe rfo rm an ce
In st ea d, th e ev al ua tio n w ill qu al ita tiv el y as se ss th e de gr ee o f s el f-pe rfo rm an ce d ire ct ly b y fir m
's o w n pe rs on ne l t ak in g in to a cc ou nt a ll th e in fo rm at io n pr ov id ed o n
At ta ch m en t B
O ffe ro rs s ho ul d be a s de sc rip tiv po ss ib le w hi le re m ai ni ng w ith in th e
At ta ch m en t B p ag e lim ita tio n.
S ee a ls o th e
G ov er nm en t's re sp on se to R
FI
0.
A s st at ed in th e so lic ita tio n, "f av or ab le ch ac te ris tic s m ay b e co ns id ng th s.
In di vi du al fa vo ra bl e ch ar ac te ris tic s m ay b e co ns id er ed s tre ng th s on ly a fte r a ss es si ng th e co m pl et e pi ct ur pr oj ec t, an d th e po rtf ol io o f p ro je ct s su bm itt ed a s a w ho le . T hi s ap pr oa ch re s th at in di vi du al c ha ra ct er is tic s ar e no t j ud ge d in is ol at io n.
In a cc or da nc e w ith th e go ve rn m en t st at ed o bj ec tiv es u nd er F
AR
P ar t a nd F
AR
P ar t 7
.1 to m ax im iz e co m pe tit io n an d en co ur ag e sm al l bu si ne ss p ar tic ip at io n, w ill G
SA
vi se th e so lic ita tio n to a llo le va nt p as t p er fo rm an ce ith at e, c ou nt y, o r m un ic ip al ly o w ne d bu ild in g pr oj ec ts to b e ev al ua te on pa ra bl e or e qu al fo ot in g ith fe ra lly o w ne d bu ild in g pr oj ec ts
Th er e is n o re qu ire m en t i n th e so lic ita tio n th at p ro je ct s m us t h av e be en a "f ed er al ly ow ne d bu ild in g pr oj ec t" in o rd er to b e re le va nt fo r e va lu at io n.
R ef er to p ag e an d pa ge fo r p ro je ct re le va nc y re qu ire m en ts
Al so , s ee re sp on se to
R
FI
7.
File details come from the government source that posted it. Updated .