Attachment_J.2_-_HC_Prototype_Drawings_-_5_of_6_-_Sanitary.pdf
PDF 3 MB Posted
- Solicitation number
- SOL-663-16-000001
About this file
Attachment J.2 - HC Prototype Drawings - 5 of 6 - Sanitary
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PVC vent pipe
LEGEND
Shower
W.C.
Low flush water closet
S.H.
H.W.B
Stainless Steel Washing Basin
Gate valve
(C.W) Cold water supply, PPR-PN20
Hand Wash Basin
Water Heater,Electrical
W.H.
S.S.W
(H.W.) Hot water supply, PPR-PN20
Waste Water Drain, PVC-PN6
S.S.T
Surgeon Scrub-up Trough
L.S.
Laboratory Sink (Stainless Steel)
H.W.T
Hand Wash Trough
Laundry TroughL.T.
J.S.
Janitor Trough (with Concrete)
NOTE
PROXIMITY OF SERVICES
Buried Pipes:
1. Parallel Construction: The horizontal distance between pressure water line and waste water lines shall be a minimum of 3 meters.
2. Perpendicular Construction (Crossing):Water Lines shall be a minimum of 300mm above the top of any waste water line.
3. Water lines shall not be installed in the same trench as a waste water line
4. Where separation as stated above cannot be achieved,the water line shall be installed in a continuous sleeve, free from joints, for the length of the impacted area plus 1 meter either side of the impacted area.
In no case shall a water line be installed closer than 100mm from a waste water line.
5. Electrical cable shall be installed in suitable conduit and minimum of 600mm from liquid service lines(parallel)or 100mm above liquid lines (crossover).
ABOVE GRADE:
6. No electrical cable shall be installed less than 100mm of any liquid service line.
7. Waste pipes shall be installed at a gradient of 2% within the building perimeter to the manhole.
8. Vents to be provided at upstream end of wastewater lines.
Adapter for Dissimilar Pipes
Top Elevation
T.E.
Invert Elevation
I.E.
Clean Out
C.O.
S A
N
IT
A R Y
G E
N E
R A
L
N
O T
E S
SN-000
SANITARY GENERAL NOTES
BE
T
BE
T
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
F
IN
A L
D
ES
IG
N
S U
B M
IT
TA
L
TTD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
AP
R
SY
MB
100%
FINAL
DESIGN
SUBMITTAL
FI
NA
L D
ES
IG
N
DR
AW
IN
GS
LABORATORY
EXAM 01
FAMILY
PLANNING
EMERGENCY
VCT
(HIV counseling)
UNDER FIVE
CLINIC
E F G H
EXAM 02
ANC/PMTCT
VACCINATION/
TREATMENT
ART
PNC
I
NURSE
STATION
CORRIDOR
Ø20
50L.W.H
To Manhole
Ø
To Manhole
Ø
To Manhole
Ø
Ø25
Ø25
SN-001 SN-001
A
SN-001 SN-002
C
SN-001 SN-002
B
From
Water Supply Line
Ø25
Ø25
SSW
LS
Ø
Ø25
From
Water Supply Line
To Manhole
Ø80
50L.W.H
SSW
To Manhole
Ø25
From
Water Supply Line
Ø110
SN-001 SN-001
D
Ø50 Vent up to Roof
Ø50 Vent up to Roof Ø50 Vent up to Roof
Ø50 Vent up to Roof
Ø25
From
Water Supply Line
From
Water
Supply Line
Ø20
H.W.B. H.W.B.
Ø80
SN-001 SN-001
A
LABORATORY
G
SSW
LS
ENLARGED LABORATORY PLAN
50L.W.H
From
Water Supply Line
Ø25
Ø25
C-010ASN-001
D
To Manhole
Ø
Ø25
Ø25
Ø
Ø50 Vent up to Roof
Ø25
Ø
+0.40
+0.00
GFL
50L.W.H
+2.60
+0.80 +0.80
Ø25
Ø25
Ø25
LS SSW
From
Water Supply Line
Ø25
T&P VALVE
Ø
TO MANHOLE
LS
Ø50 SSW
Ø50 Ø
TO MANHOLE
G
F
L
G
F
L
ROOF
VENT CAP
DRAIN F/W.H. TO EXT. WALL
VENT CAP
Ø50 Vent
LABORATORY
SUPPLY
TREATMENT
SUPPLY
LABORATORY
WASTE
TREATMENT
WASTE
TO DRAINAGE
Ø25
Ø50 Vent
T&P
Ø15
+0.00
GFL
+0.40
Ø25 From
Water Supply Line
TOILET
CISTERN
TO MANHOLE
H.W.B.
ROOF
VENT CAP
Ø
G
F
L
Ø15
WASTE
HWB.
+0.80
+1.90
SAMPLE TOILET SUPPLY
TO WC
Ø25
Ø50 Vent
Ø25
From
Water Supply Line
WC
SN-001 SN-001
D
ENLARGED WC PLAN
To Manhole
Ø110
Ø50 Vent up to Roof
Ø80
WC.
ROOF
VENT CAP
+0.00
GFL
TO MH
Ø
Ø50 Vent
UNLESS OTHERWISE NOTED, ALL
DIMENSIONS SHOWN ARE IN CENTIMETERS.
B
LO
C K -B
O
P D
S N
F
LO
O R P
LA
N
R
IS
ER
D
IA
G R A
M
KEY PLAN
BLOCK B, OPD
SN FLOOR PLAN & RISER DIAGRAM
SN-001
.50 0 .50 1
Ø
BE
T
BE
T
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
F
IN
A L
D
ES
B M
IT
TA
L
TTD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
AP
R
SY
MB
100%
FINAL
DESIGN
SUBMITTAL
FI
NA
L D
ES
IG
N
DR
AW
IN
GS
Ø
TO MANHOLE
Ø
+0.40
+0.00
GFL
Ø25
+0.80H.W.B.
H.W.B.
From Water Supply Line
ENLARGED EXAM PLAN
G
F
L
ROOF
VENT CAP
Ø50 Vent
SN-002 SN-001
B
EXAM 01
EXAM 02
ENLARGED EXAM PLAN
Ø25
Ø25
From
Water
Supply Line
From
Water Supply Line
To Manhole
Ø
To Manhole
Ø
Ø50 Vent up to Roof
H.W.B. H.W.B.
SN-002 SN-001
C
EMERGENCY
SSW
ENLARGED EMERGENCY PLAN
89 48
From
Water Supply Line
50L.W.H
To Manhole
Ø80
Ø50 Vent up to Roof
Ø25
Ø
TO MANHOLE
Ø
+0.00
GFL
From Water Supply Line
SSW
SSW
+0.40
+0.80
50L.W.H
+2.60
G
F
L
ROOF
VENT CAP
T&P VALVE
TO DRAIN
W.H.
Ø50 Vent
Ø25
DRAIN F/W.H. TO EXT. WALL
Ø15
T&P
UNLESS OTHERWISE NOTED, ALL
DIMENSIONS SHOWN ARE IN CENTIMETERS.
B
LO
C K -B
O
P D
S N
F
LO
O R P
LA
N
R
IS
ER
D
IA
G R A
M
KEY PLAN
BLOCK B, OPD
SN FLOOR PLAN & RISER DIAGRAM
SN-002
.50 0 .50 1
Ø
BE
T
BE
T
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
F
IN
A L
D
ES
B M
IT
TA
L
TTD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
AP
R
SY
MB
100%
FINAL
DESIGN
SUBMITTAL
FI
NA
L D
ES
IG
N
DR
AW
IN
GS
SN-003 SN-003
B
PHARMACY
ENLARGED PHARMACY PLAN
Ø25
From
Water Supply Line
SSW
Dispensary
Counter
To Manhole
Ø80
Ø50 Vent up to Roof
Ø
+0.00
GFL
+0.40
+0.80SSW
Ø
TO MANHOLE
SSW
Ø50
From
Water Supply Line
ROOF
VENT CAP
Ø50 Vent
BLOCK C, ADMINISTRATION & PHARMACY
SN FLOOR PLAN & RISER DIAGRAM
UNLESS OTHERWISE NOTED, ALL
DIMENSIONS SHOWN ARE IN CENTIMETERS.
B
LO
C K -C
A
D M
IN
IS
TR
A
TI
O
P
H A
R M
A C
Y
S N
F
LO
O R P
LA
N
R
IS
ER
D
IA
G R A
M
KEY PLAN
SN-003
.50 0 .50 1
BE
T
BE
T
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
F
IN
A L
D
ES
B M
IT
TA
L
TTD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
AP
R
SY
MB
100%
FINAL
DESIGN
SUBMITTAL
FI
NA
L D
ES
IG
N
DR
AW
IN
GS
SN-004 SN-004
SN-004 SN-004
A
SN-004 SN-005
C
P Q R
SCRUB
STERILIZATION
DELIVERY
RECOVERY BEDS
MINOR OPERATION ROOM
LABOUR
PREPARATION/
NURSE STATION
SLUICE
STORE
O
TOILET
CORRIDOR
CHANGING
Ø80
50L.W.H
Ø25
Ø25
To Manhole
From
Water Supply Line
Ø
From
Water
Supply Line
D2
Ø50 Vent up to Roof
Ø50 Vent up to Roof
To Manhole
From
Water Supply Line
50L.W.H
80L.W.H
Ø25
To Manhole
From
Water Supply Line
Ø110
Ø80
Ø50 Vent up to Roof
Q
R
SCRUB
STERILIZATION
CHANGING
50L.W.H
SN-004 SN-004
A
To Manhole
From
Water Supply Line
ENLARGED SCRUB PLAN
Ø50 Vent up to Roof
Ø80
Ø25
Ø
S.S.T.
50L.W.H
Ø25 Ø25
Ø25
Ø
S.S.T.
Ø50
GROUND
FLOOR
TO
MANHOLE
+2.60
+0.80
+0.00
GFL
From
Water Supply Line
+0.20
VENT CAP
Ø50VENT
See Vent Detail
Sheet SN-010 foot actuated valve on floor
TO DRAIN
T&P VALVE
Roof
Level
DRAIN F/W.H. TO EXT. WALL
T&P
Ø15
Ø
Sluice sink.
Sluice Sink
TO MANHOLE
GROUND
FLOOR
+0.80
+0.00
GFL
Ø25
+0.40
From
Water Supply Line
Ø
Ø
VENT CAP
Ø50VENT
See Sheet
SN-010
50L.W.H
+2.60
TO DRAIN
T&P VALVE
Cistern
+1.60
S.H.
Roof
Level
Ø25
Ø25
DRAIN F/W.H. TO EXT. WALL
T&P
Ø15
SN-004 SN-004
B
Ø
ENLARGED SLUICE PLAN
SLUICE
STORE
To Manhole
50L.W.H
Ø25
Ø50 Vent up to Roof
From
Water
Supply Line
Ø80
UNLESS OTHERWISE NOTED, ALL
DIMENSIONS SHOWN ARE IN CENTIMETERS.
KEY PLAN
BLOCK D, DELIVERY
SN FLOOR PLAN & RISER DIAGRAMS
.50 0 .50 1
B
LO
C K -D
D
EL
IV
ER
Y
S N
F
LO
O R P
LA
N
R
IS
ER
D
IA
G R A
M
SN-004
Ø
BE
T
BE
T
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
F
IN
A L
D
ES
B M
IT
TA
L
TTD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
AP
R
SY
MB
100%
FINAL
DESIGN
SUBMITTAL
FI
NA
L D
ES
IG
N
DR
AW
IN
GS
SN-005 SN-004
C
ENLARGED TOILET PLAN
Ø25
Ø25
To Manhole
From
Water Supply Line
TOILET
80L.W.H
Ø110
Ø80
Ø50 Vent up to Roof
Ø
80L.W.H
S.H.
H.W.B.
TO MANHOLE
GROUND
FLOOR
VENT CAP
+2.60
+2.00
+0.40
+0.80
H.W.B.
Ø50
S.H.
+0.00
GFL
Ø
Ø25
Ø25
Ø
Ø
Ø50(with trap)
Ø50VENT
Ø
+0.00
GFL
From
Water Supply Line
From
Water Supply Line
TO DRAIN
T&P VALVE
+1.60
Toilet cistern
TO MANHOLE
W.C.
Ø50VENT
+0.00
GFL
Ø
Roof
Level
Roof
Level
TO WC
DRAIN F/W.H. TO EXT. WALL
T&P
Ø15
TO
S.H.&H.W.B
UNLESS OTHERWISE NOTED, ALL
DIMENSIONS SHOWN ARE IN CENTIMETERS.
BLOCK D, DELIVERY
SN FLOOR PLAN & RISER DIAGRAMS
.50 0 .50 1
SN-005
B
LO
C K -D
D
EL
IV
ER
Y
S N
F
LO
O R P
LA
N
R
IS
ER
D
IA
G R A
M
Ø
BE
T
BE
T
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
F
IN
A L
D
ES
B M
IT
TA
L
TTD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
AP
R
SY
MB
100%
FINAL
DESIGN
SUBMITTAL
FI
NA
L D
ES
IG
N
DR
AW
IN
GS
SN-006 SN-007
SN-006 SN-006
A
SN-006 SN-007
C
SN-006 SN-006
A
MALE WARD
JANITOR
ROOM
NURSE
STATION
NURSE PREP
FEMALE & PEDIATRIC
WARD
S T
CORRIDOR
IRONING/CLEAN
LINEN STORE
U
SH.
TOILET(GENTS)
TOILET(LADIES)
Ø80
Ø80
To Manhole
To Manhole
Ø20
Ø20
From
Water Supply Line
Ø20
SH.
C
Ø50 Vent up to Roof
From
Water Supply Line
Ø50 Vent up to Roof
Ø32
Ø20
Ø25
Ø25
From
Water Supply Line
Ø80
To Manhole
Ø50
(With Trap)
Ø80
Ø50 Vent up to Roof
80L.W.H
Ø32
From
Water Supply Line
Ø20
Ø25
Ø25
Ø80
To Manhole
Ø50
(With Trap)
Ø80
Ø50 Vent up to Roof
80L.W.H
U
SH.
TOILET(GENTS)
Ø25
Ø20
Ø25
SN-006 SN-006
A
Ø25
From
Water Supply Line
ENLARGED TOILET(TYP) PLAN
Ø80
To Manhole
Ø50
(With Trap)
Ø80
Ø50 Vent up to Roof
80L.W.H
Ø
+0.40
+0.00
GFL
Ø
Ø25
S.H.
+2.00
H.W.T. +0.80
Ø25
Ø
TO MANHOLE
Roof
Level
VENT CAP
H.W.T
Ø50
S.H.
Ø
Ø50
Ø50VENT
From
Water Supply Line
G
F
L
Ø25
G
F
L
GROUND
FLOOR
See Vent Detail
Sheet SN-010
DRAIN F/W.H. TO EXT. WALL
80L.W.H
+2.60
Ø25
Ø25
Ø
+0.00
GFL
From
Water Supply Line
TO DRAIN
T&P VALVE
Ø15
T&P
UNLESS OTHERWISE NOTED, ALL
DIMENSIONS SHOWN ARE IN CENTIMETERS.
KEY PLAN
.50 0 .50 1
SN-006
B
LO
C K -E
IP
D
S N
F
LO
O R P
LA
N
R
IS
ER
D
IA
G R A
M
BLOCK E, IPD
SN FLOOR PLAN & RISER DIAGRAMS
Ø
BE
T
BE
T
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
F
IN
A L
D
ES
B M
IT
TA
L
TTD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
AP
R
SY
MB
100%
FINAL
DESIGN
SUBMITTAL
FI
NA
L D
ES
IG
N
DR
AW
IN
GS
JANITOR ROOM
Ø25
Ø25
From
Water Supply Line
SN-007 SN-006
B
ENLARGED JANITOR ROOM PLAN
Ø80
To Manhole
Ø50 Vent up to Roof
Ø
G
F
L
+0.80
J.T
TO MANHOLE
J.T
Ø
From
Water Supply Line
GROUND
FLOOR
Ø
ROOF
VENT CAP
WET TRAP
Ø50 Vent
NURSE
STATION
NURSE PREP
ENLARGED NURSE PREP PLAN
SN-007 SN-006
C
S
Ø80
To Manhole
Ø20
From
Water Supply Line
Ø50 Vent up to Roof
+0.80
H.W.B.
TO MANHOLE
H.W.B
Ø50
Ø
Ø
G
F
L
From
Water Supply Line
GROUND
FLOOR
ROOF
VENT CAP
Ø50 Vent
UNLESS OTHERWISE NOTED, ALL
DIMENSIONS SHOWN ARE IN CENTIMETERS.
KEY PLAN
.50 0 .50 1
SN-007
B
LO
C K -E
IP
D
S N
F
LO
O R P
LA
N
R
IS
ER
D
IA
G R A
M
BLOCK E, IPD
SN FLOOR PLAN & RISER DIAGRAMS
BE
T
BE
T
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
F
IN
A L
D
ES
B M
IT
TA
L
TTD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
AP
R
SY
MB
100%
FINAL
DESIGN
SUBMITTAL
FI
NA
L D
ES
IG
N
DR
AW
IN
GS
SN-008 SN-008
A
WV
INFECTIOUS DISEASE
STORE
From
Water Supply Line
ENLARGED PIT LATRINE PLAN
HWB TO MANHOLE
Ø
See Vent Detail
Sheet SN-010
+0.00
GFL
+0.40
H.W.B.
Ø25
+0.80
Roof
Level
VENT CAP
Ø50VENT
From Water Supply Line
To Manhole
Ø25
Ø80
Ø50 Vent up to Roof
UNLESS OTHERWISE NOTED, ALL
DIMENSIONS SHOWN ARE IN CENTIMETERS.
KEY PLAN
SN-008
.50 0 .50 1
B
LO
C K -F
IN
FE
C
TI
O
U S D
IS
EA
S E
S N
F
LO
O R P
LA
N
R
IS
ER
D
IA
G R A
M
BLOCK F, INFECTIOUS DISEASE
SN FLOOR PLAN & RISER DIAGRAMS
BE
T
BE
T
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
F
IN
A L
D
ES
B M
IT
TA
L
TTD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
AP
R
SY
MB
100%
FINAL
DESIGN
SUBMITTAL
FI
NA
L D
ES
IG
N
DR
AW
IN
GS
SN-009 SN-009
A
X
PIT(GENTS)
PIT FOR
DISABLED
PIT LATRINE LINE BELOW
PIT
PIT FOR
DISABLED
PIT(LADIES)
Ø25
Ø20
From Water Line
Ø25
To Manhole
Ø80
Ø50 Vent up to Roof
PIT
PIT FOR
DISABLED
PIT(GENTS AND LADIES)
Y Y'
WALK WAY
30x30x1
Ceramic Tile f.f.
A=7.2m²
Ø20
Ø20
From Water Line
Ø80
To Manhole
Ø50 Vent up to Roof
Ø25
PIT
PIT FOR
DISABLED
PIT(GENTS AND LADIES)
WALK WAY
30x30x1
Ceramic Tile f.f.
A=7.2m²
Ø25
Ø25
Ø25
From Water Line
Ø80
To Manhole
Ø50 Vent up to Roof
SN-009 SN-009
A
ENLARGED TOILET & INFECTIOUS PLAN
Ø
H.W.T.
Ø25
H.W.T.
Ø25
+0.40
+0.80
GFL
+0.00
Ø25
To
Manhole
Ø
G
F
L
Roof
Level
VENT CAP
Ø50VENT
+0.00
GFL
Ø
TO MANHOLE
L.T. L.T.
Ø50
Ø50
Ø
G
F
L
From
Water Supply Line Ø25
Ø25
+0.80 L.T. +0.80L.T.39
To Manhole
Ø80
From
Water Supply Line
Ø25
Ø25
To Manhole
Ø80
L.T.L.T.
PVC drain, TYP
UNLESS OTHERWISE NOTED, ALL
DIMENSIONS SHOWN ARE IN CENTIMETERS.
B
LO
C K -G
P
IT
L A
TR
IN
B
LO
C
K I
LA
U N
D R Y
S N
F
LO
O R P
LA
N
R
IS
ER
D
IA
G R A
M S
KEY PLAN
BLOCK G, PIT LATRIN & BLOCK-I, LAUNDRY
SN FLOOR PLAN & RISER DIAGRAMS
SN-009
.50 0 .50 1
BE
T
BE
T
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
F
IN
A L
D
ES
B M
IT
TA
L
TTD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
AP
R
SY
MB
100%
FINAL
DESIGN
SUBMITTAL
FI
NA
L D
ES
IG
N
DR
AW
IN
GS
SANITARY VENT
PIPE DETAIL
Scale 1:10
Ø50 UPVC
vent pipe
Ø 110 UPVC vent pipe coming out of side wall
Ega sheet roofing
Ø110 pvc vent cap
Fly screen wire mesh 3mmX3mm spacing
Sheet metal flashing extends to vent outlet
Ø110 to Ø50 reducer
UNLESS OTHERWISE NOTED, ALL
DIMENSIONS SHOWN ARE IN CENTIMETERS.
TY
P
IC
A L
S A
N
IT
A R Y M
A
IN
V
EN
T P
IP
E
LA
Y O
U T
P
LA
N A
N D
D
ET
A
IL
TYPICAL SANITARY MAIN VENT PIPE
LAYOUT PLAN AND DETAIL SN-009A
BE
T
BE
T
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
F
IN
A L
D
ES
B M
IT
TA
L
TTD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
AP
R
SY
MB
100%
FINAL
DESIGN
SUBMITTAL
FI
NA
L D
ES
IG
N
DR
AW
IN
GS
TYPICAL SANITARY MAIN VENT PIPE
LAYOUT PLAN AND DETAIL
Scale 1:200
TYPICAL SANITARY MAIN VENT PIPE
LAYOUT DETAIL
Scale 1:100
TYPICAL SANITARY MAIN VENT PIPE
LAYOUT DETAIL
Scale 1:100
[where proposed]
FLOOR DRAIN
STRAINERFINISHED FLOOR
SURFACE
NEOPRENE
GASKET
TRAP GUARD
DRAIN BODY POURED
IN PLACE
CONCRETE FLOOR SLAB
DEEP SEAL "P" TRAP
N.T.S. NOTE:FOR SHOWER AND JANITOR TROUGH
UNLESS OTHERWISE NOTED, ALL
DIMENSIONS SHOWN ARE IN CENTIMETERS.
S A
N I T
A R
Y
D
E T
A I L
S
KEY PLAN
SANITARY DETAILS
SN-010
1 .50 0 .50 1
BE
T
BE
T
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
F
IN
A L
D
ES
B M
IT
TA
L
TTD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
AP
R
SY
MB
100%
FINAL
DESIGN
SUBMITTAL
FI
NA
L D
ES
IG
N
DR
AW
IN
GS
| SN-000- SN-009-SN-000 |
| SN-000- SN-009-SN-001 |
| SN-000- SN-009-SN-002 |
| SN-000- SN-009-SN-003 |
| SN-000- SN-009-SN-004 |
| SN-000- SN-009-SN-005 |
| SN-000- SN-009-SN-006 |
| SN-000- SN-009-SN-007 |
| SN-000- SN-009-SN-008 |
| SN-000- SN-009-SN-009 |
| SN-009A,SN-010-SN-009A |
| SN-009A,SN-010-SN-0010 |
File details come from the government source that posted it. Updated .