Environmental Mitigation and Monitoring Plan
Activity Potential Impact Mitigation Objective Mitigation Measures Responsibility Findings Monitoring/
Verification Method Monitoring Record
Health Facility Construction Activities
Road improvement or construction of new road
Increase of sedimentation;
increased noise and dust; increased soil erosion; damage to surrounding environment (water, ecosystems, others);
Minimize environmental impact from road improvement or new road construction;
Follow best practices for construction, including: following the contour lines where possible, using camber and turnout drains, etc.
• Reference - the Environmental Guidelines for Small Scale Activities in
Africa (EGSSAA) - chapter 14 - Rural Roads (http://www.encapafrica.org/EGSSAA/roads.pdf) and follow wherever applicable;
• Woreda or Kabele Administration or
• Construction Contractor
No significant impact with implementation of Mitigation Measures
• Contractor if engages in road works shall conduct regular inspections during construction
• Contractor to assure dust control measures implemented throughout construction period.
• Project Environmental Mitigation and Monitoring Plan (EMMP) – to include road work activities if so engaged.
• Project inspection records for erosion, dust and drainage mitigation in roadway areas.
Site mobilization of new equipment and temporary facilities
Impacts associated with:
fuel storage, fueling, vehicle repair; human and solid waste disposal; water supply needs; provision of power to site;
Minimize impacts; provide training where needed;
establish meaningful consequences if not followed;
• Require quality construction of temporary structures, and organization and delineation of site staging, work, and laydown areas.
• Enforce regular inspection and maintenance of site office, staging and laydown areas
• Provide temporary sanitation on-site and ensure protection of ground and surface water; Sanitary waste will be transported off-site to an approved disposal site/facility
• Establish berms and rain protection over fuel storage locations; Prevent dumping of any fuels; Train workers on best management practices
• Set protocols for vehicle maintenance and train workers on best management practices – e.g. requiring repairs/fueling occur elsewhere or on impervious surface (plastic sheeting)
• Establish meaningful consequences – e.g. termination if violated.
• Design drawings to locate site staging and office areas.
Construction Contractor
No significant impact with implementation of Mitigation Measures
• Contractor shall conduct: daily/ weekly inspections;
Additional checks during major storm events;
• Project Environmental Mitigation and Monitoring Plan (EMMP) – to include site mobilization activities
• Education package / guideline document for construction members – with signatures of all crew members trained
Demolition of existing structures on the sites
Disturbance to neighbors;
Contamination of soil, groundwater or surface water from demolition waste;
Remove debris and utilize or dispose of in environmentally sustainable method;
• Recover all reusable materials (if former tenant or Woreda can use materials
– make available to them initially)
• Explore environmentally-friendly options for reuse of materials
• Dispose of non-reusable materials in environmentally-friendly manner
• Construction Contractor
No significant impact with implementation of Mitigation Measures
• Contractor shall conduct: daily site inspections during demolition periods;
• Inspection records/ checklist
• Maintain records of final disposal methods, quantities, and final disposal site
Site clearing
Erosion impacts due to bare soil which may impact nearby water bodies;
Minimize erosion impacts on-site
• Follow contract documents (e.g. drawings and specifications for erosion control)
• Construction Contractor
No significant impact with implementation of Mitigation Measures
Contractor shall conduct: daily/ weekly inspections as outlined in specification section
– “Erosion Control/ Pollution Prevention.
Additional checks during major storm events;
• Construction record of cleared site area.
• Contractor inspection log
Site leveling, Erosion impacts, siltation or damage to aquatic ecosystems if excavation pile is not properly addressed or covered;
Minimize erosion or siltation impacts from excavated materials
• Follow contract documents (e.g. drawings and specifications for erosion control)
• Construction Contractor
No significant impact with implementation of Mitigation Measures
Contractor shall conduct: daily/ weekly inspections as outlined in specification section
– “Erosion Control/ Pollution Prevention.
Additional checks during major storm events;
• Construction record of graded site area.
• Contractor inspection log http://www.encapafrica.org/EGSSAA/roads.pdf
Objective Mitigation Measures Responsibility Findings Monitoring/
Verification Method Monitoring Record
Site excavation, backfilling
Block water courses or destroy ecosystems if fill is inappropriately placed;
can also cause land subsidence or landslides if inappropriately placed;
Ensure proper placement and use of fill
• Follow contract documents (e.g. drawings and specifications for erosion control)
• Construction Contractor
No significant impact with implementation of Mitigation Measures
Contractor shall conduct: daily/ weekly inspections as outlined in specification section
– “Erosion Control/ Pollution Prevention
Additional checks during major storm events;
• Construction record of site excavation and backfilling activity.
• Contractor inspection log
Construction of buildings and associated utilities
Noise, dust, use of heavy machinery, solid and hazardous waste management – may impact neighboring communities and environment;
Minimize impacts to the surrounding community and the environment from construction practices
• Limit working hours to daylight hours
• Maintain equipment, including generators, in good working order
• Limit vehicle idling
• Use of water (or equivalent) to suppress dust
• Establish stable ground cover to prevent mobilization of dust
• Cover trucks transporting earth, sand or stone with tarps
• Install utilities in compliance with local municipal codes and standards
• Limit use of toxic/hazardous material and reduce unnecessary waste and recycle reusable materials where possible – follow appropriate contract specifications (e.g. – spec 9900 – “Paints and Coatings”)
• Train workers on best management practices for hazardous waste (if applicable) – including labeling, storage, handling and proper off-site disposal in approved location
• Construction Contractor
No significant impact with implementation of Mitigation Measures
Contractor shall conduct daily inspections and testing according to the Specifications and the Contractor’s QA/QC plan
Contractor shall maintain daily logs and all records of testing and verification of compliance with the drawings and specifications, shop drawings submittals and all other records in accordance with the Contractor’s QA/QC plan.
Utilities installation permits.
Site demobilization of new equipment and temporary facilities
Impact to local communities or local environment due to abandoned wastes and other materials;
Return site to pre-construction state
• Remove temporary sanitation facilities and dispose of properly
• Remove any excess materials and dispose of properly – e.g. excess fuel
• Remove and dispose of hazardous wastes in approved location
• Remove any temporary structures and recycle or dispose of materials in approved location
• Return site to pre-construction state, unless site is to be used by Woreda or other s
• Contractor
No significant impact with implementation of Mitigation Measures
Contractor shall oversee dismantling activities to assure proper disposal of waste materials and restoration of the site to the satisfaction of the local authorities and USAID, in accordance with the Contractor’s Environmental Plan
(EMMP).
Contractor shall maintain logs of activities in accordance with the CRMS Contractor’s QA/QC and EMMP Plan.
Biomedical waste management
Spread disease and/ or expose local community and environment to infectious waste due to improper disposal methods
Properly dispose of biomedical waste
• Establish a complete waste management program and train healthcare employees
• Monitor and enforce the program
• Provide design options for proper disposal of healthcare waste
• Incorporate siting, design and operation and maintenance to minimize environmental and social impacts (Reference - the Environmental Guidelines for Small Scale Activities in Africa (EGSSAA) - Chapter 8 – healthcare waste – generation, treatment and disposal – available at:
http://www.encapafrica.org/EGSSAA/medwaste.pdf and follow wherever applicable);
• Project Site Manager (implementation)
• FmoH/Rural Health Bureau (RHB) (policy)
• A&E Contractor – design options (e.g.
– incinerators, placenta pits, etc.)
No significant impact with implementation of Mitigation Measures
Site operations personnel closely monitor biomedical waste generation and disposal
Site operations personnel maintain detailed inventory of biomedical waste generation and disposal; with institutional support from RHB and local Health Authorities http://www.encapafrica.org/EGSSAA/medwaste.pdf
Objective Mitigation Measures Responsibility Findings Monitoring/ Verification Method Monitoring Record
Water Supply Construction Activities
Site mobilization of new equipment and temporary facilities
Impacts associated with:
fuel storage, fueling, vehicle repair; human and solid waste disposal; water supply needs; provision of power to site;
Minimize impacts; provide training where needed;
establish meaningful consequences if not followed;
• Require quality construction of temporary structures, and organization and delineation of site staging, work, and laydown areas.
• Enforce regular inspection and maintenance of site office, staging and laydown areas
• Provide temporary sanitation on-site and ensure protection of ground and surface water; Sanitary waste will be transported off-site to an approved disposal site/facility
• Establish berms and rain protection over fuel storage locations; Prevent dumping of any fuels; Train workers on best management practices
• Set protocols for vehicle maintenance and train workers on best management practices – e.g. requiring repairs/fueling occur elsewhere or on impervious surface (plastic sheeting)
• Use local labor, if feasible
• Establish meaningful consequences – e.g. termination if violated.
• Design drawings to locate site staging and office areas.
Construction Contractor
No significant impact with implementation of Mitigation Measures
• Contractor shall conduct: daily/ weekly inspections;
Additional checks during major storm events;
• Project Environmental Mitigation and Monitoring Plan (EMMP) – to include site mobilization activities
• Education package / guideline document for construction members – with signatures of all crew members trained
Site clearing and leveling
Erosion impacts due to bare soil which may impact nearby water bodies;
Minimize erosion impacts on-site
• Follow contract documents (e.g. drawings and specifications for erosion control)
• Construction Contractor
No significant impact with implementation of Mitigation Measures
Contractor shall conduct: daily/ weekly inspections as outlined in specification section
– “Erosion Control/ Pollution Prevention.
Additional checks during major storm events;
• Construction record of cleared, leveled site area.
• Contractor inspection log
Drilling well and installation of steel casing and pumps
Deplete/contaminate ground and/ or surface water resources and damage local ecosystems or downstream/ gradient communities;
Avoid depletion/contam ination of ground or surface water resources and environmental damage
• Determine safe and sustainable yield
• Test water quality after installing new well to ensure quality
• Disinfect newly installed well and equipment
• Properly protect/secure finished well head
• Properly contain and treat all well fluids prior to final discharge
• Drilling contractor
No significant impact with implementation of Mitigation Measures
The implementing partner shall assure proper implementation of activities.
Driller’s logs and water quality testing data
Well development
Contamination of groundwater or surface water with pathogens, nutrients, biological oxygen demand (BOD), suspended solids;
Avoid contamination of water sources
• Test water quality after installing new well to ensure quality
• Disinfect newly installed well and equipment
• Properly protect/secure finished well head
• Properly contain and treat all well fluids prior to final discharge
• Drilling contractor
No significant impact with implementation of Mitigation Measures
Contractor shall oversee testing according to the Specifications and the Contractor’s QA/QC plan
Driller’s water quality testing data
Site trenching and installation of underground pipe
Erosion impacts due to bare soil which may impact nearby water bodies;
Minimize erosion impacts on-site
• Follow contract documents (e.g. drawings and specifications for erosion control)
• Construction Contractor
No significant impact with implementation of Mitigation Measures
Contractor shall conduct: daily/ weekly inspections; Additional checks during major storm events;
• Construction record of trenched site area.
Site demobilization of drilling equipment
Impact to local communities or local environment due to abandoned wastes and other materials;
Return site to pre-construction state
• Remove temporary sanitation facilities and dispose of properly
• Remove any excess materials and dispose of properly – e.g. excess fuel
• Remove and dispose of hazardous wastes in approved location
• Remove any temporary structures and recycle or dispose of materials in approved location
• Return site to pre-construction state, unless site is to be used by Woreda or other s
• Drilling contractor
No significant impact with implementation of Mitigation Measures
Contractor shall oversee dismantling activities to assure proper disposal of waste materials and restoration of the site to the satisfaction of the local authorities and USAID, in accordance with the Contractor’s Environmental Plan
(EMMP)
Contractor shall maintain logs of activities in accordance with the CRMS Contractor’s QA/QC and EMMP Plan..