Arkansas Valley Conduit - Crowley Reach 1
Solicitation number
140R6026R0001
Issued by

About this file

This is a formal solicitation for construction services issued by the U.S. Department of the Interior, Bureau of Reclamation, for the Arkansas Valley Conduit (AVC) – Crowley Reach 1 project located in Colorado. The solicitation number is 140R6026R0001, with proposals due by May 18, 2026 at 2:00 PM MDT and a 90-day acceptance period for offers.

The estimated project magnitude ranges from $40,000,000 to $65,000,000, classified under NAICS code 237110 (Construction of Water Supply Facilities) with a small business size standard of $45,000,000. The contract will be firm-fixed-price, requiring performance and payment bonds within 10 days of award. The contractor must begin work within 10 days of notice to proceed and complete all construction within 781 calendar days. The work includes pipeline construction, trenchless crossings, cathodic protection systems, fiber optic cable installation, dewatering operations, and related infrastructure for a water supply conveyance system. An optional Price Schedule B covers railroad crossing work contingent on right-of-way acquisition from Union Pacific Railroad, which the Government may exercise within 367 days of contract start. The Government will conduct a technical evaluation based on three factors: Technical Approach and Schedule (50-page limit for technical proposals), Past Performance using questionnaires from minimum three to five references within the past ten years, and Cost/Price reasonableness. Evaluation Factors 1 and 2 combined are approximately equal in weight to Factor 3. Award will be made to the responsible offeror providing the best value considering all factors. All proposals must be submitted electronically via Microsoft Teams or Kiteworks, with three separate volumes required: Business Proposal, Technical Proposal/Past Performance, and Pricing Proposal. Offerors must complete all Price Schedules A through D and acknowledge all solicitation amendments. A bid guarantee of 20 percent of bid price or $3 million (whichever is less) is required.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Document No.

140R6026R0001

Document Title Arkansas Valley Conduit (AVC) – Crowley Reach 1

Arkansas Valley Conduit (AVC)

– Crowley Reach 1

Fryingpan-Arkansas Project, Colorado

Missouri Basin Region

Solicitation No. 140R6026R0001

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

MISSOURI BASIN REGION

BILLINGS, MONTANA

Document Title Arkansas Valley Conduit (AVC) – Crowley Reach 1

Preface This section is a synopsis of the items identified by Reclamation that have been problematic for some contractors. The items have been identified through previous real-world performance of construction with Reclamation. The following items are not all encompassing of problems that may or may not be encountered and are only meant to identify general challenges contractors may run into when contracting with Reclamation for construction work. The purpose of this document is to allow contractors to price construction more accurately at contract inception and reduce contract interpretation disagreements after contract award. It is highly recommended the Contractor read and become intimately familiar with both the solicitation and contract specifications and drawings prior to construction, as that can also head off potential disagreements as the work is being completed.

NOTE: The examples given below are for reference purposes only. Reclamation does not take responsibility for the application of calculations during proposal creation. The Contractor is required to apply all calculations internally, and the items in this document are for awareness purposes only.

Estimated Magnitude of Construction:

The estimated magnitude of construction is between $40,000,000 and $65,000,000.

NAICS Code and Size Standard The applicable NAICS code for this solicitation is 237110 with a small business size standard of $45,000,000. Offerors must have an active SAM.gov registration under this NAICS at the time of proposal submission.

Quality Control & Quality Assurance:

FAR Clause 52.246-12 requires the Contractor to establish a construction inspection system to ensure quality. Accordingly, per section 01 46 00 – Quality Procedures, a Quality Control Plan is required to clearly outline the Contractors Quality Control (QC) Program to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents. The program must include a qualified, experienced Quality Control Supervisor (see part 1.05 Qualifications of the above specification section), who has authority delegated from an authorized official of the firm, to develop and manage quality control processes for all aspects of work specified and who has authorization to stop work if necessary. A well-managed Contractor’s QC Program is essential to ensuring the work conforms to contract requirements. The effectiveness of the Contractor’s QC Program will be subject to continued review and approval by the Government’s Contracting Officer (CO).

The contractor will conduct its own Quality Assurance (QA) program, and Reclamation will only intermittently conduct its own Quality Assurance for specification compliance only, which may include inspection and tests performed by Government staff to ensure compliance with terms of the contract. Test performed by Reclamation will be used to ensure compliance with contract requirements and are not to be a replacement for specified Contractor quality contract and quality assurance testing.

In the event of a discrepancy between Contractor’s and Government’s test results if performed, Reclamation’s quality assurance test results will be compared to the contractor’s results and a determination must be made whether the item conforms to the specifications or needs to be repaired/replaced at no additional cost to the government.

Quantity Surveys:

FAR Clause 52.236-16 Alt I Quantity Surveys will be included in this contract. Many contractor personnel have had issues providing adequate survey data IAW the referenced clause. This requires both preliminary and final surveys to be performed by the contractor. The contract requires (specs and clause) that a surveying plan be submitted (Surveying Plan) IAW specification 01 33 00. The surveying plan must be approved by Reclamation prior to the beginning of surveying work. The contract also requires submittal of all quantity survey notes and computations, as well as workday’s survey notes. This is important as the quantity for payment must be verified against the actual survey data. Quantity surveys and calculations, along with as-built drawings, are required to be submitted with each monthly construction progress payment for a contractor’s invoice to be considered as proper. Once construction is complete and all submittals are finalized, the balance of the lump sum price will be paid in the final invoice, quantity surveys are used to ensure the government does not unintentionally advance pay during progress payments.

The Government will have survey crews on site as part of its internal construction oversight and inspection program.

Document Title Arkansas Valley Conduit (AVC) – Crowley Reach 1

However, this is not to be relied on by the Contractor as meeting the survey specifications. The Contractor is expected to provide fulltime survey support under the direction of a registered professional land surveyor licensed in the state where the work is being completed IAW the survey specifications (section 01 71 20 – Surveying). Historically, many contractors have missed this requirement, and it has led to payment disagreements.

Submittals:

The submittals required for Reclamation projects can be very detailed. Reclamation is a very data-centric organization of engineering-minded personnel. As such, the data needs to be correct and submittals shall be thought out, in a logical format, and be thorough. A ‘shotgun-spread’ approach will not work. Meaning, if a contractor submits superfluous information and/or with no format or shown understanding of the items, it will likely lead to rejection and a required resubmittal of the items. The same is true if a contractor only submits a portion of the items required under a requirement submittal number (RSN). The Contractor is responsible for providing quality control of contractor and subcontractor submittals to ensure they contain all, but no more than, the items required by a particular RSN. Reclamation will retain many, if not all, of the records in library retention for many years. This is for awareness purposes only.

Project Record Documents (i.e. As-Built Drawings):

Section 01 78 30 of the specifications covers this in detail. Reclamation expects full compliance with keeping drawings on site as required in the specifications and final electronic as-builts in .dwg format. See specifications for further information.

Cultural Resources Compliance and Archaeological Monitoring:

Given the density of archaeological sites and artifacts in this area of the country, some items of archaeological and cultural importance may be encountered during construction, including previously unknown sites and artifacts called discoveries. The delays for any ROW restrictions needed to protect those resources shown in the bid documents shall be included in the initial bid. The contract may be modified for time and/or cost if cultural resources discoveries are encountered, and the Contractor does not have other areas where work can be shifted. Be sure to read the specifications sections. See specifications section 01 57 60 and 01 57 90 for further details. It can be expected that the construction monitors of an Archaeological or Monitoring Firm may contact the Reclamation personnel and have the CO direct a temporary stop work until the discovery is mitigated or otherwise addressed and resolved.

Project Specific Areas of Concern:

The project crosses an area within the Town of Boone with potentially contaminated materials. See specification sections 01 57 20, 51 02 60 and 51 02 61 for preliminary findings, required testing, and required CDPHE submittals. See specification sections 31 23 22 and 33 11 10 and drawings for the special encasement required to protect the pipe in this area.

Another project specific area of concern is the limited footprint available near the western limits of the Horizontal Directional Drilled (HDD) installation. This falls within the Town of Boone. Also see specification sections 01 55 00 and 01 55 20 for requirements for maintaining access for residents and the general public.

Permitting for the railroad crossings has not been finalized at the time of this solicitation; therefore, this work is included as a separate executable option. Refer to the drawings and Specification Section 01 11 00 for the scope and definition of Option A (identified as Optional Price Schedule B in Section B). Attachment 4, “DRAFT UPRR Exhibit C – Insurance Requirements,” includes a draft copy of the Union Pacific Railroad pipeline permit and the associated insurance requirements. These insurance requirements will only be applicable upon exercise of the option and are in addition to those outlined in clause

1452.228‑70, LIABILITY INSURANCE – DEPARTMENT OF THE INTERIOR (JULY 1996).

Taxes:

In accordance with FAR 52.229-3, the contract price offered by contractors includes all applicable Federal, State, and local taxes. The Contractor must rely on its internal tax experts to ensure full compliance with tax laws.

Site Visit:

Please see section L SITE CONDITIONS AND PRESENTATION (CONSTRUCTION) for information regarding site conditions/visit.

Subcontractors:

Subcontractors cannot submit partial bids straight to the Government. Subcontractors shall bid directly to prime contractors.

Items will not be pre-qualified during the synopsis or solicitation period. It is the prime contractor’s responsibility to confirm

Document Title Arkansas Valley Conduit (AVC) – Crowley Reach 1 an item meets the specifications of this requirement.

52.222-11 SUBCONTRACTS (LABOR STANDARDS) MAY 2014:

Please carefully read this clause and ensure SF1413’s are emailed to the COR and Contract Specialist, with a cc to the Contracting Officer.

QUESTIONS and ANSWERS All questions related to this project must be submitted electronically to david_bryan@ios.doi.gov and monica_burgio@ios.doi.gov and must reference Solicitation No. 140R6026R0001. Questions must be received no later than 1400 hours (2:00 PM) MDT on April 27, 2026, to allow Reclamation sufficient time to prepare and issue responses to all Offerors before the proposal due date. Only written questions will receive a response.

Each submitted question must include the following information: the document name, document date, and the specific page, paragraph, clause, or other precise citation for which clarification is requested.

All questions, along with their corresponding answers and any new or revised documents, will be issued through an amendment to the solicitation.

SYSTEM NOTICE - REPRESENTATIONS IN SAM.GOV (DOI-AAAP-0209 / CAAC Letter 2025-01, Supplement 1) System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include FAR 52.222-25, Affirmative Action Compliance, and paragraph (d) of FAR 52.212-3, Offeror Representations and Certifications— Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

SYSTEM NOTICE - REPRESENTATIONS IN SAM.GOV (DOI-AAAP-0210 / CAAC Letter 2025-02, Supplement 1) System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including FAR 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph (t) of FAR 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF

SEALED BID (IFB) INVITATION FOR BID

9. FOR

INFORMATION CALL

PAGES

Bureau of Reclamation Missouri Basin Regional Office 2021 4th Avenue North Billings MT 59101

0044032816

R60

Monica Burgio 8015243780

04/06/2026

05/18/2026

10 781

THE SOLICITATION AS A WHOLE.

1 66

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Continued...

AMENDMENT

NUMBER

DATE.

Bureau of Reclamation Missouri Basin Regional Office 2021 4th Avenue North Billings MT 59101

R60

David Bryan

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

Delivery Location Code: 0011285678

Bureau of Reclamation-GP-ECAO

Eastern Colorado Area Office

11056 W. CR 18E

Loveland CO 80537 US

00010 AVC Crowley Reach 1

Please See Continuation of Section B -

Construction Price Schedule

(CLINS A-1 through A-41, C-1, and D-1)

Product/Service Code: Y1NE

Product/Service Description: CONSTRUCTION OF

WATER SUPPLY FACILITIES

Period of Performance: 09/01/2026 to

10/31/2028

00020 AVC Crowley Reach 1 Option A (Specification

Section 01 11 00)

Please See Continuation of Section B -

Construction Price Schedule

(CLINS B-1 through B-20)

Product/Service Code: Y1NE

Product/Service Description: CONSTRUCTION OF

WATER SUPPLY FACILITIES

Period of Performance: 09/01/2026 to

10/31/2028

Arkansas Valley Conduit Crowley Reach 1 Fryingpan-Arkansas Project, Colorado Solicitation No. 140R6026R0001

SECTION B – Arkansas Valley Conduit – Crowley Reach 1

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES

B.1 PRICE SCHEDULES

(a) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the Price Schedules.

(1) Offerors shall complete Price Schedules A, B, C, and D. Offers for less than the total of Price Schedules A, B, C, and D will be considered nonresponsive and will not be evaluated for award.

(2) Offers will be evaluated based on the total of Price Schedules A, B, C, and D.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Quantities in Price Schedule are estimated quantities for comparison of offers only. Except as provided in contract clause at H.2, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. Contract clause at H.2 Variation in Estimated Quantity does not apply to lump sum items.

(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(e) Price Schedule C will be paid after all work in Price Schedule A (and if exercised, Price Schedule B) is complete.

(f) Definitions:

(1) CLIN – Contract Line Item Number

PRICE SCHEDULE A

CLIN Section Supplies or Services Quantity and Unit Unit Price Amount

A-1 WBR

1452.232-

Mobilization and Preparatory Work For the lump sum of $

A-2 01 33 00 Submittals Requiring Colorado Department of Public Health and Environment (CDPHE) Review

For the lump sum of $

Solicitation

Document No.

and Unit Unit Price Amount

A-3 01 51 15 Utility Relocation – Lumen Technologies – Non-Pass-Through3

For the lump sum of $

A-4 01 51 15 Utility Relocation – Xcel Energy

– Non-Pass-Through3

For the lump sum of $

A-5 01 52 10 Field Office and Laboratory For the lump sum of $ A-6 01 55 20 Traffic Control Management For the lump sum of $ A-7 01 57 15 Utility Crossing Investigations –

Price Schedule A For the lump sum of $

A-8 03 15 19 Hydrophilic Strip Waterstop For the lump sum of $ A-9 03 15 22 Modular Seals For the lump sum of $ A-10 03 30 00 Concrete Pavement 68 yd2 $ $ A-11 26 42 11 Buried Galvanic Cathodic

Protection and Corrosion Monitoring System – Price Schedule A

For the lump sum of $

A-12 27 05 43 Fiber Communications Infrastructure – Price Schedule A

For the lump sum of $

A-13 31 02 10 Water for Dust Abatement – Price Schedule A

2,351 Mgal $ $

A-14 31 02 30 Dust Palliative – Price Schedule A

23.53 Mgal $ $

A-15 31 03 33 System Design For the lump sum of $ A-16 31 03 33 Dewatering Materials – Price

Schedule A 25,650 lin ft $ $

A-17 31 03 33 Dewatering System Installation and Removal – Price Schedule A

25,650 lin ft $ $

A-18 31 03 33 Dewatering Operation – Price Schedule A

25,650 lin ft $ $

A-19 31 03 33 Observation Wells Materials, Installation, and Removal – Price Schedule A

25,650 lin ft $ $

A-20 31 03 33 Unwatering System Materials, Installation, Operation, and Removal

For the lump sum of $

A-21 31 11 00 Clearing and Grubbing – Price Schedule A

25.71 acre $ $

A-22 31 14 10 Stripping, Stockpiling, and Placement – Price Schedule A

123,650 yd2 $ $

A-23 31 23 22 Imported Backfill Material 31,000 yd3 $ $ A-24 31 23 22 Rock Excavation 5,300 yd3 $ $

Unit Price Amount

A-25 32 12 22 Asphalt Concrete Pavement – Price Schedule A

177 yd2 $ $

A-26 32 15 10 Gravel Surfacing 2,400 yd2 $ $ A-27 32 17 20 Painted Traffic Lines and

Markings 160 lin ft $ $

A-28 32 92 20 Seeding and Soil Supplements – Price Schedule A

123,650 yd2 $ $

A-29 33 05 22 Horizontal Directional Drilling – Line Pipe

For the lump sum of $

A-30 33 05 22 Horizontal Directional Drilling – Fiber Optic Line

For the lump sum of $

A-31 33 11 10* PVC Line Pipe Delivered to Site – Price Schedule A

25,035 lin ft $ $

A-32 33 11 10* HDPE Line Pipe Delivered to Site

– Price Schedule A

25,035 lin ft $ $

A-33 33 11 10 Line Pipe Installed (CLSM) – Price Schedule A

7,900 lin ft $ $

A-34 33 11 10 Line Pipe Installed (Select Material)

6,200 lin ft $ $

A-35 33 11 10 Line Pipe Installed (Special Encasement)

935 lin ft $ $

A-36 33 11 10 Filling and Testing Pipe For the lump sum of $ A-37 33 22 15 Air Valve Assemblies – Price

Schedule A 8 ea $ $

A-38 33 22 15 Blowoff Assemblies 7 ea $ $ A-39 33 22 15 Sampling Station Assemblies 2 ea $ $ A-40 33 22 15 Sectionalizing Valve Assemblies 3 ea $ $ A-41 33 82 23 Optical Fiber Cable – Price

Schedule A 28,800 lin ft $ $

Subtotal of CLINs A-1 through A-41 $ Notes: *Include price for delivering and installing either PVC or HDPE but not both.

1. Mgal = thousand gallons.

2. Refer to Price Schedule D for CLINs related to permitting and utilities. Include costs not listed in Price Schedule D in Price Schedule A CLINs.

3 Price offered for CLINs A-3 and A-4 shall not include pass-through costs. Refer to Price Schedule D.

TOTAL FOR PRICE SCHEDULE A $

OPTIONAL PRICE SCHEDULE B

and Unit Unit Price Amount

B-1 01 57 15 Utility Crossing Investigations – Optional Price Schedule B

For the lump sum of $

B-2 26 42 11 Buried Galvanic Cathodic Protection and Corrosion Monitoring System – Optional Price Schedule B

For the lump sum of $

B-3 27 05 43 Fiber Communications Infrastructure – Optional Price Schedule B

For the lump sum of $

B-4 31 02 10 Water for Dust Abatement – Optional Price Schedule B

49 Mgal $ $

B-5 31 02 30 Dust Palliative – Optional Price Schedule B

0.47 Mgal $ $

B-6 31 03 33 Dewatering Materials – Optional Price Schedule B

750 lin ft $ $

B-7 31 03 33 Dewatering System Installation and Removal – Optional Price Schedule B

750 lin ft $ $

B-8 31 03 33 Dewatering Operation – Optional Price Schedule B

750 lin ft $ $

B-9 31 03 33 Observation Wells Materials, Installation, and Removal – Optional Price Schedule B

750 lin ft $ $

B-10 31 11 00 Clearing and Grubbing – Optional Price Schedule B

0.29 acre $ $

B-11 31 14 10 Stripping, Stockpiling, and Placement – Optional Price Schedule B

1,350 yd2 $ $

B-12 32 12 22 Asphalt Concrete Pavement – Optional Price Schedule B

73 yd2 $ $

B-13 32 92 20 Seeding and Soil Supplements – Optional Price Schedule B

1,350 yd2 $ $

B-14 33 05 21 Bored Crossing at Railroad – Line Pipe

For the lump sum of $

B-15 33 05 21 Bored Crossing at Railroad – Fiber Optic Line

For the lump sum of $

B-16 33 11 10* PVC Line Pipe Delivered to Site – Optional Price Schedule B

519 lin ft $ $

B-17 33 11 10* HDPE Line Pipe Delivered to Site – Optional Price Schedule B

519 lin ft $ $

Unit Price Amount

B-18 33 11 10 Line Pipe Installed (CLSM) – Optional Price Schedule B

519 lin ft $ $

B-19 33 22 15 Air Valve Assemblies – Optional Price Schedule B

1 ea $ $

B-20 33 82 23 Optical Fiber Cable – Optional Price Schedule B

700 lin ft $ $

Subtotal of CLINs B-1 through B-20 $ Notes: *Include price for delivering and installing either PVC or HDPE but not both.

1. Mgal = thousand gallons.

2. Refer to Price Schedule D for CLINs related to permitting and utilities. Include applicable costs not listed in Price Schedule D in Optional Price Schedule B CLINs.

TOTAL FOR OPTIONAL PRICE SCHEDULE B $

PRICE SCHEDULE C

CLIN Supplies or Services Quantity and Unit Unit Price Amount C-1 Technical Data For the lump sum of $

Note: 1. Technical Data includes approved submittals of as-built drawings, Final Data, Final Drawings, Final Reports, and Operation and Maintenance Manuals.

TOTAL FOR PRICE SCHEDULE C $

PRICE SCHEDULE D

CLIN Section Supplies or Services Quantity and

Unit Estimated Unit Price

Estimated Amount

D-1 01 41 26 Pass-Through Costs for Permits Researched by Government

For the lump sum of $ 250,125.00

Notes: 1. Overhead and profit costs associated with utility relocation shall be incorporated in the associated Price Schedule A CLIN, CLIN A-3 or A-4; price offered for CLINs A-3 and A-4 shall not include pass-through costs.

2. Amount listed by the Government is estimated and shall be used for offeror’s proposal pricing.

3. Include costs not listed in Price Schedule D in Price Schedule A CLINs.

TOTAL FOR PRICE SCHEDULE D $ 250,125.00

TOTAL FOR PRICE SCHEDULES A, B, C, and D $

END OF PRICE SCHEDULES

SECTION C – Statement / Description / Specification of Work

Please See Section J Attachment(s) 1-3 for specifications, drawings, and supporting data.

SECTION D – Packaging and Marking

There are no clauses included in this section.

SECTION E – Inspection and Acceptance

E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEBRUARY 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:

FAR Clauses - https://www.acquisition.gov/far/

CLAUSES INCORPORATED BY REFERENCE

Clause Title Date 52.246-12 Inspection of Construction August 1996 https://www.acquisition.gov/far/

SECTION F -- Deliveries or Performance

F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEBRUARY 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses: FAR Clauses - https://www.acquisition.gov/far/

52.242-14 Suspension of Work April 1984

SECTION G - Contract Administration Data

G.1 1452.201-70 AUTHORITIES AND DELEGATIONS (SEPTEMBER 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers having been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers exceeding the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR via electronic transmission. This can be through email, mail, or fax. If by fax please request the appropriate fax number. Email is the preferred method of delivery.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of Clause)

G.2 DOI-AAAP 0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE

PROCESSING PLATFORM (IPP) (APRIL 2013)

Payment requests must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform System (IPP).

"Payment requests" means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions-Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice, failure to provide the items will result in invoice rejection:

1 – Quantity Surveys (if applicable) 2 – Current Copy of As-Built Drawings 3 – Quantity sheets reflecting the CLIN in schedule B, percentage complete, and bold any items nearing or exceeding 100% of the CLIN amount.

4 – Approved construction schedule

Once the invoice has been submitted into the IPP system, the Contractor shall also submit an electronic copy of the invoice to the following:

Contracting Officer: (David Bryan, david_bryan@ios.doi.gov) Contract Specialist: (Monica Burgio, monica_burgio@ios.doi.gov) Procurement Technician: (Thomas (Scott) Becker, thomas_becker@ios.doi.gov)

Failure to transmit invoices via electronic transmission may cause significant delay or possible rejection of your payment request.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

G.3 WBR 1452.242-80 POST AWARD CONFERENCE BUREAU OF RECLAMATION (MARCH

2022)

(a) Prior to the contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The contractor's project manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.

(b) The conference will be held at Southeastern Colorado Water Conservancy District office, 31717 E United Ave, Pueblo, CO 81001. If it cannot be held in-person for any reason, it will be held virtually using Microsoft Teams. If held virtually, each attendee shall attend using a separate computer/camera.

(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the contracting officer shall establish the date for the conference.

(d) The Contractor shall not be entitled to the reimbursement any costs associated with attendance at the conference beyond the agreed-to contract price.

https://www.ipp.gov/ mailto:ippgroup@bos.frb.org

G.4 WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND

LIMITATIONS BUREAU OF RECLAMATION (MAY 2018)

(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:

(1) Inspecting and accepting or rejecting work performed under the contract.

(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.

(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.

(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.

(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -

(1) Constitutes a direction of additional work outside the Contract requirements;

(2) Constitutes a change as defined in the contract clause entitled “Changes;”

(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;

(4) Changes any of the expressed terms, conditions or specifications of the contract; or

(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.

(d) All technical direction shall be issued in writing by the COR.

(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -

(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or

(2) Advise the Contractor that the Government will issue a written change order.

(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”

(End of clause)

SECTION H -- Special Contract Requirements

H.1 OPTION FOR RIGHT-OF-WAY DEPENDENT WORK (OPTIONAL PRICE SCHEDULE B)

(a) Description of Option Work The work identified in Contract Line Item Numbers (CLINs) B-1 through B-20 is contingent upon the Government obtaining the necessary right‑of‑way from Union Pacific Railroad. The Contractor shall not commence this work until the Contracting Officer issues a formal written notice exercising the option.

(b) Government Right to Exercise the Option The Government may exercise this option by written notice to the Contractor at any time within 367 days after the start of the contract Period of Performance (POP). If exercised on or before this date, no adjustment shall be made to the contract’s overall POP.

(c) Option Exercise After 367 days from POP start date If the Government exercises the option after 367 days from the POP start date, the Contractor shall be entitled to an equitable extension of the POP. The extension will consist of the minimum number of calendar days reasonably required to complete the option work, considering site conditions, access constraints, and project sequencing. The Contracting Officer will issue a unilateral modification establishing the adjusted POP.

(d) Pricing of Option Work The Contractor’s pricing for CLINs B-1 through B-20 shall include all labor, materials, equipment, mobilization/demobilization, additional insurance, and other incidentals necessary to perform the option work. Pricing shall remain valid through the latest date by which the Government may exercise the option, as stated in this clause.

(e) No Duty to Exercise The Government is under no obligation to exercise this option. The Contractor shall have no claim for lost profits, standby costs, or other damages should the Government choose not to exercise the option.

(f) Notice of Expectation Only Any discussions, schedules, forecasts, or informal communications regarding potential right‑of‑way timing shall not constitute notice of intent to exercise the option or obligate the Government in any way.

H.2 VARIATION IN ESTIMATED QUANTITY

If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract.

Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

H.3 DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

(DECEMBER 2015)

1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at: https://www.cpars.gov/.

a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.

b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

c) All information provided should be reviewed for accuracy prior to submission.

d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.

e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

6)The following guidelines apply concerning your use of the past performance evaluation:

a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.

8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

https://www.cpars.gov/

SECTION I - Contract Clauses

I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEBRUARY 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:

FAR Clauses - https://www.acquisition.gov/far/

52.202-1 Definitions June 2020 52.203-3 Gratuities April 1984 52.203-5 Covenant Against Contingent Fees May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government June 2020 52.203-7 Anti-Kickback Procedures June 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity May 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity May 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions June 2020

52.203-13 Contractor Code of Business Ethics and Conduct November 2021 52.203-17 Contractor Employee Whistleblower Rights November 2023 52.203-19 Prohibition on Requiring Certain Internal Confidentiality

Agreements or Statements January 2017

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (RFO-DEVIATION March 2026)

June 2020

52.204-13 System for Award Management Maintenance (RFO- DEVIATION March 2026)

October 2018

52.204-14 Service Contract Reporting Requirements (RFO-DEVIATION March 2026)

October 2016

52.204-19 Incorporation by Reference of Representations and Certifications

December 2014

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

January 2025

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

October 2018

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations November 2015 52.210-1 Market Research (RFO-DEVIATION July 2025) November 2021 52.215-2 Audit and Records – Negotiations June 2020 52.215-8 Order of Precedence – Uniform Contract Format October 1997 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data—

Modifications June 2020

52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications June 2020 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other

Than Certified Cost or Pricing Data November 2021

52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data – Modifications

November 2021

52.219-6 Notice of Total Small Business Set-Aside (RFO-DEVIATION January 2026)

November 2020

52.219-8 Utilization of Small Business Concerns (RFO-DEVIATION January 2026)

January 2025

52.219-14 Limitations on Subcontracting (RFO-DEVIATION January 2026)

October 2022

52.222-3 Convict Labor June 2003 52.222-4 Contract Work Hours and Safety Standards Act – Overtime

Compensation May 2018

52.222-6 Construction Wage Rate Requirements August 2018 52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records August 2018 52.222-9 Apprentices and Trainees July 2005 52.222-10 Compliance with Copeland Act Requirements February 1988 52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination – Debarment May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and

Related Regulations May 2014

52.222-14 Disputes Concerning Labor Standards February 1988 52.222-15 Certification of Eligibility May 2014 52.222-35 Equal Opportunity for Veterans June 2020 52.222-36 Equal Opportunity for Workers with Disabilities June 2020 52.222-37 Employment Reports on Veterans June 2020 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act December 2010

52.222-50 Combating Trafficking in Persons October 2025 52.222-54 Employment Eligibility Verification January 2025 52.222-55 Minimum Wages Under Executed Order 13658 January 2022 52.222-62 Paid Sick Leave Under Executive Order 13706 January 2022 52.223-3 Alt I Hazardous Material Identification and Material Safety Data –

Alternate I (February 2021) July 1995

52.225-13 Restrictions on Certain Foreign Purchases February 2021 52.226-7 Drug-Free Workplace May 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While

Driving May 2024

52.227-1 Authorization and Consent June 2020 52.227-2 Notice and Assistance Regarding Patent and Copyright

Infringement June 2020

52.227-4 Patent Indemnity – Construction Contracts December 2007 52.228-2 Additional Bond Security October 1997 52.228-5 Insurance – Work on a Government Installation January 1997 52.228-11 Pledges Of Assets February 2021 52.228-12 Prospective Subcontractor Requests for Bonds December 2022 52.228-14 Irrevocable Letter of Credit November 2014 52.228-15 Performance and Payment Bonds–Construction June 2020 52.229-3 Federal, State And Local Taxes (RFO-DEVIATION March

2026) February 2013

52.230-2 Cost Accounting Standards June 2020 52.230-3 Disclosure and Consistency of Cost Accounting Practices June 2020 52.230-6 Administration of Cost Accounting Standards June 2010

52.232-5 Payments Under Fixed-Price Construction May 2014 52.232-16 Progress Payments November 2021 52.232-17 Interest May 2014 52.232-23 Assignment Of Claims May 2014 52.232-27 Prompt Payment for Construction Contracts January 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award

Management October 2018

52.232-39 Unenforceability of Unauthorized Obligations June 2013 52.232-40 Providing Accelerated Payment to Small Business

Subcontractors March 2023

52.233-1 Disputes May 2014 52.233-3 Protest After Award August 1996 52.233-4 Applicable Law for Breach of Contract Claim October 2004 52.236-1 Performance of Work by the Contractor April 1984…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .