Amendment_3_Attachment_2_Continuation_of_Section_B_updated_05_05_2026_0003.docx

DOCX document 93 KB Posted

Attached to
Arkansas Valley Conduit - Crowley Reach 1
Solicitation number
140R6026R0001
Issued by

About this file

This is a Price Schedule Amendment document (Amendment 3, Attachment 2) for a water infrastructure construction project. The amendment outlines mandatory and optional pricing schedules for the Arkansas Valley Conduit – Crowley Reach 1 project in Colorado, managed by the Department of the Interior Bureau of Reclamation.

Offerors must submit complete pricing for all four price schedules (A, B, C, and D) to be considered responsive; partial offers will be rejected. Price Schedule A contains 41 mandatory line items covering mobilization, submittals, utility relocations (Lumen Technologies and Xcel Energy), field operations, traffic control, water line pipe installation, valve assemblies, fiber optic cable, and ancillary construction services such as clearing, grubbing, backfill, seeding, dewatering, and dust abatement. Quantities range from unit prices (e.g., 68 cubic yards of concrete pavement, 8 air valve assemblies) to lump sum items. Price Schedule B is optional and includes 20 line items for similar services with reduced quantities or scope variations, including an optional railroad bored crossing. Price Schedule C requires pricing for technical deliverables (as-built drawings, final reports, operation and maintenance manuals) as a lump sum item, payable only after Price Schedule A completion. Price Schedule D contains one line item for pass-through permit costs with a government-estimated amount of $250,125.00. Utility relocation overhead and profit must be included in Schedule A pricing, excluding pass-through costs. All estimated quantities are for comparative evaluation only, with no contractor claims permitted for overruns or underruns except as specified in contract variation clauses.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B – Arkansas Valley Conduit – Crowley Reach 1

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES

B.1 PRICE SCHEDULES

(a) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the Price Schedules.

(1) Offerors shall complete Price Schedules A, B, C, and D. Offers for less than the total of Price Schedules A, B, C, and D will be considered nonresponsive and will not be evaluated for award.

(2) Offers will be evaluated based on the total of Price Schedules A, B, C, and D.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Quantities in Price Schedule are estimated quantities for comparison of offers only. Except as provided in contract clause at H.2, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. Contract clause at H.2 Variation in Estimated Quantity does not apply to lump sum items.

(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(e) Price Schedule C will be paid after all work in Price Schedule A (and if exercised, Price Schedule B) is complete.

(f) Definitions:

(1) CLIN – Contract Line Item Number

PRICE SCHEDULE A

CLIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount
A-1
WBR 1452.232-
Mobilization and Preparatory Work
For the lump sum of
$
A-2
01 33 00
Submittals Requiring Colorado Department of Public Health and Environment (CDPHE) Review
For the lump sum of
$

Solicitation

Document No.

140R6026R0001 Document Title Arkansas Valley Conduit (AVC) – Crowley Reach 1

Arkansas Valley Conduit Crowley Reach 1 Fryingpan-Arkansas Project, Colorado Solicitation No. 140R6026R0001

CLIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount
A-3
01 51 15
Utility Relocation – Lumen

Technologies – Non-Pass-Through3

For the lump sum of
$
A-4
01 51 15
Utility Relocation – Xcel Energy – Non-Pass-Through3
For the lump sum of
$
A-5
01 52 10
Field Office and Laboratory
For the lump sum of
$
A-6
01 55 20
Traffic Control Management
For the lump sum of
$
A-7
01 57 15
Utility Crossing Investigations – Price Schedule A
For the lump sum of
$
A-8
03 15 19
Hydrophilic Strip Waterstop
For the lump sum of
$
A-9
03 15 22
Modular Seals
For the lump sum of
$
A-10
03 30 00
Concrete Pavement
68 yd2
$
$
A-11
26 42 11
Buried Galvanic Cathodic Protection and Corrosion Monitoring System – Price Schedule A
For the lump sum of
$
A-12
27 05 43
Fiber Communications Infrastructure – Price Schedule A
For the lump sum of
$
A-13
31 02 10
Water for Dust Abatement – Price Schedule A
2,351 Mgal
$
$
A-14
31 02 30
Dust Palliative – Price Schedule A
23.53 Mgal
$
$
A-15
31 03 33
System Design
For the lump sum of
$
A-16
31 03 33
Dewatering Materials – Price Schedule A
25,650 lin ft
$
$
A-17
31 03 33
Dewatering System Installation and Removal – Price Schedule A
25,650 lin ft
$
$
A-18
31 03 33
Dewatering Operation – Price Schedule A
25,650 lin ft
$
$
A-19
31 03 33
Observation Wells Materials, Installation, and Removal – Price Schedule A
25,650 lin ft
$
$
A-20
31 03 33
Unwatering System Materials, Installation, Operation, and Removal
For the lump sum of
$
A-21
31 11 00
Clearing and Grubbing – Price Schedule A
25.71 acre
$
$
A-22
31 14 10
Stripping, Stockpiling, and Placement – Price Schedule A
123,650 yd2
$
$
A-23
31 23 22
Imported Backfill Material
31,000 yd3
$
$
A-24
31 23 22
Rock Excavation
5,300 yd3
$
$

Solicitation

Document No.

140R6026R0001 Document Title Arkansas Valley Conduit (AVC) – Crowley Reach 1

CLIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount
A-25
32 12 22
Asphalt Concrete Pavement –

Price Schedule A

177 yd2
$
$
A-26
32 15 10
Gravel Surfacing
2,400 yd2
$
$
A-27
32 17 20
Painted Traffic Lines and Markings
160 lin ft
$
$
A-28
32 92 20
Seeding and Soil Supplements – Price Schedule A
123,650 yd2
$
$
A-29
33 05 22
Horizontal Directional Drilling – Line Pipe
For the lump sum of
$
A-30
33 05 22
Horizontal Directional Drilling – Fiber Optic Line
For the lump sum of
$
A-31
33 11 10*
PVC Line Pipe Delivered to Site – Price Schedule A
25,035 lin ft
$
$
A-32
33 11 10*
HDPE Line Pipe Delivered to Site – Price Schedule A
25,035 lin ft
$
$
A-33
33 11 10
Line Pipe Installed (CLSM) – Price Schedule A
7,900 lin ft

17,900 lin ft

$
$
A-34
33 11 10
Line Pipe Installed (Select Material)
6,200 lin ft
$
$
A-35
33 11 10
Line Pipe Installed (Special Encasement)
935 lin ft
$
$
A-36
33 11 10
Filling and Testing Pipe
For the lump sum of
$
A-37
33 22 15
Air Valve Assemblies – Price Schedule A
8 ea
$
$
A-38
33 22 15
Blowoff Assemblies
7 ea
$
$
A-39
33 22 15
Sampling Station Assemblies
2 ea
$
$
A-40
33 22 15
Sectionalizing Valve Assemblies
3 ea
$
$
A-41
33 82 23
Optical Fiber Cable – Price Schedule A
28,800 lin ft
$
$
Subtotal of CLINs A-1 through A-41
$

Notes: *Include price for delivering and installing either PVC or HDPE but not both.

1. Mgal = thousand gallons.

2. Refer to Price Schedule D for CLINs related to permitting and utilities. Include costs not listed in Price Schedule D in Price Schedule A CLINs.

3 Price offered for CLINs A-3 and A-4 shall not include pass-through costs. Refer to Price Schedule D.

TOTAL FOR PRICE SCHEDULE A $

OPTIONAL PRICE SCHEDULE B

CLIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount
B-1
01 57 15
Utility Crossing Investigations – Optional Price Schedule B
For the lump sum of
$
B-2
26 42 11
Buried Galvanic Cathodic Protection and Corrosion Monitoring System – Optional Price Schedule B
For the lump sum of
$
B-3
27 05 43
Fiber Communications Infrastructure – Optional Price Schedule B
For the lump sum of
$
B-4
31 02 10
Water for Dust Abatement – Optional Price Schedule B
49 Mgal
$
$
B-5
31 02 30
Dust Palliative – Optional Price Schedule B
0.47 Mgal
$
$
B-6
31 03 33
Dewatering Materials – Optional Price Schedule B
750 lin ft
$
$
B-7
31 03 33
Dewatering System Installation and Removal – Optional Price Schedule B
750 lin ft
$
$
B-8
31 03 33
Dewatering Operation – Optional Price Schedule B
750 lin ft
$
$
B-9
31 03 33
Observation Wells Materials, Installation, and Removal – Optional Price Schedule B
750 lin ft
$
$
B-10
31 11 00
Clearing and Grubbing – Optional Price Schedule B
0.29 acre
$
$
B-11
31 14 10
Stripping, Stockpiling, and Placement – Optional Price Schedule B
1,350 yd2
$
$
B-12
32 12 22
Asphalt Concrete Pavement – Optional Price Schedule B
73 yd2
$
$
B-13
32 92 20
Seeding and Soil Supplements – Optional Price Schedule B
1,350 yd2
$
$
B-14
33 05 21
Bored Crossing at Railroad – Line Pipe
For the lump sum of
$
B-15
33 05 21
Bored Crossing at Railroad – Fiber Optic Line
For the lump sum of
$
B-16
33 11 10*
PVC Line Pipe Delivered to Site – Optional Price Schedule B
519 lin ft
$
$
B-17
33 11 10*
HDPE Line Pipe Delivered to Site – Optional Price Schedule B
519 lin ft
$
$
CLIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount
B-18
33 11 10
Line Pipe Installed (CLSM) – Optional Price Schedule B
519 lin ft
$
$
B-19
33 22 15
Air Valve Assemblies – Optional

Price Schedule B

1 ea
$
$
B-20
33 82 23
Optical Fiber Cable – Optional Price Schedule B
700 lin ft
$
$
Subtotal of CLINs B-1 through B-20
$

Notes: *Include price for delivering and installing either PVC or HDPE but not both.

1. Mgal = thousand gallons.

2. Refer to Price Schedule D for CLINs related to permitting and utilities. Include applicable costs not listed in Price Schedule D in Optional Price Schedule B CLINs.

TOTAL FOR OPTIONAL PRICE SCHEDULE B $

PRICE SCHEDULE C

CLIN
Supplies or Services
Quantity and Unit
Unit Price
Amount
C-1
Technical Data
For the lump sum of
$

Note: 1. Technical Data includes approved submittals of as-built drawings, Final Data, Final Drawings, Final Reports, and Operation and Maintenance Manuals.

TOTAL FOR PRICE SCHEDULE C $

PRICE SCHEDULE D

CLIN
Section
Supplies or Services
Quantity and Unit
Estimated Unit Price
Estimated Amount
D-1
01 41 26
Pass-Through Costs for Permits Researched by Government
For the lump sum of
$ 250,125.00

Notes: 1. Overhead and profit costs associated with utility relocation shall be incorporated in the associated Price Schedule A CLIN, CLIN A-3 or A-4; price offered for CLINs A-3 and A-4 shall not include pass-through costs.

2. Amount listed by the Government is estimated and shall be used for offeror’s proposal pricing.

3. Include costs not listed in Price Schedule D in Price Schedule A CLINs.

TOTAL FOR PRICE SCHEDULE D $ 250,125.00

TOTAL FOR PRICE SCHEDULES A, B, C, and D $