SECTION B – Arkansas Valley Conduit – Crowley Reach 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
B.1 PRICE SCHEDULES
(a) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the Price Schedules.
(1) Offerors shall complete Price Schedules A, B, C, and D. Offers for less than the total of Price Schedules A, B, C, and D will be considered nonresponsive and will not be evaluated for award.
(2) Offers will be evaluated based on the total of Price Schedules A, B, C, and D.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in Price Schedule are estimated quantities for comparison of offers only. Except as provided in contract clause at H.2, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. Contract clause at H.2 Variation in Estimated Quantity does not apply to lump sum items.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(e) Price Schedule C will be paid after all work in Price Schedule A (and if exercised, Price Schedule B) is complete.
(f) Definitions:
(1) CLIN – Contract Line Item Number
PRICE SCHEDULE A
| CLIN |
| Section |
| Supplies or Services |
| Quantity and Unit |
| Unit Price |
| Amount |
| Mobilization and Preparatory Work |
| For the lump sum of |
| $ |
| A-2 |
| 01 33 00 |
| Submittals Requiring Colorado Department of Public Health and Environment (CDPHE) Review |
| For the lump sum of |
| $ |
Solicitation
Document No.
140R6026R0001 Document Title Arkansas Valley Conduit (AVC) – Crowley Reach 1
Arkansas Valley Conduit Crowley Reach 1 Fryingpan-Arkansas Project, Colorado Solicitation No. 140R6026R0001
| CLIN |
| Section |
| Supplies or Services |
| Quantity and Unit |
| Unit Price |
| Amount |
| A-3 |
| 01 51 15 |
| Utility Relocation – Lumen |
Technologies – Non-Pass-Through3
| A-4 |
| 01 51 15 |
| Utility Relocation – Xcel Energy – Non-Pass-Through3 |
| For the lump sum of |
| $ |
| A-5 |
| 01 52 10 |
| Field Office and Laboratory |
| For the lump sum of |
| $ |
| A-6 |
| 01 55 20 |
| Traffic Control Management |
| For the lump sum of |
| $ |
| A-7 |
| 01 57 15 |
| Utility Crossing Investigations – Price Schedule A |
| For the lump sum of |
| $ |
| A-8 |
| 03 15 19 |
| Hydrophilic Strip Waterstop |
| For the lump sum of |
| $ |
| A-9 |
| 03 15 22 |
| Modular Seals |
| For the lump sum of |
| $ |
| A-10 |
| 03 30 00 |
| Concrete Pavement |
| 68 yd2 |
| $ |
| $ |
| A-11 |
| 26 42 11 |
| Buried Galvanic Cathodic Protection and Corrosion Monitoring System – Price Schedule A |
| For the lump sum of |
| $ |
| A-12 |
| 27 05 43 |
| Fiber Communications Infrastructure – Price Schedule A |
| For the lump sum of |
| $ |
| A-13 |
| 31 02 10 |
| Water for Dust Abatement – Price Schedule A |
| 2,351 Mgal |
| $ |
| $ |
| A-14 |
| 31 02 30 |
| Dust Palliative – Price Schedule A |
| 23.53 Mgal |
| $ |
| $ |
| A-15 |
| 31 03 33 |
| System Design |
| For the lump sum of |
| $ |
| A-16 |
| 31 03 33 |
| Dewatering Materials – Price Schedule A |
| 25,650 lin ft |
| $ |
| $ |
| A-17 |
| 31 03 33 |
| Dewatering System Installation and Removal – Price Schedule A |
| 25,650 lin ft |
| $ |
| $ |
| A-18 |
| 31 03 33 |
| Dewatering Operation – Price Schedule A |
| 25,650 lin ft |
| $ |
| $ |
| A-19 |
| 31 03 33 |
| Observation Wells Materials, Installation, and Removal – Price Schedule A |
| 25,650 lin ft |
| $ |
| $ |
| A-20 |
| 31 03 33 |
| Unwatering System Materials, Installation, Operation, and Removal |
| For the lump sum of |
| $ |
| A-21 |
| 31 11 00 |
| Clearing and Grubbing – Price Schedule A |
| 25.71 acre |
| $ |
| $ |
| A-22 |
| 31 14 10 |
| Stripping, Stockpiling, and Placement – Price Schedule A |
| 123,650 yd2 |
| $ |
| $ |
| A-23 |
| 31 23 22 |
| Imported Backfill Material |
| 31,000 yd3 |
| $ |
| $ |
| A-24 |
| 31 23 22 |
| Rock Excavation |
| 5,300 yd3 |
| $ |
| $ |
Solicitation
Document No.
140R6026R0001 Document Title Arkansas Valley Conduit (AVC) – Crowley Reach 1
| CLIN |
| Section |
| Supplies or Services |
| Quantity and Unit |
| Unit Price |
| Amount |
| A-25 |
| 32 12 22 |
| Asphalt Concrete Pavement – |
Price Schedule A
| A-26 |
| 32 15 10 |
| Gravel Surfacing |
| 2,400 yd2 |
| $ |
| $ |
| A-27 |
| 32 17 20 |
| Painted Traffic Lines and Markings |
| 160 lin ft |
| $ |
| $ |
| A-28 |
| 32 92 20 |
| Seeding and Soil Supplements – Price Schedule A |
| 123,650 yd2 |
| $ |
| $ |
| A-29 |
| 33 05 22 |
| Horizontal Directional Drilling – Line Pipe |
| For the lump sum of |
| $ |
| A-30 |
| 33 05 22 |
| Horizontal Directional Drilling – Fiber Optic Line |
| For the lump sum of |
| $ |
| A-31 |
| 33 11 10* |
| PVC Line Pipe Delivered to Site – Price Schedule A |
| 25,035 lin ft |
| $ |
| $ |
| A-32 |
| 33 11 10* |
| HDPE Line Pipe Delivered to Site – Price Schedule A |
| 25,035 lin ft |
| $ |
| $ |
| A-33 |
| 33 11 10 |
| Line Pipe Installed (CLSM) – Price Schedule A |
| 7,900 lin ft |
17,900 lin ft
| A-34 |
| 33 11 10 |
| Line Pipe Installed (Select Material) |
| 6,200 lin ft |
| $ |
| $ |
| A-35 |
| 33 11 10 |
| Line Pipe Installed (Special Encasement) |
| 935 lin ft |
| $ |
| $ |
| A-36 |
| 33 11 10 |
| Filling and Testing Pipe |
| For the lump sum of |
| $ |
| A-37 |
| 33 22 15 |
| Air Valve Assemblies – Price Schedule A |
| 8 ea |
| $ |
| $ |
| A-38 |
| 33 22 15 |
| Blowoff Assemblies |
| 7 ea |
| $ |
| $ |
| A-39 |
| 33 22 15 |
| Sampling Station Assemblies |
| 2 ea |
| $ |
| $ |
| A-40 |
| 33 22 15 |
| Sectionalizing Valve Assemblies |
| 3 ea |
| $ |
| $ |
| A-41 |
| 33 82 23 |
| Optical Fiber Cable – Price Schedule A |
| 28,800 lin ft |
| $ |
| $ |
| Subtotal of CLINs A-1 through A-41 |
| $ |
Notes: *Include price for delivering and installing either PVC or HDPE but not both.
1. Mgal = thousand gallons.
2. Refer to Price Schedule D for CLINs related to permitting and utilities. Include costs not listed in Price Schedule D in Price Schedule A CLINs.
3 Price offered for CLINs A-3 and A-4 shall not include pass-through costs. Refer to Price Schedule D.
TOTAL FOR PRICE SCHEDULE A $
OPTIONAL PRICE SCHEDULE B
| CLIN |
| Section |
| Supplies or Services |
| Quantity and Unit |
| Unit Price |
| Amount |
| B-1 |
| 01 57 15 |
| Utility Crossing Investigations – Optional Price Schedule B |
| For the lump sum of |
| $ |
| B-2 |
| 26 42 11 |
| Buried Galvanic Cathodic Protection and Corrosion Monitoring System – Optional Price Schedule B |
| For the lump sum of |
| $ |
| B-3 |
| 27 05 43 |
| Fiber Communications Infrastructure – Optional Price Schedule B |
| For the lump sum of |
| $ |
| B-4 |
| 31 02 10 |
| Water for Dust Abatement – Optional Price Schedule B |
| 49 Mgal |
| $ |
| $ |
| B-5 |
| 31 02 30 |
| Dust Palliative – Optional Price Schedule B |
| 0.47 Mgal |
| $ |
| $ |
| B-6 |
| 31 03 33 |
| Dewatering Materials – Optional Price Schedule B |
| 750 lin ft |
| $ |
| $ |
| B-7 |
| 31 03 33 |
| Dewatering System Installation and Removal – Optional Price Schedule B |
| 750 lin ft |
| $ |
| $ |
| B-8 |
| 31 03 33 |
| Dewatering Operation – Optional Price Schedule B |
| 750 lin ft |
| $ |
| $ |
| B-9 |
| 31 03 33 |
| Observation Wells Materials, Installation, and Removal – Optional Price Schedule B |
| 750 lin ft |
| $ |
| $ |
| B-10 |
| 31 11 00 |
| Clearing and Grubbing – Optional Price Schedule B |
| 0.29 acre |
| $ |
| $ |
| B-11 |
| 31 14 10 |
| Stripping, Stockpiling, and Placement – Optional Price Schedule B |
| 1,350 yd2 |
| $ |
| $ |
| B-12 |
| 32 12 22 |
| Asphalt Concrete Pavement – Optional Price Schedule B |
| 73 yd2 |
| $ |
| $ |
| B-13 |
| 32 92 20 |
| Seeding and Soil Supplements – Optional Price Schedule B |
| 1,350 yd2 |
| $ |
| $ |
| B-14 |
| 33 05 21 |
| Bored Crossing at Railroad – Line Pipe |
| For the lump sum of |
| $ |
| B-15 |
| 33 05 21 |
| Bored Crossing at Railroad – Fiber Optic Line |
| For the lump sum of |
| $ |
| B-16 |
| 33 11 10* |
| PVC Line Pipe Delivered to Site – Optional Price Schedule B |
| 519 lin ft |
| $ |
| $ |
| B-17 |
| 33 11 10* |
| HDPE Line Pipe Delivered to Site – Optional Price Schedule B |
| 519 lin ft |
| $ |
| $ |
| CLIN |
| Section |
| Supplies or Services |
| Quantity and Unit |
| Unit Price |
| Amount |
| B-18 |
| 33 11 10 |
| Line Pipe Installed (CLSM) – Optional Price Schedule B |
| 519 lin ft |
| $ |
| $ |
| B-19 |
| 33 22 15 |
| Air Valve Assemblies – Optional |
Price Schedule B
| B-20 |
| 33 82 23 |
| Optical Fiber Cable – Optional Price Schedule B |
| 700 lin ft |
| $ |
| $ |
| Subtotal of CLINs B-1 through B-20 |
| $ |
Notes: *Include price for delivering and installing either PVC or HDPE but not both.
1. Mgal = thousand gallons.
2. Refer to Price Schedule D for CLINs related to permitting and utilities. Include applicable costs not listed in Price Schedule D in Optional Price Schedule B CLINs.
TOTAL FOR OPTIONAL PRICE SCHEDULE B $
PRICE SCHEDULE C
| CLIN |
| Supplies or Services |
| Quantity and Unit |
| Unit Price |
| Amount |
| C-1 |
| Technical Data |
| For the lump sum of |
| $ |
Note: 1. Technical Data includes approved submittals of as-built drawings, Final Data, Final Drawings, Final Reports, and Operation and Maintenance Manuals.
TOTAL FOR PRICE SCHEDULE C $
PRICE SCHEDULE D
| CLIN |
| Section |
| Supplies or Services |
| Quantity and Unit |
| Estimated Unit Price |
| Estimated Amount |
| D-1 |
| 01 41 26 |
| Pass-Through Costs for Permits Researched by Government |
| For the lump sum of |
| $ 250,125.00 |
Notes: 1. Overhead and profit costs associated with utility relocation shall be incorporated in the associated Price Schedule A CLIN, CLIN A-3 or A-4; price offered for CLINs A-3 and A-4 shall not include pass-through costs.
2. Amount listed by the Government is estimated and shall be used for offeror’s proposal pricing.
3. Include costs not listed in Price Schedule D in Price Schedule A CLINs.
TOTAL FOR PRICE SCHEDULE D $ 250,125.00
TOTAL FOR PRICE SCHEDULES A, B, C, and D $
END OF PRICE SCHEDULES