Amendment_4_Attachment_1_Description_of_Changes_0004.pdf

PDF 85 KB Posted

Attached to
Arkansas Valley Conduit - Crowley Reach 1
Solicitation number
140R6026R0001
Issued by

About this file

This is Amendment No. 0004 to Solicitation No. 140R6026R0001, which modifies six specification sections and four drawings within the original solicitation documents. The amendment replaces specifications in Attachment 1 – Section C for: Section 01 41 26 (Permit Requirements), Section 31 23 22 (Pipe Trench Earthwork), Section 33 05 21 (Bored Crossings), Section 33 11 10 (Pipeline General Requirements), Section 33 11 50 (Pipe Crossings at Existing Utility Pipelines), and Section 52 00 00 (Drawings). The amendment also updates four drawings in Attachment 2 – Section 52 00 00, specifically Sheet Nos. 4, 41, 47, and 49 containing drawing numbers 382-D-60617 (Revision 1), 382-D-60657 (Revision 2), 382-D-60663 (Revision 1), and 382-D-60666 (Revision 1), respectively.

The solicitation involves pipeline construction work, including specifications for permit requirements, earthwork, boring operations, and utility crossings. Essential changes to the revised specifications and drawings are indicated by vertical lines in the margins for contractor reference. All portions of the revised solicitation pages apply regardless of whether specific changes are marked, and contractors must ensure compliance with all updated requirements when preparing their responses.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment No. 0004 Solicitation No. 140R6026R0001

Description of Changes:

1. In Attachment 1 – Section C, remove specifications Section 01 41 26 – Permit Requirements in its entirety and substitute therefor the attached revised Section 01 41 26.

2. In Attachment 1 – Section C, remove specifications Section 31 23 22 – Pipe Trench Earthwork in its entirety and substitute therefor the attached revised Section 31 23 22.

3. In Attachment 1 – Section C, remove specifications Section 33 05 21 – Bored Crossings in its entirety and substitute therefor the attached revised Section 33 05 21.

4. In Attachment 1 – Section C, remove specifications Section 33 11 10 – Pipeline General Requirements in its entirety and substitute therefor the attached revised Section 33 11 10.

5. In Attachment 1 – Section C, remove specifications Section 33 11 50 – Pipe Crossings at

Existing Utility Pipelines in its entirety and substitute therefor the attached revised Section 33 11 50.

6. In Attachment 1 – Section C, remove specifications Section 52 00 00 – Drawings in its entirety and substitute therefor the attached revised Section 52 00 00.

7. In Attachment 2, in Section 52 00 00 – Drawings, remove the following drawings and substitute therefor the attached revised drawing:

Sheet No. Drawing No.

4 382-D-60617 – Revision 1 41 382-D-60657 – Revision 2 47 382-D-60663 – Revision 1 49 382-D-60666 – Revision 1

For convenience, essential changes on the revised solicitation pages are indicated by a vertical line within the margin, whereby the lines or paragraphs are changed from the previous version.

However, all portions of the revised solicitation pages shall apply whether changes thereon have been indicated or not.