This is a Request for Proposal (RFP) for the Azotea Portal and Drop Structures Repairs project issued by the Bureau of Reclamation's Upper Colorado Region Albuquerque Area Office. The solicitation (No. 140R4024R0026) seeks a contractor to perform repairs and construction work on multiple drop structures located approximately 5 miles southwest of Chama, New Mexico, with a total project value estimated between $1,000,000 and $5,000,000.

Key project components include diversion and care of flows, water removal, clearing and grubbing, core drilling, removal of existing reinforced concrete drop structures, excavation, backfilling, constructing new reinforced concrete structures, installing drainage systems, replacing riprap, and implementing safety measures. The proposal is due by 5:00 PM Mountain Time on July 18, 2025, with a mandatory site visit scheduled for July 8, 2025. The contract will be awarded on a best-value basis, with technical capability and past performance considered more important than price. The project has a performance period from September 19, 2025, to March 15, 2027, and includes a one-year warranty on materials and workmanship.

View the file

Other files for this federal contract opportunity

Other files attached to SJC AZOTEA PORTAL AND DROP STRUCTURES, newest first.
File Type Posted
Sol_140R4024R0026_Amd_0005.pdf PDF
Sol_140R4024R0026_Amd_0004.pdf PDF
Sol_140R4024R0026_Amd_0003.pdf PDF
Azotea_Drawing_Set_-_B_W_0003.pdf PDF
Att_3_Azotea_Existing_Drawings_Revised_0003.pdf PDF
SJC_Azotea_Portal__Drop_Structures_Backfill_0003.pdf PDF
Att2_SJC_Azotea_Portal_Drop_Structures_Specs3_0003.docx DOCX document
Sol_140R4024R0026_updated_price_schedule_Amd_2_0002.docx DOCX document
Azotea_Standard_Drawings_0002.pdf PDF
Att_5_Pricing_Schedule_rev1_Amd_2_0002.xlsx XLSX spreadsheet
Sol_140R4024R0026_Amd_0002.pdf PDF
Blico_Floor_Door_Size_Chart-1_0001.pdf PDF
Sol_140R4024R0026_Amd_0001.pdf PDF
Att2_SJC_Azotea_Portal_Drop_Structures_Specs2_0001.pdf PDF
Att_5_Pricing_Schedule.xlsx XLSX spreadsheet
Att_3_Azotea_Existing_Drawings.pdf PDF
Att6-Notice_to_Contractors-CPARS_(December_2015).docx DOCX document
Att8-DI-137_Release_of_Claims.pdf PDF
Att2_SJC_Azotea_Portal___Drop_Structures_Specs.docx DOCX document
Att7-SF25A-16e_Payment_Bond_Form.pdf PDF
Att7-SF25-16e_Performance_Bond_Form.pdf PDF
Att_4_Wage_Determination_NM20250026_4-18-25.pdf PDF
Att1-Construction_Contract_Administration_Information.pdf PDF
Att_3_Azotea_Final_Drawings_All_B_W.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF RECLAMATION

Upper Colorado Region

Albuquerque Area Office

555 Broadway Blvd NE, Suite 100

Albuquerque, NM 87102

Solicitation: 140R4024R0026

Request for Proposal

SJC Azotea Portal and Drop Structures

Magnitude of construction per FAR 36.204: between $1,000,000 and $5,000,000

Quotations Due No-Later-Than:

5:00 PM Mountain Time on Friday, July 18, 2025

• Site Visit will be held on July 8, 2025 – see pages 51-52 clause 52.236-27

Site Visit (Construction) for details.

• Last day for Questions is Friday, July 11, 2025

Solicitation Document No.

140R4024R0026

Document Title Azotea Portal and Drop Structures Repairs

TABLE OF CONTENTS

CONTINUATION OF SECTION B - Supplies or Services/Prices

SECTION C - Description/Specifications

SECTION D - Packaging and Marking

SECTION E - Inspection and Acceptance

SECTION F - Deliveries or Performance

SECTION G - Contract Administration Data

SECTION H - Special Contract Requirements

SECTION I - Contract Clauses

SECTION J - List of Documents, Exhibits and Other Attachments

SECTION K - Representations, Certifications, and Other Statements of Bidders

SECTION L - Instructions,Conditions, and Notices to Bidders

SECTION M - Evaluation Factors for Award

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION CALL

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040667575

Bureau of Reclamation

Upper Colorado Region

Regional Office 125 South State Street, Room 8100

R40

Salt Lake City UT 84138

Mary Maestas 505-462-3581

1x 06/18/2025

140R4024R0026

INVITATION FOR BID

REQUEST FOR PROPOSAL

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Specifications and Drawings

Summary of Work: Azotea Tunnel Portal and Drop Structures are located in Rio Arriba

County, New Mexico approximately 5 miles southwest of Chama, New Mexico.

Principle Components of Work:

1. Diversion and Care of flows at the Azotea Portal, Azotea Creek, and Willow Creek

2. Removal of water from excavations (dewatering for construction of the drop structure foundations.

3. Clearing and Grubbing.

4. Core drill existing reinforced concrete covered flume right wall at Station

1424+45 to 1424+50 for pipe sleeve, PVC pipe, and link seal.

5. Removal of existing reinforced concrete drop structures at the follow locations:

a. Station 1424+83.69 Azotea Portal and Drop Structure.

b. Station1565+00 at Azotea Creek drop structure.

c. Station 1702+75 at Willow Creek drop structure.

d. Station 1831+17 at Willow Creek drop structure.

6. Excavation for foundation and about structures.

7. Backfill and Compaction

8. Construct new flume drain access vault at Station 1424+45 includes dowel anchors into existing cover flume walls.

Continued ...

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 469 calendar days and complete it within ________________ ________________ calendar days after receiving

07/18/2025

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 12/2022)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Upper Colorado Region

Albuquerque Area Office 555 Broadway Blvd NE, Suite 100

R4Q

Albuquerque NM 87102

Mary B. Maestas

28. NEGOTIATED AGREEMENT 29. AWARD

and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

10 U.S.C. 3204(a) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 12/2022) BACK

Continued...

and return

(Contractor is not required to sign this document.) Your offer on this

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 56

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140R4024R0026

9. Construct new reinforced concrete structures at the following stations:

a. Station 1424+83.69 Azotea Portal and Drop Structure.

b. Station 1565+00 at Azotea Creek drop structure.

c. Station 1702+75 at Willow Creek drop structure.

d. Station 1831+17 at Willow Creek drop structure.

10. Placing 5,500 psi reinforced concrete for walls and inverts for the drop structures.

11. Remove existing Riprap at the downstream of drop structures.

12. Replace existing Riprap to the lines and grades as shown of the drawings.

13. Furnishing and placing Geotextile fabric for slotted pipe gravel filter.

14. Furnishing and installing 6-inch diameter DR 51 schedule 80 PVC non-slotted pipe and 6-inch diameter DR 51 schedule 80 PVC slotted pipe drains.

15. Remove, Replace, or Install new hand railing.

16. Furnish and Install Safety Access Ladder at approximately Station 1425+15 shall be removable and lockable.

SJC Azotea Portal and Drop Structures

Delivery: 03/11/2026

Delivery Location Code: 0011285643

Bureau of Reclamation-UC-CFD

Chama Field Division

193 North Pinon Dr.

Chama NM 87520-0426 US

Period of Performance: 09/19/2025 to 03/15/2027

00010 SCHEDULE A - AZOTEA PORTAL AND DROP STRUCTURE

STA. 1424+83.69

Product/Service Code: Z2KB

Product/Service Description: REPAIR OR ALTERATION

OF CANALS

Fixed Price

PSC: Z2KB Repair or Alteration of Canals

Unit of Measure: (AU) Activity Unit

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 56

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140R4024R0026

00011 SCHEDULE B - AZOTEA CREEK DROP STRUCTURE STA.

1565+00

Product/Service Code: Z2KB

Product/Service Description: REPAIR OR ALTERATION

OF CANALS

Fixed Price

PSC: Z2KB Repair or Alteration of Canals

Unit of Measure: (AU) Activity Unit

00012 SCHEDULE C - WILLOW CREEK DROP STRUCTURE STA.

1702+25

Product/Service Code: Z2KB

Product/Service Description: REPAIR OR ALTERATION

OF CANALS

Fixed Price

PSC: Z2KB Repair or Alteration of Canals

Unit of Measure: (AU) Activity Unit

00013 SCHEDULE D - WILLOW CREEK DROP STRUCTURE STA.

1831+17

Product/Service Code: Z2KB

Product/Service Description: REPAIR OR ALTERATION

OF CANALS

Fixed Price

PSC: Z2KB Repair or Alteration of Canals

Unit of Measure: (AU) Activity Unit

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

140R4024R0026

CONTINUATION OF SECTION B – SUPPLIES OR SERVICES/PRICES

SECTION B – SUPPLIES OR SERVICES AND PRICES

SCHEDULE

Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the schedule.

Offerors shall complete Price Schedules A, B, C, and D. Offers for less than the total of

Schedules A, B, C and D will be considered nonresponsive and will not be evaluated for award.

Offers are subject to the terms and conditions of this solicitation.

Quantities in the Price Schedule[s] are estimated quantities for comparison of offers only.

Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated

Quantity, no claim shall be made against the Government for overruns or underruns

See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory

Offeror shall complete work per agreed to project schedule for Schedules A, B, C, and D and receive written notice of substantial completion from the Government or the Government will apply liquidated damages according to contract clause at FAR 52.11-12 Liquidated

Damages – Construction (Sept 2000).

Definitions:

LIN – Line-Item Number

SCHEDULE A - AZOTEA PORTAL AND DROP STRUCTURE STA. 1424+83.69

LIN Section Supplies or Services

Quantity and Unit Unit Price Amount

1)

WBR

1452.232-81 Mobilization and Preparatory Work Lump Sum $ $

2) 31 11 00 Clearing and Grubbing Lump Sum $ $

3) 31 03 15

Diversion and Care of Flows in Azotea

Tunnel Lump Sum $ $

4) 31 03 33 Removal of Water for Construction Lump Sum $ $

5) 03 81 10

Demolition and Removal of Existing

Reinforced Concrete Drop Structure

Sta. 1424+79.37 200 CY $ $

6) 31 23 11 Excavation 2,730 CY $ $

7) 31 23 11 Backfill, Structural 3,330 CY $ $

8) 31 23 02 Backfill, Compaction 2,460 CY $ $

140R4024R0026

9) 33 11 16

Furnish and Install 6-inch diameter schedule 80 PVC Slotted Pipe for

French Drain 450 LF $ $

10) 31 32 32

Furnish and Install Geotextile under DR

51 gravel filter for 6-inch diameter PVC

Slotted Pipe French Drain 6,750 SF $ $

11) 31 37 00

Furnish and Place DR 51 Gravel Filter

Material for 6-inch diameter Slotted

Pipe French Drain 306 TN $ $

12) 33 11 16

Furnish and Install 6-inch diameter schedule 80 PVC Pipe for Flume Drain 100 LF $ $

13) 31 37 00

Removing and Replacing existing

Riprap for Downstream Protection Lump Sum $ $

14) 03 30 00

Furnishing and Placing 5,500 psi reinforced concrete 200 CY $ $

15) 05 50 00

Miscellaneous Metalwork (Guard

Railing) 1 TN $ $

16) 08 31 15

Furnish and Install Flume Drain Access

Well Floor Door 1 EA $ $

17) 05 51 55

Furnish and Install Safety Ladders and

Fall Protection Systems 2 EA $ $

18) 33 12 10

Butterfly Valve, flanged ductile iron pipe section, sleeve, nipples and fittings Lump Sum $ $

19) 32 92 15 Final Grading and Seeding 600 SY $ $

Schedule A – Estimated Subtotal Costs = $

SCHEDULE B – AZOTEA CREEK DROP STRUCTURE STA. 1565+00

LIN Section Supplies or Services

Quantity and Unit Unit Price Amount

20)

WBR

1452.232-81 Mobilization and Preparatory Work Lump Sum $ $

21) 31 11 00 Clearing and Grubbing Lump Sum $ $

22) 31 03 15

Diversion and Care of Flows in Azotea

Channel Lump Sum $ $

23) 31 03 33 Removal of Water for Construction Lump Sum $ $

24) 03 81 10

Demolition and Removal of Existing

Reinforced Concrete 145 CY $ $

25) 31 23 11 Excavation 965 CY $ $

26) 31 23 11 Backfill, Structural 1,180 CY $ $

27) 31 23 02 Backfill, Compaction 870 CY $ $

28) 31 37 00

Removing and Replacing existing Rip for Downstream Protection Lump Sum $ $

29) 03 30 00

Furnishing and Placing 5,500 psi

Reinforced Concrete 145 CY $ $

140R4024R0026

30) 05 50 00

Miscellaneous Metalwork (Guard

Railing) 0.5 TN $ $

31) 32 92 15 Final Grading and Seeding 510 SY $ $

Schedule B – Estimated Subtotal Costs = $

SCHEDULE C – WILLOW CREEK DROP STRUCTURE STA. 1702+25

LIN Section Supplies or Services

Quantity and Unit Unit Price Amount

32)

WBR

1452.232-81 Mobilization and Preparatory Work Lump Sum $ $

33) 31 11 00 Clearing and Grubbing Lump Sum $ $

34) 31 03 15

Diversion and Care of Flows in Azotea

Channel & Willow Creek Lump Sum $ $

35) 31 03 33 Removal of Water for Construction Lump Sum $ $

36) 03 81 10

Demolition and Removal of Existing

Reinforced Concrete Structure. 213 CY $ $

37) 31 23 11 Excavation 1,200 CY $ $

38) 31 23 11 Backfill, Structural 1,450 CY $ $

39) 31 23 02 Backfill, Compaction 1,080 CY $ $

40) 31 37 00

Removing and Replacing existing Rip for Downstream Protection Lump Sum $ $

41) 03 30 00

Furnishing and Placing 5,500 psi reinforced concrete for drop structure walls. 213 CY $ $

42) 05 50 00

Miscellaneous Metalwork (Guard

Railing) 0.5 TN $ $

43) 32 92 15 Final Grading and Seeding 500 SY $ $

Schedule C – Estimated Subtotal Costs = $

SCHEDULE D – WILLOW CREEK DROP STRUCTURE STA. 1831+17

LIN Section Supplies or Services

Quantity and Unit Unit Price Amount

44)

WBR

1452.232-81 Mobilization and Preparatory Work Lump Sum $ $

45) 31 11 00 Clearing and Grubbing Lump Sum $ $

46) 31 03 15

Diversion and Care of Flows in Azotea

Channel and Willow Creek Lump Sum $ $

47) 31 03 33 Removal of Water for Construction Lump Sum $ $

48) 03 81 10

Demolition and Removal of Existing

Reinforced Concrete Structure. 145 CY $ $

49) 31 23 11 Excavation 1,150 CY $ $

50) 31 23 11 Backfill, Structural 1,386 CY $ $

51) 31 23 02 Backfill, Compaction 1,650 CY $ $

140R4024R0026

52) 31 37 00

Removing and Replacing existing

Riprap for Downstream Protection Lump Sum $ $

53) 03 30 00

Furnishing and Placing 5000 psi reinforced concrete for drop structure walls. 145 CY $ $

54) 05 50 00

Miscellaneous Metalwork (Guard

Railing) 0.5 TN $ $

55) 32 92 15 Final Grading and Seeding 500 SY $ $

Schedule D – Estimated Subtotal Costs = $

Schedules A, B, C, & D – Estimated Total Costs = $

B2. WARRANTY

Materials and supplies used under these contract/specifications shall be warranty where applicable to be free of such defects in workmanship as appears under normal use, service, and operation within specified warranty period.

Warranty Period: One (1) year after the Government has issued letter of Substantial

Completion.

END OF SCHEDULE

140R4024R0026

SECTION C - Description/Specifications

Please see Section J – Attachments 2 and 3 for specifications and drawings.

140R4024R0026

SECTION D - Packaging and Marking

This page intentionally left blank.

140R4024R0026

SECTION E - Inspection and Acceptance

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

FAR Clauses: https://www.acquisition.gov/far/

CLAUSES INCORPORATED BY REFERENCE

Clause Title Date

52.246-12 Inspection of Construction August 1996

(End of clause) https://www.acquisition.gov/far/

140R4024R0026

SECTION F - Deliveries or Performance

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

FAR Clauses: https://www.acquisition.gov

CLAUSES INCORPORATED BY REFERENCE

Clause Title Date

52.211-13 Time Extensions SEPT 2000

52.211-18 Variation in Estimated Quantity APR 1984

52.236-15 Schedules for Construction Contracts APR 1984

52.242-14 Suspension of Work APR 1984

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar day (calendar days) after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use within approximately 469 day (calendar days). The time stated for completion shall include final cleanup of the premises. Completion no later than 3/15/2027.

52.211-12 Liquidated Damages – Construction (SEPT 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,111.00 for each calendar day (calendar day) of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

https://www.acquisition.gov/

140R4024R0026

SECTION G - Contract Administration Data

1452.201-70 Authorities and Delegations - Department of the Interior (SEPT 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.

The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The

COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.

Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The

Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the

COR's appointment, within 3 day (calendar day)s of the occurrence. Unless otherwise provided in this contract, the

Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting

Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 day (calendar day)s to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of Clause)

140R4024R0026

DOI-AAAP 0028 Electronic Invoicing and Payment Requirements - Invoice Processing Platform

(IPP) (FEB 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice

Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable

Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions -

Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

When progress payment invoice includes unit priced pay item that surveys required for computing quantities, this submittal is part of documentation required for a proper invoice for progress payments in accordance with paragraph (a)(2)(xi) of the clause at FAR 52.232-27 - Prompt Payment for Construction

Contracts.

Once the invoice has been submitted to IPP, the Contractor shall also provide an electronic copy of the IPP invoice to the following:

Contracting Officer Representative, To be determined

Contracting Officer, Mary B. Maestas mmaestas@usbr.gov

Failure to email the invoice may cause significant delay or possible rejection of your payment request.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The

Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business day (calendar day)s of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the

Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

WBR 1452.242-80 POSTAWARD CONFERENCE -- BUREAU OF RECLAMATION (MAR 2022)

(a) Prior to the contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The contractor's project manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.

(b) The conference will be held in person at location to be determined at award.

(c) The contracting officer and the contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the contracting officer shall establish the date for the conference.

(d) The contractor shall not be entitled to the reimbursement any costs associated with attendance at the conference beyond the agreed-to contract price.

WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND

LIMITATIONS -- BUREAU OF RECLAMATION (MAY 2018)

https://www.ipp.gov/ https://www.ipp.gov/ mailto:mmaestas@usbr.gov mailto:IPPCustomerSupport@fiscal.treasury.gov

140R4024R0026

a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation

Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:

(1) Inspecting and accepting or rejecting work performed under the contract.

(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.

(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.

(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.

(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -

(1) Constitutes a direction of additional work outside the Contract requirements;

(2) Constitutes a change as defined in the contract clause entitled “Changes;”

(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;

(4) Changes any of the expressed terms, conditions or specifications of the contract; or

(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.

(d) All technical direction shall be issued in writing by the COR.

(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through

(c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five

(5) working day (calendar day)s after receipt of any such instruction or direction and must request the Contracting

Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting

Officer must -

(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or

(2) Advise the Contractor that the Government will issue a written change order.

(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”

140R4024R0026

SECTION H - Special Contract Requirements

DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

(DECEMBER 2015)

1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The

Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting

System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a webbased system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 day (calendar day)s after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

5) Within 60 day (calendar day)s after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at: https://www.cpars.gov/.

a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.

b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

c) All information provided should be reviewed for accuracy prior to submission.

d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.

e) Your response is due within 60 calendar day (calendar day)s after receipt of the CPAR. On day (calendar day) 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

f) If you do not sign and submit the CPAR within 60 day (calendar day)s, it will automatically be returned to the

Government and will be annotated: "The report was delivered/received by the contractor on (date).

The contractor neither signed nor offered comment in response to this assessment."

6)The following guidelines apply concerning your use of the past performance evaluation:

a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never

140R4024R0026 released to persons or entities outside of your control.

c) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven day (calendar day)s following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day (calendar day) review period.

8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

140R4024R0026

SECTION I - Contract Clauses

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

FAR Clauses: https://www.acquisition.gov

CLAUSES INCORPORATED BY REFERENCE

Clause Title Date

52.202-1 Definitions. JUN 2020

52.203-3 Gratuities. APR 1984

52.203-5 Covenant Against Contingent Fees. MAY 2014

52.203-6 Restrictions on Subcontractor Sales to the Government JUN 2020

52.203-7 Anti-Kickback Procedures. JUN 2020

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity.

MAY 2014

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. MAY 2014

52.203-12 Limitation on Payments to Influence Certain Federal

Transactions.

JUN 2020

52.203-13 Contractor Code of Business Ethics and Conduct. NOV 2021

52.203-17 Contractor Employee Whistleblower Rights. NOV 2023

52.203-19 Prohibition on Requiring Certain Internal Confidentiality

Agreements or Statements.

JAN 2017

52.204-10 Reporting Executive Compensation and First-Tier Subcontract

Awards.

JUN 2020

52.204-13 System for Award Management Maintenance. OCT 2018

52.204-14 Service Contract Reporting Requirements. OCT 2016

52.204-18 Commercial and Government Entity Code Maintenance. AUG 2020

52.204-19 Incorporation by Reference of Representations and

Certifications. (DEC 2014)

DEC 2014

52.204-23 Prohibition on Contracting for Hardware, Software, and

Services Developed or Provided by Kaspersky Lab Covered

Entities.

DEC 2023

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

NOV 2021

52.204-27 Prohibition on a ByteDance Covered Application. JUN 2023

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment.

NOV 2021

52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters.

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations. (NOV 2015)

NOV 2015

52.210-1 Market Research. NOV 2021

52.215-2 Audit and Records - Negotiation. JUN 2020

52.215-8 Order of Precedence - Uniform Contract Format. OCT 1997

52.215-17 Waiver of Facilities Capital Cost of Money. OCT 1997

52.219-6 Notice of Total Small Business Set-Aside. NOV 2020

52.219-8 Utilization of Small Business Concerns. FEB 2024 https://www.acquisition.gov/

140R4024R0026

52.219-28 Post-Award Small Business Program Rerepresentation. FEB 2024

52.222-3 Convict Labor. JUNE 2003

52.222-4 Contract Work Hours and Safety Standards - Overtime

Compensation.

MAY 2018

52.222-6 Construction Wage Rate Requirements. AUG 2018

52.222-7 Withholding of Funds. MAY 2014

52.222-8 Payrolls and Basic Records. JUL 2021

52.222-10 Compliance With Copeland Act Requirements. FEB 1988

52.222-11 Subcontracts (Labor Standards). MAY 2014

52.222-12 Contract Termination - Debarment. MAY 2014

52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations.

MAY 2014

52.222-14 Disputes Concerning Labor Standards. FEB 1988

52.222-15 Certification of Eligibility. MAY 2014

52.222-35 Equal Opportunity for Veterans. JUN 2020

52.222-36 Equal Opportunity for Workers with Disabilities. JUN 2020

52.222-37 Employment Reports on Veterans. JUN 2020

52.222-40 Notification of Employee Rights Under the National Labor

Relations Act.

DEC 2010

52.222-50 Combating Trafficking in Persons. NOV 2021

52.222-54 Employment Eligibility Verification. MAY 2022

52.222-55 Minimum Wages for Contractor Workers Under Executive

Order 14026.

JAN 2022

52.222-62 Paid Sick Leave Under Executive Order 13706. JAN 2022

52.223-3 Hazardous Material Identification and Material Safety Data.

(FEB 2021) - Alternate I

JUL 1995

52.223-5 Pollution Prevention and Right-to-Know Information. MAY 2024

52.225-11 Buy American - Construction Materials Under Trade

Agreements - Alternate I

NOV 2023

52.225-13 Restrictions on Certain Foreign Purchases. FEB 2021

52.226-7 Drug-Free Workplace. MAY 2024

52.226-8 Encouraging Contractor Policies To Ban Text Messaging

While Driving.

MAY 2024

52.227-1 Authorization and Consent. JUN 2020

52.227-2 Notice and Assistance Regarding Patent and Copyright

Infringement.

JUN 2020

52.227-4 Patent Indemnity--Construction Contracts. DEC 2007

52.228-2 Additional Bond Security. OCT 1997

52.228-11 Individual Surety-Pledge of Assets. FEB 2021

52.228-12 Prospective Subcontractor Requests for Bonds. DEC 2022

52.228-14 Irrevocable Letter of Credit. NOV 2014

52.229-3 Federal, State, and Local Taxes. FEB 2013

52.232-5 Payments Under Fixed-Price Construction Contracts. MAY 2014

52.232-16 Progress Payments - Alternate I MAR 2000

52.232-17 Interest. MAY 2014

52.232-18 Availability of Funds. APR 1984

52.232-23 Assignment of Claims. MAY 2014

52.232-27 Prompt Payment for Construction Contracts. JAN 2017

52.232-33 Payment by Electronic Funds Transfer - System for Award

Management.

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations. JUN 2013

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors.

MAR 2023

140R4024R0026

52.233-1 Disputes. MAY 2014

52.233-3 Protest After Award. AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim. OCT 2004

52.236-2 Differing Site Conditions. APR 1984

52.236-3 Site Investigation and Conditions Affecting the Work. APR 1984

52.236-5 Material and Workmanship. APR 1984

52.236-6 Superintendence by the Contractor. APR 1984

52.236-7 Permits and Responsibilities. NOV 1991

52.236-8 Other Contracts. APR 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

APR 1984

52.236-10 Operations and Storage Areas. APR 1984

52.236-11 Use and Possession Prior to Completion. APR 1984

52.236-12 Cleaning Up. APR 1984

52.236-13 Accident Prevention. NOV 1991

52.236-17 Layout of Work. APR 1984

52.236-21 Specifications and Drawings for Construction. FEB 1997

52.236-26 Preconstruction Conference. FEB 1995

52.242-13 Bankruptcy. JUL 1995

52.243-4 Changes. JUN 2007

52.246-21 Warranty of Construction MAR 1994

52.248-3 Value Engineering - Construction. OCT 2020

52.249-2 Termination for Convenience of the Government (Fixed-Price)

Alternate I

SEPT 1996

52.249-10 Default (Fixed-Price Construction). APR 1984

52.253-1 Computer Generated Forms. JAN 1991

(End of clause)

52.228-15 Performance and Payment Bonds-Construction (Jun 2020)

(a) Definitions. As used in this clause-

Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in

Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:

(1) Performance bonds ( Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bonds ( Standard Form 25A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(3) Additional bond protection. (i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.

(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

140R4024R0026

(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.

(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular

570 is published in the Federal Register or may be obtained from the:

U.S. Department of the Treasury, Financial Management, Service Surety Bond Branch, 3700 East West Highway, Room 6 F01, Hyattsville, MD 20782.

Or via the internet at http://www.fms.treas.gov/c570/.

(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.

52.252-6 Authorized Deviations in Clauses. (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the date of the clause.

(b) The use in this solicitation or contract of any [insert regulation name] (48 CFR [ ]) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the name of the regulation.

(End of clause)

52.203-14 Display of Hotline Poster(s). (NOV 2021)

(a) Definition.

United States, as used in this clause, means the 50 States, the District of Columbia, and outlying areas.

(b) Display of fraud hotline poster(s). Except as provided in paragraph (c)-

(1) During contract performance in the United States, the Contractor shall prominently display in common work areas within business segments performing work under this contract and at contract work sites-

(i) Any agency fraud hotline poster or Department of Homeland Security (DHS) fraud hotline poster identified in paragraph (b)(3) of this clause; and

(ii) Any DHS fraud hotline poster subsequently identified by the Contracting Officer.

(2) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the poster(s) at the website.

140R4024R0026

(3) Any required posters may be obtained as follows:

Poster(s) Obtain from

Downloadable hotline posters as well as instructions for obtaining a hard copy poster are available at:

https://www.doioig.gov/complaints-requests/contractor-recipient-resources

(c) If the Contractor has implemented a business ethics and conduct awareness program, including a reporting mechanism, such as a hotline poster, then the Contractor need not display any agency fraud hotline posters as required in paragraph (b) of this clause, other than any required DHS posters.

(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in all subcontracts that exceed the threshold specified in Federal Acquisition Regulation 3.1004(b)(1) on the date of subcontract award, except when the subcontract-

(1) Is for the acquisition of a commercial product or commercial service; or

(2) Is performed entirely outside the United States.

52.219-14 Limitations on Subcontracting. (OCT 2022) (DEVIATION OCT 2022)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that-

(1) Has the same small business program status as that which qualified the prime contractor for the award

(e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status);

and

(2) Is considered small for the size standard under the North American Industry Classification System

(NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to-

(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;

(4) Orders expected to exceed the simplified acquisition threshold and that are-

(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to small business concerns under multiple-award contracts as described in

19.504(c)(1)(ii);

(5) Orders, regardless of dollar value, that are-

140R4024R0026

(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees to the following requirements in the performance of a contract assigned a North American Industry Classification

System (NAICS) code applicable to this contract:

(1) Services (except construction). It will not pay more than 50 percent of the amount paid by the

Government for contract performance, excluding certain other direct costs and certain work performed outside the

United States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract.

(i) The following services may be excluded from the 50 percent limitation:

(A) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code (562910), cloud computing services, or mass media purchases.

(B) Work performed outside the United States on awards made pursuant to the Foreign

Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.

(2) Supplies (other than procurement from a nonmanufacturer of such supplies). It will not pay more than

50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract.

(3) General construction. It will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.

(4) Construction by special trade contractors. It will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 75 percent subcontract amount that cannot be exceeded.

(f) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause –

_X_ By the end of the base term of the contract and then by the end of each subsequent option period; or

__ By the end of the performance period for each order issued under the contract.

140R4024R0026

(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.

(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph

(e) of this clause will be performed by the aggregate of the joint venture participants.

(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business

Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.

1452.203-70 Restrictions on Endorsements (JUL 1996)

The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government or is considered by the Government to be superior to other products or services.