Sol_140R4024R0026_updated_price_schedule_Amd_2_0002.docx

DOCX document 37 KB Posted

Attached to
SJC AZOTEA PORTAL AND DROP STRUCTURES
Solicitation number
140R4024R0026
Issued by

About this file

This document is a detailed Price Schedule for the Azotea Portal and Drop Structures Repairs solicitation (No. 140R4024R0026) issued by the Department of the Interior Bureau of Reclamation. The solicitation covers four separate schedules (A, B, C, and D) for repair and construction work at different drop structure locations: Azotea Portal (Station 1424+83.69), Azotea Creek Drop Structure (Station 1565+00), Willow Creek Drop Structure (Station 1702+25), and another Willow Creek Drop Structure (Station 1831+17).

The price schedule includes comprehensive construction activities such as mobilization, clearing, excavation, backfilling, concrete work, drainage installations, metalwork, and site restoration. Key requirements include completing work per an agreed project schedule, with potential liquidated damages for delays. Contractors must submit pricing for all four schedules, with a one-year warranty period after substantial completion. The estimated total project cost is not explicitly stated, as unit prices are left blank, but the document provides detailed quantity breakdowns for each construction element across the four project locations.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Document No.

140R4024R0026 Document Title Azotea Portal and Drop Structures Repairs

Solicitation
Document No.

140R4024R0026 Document Title Azotea Portal and Drop Structures Repairs

CONTINUATION OF SECTION B – SUPPLIES OR SERVICES/PRICES

Updated – Amendment 2

SECTION B – SUPPLIES OR SERVICES AND PRICES

SCHEDULE

Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the schedule.

Offerors shall complete Price Schedules A, B, C, and D. Offers for less than the total of Schedules A, B, C and D will be considered nonresponsive and will not be evaluated for award.

Offers are subject to the terms and conditions of this solicitation.

Quantities in the Price Schedule[s] are estimated quantities for comparison of offers only. Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Offeror shall complete work per agreed to project schedule for Schedules A, B, C, and D and receive written notice of substantial completion from the Government or the Government will apply liquidated damages according to contract clause at FAR 52.11-12 Liquidated Damages – Construction (Sept 2000).

Definitions:

LIN – Line-Item Number

SCHEDULE A - AZOTEA PORTAL AND DROP STRUCTURE STA. 1424+83.69

LIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount

WBR

1452.232-81

Mobilization and Preparatory Work
Lump Sum
$
$
31 11 00
Clearing and Grubbing
Lump Sum
$
$
31 03 15
Diversion and Care of Flows in Azotea Tunnel
Lump Sum
$
$
31 03 33
Removal of Water for Construction
Lump Sum
$
$
03 81 10
Demolition and Removal of Existing Reinforced Concrete Drop Structure Sta. 1424+79.37
200 CY
$
$
31 23 11
Excavation
2,730 CY
$
$
31 23 11
Backfill, Structural
3,330 CY
$
$
31 23 02
Backfill, Compaction
2,460 CY
$
$
33 11 16
Furnish and Install 6-inch diameter schedule 80 PVC Slotted Pipe for French Drain
450 LF
$
$
31 32 32
Furnish and Install Geotextile under DR 51 gravel filter for 6-inch diameter PVC Slotted Pipe French Drain
6,750 SF
$
$
31 37 00
Furnish and Place DR 51 Gravel Filter Material for 6-inch diameter Slotted Pipe French Drain
306 TN
$
$
33 11 16
Furnish and Install 6-inch diameter schedule 80 PVC Pipe for Flume Drain
100 LF
$
$
31 37 00
Removing and Replacing existing Riprap for Downstream Protection
Lump Sum
$
$
03 30 00
Furnishing and Placing 5,500 psi reinforced concrete
200 CY
$
$
05 50 00
Miscellaneous Metalwork (Guard Railing)
1 TN
$
$
08 31 15
Furnish and Install Flume Drain Access Well Floor Door
1 EA
$
$
05 51 55
Furnish and Install Safety Ladders and Fall Protection Systems
2 EA
$
$
33 12 10
Butterfly Valve, flanged ductile iron pipe section, sleeve, nipples and fittings
Lump Sum
$
$
32 92 15
Final Grading and Seeding
600 SY
$
$
Applicable Taxes:
% rate:
$

Schedule A – Estimated Subtotal Costs = $

SCHEDULE B – AZOTEA CREEK DROP STRUCTURE STA. 1565+00

LIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount

WBR

Mobilization and Preparatory Work
Lump Sum
$
$
31 11 00
Clearing and Grubbing
Lump Sum
$
$
31 03 15
Diversion and Care of Flows in Azotea Channel
Lump Sum
$
$
31 03 33
Removal of Water for Construction
Lump Sum
$
$
03 81 10
Demolition and Removal of Existing Reinforced Concrete
145 CY
$
$
31 23 11
Excavation
965 CY
$
$
31 23 11
Backfill, Structural
1,180 CY
$
$
31 23 02
Backfill, Compaction
870 CY
$
$
31 37 00
Removing and Replacing existing Rip for Downstream Protection
Lump Sum
$
$
03 30 00
Furnishing and Placing 5,500 psi Reinforced Concrete
145 CY
$
$
05 50 00
Miscellaneous Metalwork (Guard Railing)
0.5 TN
$
$
32 92 15
Final Grading and Seeding
510 SY
$
$
Applicable Taxes:
% rate:
$

Schedule B – Estimated Subtotal Costs = $

SCHEDULE C – WILLOW CREEK DROP STRUCTURE STA. 1702+25

LIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount

WBR

Mobilization and Preparatory Work
Lump Sum
$
$
31 11 00
Clearing and Grubbing
Lump Sum
$
$
31 03 15
Diversion and Care of Flows in Azotea Channel & Willow Creek
Lump Sum
$
$
31 03 33
Removal of Water for Construction
Lump Sum
$
$
03 81 10
Demolition and Removal of Existing Reinforced Concrete Structure.
213 CY
$
$
31 23 11
Excavation
1,200 CY
$
$
31 23 11
Backfill, Structural
1,450 CY
$
$
31 23 02
Backfill, Compaction
1,080 CY
$
$
31 37 00
Removing and Replacing existing Rip for Downstream Protection
Lump Sum
$
$
03 30 00
Furnishing and Placing 5,500 psi reinforced concrete for drop structure walls.
213 CY
$
$
05 50 00
Miscellaneous Metalwork (Guard Railing)
0.5 TN
$
$
32 92 15
Final Grading and Seeding
500 SY
$
$
Applicable Taxes:
% rate:
$

Schedule C – Estimated Subtotal Costs = $

SCHEDULE D – WILLOW CREEK DROP STRUCTURE STA. 1831+17

LIN
Section
Supplies or Services
Quantity and Unit
Unit Price
Amount

WBR

Mobilization and Preparatory Work
Lump Sum
$
$
31 11 00
Clearing and Grubbing
Lump Sum
$
$
31 03 15
Diversion and Care of Flows in Azotea Channel and Willow Creek
Lump Sum
$
$
31 03 33
Removal of Water for Construction
Lump Sum
$
$
03 81 10
Demolition and Removal of Existing Reinforced Concrete Structure.
145 CY
$
$
31 23 11
Excavation
1,150 CY
$
$
31 23 11
Backfill, Structural
1,386 CY
$
$
31 23 02
Backfill, Compaction
1,650 CY
$
$
31 37 00
Removing and Replacing existing Riprap for Downstream Protection
Lump Sum
$
$
03 30 00
Furnishing and Placing 5000 psi reinforced concrete for drop structure walls.
145 CY
$
$
05 50 00
Miscellaneous Metalwork (Guard Railing)
0.5 TN
$
$
32 92 15
Final Grading and Seeding
500 SY
$
$
Applicable Taxes:
% rate:
$

Schedule D – Estimated Subtotal Costs = $ Schedules A, B, C, & D – Estimated Total Costs = $

B2. WARRANTY

Materials and supplies used under these contract/specifications shall be warranty where applicable to be free of such defects in workmanship as appears under normal use, service, and operation within specified warranty period.

Warranty Period: One (1) year after the Government has issued letter of Substantial Completion.

END OF SCHEDULE