About this file

This document is an informational page about Construction Contract Administration requirements under Federal Acquisition Regulation (FAR) 36.211(b). The document outlines a regulatory requirement for federal agencies to provide detailed descriptions of policies and procedures related to definitizing equitable adjustments for change orders in construction contracts. Specifically, the document directs readers to a Department of the Interior (DOI) website (https://www.doi.gov/pam/acquisition/policy/constructioncontract) where additional information about the time required to definitize change order adjustments can be found.

View the file

Other files for this federal contract opportunity

Other files attached to SJC AZOTEA PORTAL AND DROP STRUCTURES, newest first.
File Type Posted
Sol_140R4024R0026_Amd_0005.pdf PDF
Sol_140R4024R0026_Amd_0004.pdf PDF
Sol_140R4024R0026_Amd_0003.pdf PDF
Azotea_Drawing_Set_-_B_W_0003.pdf PDF
Att_3_Azotea_Existing_Drawings_Revised_0003.pdf PDF
SJC_Azotea_Portal__Drop_Structures_Backfill_0003.pdf PDF
Att2_SJC_Azotea_Portal_Drop_Structures_Specs3_0003.docx DOCX document
Sol_140R4024R0026_updated_price_schedule_Amd_2_0002.docx DOCX document
Azotea_Standard_Drawings_0002.pdf PDF
Att_5_Pricing_Schedule_rev1_Amd_2_0002.xlsx XLSX spreadsheet
Sol_140R4024R0026_Amd_0002.pdf PDF
Blico_Floor_Door_Size_Chart-1_0001.pdf PDF
Sol_140R4024R0026_Amd_0001.pdf PDF
Att2_SJC_Azotea_Portal_Drop_Structures_Specs2_0001.pdf PDF
Sol_140R4024R0026.pdf PDF
Att_5_Pricing_Schedule.xlsx XLSX spreadsheet
Att_3_Azotea_Existing_Drawings.pdf PDF
Att6-Notice_to_Contractors-CPARS_(December_2015).docx DOCX document
Att7-SF25A-16e_Payment_Bond_Form.pdf PDF
Att8-DI-137_Release_of_Claims.pdf PDF
Att2_SJC_Azotea_Portal___Drop_Structures_Specs.docx DOCX document
Att7-SF25-16e_Performance_Bond_Form.pdf PDF
Att_4_Wage_Determination_NM20250026_4-18-25.pdf PDF
Att_3_Azotea_Final_Drawings_All_B_W.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Contract Administration

Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at:

https://www.doi.gov/pam/acquisition/policy/constructioncontract.