This is a bid pack document for Gardner Elementary School's food service equipment replacement and renovation project, issued by the Lansing School District in collaboration with Colliers Engineering & Design (architect), Beckering Construction (contractor), and supporting consultants. The project encompasses renovation of kitchen, serving, and cafeteria spaces located at 333 Dahlia Drive, Lansing, Michigan, to update finishes, equipment, and lighting across approximately 9,802 square feet of cafeteria and 3,695 square feet of kitchen space within the 322,384 square foot Type IIB sprinklered educational facility. The project is divided into two phases: Phase 1 to be completed Summer 2026 and Phase 2 to be completed Summer 2027. The bid pack includes comprehensive architectural drawings, code compliance and life safety plans, general notes and requirements, demolition plans, floor and ceiling plans, finish plans, door schedules, and food service equipment plans with associated mechanical, plumbing, and electrical coordination requirements.
The project shall comply with the 2021 Michigan Building Code, Rehabilitation Code, Fire Safety Rules, Mechanical Code, Plumbing Code, 2023 Michigan Electrical Code, and applicable accessibility standards. All permit fees are the contractor's responsibility, and work must be coordinated with the Authority Having Jurisdiction and fire marshal. The renovation involves selective demolition including removal of existing ceiling systems, light fixtures, HVAC equipment, food service equipment, flooring, and partition walls, with careful protection of existing construction elements noted to remain. New construction includes suspended ceiling systems, updated finishes in resilient tile and epoxy flooring, ceramic tile, painted surfaces, acoustic ceiling tiles, and coordinated mechanical, plumbing, and electrical systems. All work must follow detailed specifications for materials, testing, quality control, waste management, and closeout procedures as outlined in the general notes and requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X4
X4
X4
24X42 24X42
24X4824X48
24X60
X4
X5
24X42 24X42
X4
X4
X4
24X42 24X42
X4
X4
X4
X4
24X48 24X48
24X48
24X42 24X42
X4
X4
24X42
24X42
X4
X4
24X42
D
W
WEST SERVING AREA
WEST PLATFORM
EAST PLATFORM
KITCHEN
EAST SERVING AREA
COMBINED CAFETERIA
STORAGE
PHASING LEGEND
PHASE 1 - TO BE COMPLETED
SUMMER 2026
PHASE 2 - TO BE COMPLETED
SUMMER 2027
SHEET INDEX
00 - GENERAL
G000 COVER SHEET
G001 CODE COMPLIANCE & LIFE SAFETY PLANS
04 - ARCHITECTURAL
A001 GENERAL NOTES AND LEGENDS
A002 GENERAL REQUIREMENTS
AD101 FIRST FLOOR AND CEILING DEMOLITION PLANS
A101 FIRST FLOOR AND CEILING PLANS
A141 FIRST FLOOR FINISH PLAN
A601 DOOR SCHEDULE AND SPECIFICATIONS
05 - MECHANICAL
MD101 FIRST FLOOR PLAN - DEMOLITION
M101 FIRST FLOOR PLAN - MECHANICAL
06 - PLUMBING
PD101 FIRST FLOOR PLAN - DEMOLITION
P101 FIRST FLOOR PLAN - PLUMBING
08 - ELECTRICAL
E100 DETAILS, SYMBOL LEGEND & SPECIFICATIONS
E200 ONE-LINE DIAGRAM
ED101 FIRST FLOOR PLAN - DEMOLITION
EL101 FIRST FLOOR PLAN - LIGHTING
EL102 FIRST FLOOR PLAN - PHOTOMETRICS
EP101 FIRST FLOOR PLAN - POWER
10 - FOOD SERVICE
FSE-0 FOOD SERVICE - EQUIPMENT DEMOLITION FLOOR PLAN
FSE-1 FOOD SERVICE - EQUIPMENT FLOOR PLAN
FSE-2 FOOD SERVICE - EQUIPMENT SCHEDULE
FSE-3 FOOD SERVICE - ELECTRICAL FLOOR PLAN
FSE-4 FOOD SERVICE - PLUMBING FLOOR PLAN
FSE-5 FOOD SERVICE - REFRIGERATION SCHEDULE
FSE-6 FOOD SERVICE - EQUIPMENT DETAIL SHEET
PROJECT SCOPE
RENOVATION OF KITCHEN, SERVING, AND CAFETERIA SPACES TO UPDATE FINISHES, EQUIPMENT, AND LIGHTING.
APPLICABLE BUILDING CODES
BUILDING CODE: 2021 MICHIGAN BUILDING CODE
2021 MICHIGAN REHABILITATION CODE
MI FIRE SAFETY
STATE RULES: NFPA 101-2012
2016 SCHOOL FIRE SAFETY RULES
MECHANICAL CODE: 2021 MICHIGAN MECHANICAL CODE
PLUMBING CODE: 2021 MICHIGAN PLUMBING CODE
ELECTRICAL CODE: 2023 MICHIGAN ELECTRICAL CODE, PART 8 RULES (BY REFERENCE 2023 NEC)
ACCESSIBILITY: BARRIER FREE - ICC A117.1-2017
ENERGY CODE: 2021 MICHIGAN ENERGY CODE
BUILDING DATA
CONSTRUCTION TYPE= IIB
SPRINKLERED
WHOLE BUILDING AREA: 322,384 SF
CAFETERIA AREA: 9,802 SF
KITCHEN AREA: 3,695 SF
USE AND OCCUPANCY
BUILDING IS CLASSIFIED AS "E" EDUCATION
INTERIOR FINISH
SECTION 803 INTERIOR FINISH AND TRIM: SPRINKLERED TABLE 803.11
INTERIOR FINISHES AND TRIM SHALL MEET FLAME SPREAD, SMOKE DEVELOPED AND CLASS RATINGS
AS REQUIRED FOR SPECIFIC USE AND AREA: E
PROJECT LOCATION
www.colliersengineering.com
GRAND RAPIDS
560 5th St. NW Suite 305 // Grand Rapids, MI 49504
Phone: 616.827.4270
Colliers Engineering
& Design A
R C
H D x
DRAWING NUMBER:
Copyright © 2025. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of
Colliers Engineering & Design.
NOTE: DO NOT SCALE DRAWING FOR CONSTRUCTION.
MI ARCHITECTURE
FIRM LICENSE # NLP000605
DRAWING INDEXPROJECT CONTACT LIST
PROJECT LOCATION MAP
OWNER:
LANSING SCHOOL DISTRICT
519 W KALAMAZOO
LANSING, MI
CONTACT: TODD COE
ARCHITECT:
COLLIERS ENGINEERING & DESIGN
560 5TH ST, STE 305
GRAND RAPIDS, MI
CONTACT: COURTNEY NORRIS
PHONE: 616-827-4276
CONTRACTOR:
BECKERING CONSTRUCTION
650 44TH ST SE
GRAND RAPIDS, MI
CONTACT: DAVID BECKERING
MECHANICAL ENGINEER:
COLLIERS ENGINEERING & DESIGN
100 CESAR E CHAVEZ AVE SW, #400
GRAND RAPIDS, MI
CONTACT: LARRY WOOD
ELECTRICAL ENGINEER:
CLASSIC ENGINEERING
100 CESAR E CHAVEZ AVE SW, #400
GRAND RAPIDS, MI
CONTACT: CINDY LADEWIG
CONSULTANT:
JRA FOOD SERVICE CONSULTANTS
3113 W. RIVER ROAD
MUSKEGON, MI 49445
CONTACT: JIM RIEMENSCHNEIDER
PHON: 616-454-4433
CODE REVIEW
BID PACK 2
/1
/2
:0 :0
P
M
GARDNER ELEMENTARY FOOD SERVICE - EQUIPMENT
REPLACEMENT & RENOVATION SO-1852
333 DAHLIA DRIVE
LANSING, MI 48911
G000
3/13/26
SCALE : 1" = 30'-0"
PHASING DIAGRAM
REV DATE DESCRIPTION
3 03/13/26 BID PACK 2 - BIDS & PERMITS
FE
FE
X
X
X
24X42 24X42
24X4824X48
24X60
X
X
24X42 24X42
X
X
X
24X42 24X42
X
X
X
X
24X48 24X48
24X48
24X42 24X42
X
X
24X42
24X42
X
X
24X42
D
W
OCCUPANCY GROUP
# OCCUPANTS
S.F.
PHASING LEGEND
EXIT SIGN
EXIT
COMMON PATH OF EGRESS DISTANCE
EXIT ACCESS TRAVEL DISTANCE
(ALONG STAIRWAY NOSING AT OPEN
STAIRWAYS)
FIRE EXTINGUISHER ON WALL BRACKET
FIRE EXTINGUISHER CABINET
1-HR RATED WALL
1-HR. RATED FLOOR/BEAM/COLUMN
TO SUPPORT RATED ELEVATOR
SHAFT & MACHINE ROOM ENCLOSURE
DF DRINKING FOUNTAIN
SS SERVICE SINK
SIGN DIRECTION
FACE OF SIGN
EATD
CPET
1. APPLICABLE CODES:
A. WORK SHALL CONFORM TO FEDERAL, STATE AND LOCAL CODES
AS INTERPRETED BY THE AUTHORITY HAVING JURISDICTION.
2. COMPLIANCE:
A. PROVIDE FIRE EXTINGUISHERS IN CONFORMANCE WITH THE FIRE
CODE SECTION 906 AND COORDINATE WITH FIRE MARSHAL
PRIOR TO INSTALLATION. DO NOT INSTALL FIRE EXTINGUISHERS
UNTIL LOCATIONS HAVE BEEN REVIEWED AND APPROVED BY THE
AUTHORITY HAVING JURISDICTION.
B. OBTAIN ALL REQUIRED PERMITS AND PAYMENT OF PERMIT AND
APPLICATION FEES FOR THE WORK.
3. CERTIFICATIONS:
A. THE ARCHITECT'S CERTIFICATION IS ONLY FOR THE WORK
SHOWN TO BE DONE. IT DOES NOT CONSTITUTE APPROVAL OF
PRE-EXISTING CONDITIONS OR REVIEW OF THOSE CONDITIONS
FOR CODE COMPLIANCE.
GENERAL NOTES
A-2
7068 SF
/15 = 471
A-2
2800 SF
/200 = 14
A-2
760 SF
/60 = 12
COMBINED CAFETERIA
EAST SERVING AREA
WEST SERVING AREA
KITCHEN
NEW COOLER
130B
STORAGE
WEST PLATFORM
EAST PLATFORM
STORAGE
D-126
STORAGE
D-118
CORRIDOR
D-111
CORRIDOR
D-123
CORRIDOR
D-147
VESTIBULE
D-112
A-2
760 SF
/60 = 12
TRAVEL DISTANCE: 78' - 6"
TRAVEL DISTANCE: 35' - 0"
TRAVEL DISTANCE: 18' - 6"
TRAVEL DISTANCE: 78' - 6"
TRAVEL DISTANCE: 40' - 6"
TRAVEL DISTANCE: 82' - 0"
TRAVEL DISTANCE: 80' - 0"
TRAVEL DISTANCE: 78' - 0"
Colliers Engineering & Design, Architecture, Landscape Architecture, Surveying, CT P.C.
Colliers
Engineering & Design
Colliers
Engineering & Design
GRAND RAPIDS
560 5th St. NW
Suite 305
Grand Rapids, MI 49504
Phone: 616.827.4270
A R
C H
D x
PROJECT MANAGER:
DESIGNER: REVIEWER:
DISCIPLINE LEAD:
DRAWING NUMBER:
DATE ISSUED: PROJECT NUMBER:
SHEET NAME:
Copyright © 2024. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of
Colliers Engineering & Design.
www.colliersengineering.com
NOTE: DO NOT SCALE DRAWING FOR CONSTRUCTION.
MI ARCHITECTURE
FIRM LICENSE # NLP000605
E F
D
CB
A
KEY PLAN
BID PACK 2
/1
/2
:0 :0
P
M
GARDNER ELEMENTARY
FOOD SERVICE - EQUIPMENT
REPLACEMENT &
RENOVATION SO-1852
333 DAHLIA DRIVE
LANSING, MI 48911
C NORRIS
E POST
B HUYLER
G001
CODE COMPLIANCE &
LIFE SAFETY PLANS
LANSING SCHOOL
DISTRICT
3/13/26 26000752A
SCALE : 1/16" = 1'-0"
LIFE SAFETY PLAN - AREA OF WORK
N
REHABILITATION OF EXISTING STRUCTURES:
REPAIRS
PER THE 2021 MICHIGAN RAHABILITATION CODE FOR EXISTING BUILDINGS (2021 EIBC)
ALTERATIONS - LEVEL 1
CHANGE OF OCCUPANCY
FORMER OCCUPANCY CLASSIFICATION(S):
NEW OCCUPANCY CLASSIFICATION(S):
PARTIAL CHANGE OF OCCUPANCY: YES NO
ADDITIONS
IF YES: SEPARATED NOT SEPARATED
ALTERATIONS - LEVEL 2
ALTERATIONS - LEVEL 3
SEPARATED ADDITION: YES NO
IF YES, FIRE RESISTENCE RATING:
HISTORIC BUILDING
(CHAPTER 6)
(CHAPTER 7)
(CHAPTER 8)
(CHAPTER 9)
(CHAPTER 10)
(CHAPTER 11)
(CHAPTER 12)
RELOCATED BUILDING (CHAPTER 13)
ACCESSIBILITY UPGRADES: COMPLY WITH
SECTION 410 AND ADDENDA
FIRE WALL
FIRE BARRIER
HR
HR
X
SINGLE
MIXED OCCUPANCY
IF SEPARATED, FIRE RESISTANCE RATING OF FIRE BARRIER:
OCCUPANCY CLASSIFICATION(S):
USES:
HR
(CHAPTERS 3 & 5)
(TABLE 508.4)
SEPARATED COMBINATIONNON-SEPARATED
OCCUPANCY CLASSIFICATION AND MIXED OCCUPANCIES:
ACCESSORY - GROUP ; % OF FLOOR AREA
AREA OF WORK IS KITCHEN/SERVING (B/M) AND CAFETERIA (A-2)
E- EDUCATION
X
AUTOMATIC SPRINKLER SYSTEM PROVIDED THROUGHOUT BUILDING:
YES
13R
NO
13NFPA STANDARD:
PARTIAL/LIMITED-AREA SPRINKLER SYSTEM:
YES NO
ALT. FIRE PROTECTION SYSTEM:
X
CONSTRUCTION TYPE:
REQUIRED PROVIDED
STRUCTURAL FRAME
BEARING WALLS
NON-BEARING WALLS
NON-BEARING WALLS
FLOOR CONSTRUCTION
ROOF CONSTRUCTION
SECTION
(TABLE 601)
(TABLE 601)
(TABLE 602)
(TABLE 601)
(TABLE 601)
(TABLE 601)
(EXTERIOR)
(INTERIOR)
(EXTERIOR)
BEARING WALLS (TABLE 601)(INTERIOR)
FIRE RESISTANCE OF BUILDING ELEMENTS:
(CHAPTER 6)
BUILDING ELEMENTS
SECTION 601II (000)
BUILDING CODE SUMMARY
PROJECT NAME:
PROJECT INFORMATION:
PROJECT NUMBER:
PREPARED BY:
DATE:
CHECKED BY:
DATE:
APPLICABLE CODE:
COMPLIANCE WITH THE: 2021 MICHIGAN BUILDING, REHABILITATION, AND ENERGY CONSERVATION CODES (BASED ON 2021 I-CODES), 2021 MICHIGAN MECHANICAL CODE, 2021 PLUMBING CODE (BASED ON 2021 IPC) INCLUDING MICHIGAN ADDENDA AND ERRATA; 2023 MICHIGAN ELECTRICAL CODE, PART 8 RULES (BY REFERENCE, 2023 NEC); BOILER CODE (2019 ASME BOILER AND PRESSURE VESSEL CODES WITH ADDENDA); ELEVATOR CODE (2016 ASME 17.1, 2011 ASME A18.1 AND ELEVATOR SAFETY BOARD GENERAL RULES, ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES (ICC A117.1-17), AND OTHER LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS APPLICABLE TO THIS PROJECT.
DWIGHT RICH CAFETERIA RENOVATIONS
25015929A/25015928A
E POST
2/19/20
C NORRIS
INTERIOR FINISH:
WALL AND CEILING
LOCATION
(CHAPTER 8)
FINISH CLASS
A EXITS CORRIDORS/ EXIT ACCESS ROOMS/ SPACES
B EXITS CORRIDORS/ EXIT ACCESS ROOMS/ SPACES
C EXITS CORRIDORS/ EXIT ACCESS ROOMS/ SPACES
OCCUPANCIES
ALL GROUPS:
ALL GROUPS:
ALL GROUPS:
FINISH CLASS
I
FLOORING
OCCUPANCY:
II
DOC FF-1
X
X
X X
X
X
X
X
X
X
X E
SCALE : 6" = 1'-0"
LIFE SAFETY PLAN - OVERALL EXISTING ALL TRAVEL DISTANCE AND EGRESS IS EXISTING
8' - 0"
XX
CEILING HEIGHT
ELEVATION NOTATION
EQUIPMENT TAG
KEYNOTE (REMOVALS)
KEYNOTE
CAST STONE
GRAVEL OR CRUSHED STONE
CONCRETE
CONCRETE MASONRY UNIT
UNDISTURBED EARTH
BRICK
RIGID INSULATION
PLYWOOD
SAND OR GYPSUM BOARD
STEEL
WOOD FRAMING (CONTINUOUS) BATT INSULATION
WOOD BLOCKING (DISCONTIN.)
EXISTING FINISH WOOD
GENERAL ARCHITECTURAL SYMBOLS
MATERIAL INDICATORS
A101
A101
XXX
XXX
N
A101
SIM
1Ref
DETAIL CALLOUT
ELEVATION MARKER
DRAWING NO.
ELEVATION
NO.
BREAK MARKER
NORTH ARROW
NEW COLUMN ID
DETAIL NO.
DRAWING NO.
EXISTING COLUMN ID
A101
1Ref
R e f
R e f
1Ref
A000
VIEW TITLE
DETAIL NO.
SECTION MARKER
SECTION NO.
DRAWING NO.
DETAIL SECTION
DRAWING NO.
ACCESSORY MARKER
DETAIL NO.
XX
EXISTING DOOR
SCHEDULED DOOR
ROOM TAG
WINDOW TYPE MARKER
DOOR MARKER
Room name
WALL STYLES
EXISTING BRICK WALL
EXISTING CMU WALL
EXISTING STUD WALL
STUD WALL
CMU WALL
BRICK WALL
EXISTING WALL REMOVAL
GENERAL NOTES WITHOUT PROJECT MANUALPARTITION NOTES
A101
DRAWING NO.
ALL GENERAL NOTES PERTAIN TO ALL ARCHITECTURAL (A-SERIES) DRAWINGS IN THIS SET
GENERAL
1. DEFINITIONS: “PROVIDE” MEANS FURNISH AND INSTALL. SUPPLY LABOR AND MATERIALS TO RESULT IN A FINISHED AND/OR OPERABLE SYSTEM.
2. CONTRACTOR RESPONSIBILITIES:
A. MATERIALS, CONSTRUCTION METHODS INCLUDING BUT NOT LIMITED TO LAYOUT, COORDINATION, SCHEDULE AND CONSTRUCTION SITE ACCESS AND WORK.
B. DAILY CLEANING: KEEP SITE FREE FROM WASTE, RUBBISH, AND DEBRIS. REMOVE DAILY. WHEN WORK IS COMPLETE, LEAVE THE PREMISES BROOM CLEAN AND CLEAN FINISHED
SURFACES, FIXTURES, GLASS, STOREFRONT, ETC.
C. FINAL CLEANING, PRIOR TO PUNCHLIST INSPECTION BROOM CLEAN ALL HARD SURFACE FLOORS, VACUUM ALL CARPETING AND WIPE DOWN ALL HORIZONTAL AND GLASS
SURFACES PROVIDING A DUST FREE SURFACE.
D. TEMPORARY PROTECTION IS REQUIRED TO MAINTAIN ONGOING BUILDING OPERATIONS, EXITING PATHS, DUST CONTROL AND OCCUPANT SAFETY. IDENTIFY THE REQUIREMENTS FOR TEMPORARY PROTECTION AND PROJECT PHASING. COORDINATE WITH OWNER FOR OTHER REQUIREMENTS.
E. COORDINATE STARTUP AND ADJUSTING OF EQUIPMENT AND OPERATING COMPONENTS. START EQUIPMENT AND OPERATING COMPONENTS AND TEST TO CONFIRM PROPER OPERATION AND CONTROL. REMOVE MALFUNCTIONING UNITS, REPLACE WITH NEW UNITS, AND RETEST.
F. CLOSEOUT DOCUMENTS, CERTIFICATE OF RELEASE FROM THE AUTHORITY OF JURISDICTION AND INSURANCE FOR CONTINUING COVERAGE, WARRANTIES, TEST & INSPECTION
RESULTS AND OPERATION, EMERGENCY & MAINTENANCE MANUALS.
3. EXISTING CONDITIONS: REVIEW EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING WORK AND REPORT DISCREPANCIES TO THE ARCHITECT IMMEDIATELY.
4. CONTRACT DOCUMENTS:
A. PLANS, ELEVATIONS, SECTIONS, DETAILS AND SCHEDULES ARE COMPLEMENTARY. PLAN DRAWINGS WILL TAKE PRECEDENCE OVER ELEVATION, SECTION AND DETAILS DRAWINGS
IN ANY CONFLICTS OF HORIZONTAL DIMENSIONS. DETAIL PLAN DRAWINGS WILL TAKE PRECEDENCE OVER LARGER SCALE PLANS IN ANY CONFLICTS WITH HORIZONTAL DIMENSIONS. WALL AND BUILDING SECTIONS WILL TAKE PRECEDENCE OVER PLAN DRAWING AND DETAILS IN ANY CONFLICTS WITH VERTICAL DIMENSIONS. DETAILS AND WALL SECTIONS WILL TAKE PRECEDENCE OVER ELEVATION AND PLAN DRAWINGS IN ANY CONFLICTS WITH MATERIAL DESCRIPTION. SCHEDULES WILL TAKE PRECEDENCE OVER OTHER ARCHITECTURAL DRAWINGS IN AND CONFLICTS WITH WALL, FLOOR AND CEILING FINISHES AND DOOR, DOOR HARDWARE AND FENESTRATION INFORMATION.
B. DRAWINGS PREPARED BY THE ARCHITECT ARE INSTRUMENTS OF THE ARCHITECT'S SERVICE FOR USE SOLELY WITH RESPECT TO THIS PROJECT AND, UNLESS OTHERWISE PROVIDED, COLLIERS ENGINEERING & DESIGN SHALL BE DEEMED THE AUTHOR OF THESE DOCUMENTS AND RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED
RIGHTS, INCLUDING THE COPYRIGHT.
C. WHERE REFERENCE IS MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH STANDARDS SHALL BE THE LATEST EDITION AND/OR ADDENDUM.
FIELD CONDITIONS
1. REPAIR: EXISTING SURFACES TO REMAIN IMPACTED BY DEMOLITION TO MATCH EXISTING ADJACENT SURFACES.
2. DISCREPANCIES: NOTIFY ARCHITECT OF EXISTING DAMAGED OR DETERIORATED BUILDING ELEMENTS REVEALED DURING DEMOLITION OR CONSTRUCTION PRIOR TO PROCEEDING
WITH ADDITIONAL WORK IN THE AREA.
3. HAZARDOUS MATERIALS: A PRE-DEMOLITION ASBESTOS SURVEY IS REQUIRED PRIOR TO DEMOLITION OF SUSPECT BUILDING MATERIALS IN ACCORDANCE WITH OSHA 29 DFR 1926.1101, AND USEPA 40 CRF 61.145. A PRE-DEMOLITION ASBESTOS SURVEY IS NOT REQUIRED FOR BUILDINGS OR STRUCTURES FOR WHICH THE ORIGINAL CONSTRUCTION COMMENCED ON OR AFTER JANUARY 1, 1974. THERMAL SYSTEM INSULATIONS AND SURFACING MATERIALS FOUND IN BUILDINGS CONSTRUCTED NO LATER THAN 1980 SHALL BE CONSIDERED PRESUMED ASBESTOS CONTAINING MATERIALS (PACM) UNLESS PROVEN OTHERWISE BY APPROPRIATE BULK SAMPLING AND LABORATORY ANALYSIS CONDUCTED BY APPROVED LICENSED PERSONNEL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COMPLY WITH ALL REGULATIONS. THE LANDLORD SHALL PROVIDE COPIES OF ANY ASBESTOS
SURVEYS THEY HAVE ON FILE AT THE REQUEST OF THE CONTRACTOR.
4. SAFETY: FOLLOW THE OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA) 29 CFR 1926.62, LEAD EXPOSURE IN CONSTRUCTION REGULATION. MATERIALS HAVING A CONCENTRATION EQUAL OR GREATER THAN 0.5% BY WEIGHT IN LEAD ARE CONSIDERED TO BE LEAD BASED. HOWEVER, OSHA CONSIDERS ANY AMOUNT OF LEAD ENCOUNTERED DURING CONSTRUCTION TO BE OF CONCERN. THE REGULATION STATES THAT THE EMPLOYER SHALL ASSURE THAT NO EMPLOYEE IS EXPOSED TO LEAD AT CONCENTRATIONS GREATER THAN FIFTY MICROGRAMS PER CUBIC METER OF AIR (50 MG/M^3) AVERAGED OVER AN 8-HOUR PERIOD. CONTRACTORS SHALL DETERMINE AND TAKE APPROPRIATE
MEASURES IF THEY SUSPECT THE PRESENCE OF LEAD.
FINISHES
A. GENERAL: FINISHED FLOORS EXTEND INTO TOE SPACES,UNDER CASEWORK ON LAB PROJECTS, CLOSETS, DOOR REVEALS AND SIMILAR OPENINGS.
B. PRODUCTS:
A. INSTALL MATERIALS USING MANUFACTURER'S APPROVED ADHESIVES AND METHODS, U.N.O.
B. PAINT DESIGNATIONS INDICATE COLOR ONLY, REFER TO SPECIFICATION FOR FINISH TYPE.
C. PROVIDE SELF LEVELING TROWELABLE UNDERLAYMENT WHERE REQUIRED TO OBTAIN FINISH MANUFACTURER'S REQUIRED SUBFLOOR CONDITION.
D. PROVIDE THE REQUIRED TRANSITIONS BASED ON TYPES IDENTIFIED ON DRAWINGS AT EACH FINISH TRANSITION LOCATION.
C. EXECUTION:
A. ADHERE TO MATERIAL OR SYSTEM MANUFACTURER’S WRITTEN INSTALLATION INSTRUCTIONS AND TOLERANCES. ANY VARIATIONS FROM WRITTEN INSTALLATION AND
INSTRUCTIONS MUST RECEIVE WRITTEN APPROVAL FROM THE MANUFACTURER AND MAINTAIN MANUFACTURER’S WARRANTIES.
B. PRIOR TO STARTING THE INSTALLATION OF A MATERIAL OR SYSTEM, VERIFY THE SUBSTRATE IS WITHIN THE MANUFACTURER’S REQUIRED TOLERANCES AND REQUIRED CLEARANCES ARE PROVIDED. NOTIFY THE CONSTRUCTION MANAGER OR GENERAL CONTRACTOR AND DEIGN PROFESSIONAL IN WRITING WHEN THE SUBSTRATE IS NOT WITHIN MANUFACTURER’S TOLERANCE OR REQUIRED CLEARANCES ARE NOT PROVIDED. PROCEEDING WITH INSTALLATION SIGNIFIES ACCEPTANCE OF THE SUBSTRATE AND
CLEARANCES.
C. PROVIDE MANUFACTURER’S REQUIRED ENVIRONMENTAL TESTS FOR MOISTURE, VAPOR DRIVE, RELATIVE HUMIDITY AND TEMPERATURE TO VERIFY THESE ARE WITHIN THE
MATERIAL MANUFACTURER’S TOLERANCE PRIOR TO INSTALLING MATERIALS.
D. MATERIAL AND INSTALLATION SHALL CONFORM WITH LOCAL, STATE AND NATIONAL BUILDING CODES AND CONSTRUCTION STANDARDS ENFORCED BY THE AUTHORITY HAVING
JURISDICTION.
E. REQUIRED DOCUMENTATION (FOR CONSTRUCTION ADMINISTRATION):
1. SAFETY DATA SHEETS.
2. PROVIDE SAMPLES WHEN SPECIFICALLY REQUESTED IN THESE DOCUMENTS.
3. PROVIDE SHOP DRAWINGS OF MATERIALS AND SYSTEMS, WHICH WILL BE BUILT INTO AND MUST BE COORDINATED WITH OTHER CONSTRUCTION. SHOP DRAWINGS SHALL
CONSIST OF PLAN, ELEVATION, SECTION VIEWS AND DETAILS AS REQUIRED TO COMMUNICATE FINAL APPEARANCE AND CONNECTION TO ADJOINING CONSTRUCTION.
F. PROTECT ADJACENT SURFACES DURING WORK.
G. REMOVE ADHESIVE OR PAINT SPOTS FROM FINISHED FLOORS, WALLS, GLASS OR OTHER SURFACES. FINISHES TO MEET OR EXCEED CODE REQUIREMENTS.
H. FILL MINOR DRYWALL IRREGULARITIES WITH SPACKLING COMPOUND AND SAND TO A SMOOTH LEVEL SURFACE. EXERCISE CARE TO AVOID RAISING THE NAP OF PAPER.
I. DO NOT PERFORM PAINTING AND OTHER FINISHING WORK UNDER CONDITIONS UNSUITABLE FOR EXECUTION OF PAINTING WORK. AIR SHALL BE FREE FROM DUST AND DIRT TO PREVENT LODGING OF FOREIGN MATTER IN FRESH PAINT. FLOORS TO BE BROOM CLEAN BEFORE PAINTING IS STARTED.
J. EDGES OF PAINT ADJOINING OTHER COLORS OR MATERIALS TO BE SHARP AND CLEAN WITHOUT OVERLAP.
K. WHENEVER NECESSARY TO OBTAIN REQUIRED RESULTS, REFINISH AN ENTIRE WALL RATHER THAN SPOT FINISHING WHERE A PORTION OF THE FINISH HAS BEEN DAMAGED OR IS
UNSATISFACTORY.
L. WHEN INSTALLING CARPET FOLLOW THE CARPET AND RUG INSTITUTE METHODS OF INSTALLATION AND MANUFACTURERS WRITTEN INSTALLATION INSTRUCTIONS.
M. WHEN INSTALLING TILE FOLLOW THE TILE COUNCIL OF NORTH AMERICA'S INSTALLATION SPECIFICATIONS AND MANUFACTURERS WRITTEN INSTALLATION INSTRUCTIONS.
N. CENTER FLOOR MATERIAL TRANSITIONS ON DOOR ABOVE.
O. FLOOR MATERIAL TRANSITIONS SHALL OCCUR BELOW THE DOOR.
WALLS
A. DIMENSIONS:
a. STUD WALLS ARE TO FACE OF STUD, UNLESS OTHERWISE INDICATED IN A.c. OR A.d. BELOW.
b. MASONRY WALLS ARE TO FACE OF MASONRY.
c. EXISTING CONSTRUCTION ARE TO FINISHED FACE OF CONSTRUCTION.
d. WHERE NOTED AS “CLR” DIMENSIONS ARE TO FINISHED SURFACE AND ARE CRITICAL FOR
ACCESSIBILITY REQUIREMENTS OR BUILT-IN FURNISHINGS.
B. RATINGS:
a. SMOKE WALLS AND SMOKE BARRIERS: SMOKE WALLS AND SMOKE BARRIERS MUST FORM A
COMPLETE BARRIER TO LIMIT THE TRANSFER OF SMOKE, INCLUDING PERIMETER DETAILS,
PENETRATIONS, AND AS REQUIRED BETWEEN WALLS AND DOOR JAMBS, OR SIDELIGHT
FRAMES. THE MEMBRANE IS TO BE CONTINUOUS THROUGH ALL CONCEALED SPACES.
1. RECESSED CABINETS, OUTLET BOXES, AND OTHER PENETRATIONS MUST BE SEALED
2. OPENINGS AROUND PENETRATIONS ARE TO BE SEALED.
3. ALL EXPOSED JOINTS, ANGLES, AND ABUTMENTS IN THE SYSTEM, INCLUDING FLOOR
AND ABOVE CEILING MUST BE TAPED AND FINISHED.
4. SEAL THE INTERFACE BETWEEN WALLS AND DOOR JAMBS, OR SIDELIGHT FRAMES.
b. FIRE WALLS AND FIRE BARRIERS: FIRE WALLS AND FIRE BARRIERS MUST BE SIMILARLY
CONSTRUCTED AS A COMPLETE BARRIER TO RESIST THE SPREAD OF SMOKE AND FIRE.
PENETRATIONS MUST BE SEALED AND LABELED WITH AN APPROVED FIRE RESISTANT JOINT
SYSTEM. INSTALL A FIRE RESISTANT JOINT SYSTEM AT THE HEAD AND FLOOR CONDITION
OF FIRE RATED WALLS AND BARRIERS.
c. FIRE AND SMOKE WALL / BARRIER / WALLS LABELING: PROVIDE LABELS ABOVE ACOUSTIC
CEILINGS IN LETTERS AT LEAST 2-INCHES IN HEIGHT AND NO MORE THAN 10-LINEAL FEET
ALONG THE WALL. LABELS SHALL BE PLACED IN SUCH A MANNER AS TO BE OBVIOUS TO
WORKERS IN THE CONCEALED SPACE ON BOTH SIDES OF THE WALL AND WILL READ AS
FOLLOWS: "X" HR. FIRE [SMOKE] WALL [BARRIER] [WALL]. PENETRATIONS MUST BE FIRE
[SMOKE] STOPPED." PROVIDE LABELING AT 12'-0" O.C. SPACING. ELECTRICAL, MECHANICAL
OR PLUMBING PENETRATIONS THROUGH FIRE-RATED WALL OR FLOOR ASSEMBLIES SHALL
BE SEALED WITH A U.L. APPROVED THROUGH-PENETRATION FIRESTOP SYSTEM
APPROPRIATE FOR THE RATING OF THE WALL BEING PENETRATED. SUBMIT PROPOSED U.L.
NUMBERS AND DETAILS TO ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO
INSTALLATION.
d. ACOUSTICAL WALLS: WALLS INDICATED WITH ACOUSTICAL BATT, AND/OR A GIVEN AN STC
RATING, SHALL BE CONSTRUCTED TO MINIMIZE SOUND TRANSMISSION AS FOLLOWS:
1. PROVIDE ACOUSTICAL SEALANT AT ALL FLOOR AND HEAD LEVELS, EACH SIDE OF THE
WALLS.
2. SET TRACK IN 3 CONTINUOUS BEADS OF ACOUSTICAL SEALANT.
3. EXTEND SOUND BATTS THOROUGH ANY INTERSECTING WALLS.
4. STAGGER OUTLETS A MINIMUM OF 24 INCHES HORIZONTAL. DO NOT INSTALL MORE
THAN ONE OUTLET IN A COMMON STUD CAVITY. SEAL JOINTS AROUND OUTLETS WITH
ACOUSTICAL SEALANT.
D. GYPSUM BOARD WALL COMPONENTS AND ACCESSORIES:
a. WALL TYPES DO NOT INDICATE FINAL FINISHES. REFER TO FINISH PLANS AND FINISH
SCHEDULE.
b. GYPSUM BOARD SHALL BE TYPE “X” FIRE RATED WITH:
1. LEVEL 1 FINISH AT JOINTS WHICH WILL REMAIN CONCEALED. PROVIDE GALVANIZED
STEEL CORNER BEADS AT CORNERS.
2. LEVEL 3 FINISH WHERE WALLS EXPOSED TO VIEW SCHEDULED FOR PAINT IN SERVICE
SPACES (eg. TELE / DATA CLOSETS, MECHANICAL ROOMS, JANITOR CLOSETS, STORAGE
ROOMS).
3. LEVEL 4 FINISH WHERE EXPOSED TO VIEW UPON PROJECT COMPLETION U.N.O.
4. LEVEL 5 FINISH AT GRAPHIC CORRIDOR, AS WELL AS DRY ERASE AND CHALK BOARD
PAINTED AREAS. REFER TO FINISH LOCATION ON PLANS, AND COORDINATE WITH
DESIGNER IN THE FIELD.
c. PROVIDE MOISTURE/ MOLD / ABUSE RESISTANT GYPSUM BOARD AT WALLS IN TOILET
ROOMS, JANITORS CLOSETS AND ANY ROOM WHERE MOISTURE CONDITIONS WILL OCCUR
AND NOT RECEIVING TILE FINISH.
d. PROVIDE GLASS MATT GYPSUM BOARD AT WALLS DIRECTLY ADJACENT TO LIVING WALL
ELEMENT AND AT ALL WET AREAS (SHOWER ROOMS, COMMUNAL KITCHEN/DISHWASHER,
ETC.) GLASS MAT GYPSUM BOARD SHALL RECEIVE FIBERGLASS TAPE AND FINISH AS
RECOMMENDED BY MANUFACTURER.
e. LOCATIONS WHERE GYPSUM BOARD WALLS TERMINATE AT DISSIMILAR MATERIALS, PROVIDE A FINISH-ABLE METAL END TRIM AND A 1/4" GAP BETWEEN TRIM AND ADJACENT
MATERIAL. FILL GAP WITH BACKER ROD AND SEALANT.
Colliers Engineering & Design, Architecture, Landscape Architecture, Surveying, CT P.C.
Colliers
Engineering & Design
Colliers
Engineering & Design
GRAND RAPIDS
560 5th St. NW
Suite 305
Grand Rapids, MI 49504
Phone: 616.827.4270
A R
C H
D x
PROJECT MANAGER:
DESIGNER: REVIEWER:
DISCIPLINE LEAD:
DRAWING NUMBER:
DATE ISSUED: PROJECT NUMBER:
SHEET NAME:
Copyright © 2024. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of
Colliers Engineering & Design.
www.colliersengineering.com
NOTE: DO NOT SCALE DRAWING FOR CONSTRUCTION.
MI ARCHITECTURE
FIRM LICENSE # NLP000605
E F
D
CB
A
KEY PLAN
BID PACK 2
/1
/2
:0 :0
P
M
GARDNER ELEMENTARY
FOOD SERVICE - EQUIPMENT
REPLACEMENT &
RENOVATION SO-1852
333 DAHLIA DRIVE
LANSING, MI 48911
C NORRIS
A001
GENERAL NOTES AND
LEGENDS
LANSING SCHOOL
DISTRICT
3/13/26 26000752A
E. INSTALLER QUALIFICATIONS: A FIRM OR INDIVIDUAL EXPERIENCED IN INSTALLING, ERECTING, APPLYING, OR ASSEMBLING WORK SIMILAR IN MATERIAL, DESIGN, AND EXTENT TO THAT INDICATED FOR THIS PROJECT, WHOSE WORK HAS RESULTED IN CONSTRUCTION WITH A RECORD OF
SUCCESSFUL IN-SERVICE PERFORMANCE.
F. TESTING AND INSPECTING AGENCY QUALIFICATIONS: AN NRTL, AN NVLAP, OR AN INDEPENDENT AGENCY WITH THE EXPERIENCE AND CAPABILITY TO CONDUCT TESTING AND INSPECTION INDICATED, AS DOCUMENTED ACCORDING TO [ASTM E329] <INSERT STANDARD>; AND WITH ADDITIONAL QUALIFICATIONS REQUIRED BY THE CONSTRUCTION DOCUMENTS; AND, WHERE REQUIRED BY AUTHORITIES HAVING JURISDICTION, THAT IS
ACCEPTABLE TO AUTHORITIES.
G. PRECONSTRUCTION TESTING: WHERE TESTING AGENCY IS INDICATED TO PERFORM PRECONSTRUCTION TESTING FOR COMPLIANCE WITH SPECIFIED REQUIREMENTS FOR PERFORMANCE AND TEST METHODS, COMPLY WITH THE FOLLOWING:
1. CONTRACTOR RESPONSIBILITIES INCLUDE THE FOLLOWING: PROVIDE TEST SPECIMENS REPRESENTATIVE OF PROPOSED PRODUCTS AND CONSTRUCTION. SUBMIT SPECIMENS IN A TIMELY MANNER WITH SUFFICIENT TIME FOR TESTING AND ANALYZING RESULTS TO PREVENT DELAYING THE WORK. WHEN TESTING IS COMPLETE, REMOVE TEST SPECIMENS AND TEST ASSEMBLIES, AND MOCKUPS UNLESS NOTED
OTHERWISE; DO NOT REUSE PRODUCTS ON PROJECT.
2. TESTING AGENCY RESPONSIBILITIES: SUBMIT A CERTIFIED WRITTEN REPORT OF EACH TEST, INSPECTION, AND SIMILAR QUALITY-ASSURANCE SERVICE TO ARCHITECT, CONTRACTOR OR CONSTRUCTION MANAGER AND COMMISSIONING AUTHORITY. INTERPRET TESTS AND INSPECTIONS AND STATE IN EACH REPORT WHETHER TESTED AND INSPECTED WORK COMPLIES WITH OR DEVIATES FROM THE CONTRACT DOCUMENTS.
H. MOCKUPS: BEFORE INSTALLING PORTIONS OF THE WORK REQUIRING MOCKUPS, BUILD MOCKUPS FOR EACH FORM OF CONSTRUCTION AND FINISH REQUIRED TO COMPLY WITH THE FOLLOWING REQUIREMENTS, USING MATERIALS INDICATED FOR THE COMPLETED WORK, TO SIZE AND LOCATION INDICATED. DEMONSTRATE THE PROPOSED RANGE OF AESTHETIC EFFECTS AND WORKMANSHIP. NOTIFY ARCHITECT, CONTRACTOR AND
CONSTRUCTION MANAGER 7 DAYS IN ADVANCE OF DATES AND TIMES WHEN MOCKUPS WILL BE CONSTRUCTED AND ALLOW 7 DAYS FOR REVIEW
AND APPROVAL. OBTAIN THE APPROVAL FROM ARCHITECT, CONTRACTOR AND CONSTRUCTION MANAGER BEFORE STARTING CORRESPONDING WORK, FABRICATION, OR CONSTRUCTION. MAINTAIN MOCKUPS DURING CONSTRUCTION IN AN UNDISTURBED CONDITION AS A STANDARD FOR JUDGING THE COMPLETED WORK. DEMOLISH AND REMOVE MOCKUPS WHEN DIRECTED UNLESS OTHERWISE INDICATED.
I. QUALITY CONTROL:
1. CONTRACTOR RESPONSIBILITIES: TESTS AND INSPECTIONS ARE CONTRACTOR'S RESPONSIBILITY. PERFORM ADDITIONAL QUALITY-CONTROL ACTIVITIES, WHETHER SPECIFIED OR NOT, TO VERIFY AND DOCUMENT THAT THE WORK COMPLIES WITH REQUIREMENTS. ENGAGE A QUALIFIED TESTING AGENCY TO PERFORM QUALITY-CONTROL SERVICES. NOTIFY TESTING AGENCIES AT LEAST [72] HOURS IN ADVANCE OF TIME WHEN WORK THAT REQUIRES TESTING OR INSPECTION WILL BE PERFORMED. COOPERATE WITH AGENCIES AND REPRESENTATIVES PERFORMING REQUIRED TESTS, INSPECTIONS, AND SIMILAR QUALITY-CONTROL SERVICES, AND PROVIDE REASONABLE AUXILIARY SERVICES AS REQUESTED.
2. TESTING AGENCY RESPONSIBILITIES: COOPERATE WITH ARCHITECT, CONTRACTOR OR CONSTRUCTION MANAGER AND COMMISSIONING
AUTHORITY IN PERFORMANCE OF DUTIES. PROVIDE QUALIFIED PERSONNEL TO PERFORM REQUIRED TESTS AND INSPECTIONS. INTERPRET TESTS AND INSPECTIONS AND STATE IN EACH REPORT WHETHER TESTED AND INSPECTED WORK COMPLIES WITH OR DEVIATES FROM REQUIREMENTS. NOTIFY ARCHITECT, CONTRACTOR OR CONSTRUCTION MANAGER AND COMMISSIONING AUTHORITY PROMPTLY OF IRREGULARITIES OR DEFICIENCIES OBSERVED IN THE WORK DURING PERFORMANCE OF ITS SERVICES.
3. CONTRACTOR AND TESTING AGENCY SHALL COORDINATE SEQUENCE OF ACTIVITIES TO ACCOMMODATE REQUIRED QUALITY-ASSURANCE AND QUALITY-CONTROL SERVICES WITH A MINIMUM OF DELAY AND TO AVOID NECESSITY OF REMOVING AND REPLACING CONSTRUCTION TO
ACCOMMODATE TESTING AND INSPECTION.
J. SPECIAL TESTS AND INSPECTIONS: OWNER WILL ENGAGE A QUALIFIED TESTING AGENCY OR SPECIAL INSPECTOR TO CONDUCT SPECIAL TESTS AND INSPECTIONS REQUIRED BY AUTHORITIES HAVING JURISDICTION AS THE RESPONSIBILITY OF OWNER AS INDICATED IN THE STATEMENT OF
SPECIAL INSPECTIONS, AND AS FOLLOWS:
1. VERIFYING THAT MANUFACTURER MAINTAINS DETAILED FABRICATION AND QUALITY-CONTROL PROCEDURES AND REVIEWING THE
COMPLETENESS AND ADEQUACY OF THOSE PROCEDURES TO PERFORM THE WORK.
2. NOTIFY ARCHITECT, CONTRACTOR OR CONSTRUCTION MANAGER AND COMMISSIONING AUTHORITY PROMPTLY OF IRREGULARITIES OR
DEFICIENCIES OBSERVED IN THE WORK DURING PERFORMANCE OF ITS SERVICES.
3. SUBMITTING A CERTIFIED WRITTEN REPORT OF EACH TEST, INSPECTION, AND SIMILAR QUALITY-CONTROL SERVICE TO ARCHITECT, CONTRACTOR OR CONSTRUCTION MANAGER AND COMMISSIONING AUTHORITY WITH COPY TO CONTRACTOR AND TO AUTHORITIES HAVING JURISDICTION. SUBMIT A FINAL REPORT OF SPECIAL TESTS AND INSPECTIONS AT SUBSTANTIAL COMPLETION, WHICH INCLUDES A LIST OF
UNRESOLVED DEFICIENCIES.
4. RETESTING AND REINSPECTING CORRECTED WORK.
K. ALL RETESTING/REINSPECTING: REGARDLESS OF WHETHER ORIGINAL TESTS OR INSPECTIONS WERE CONTRACTOR'S RESPONSIBILITY OR THE OWNER’S SPECIAL INSPECTIONS, PROVIDE QUALITY-CONTROL SERVICES, INCLUDING RETESTING AND REINSPECTING, FOR CONSTRUCTION THAT
REPLACED WORK THAT FAILED TO COMPLY WITH THE CONTRACT DOCUMENTS.
CONSTRUCTION WASTE MANAGEMENT:
A. DEVELOP A WASTE MANAGEMENT PLAN AND SUBMIT PLAN FOR APPROVAL WITHIN 14 DAYS OF DATE ESTABLISHED FOR COMMENCEMENT OF THE
WORK.
B. DISTRIBUTE AND IMPLEMENT APPROVED WASTE MANAGEMENT PLAN. PROVIDE HANDLING, CONTAINERS, STORAGE, SIGNAGE, TRANSPORTATION, AND OTHER ITEMS AS REQUIRED TO IMPLEMENT WASTE MANAGEMENT PLAN DURING THE ENTIRE DURATION OF THE CONTRACT.
C. TRAIN WORKERS, SUBCONTRACTORS, AND SUPPLIERS ON PROPER WASTE MANAGEMENT PROCEDURES, AS APPROPRIATE FOR THE WORK.
D. SITE ACCESS AND TEMPORARY CONTROLS: CONDUCT WASTE MANAGEMENT OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, WALKWAYS, AND OTHER ADJACENT OCCUPIED AND USED FACILITIES. DESIGNATE AND LABEL SPECIFIC AREAS ON PROJECT SITE
NECESSARY FOR SEPARATING MATERIALS THAT ARE TO BE SALVAGED AND RECYCLED.
CLOSEOUT PROCEDURES:
A. CONTRACTOR'S LIST OF INCOMPLETE ITEMS: PREPARE AND SUBMIT A LIST OF ITEMS TO BE COMPLETED AND CORRECTED (CONTRACTOR'S "PUNCH LIST"), INDICATING THE VALUE OF EACH ITEM ON THE LIST AND REASONS WHY THE WORK IS INCOMPLETE.
B. SUBMITTALS PRIOR TO SUBSTANTIAL COMPLETION: COMPLETE THE FOLLOWING A MINIMUM OF 10 DAYS PRIOR TO REQUESTING INSPECTION FOR
DETERMINING DATE OF SUBSTANTIAL COMPLETION.
1. SUBMIT A FINAL APPLICATION FOR PAYMENT.
2. CERTIFICATE OF INSURANCE: SUBMIT EVIDENCE OF FINAL, CONTINUING INSURANCE COVERAGE.
3. CERTIFIED LIST OF INCOMPLETE ITEMS: SUBMIT CERTIFIED COPY OF ARCHITECT'S SUBSTANTIAL COMPLETION INSPECTION LIST OF ITEMS TO BE COMPLETED OR CORRECTED (PUNCH LIST), ENDORSED AND DATED BY ARCHITECT. CERTIFIED COPY OF THE LIST SHALL STATE THAT EACH ITEM
HAS BEEN COMPLETED OR OTHERWISE RESOLVED FOR ACCEPTANCE.
4. CERTIFICATES OF RELEASE: OBTAIN AND SUBMIT RELEASES FROM AUTHORITIES HAVING JURISDICTION, PERMITTING OWNER UNRESTRICTED USE OF THE WORK AND ACCESS TO SERVICES AND UTILITIES. INCLUDE OCCUPANCY PERMITS, OPERATING CERTIFICATES, AND SIMILAR
RELEASES.
5. SUBMIT CLOSEOUT SUBMITTALS AS REQUIRED, INCLUDING SPECIFIC WARRANTIES, WORKMANSHIP BONDS, MAINTENANCE SERVICE
AGREEMENTS, FINAL CERTIFICATIONS, AND SIMILAR DOCUMENTS.
6. SUBMIT MAINTENANCE MATERIAL SUBMITTALS SPECIFIED IN INDIVIDUAL SECTIONS, INCLUDING TOOLS, SPARE PARTS, EXTRA MATERIALS, AND SIMILAR ITEMS, AND DELIVER TO LOCATION DESIGNATED BY OWNER OR OWNER’S AGENT. LABEL WITH MANUFACTURER'S NAME AND MODEL
NUMBER.
7. SUBMIT TESTING, ADJUSTING, AND BALANCING RECORDS.
8. SUBMIT CHANGEOVER INFORMATION RELATED TO OWNER'S OCCUPANCY, USE, OPERATION, AND MAINTENANCE.
9. ALL CLOSE OUT DOCUMENTS TO BE SUBMITTED TO OWNER BY SINGLE THUMB DRIVE.
C. FINAL CLEANING
1. EMPLOY EXPERIENCED WORKERS OR PROFESSIONAL CLEANERS FOR FINAL CLEANING. CLEAN EACH SURFACE OR UNIT TO CONDITION EXPECTED IN AN AVERAGE COMMERCIAL BUILDING CLEANING AND MAINTENANCE PROGRAM. COMPLY WITH MANUFACTURER'S WRITTEN
INSTRUCTIONS.
2. USE CLEANING PRODUCTS THAT COMPLY WITH GREEN SEAL'S GS-37, OR IF GS-37 IS NOT APPLICABLE, USE PRODUCTS THAT COMPLY WITH THE
CALIFORNIA CODE OF REGULATIONS MAXIMUM ALLOWABLE VOC LEVELS.
3. CLEAN EXPOSED EXTERIOR AND INTERIOR HARD-SURFACED FINISHES TO A DIRT-FREE CONDITION, FREE OF STAINS, FILMS, AND SIMILAR
FOREIGN
SUBSTANCES. AVOID DISTURBING NATURAL WEATHERING OF EXTERIOR SURFACES. RESTORE REFLECTIVE SURFACES TO THEIR ORIGINAL
CONDITION.
4. VACUUM CARPET AND SIMILAR SOFT SURFACES, REMOVING DEBRIS AND EXCESS NAP; CLEAN ACCORDING TO MANUFACTURER'S
RECOMMENDATIONS IF VISIBLE SOIL OR STAINS REMAIN.
5. CLEAN TRANSPARENT MATERIALS, INCLUDING MIRRORS AND GLASS IN DOORS AND WINDOWS. REMOVE GLAZING COMPOUNDS AND OTHER NOTICEABLE, VISION-OBSCURING MATERIALS. POLISH MIRRORS AND GLASS, TAKING CARE NOT TO SCRATCH SURFACES.
6. CLEAN PLUMBING FIXTURES TO A SANITARY CONDITION, FREE OF STAINS, INCLUDING STAINS RESULTING FROM WATER EXPOSURE.
OPERATIONS AND MAINTENANCE DATA:
A. SUBMIT EACH MANUAL IN FINAL FORM PRIOR TO REQUESTING INSPECTION FOR SUBSTANTIAL COMPLETION AND AT LEAST 10 DAYS
BEFORE COMMENCING DEMONSTRATION AND TRAINING.
B. CORRECT OR REVISE EACH MANUAL TO COMPLY WITH ARCHITECT'S AND COMMISSIONING AUTHORITY'S COMMENTS. SUBMIT COPIES OF EACH CORRECTED MANUAL WITHIN 10 DAYS OF RECEIPT OF ARCHITECT'S AND COMMISSIONING AUTHORITY'S COMMENTS AND
PRIOR TO COMMENCING DEMONSTRATION AND TRAINING.
C. SUBMIT ON DIGITAL MEDIA ACCEPTABLE TO ARCHITECT BY UPLOADING TO WEB-BASED PROJECT SOFTWARE SITE OR BY EMAIL TO
ARCHITECT, IF WEB-BASED SOFTWARE IS NOT UTILIZED. ENABLE REVIEWER COMMENTS ON DRAFT SUBMITTALS.
1. ELECTRONIC FILES: USE ELECTRONIC FILES PREPARED BY MANUFACTURER WHERE AVAILABLE. WHERE SCANNING OF PAPER
DOCUMENTS IS REQUIRED, CONFIGURE SCANNED FILE FOR MINIMUM READABLE FILE SIZE.
2. BOOKMARK INDIVIDUAL DOCUMENTS BASED ON FILE NAMES. NAME DOCUMENT FILES TO CORRESPOND TO SYSTEM, SUBSYSTEM, AND EQUIPMENT NAMES USED IN MANUAL DIRECTORY AND TABLE OF CONTENTS. GROUP DOCUMENTS FOR EACH SYSTEM AND SUBSYSTEM INTO INDIVIDUAL COMPOSITE BOOKMARKED FILES, THEN CREATE COMPOSITE MANUAL, SO THAT RESULTING BOOKMARKS REFLECT THE SYSTEM, SUBSYSTEM, AND EQUIPMENT NAMES IN A READILY NAVIGATED FILE TREE. CONFIGURE
ELECTRONIC MANUAL TO DISPLAY BOOKMARK PANEL ON OPENING FILE.
D. ORGANIZATION OF MANUALS: UNLESS OTHERWISE INDICATED, ORGANIZE EACH MANUAL INTO A SEPARATE SECTION FOR EACH SYSTEM AND SUBSYSTEM, AND A SEPARATE SECTION FOR EACH PIECE OF EQUIPMENT NOT PART OF A SYSTEM. PROVIDE A TITLE
PAGE AND TABLE OF CONTENTS.
1. TITLE PAGE SHALL INCLUDE:
a. SUBJECT MATTER INCLUDED IN MANUAL.
b. DATE OF SUBMITTAL.
c. NAME AND CONTACT INFORMATION FOR CONTRACTOR AND CONSTRUCTION MANAGER WHEN APPLICABLE.
d. NAME AND CONTACT INFORMATION FOR COMMISSIONING AUTHORITY.
2. EMERGENCY MANUAL: ASSEMBLE A COMPLETE SET OF EMERGENCY INFORMATION INDICATING PROCEDURES FOR USE BY EMERGENCY PERSONNEL AND BY OWNER'S OPERATING PERSONNEL FOR TYPES OF EMERGENCIES INDICATED.
3. SYSTEMS AND EQUIPMENT OPERATION MANUAL: ASSEMBLE A COMPLETE SET OF DATA INDICATING OPERATION OF EACH SYSTEM, SUBSYSTEM, AND PIECE OF EQUIPMENT NOT PART OF A SYSTEM. INCLUDE INFORMATION REQUIRED FOR DAILY OPERATION AND MANAGEMENT, OPERATING STANDARDS, AND ROUTINE AND SPECIAL OPERATING PROCEDURES.
4. SYSTEMS AND EQUIPMENT MAINTENANCE MANUALS: ASSEMBLE A COMPLETE SET OF DATA INDICATING MAINTENANCE OF EACH SYSTEM, SUBSYSTEM, AND PIECE OF EQUIPMENT NOT PART OF A SYSTEM. INCLUDE MANUFACTURERS' MAINTENANCE DOCUMENTATION, PREVENTIVE MAINTENANCE PROCEDURES AND FREQUENCY, REPAIR PROCEDURES, WIRING AND SYSTEMS
DIAGRAMS, LISTS OF SPARE PARTS, AND WARRANTY INFORMATION.
5. PRODUCT MAINTENANCE MANUAL: ASSEMBLE A COMPLETE SET OF MAINTENANCE DATA INDICATING CARE AND MAINTENANCE OF
EACH PRODUCT, MATERIAL, AND FINISH INCORPORATED INTO THE WORK.
PROJECT RECORD DOCUMENTS:
A. RECORD PRINTS: MAINTAIN ONE SET OF MARKED-UP PAPER COPIES OF THE CONTRACT DRAWINGS AND SHOP DRAWINGS, INCORPORATING NEW AND REVISED DRAWINGS AS MODIFICATIONS ARE ISSUED.
B. MAINTAIN ONE COPY OF EACH SUBMITTAL DURING THE CONSTRUCTION PERIOD FOR PROJECT RECORD DOCUMENT PURPOSES.
POST CHANGES AND REVISIONS TO PROJECT RECORD DOCUMENTS AS THEY OCCUR; DO NOT WAIT UNTIL END OF PROJECT.
C. RECORD DIGITAL DATA FILES: IMMEDIATELY BEFORE INSPECTION FOR CERTIFICATE OF SUBSTANTIAL COMPLETION, REVIEW MARKED-UP RECORD DOCUMENTS WITH ARCHITECT, CONTRACTOR. WHEN AUTHORIZED, PREPARE A FULL SET OF CORRECTED DIGITAL DATA FILES OF THE CONTRACT DOCUMENTS. SEE OPERATIONS AND MAINTENANCE DATA SECTION ABOVE FOR SUBMISSION
FORMAT REQUIREMENTS.
DEMONSTRATION AND TRAINING:
A. FACILITATOR: CONTRACTOR OR CONSTRUCTION MANAGER SHALL PREPARE INSTRUCTION PROGRAM AND TRAINING MODULES, TO COORDINATE INSTRUCTORS, AND TO COORDINATE BETWEEN CONTRACTOR AND OWNER FOR NUMBER OF PARTICIPANTS, INSTRUCTION TIMES, AND LOCATION.
B. ENGAGE QUALIFIED INSTRUCTORS TO INSTRUCT OWNER'S PERSONNEL TO ADJUST, OPERATE, AND MAINTAIN SYSTEMS, SUBSYSTEMS, AND EQUIPMENT NOT PART OF A SYSTEM.
C. PROVIDE INSTRUCTION AT MUTUALLY AGREED-ON TIMES. FOR EQUIPMENT THAT REQUIRES SEASONAL OPERATION, PROVIDE
SIMILAR INSTRUCTION AT START OF EACH SEASON.
D. TRAINING LOCATION AND REFERENCE MATERIAL: CONDUCT TRAINING ON-SITE IN THE COMPLETED AND FULLY OPERATIONAL FACILITY USING THE ACTUAL EQUIPMENT IN-PLACE. CONDUCT TRAINING USING FINAL OPERATION AND MAINTENANCE DATA
SUBMITTALS.
E. EVALUATION: AT CONCLUSION OF EACH TRAINING MODULE, ASSESS AND DOCUMENT EACH PARTICIPANT'S MASTERY OF MODULE BY
USE A DEMONSTRATION PERFORMANCE-BASED TEST.
F. COLLECT USED AND LEFTOVER EDUCATIONAL MATERIALS AND GIVE TO OWNER. REMOVE INSTRUCTIONAL EQUIPMENT. RESTORE
SYSTEMS AND EQUIPMENT TO CONDITION EXISTING BEFORE INITIAL TRAINING USE.
GENERAL REQUIREMENTS:
ALTERNATES:
A. ALTERNATES ARE AN AMOUNT PROPOSED BY BIDDERS AND STATED ON THE BID PROM FOR CERTAIN WORK DEFINED IN THE BIDDING REQUIREMENTS THAT MAY BE ADDED TO OR DEDUCTED FROM THE BASE BID AMOUNT IF THE OWNER DECIDES TO ACCEPT A CORRESPONDING CHANGE EITHER IN THE AMOUNT OF CONSTRUCTION TO BE COMPLETED OR IN THE PRODUCTS, MATERIALS, EQUIPMENT, SYSTEMS, OR INSTALLATION METHODS DESCRIBED IN
THE CONTRACT DOCUMENTS.
B. INCLUDE AS PART OF EACH ALTERNATE, MISCELLANEOUS DEVICES, ACCESSORY OBJECTS, AND SIMILAR ITEMS INCIDENTAL TO OR REQUIRED FOR A COMPLETE INSTALLATION WHETHER INDICATED AS PART OF THE ALTERNATE. EXECUTE ACCEPTABLE ALTERNATES UNDER THE SAME CONDITIONS AS
OTHER WORK OF THE CONTRACT.
SUBSTITUTION PROCEDURES:
A. SUBSTITUTIONS FOR CAUSE: CHANGES PROPOSED BY CONTRACTOR THAT ARE REQUIRED DUE TO CHANGED PROJECT CONDITIONS, SUCH AS UNAVAILABILITY OF PRODUCT, REGULATORY CHANGES, OR UNAVAILABILITY OF REQUIRED WARRANTY TERMS.
B. SUBSTITUTIONS FOR CONVENIENCE: CHANGES PROPOSED BY CONTRACTOR OR OWNER THAT ARE NOT REQUIRED IN ORDER TO MEET OTHER PROJECT REQUIREMENTS BUT MAY OFFER ADVANTAGE TO CONTRACTOR OR OWNER. SUBSTITUTIONS FOR CONVENIENCE ARE ALLOWED ONLY BY APPROVAL OF
THE OWNER OR OWNER’S AGENT.
C. SUBMIT REQUEST FOR CONSIDERATION. IDENTIFY PRODUCT OR FABRICATION OR INSTALLATION METHOD TO BE REPLACED. INCLUDE PRODUCT, MATERIAL
OR SYSTEM NAME AND AFFECTED DRAWING NUMBERS AND TITLES.
D. EXECUTE ACCEPTED SUBSTITUTIONS UNDER THE SAME CONDITIONS AS OTHER WORK OF THE CONTRACT.
E. DOCUMENTATION: SHOW COMPLIANCE WITH REQUIREMENTS FOR SUBSTITUTIONS AND THE FOLLOWING, AS APPLICABLE:
1. COST INFORMATION, INCLUDING A PROPOSAL OF CHANGE, IF ANY, IN THE CONTRACT SUM.
2. CONTRACTOR'S CERTIFICATION THAT PROPOSED SUBSTITUTION COMPLIES WITH REQUIREMENTS IN THE CONTRACT DOCUMENTS, EXCEPT AS INDICATED IN SUBSTITUTION REQUEST, IS COMPATIBLE WITH RELATED MATERIALS AND IS APPROPRIATE FOR APPLICATIONS INDICATED.
3. STATEMENT INDICATING WHY SPECIFIED PRODUCT OR FABRICATION, OR INSTALLATION METHOD CANNOT BE PROVIDED, IF APPLICABLE.
4. COORDINATION OF INFORMATION, INCLUDING A LIST OF CHANGES OR REVISIONS NEEDED TO OTHER PARTS OF THE WORK AND TO CONSTRUCTION PERFORMED BY OWNER AND SEPARATE CONTRACTORS THAT WILL BE NECESSARY TO ACCOMMODATE PROPOSED SUBSTITUTION.
5. PRODUCT DATA, INCLUDING DRAWINGS AND DESCRIPTIONS OF PRODUCTS AND FABRICATION AND INSTALLATION PROCEDURES. INCLUDE DETAILED COMPARISON OF SIGNIFICANT QUALITIES OF PROPOSED SUBSTITUTIONS WITH THOSE OF THE WORK SPECIFIED. SIGNIFICANT QUALITIES MAY INCLUDE ATTRIBUTES, SUCH AS PERFORMANCE, WEIGHT, SIZE, DURABILITY, VISUAL EFFECT, SUSTAINABLE DESIGN CHARACTERISTICS, WARRANTIES, AND SPECIFIC FEATURES AND REQUIREMENTS INDICATED. INDICATE DEVIATIONS, IF ANY, FROM THE WORK SPECIFIED
6. CONTRACTOR'S WAIVER OF RIGHTS TO ADDITIONAL PAYMENT OR TIME THAT MAY SUBSEQUENTLY BECOME NECESSARY BECAUSE OF FAILURE OF
PROPOSED SUBSTITUTION TO PRODUCE INDICATED RESULTS.
F. ARCHITECT'S ACTION: IF NECESSARY, ARCHITECT WILL REQUEST ADDITIONAL INFORMATION OR DOCUMENTATION FOR EVALUATION WITHIN 7 DAYS OF RECEIPT OF A REQUEST FOR SUBSTITUTION. ARCHITECT WILL NOTIFY CONTRACTOR OF ACCEPTANCE OR REJECTION OF PROPOSED SUBSTITUTION WITHIN 14 DAYS OF RECEIPT OF REQUEST, OR 7 DAYS OF RECEIPT OF ADDITIONAL INFORMATION OR DOCUMENTATION.
G. ARCHITECT WILL CONSIDER CONTRACTOR'S REQUEST FOR SUBSTITUTION WHEN THE LISTED REQUIREMENTS ARE SATISFIED. IF THE LISTED REQUIREMENTS ARE NOT SATISFIED, ARCHITECT WILL RETURN REQUESTS WITHOUT ACTION, EXCEPT TO RECORD NONCOMPLIANCE WITH LISTED
REQUIREMENTS.
H. FORMS OF ACCEPTANCE: CHANGE ORDER, CONSTRUCTION CHANGE DIRECTIVE, OR ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS FOR MINOR CHANGES IN
THE WORK.
SUBMITTAL REQUIREMENTS:
A. PREPARE SUBMITTAL SCHEDULE: SUBMIT, AS AN ACTION SUBMITTAL, A LIST OF SUBMITTALS, ARRANGED IN CHRONOLOGICAL ORDER BY DATES REQUIRED BY CONSTRUCTION SCHEDULE. INCLUDE TIME REQUIRED FOR REVIEW, ORDERING, MANUFACTURING, FABRICATION, AND DELIVERY WHEN ESTABLISHING DATES. INCLUDE ADDITIONAL TIME REQUIRED FOR MAKING CORRECTIONS OR REVISIONS TO SUBMITTALS NOTED BY ARCHITECT AND CONTRACTOR AND ADDITIONAL TIME FOR HANDLING AND REVIEWING SUBMITTALS REQUIRED BY THOSE CORRECTIONS.
B. PREPARE AND SUBMIT SUBMITTALS AS INCLUDED IN THE SUBMITTAL SCHEDULED.
C. EMAIL: PREPARE SUBMITTALS AS PDF PACKAGE AND TRANSMIT TO ARCHITECT BY SENDING VIA EMAIL. INCLUDE PDF TRANSMITTAL FORM. INCLUDE
INFORMATION IN EMAIL SUBJECT LINE AS REQUESTED BY ARCHITECT.
D. WEB-BASED PROJECT MANAGEMENT SOFTWARE: PREPARE SUBMITTALS IN PDF FORM, AND UPLOAD TO WEB-BASED PROJECT MANAGEMENT SOFTWARE WEBSITE. ENTER REQUIRED DATA IN WEB-BASED SOFTWARE SITE TO FULLY IDENTIFY SUBMITTAL.
E. ACTION SUBMITTALS AND INFORMATIONAL SUBMITTALS: REVIEW EACH SUBMITTAL AND CHECK FOR COORDINATION WITH OTHER WORK OF THE CONTRACT AND FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS. NOTE CORRECTIONS AND FIELD DIMENSIONS. MARK WITH APPROVAL STAMP
BEFORE SUBMITTING TO ARCHITECT.
F. USE FOR CONSTRUCTION: RETAIN COMPLETE COPIES OF SUBMITTALS ON PROJECT SITE. USE ONLY FINAL ACTION SUBMITTALS THAT ARE MARKED WITH
APPROVAL NOTATION FROM ARCHITECT'S AND CONTRACTOR’S ACTION STAMP.
G. SUBMITTAL INFORMATION: INCLUDE THE FOLLOWING INFORMATION IN EACH SUBMITTAL:
1. PROJECT NAME, DATE AND INDICATION OF FULL OR PARTIAL SUBMITTAL.
2. ARCHITECT’S AND CONTRACTOR’S AND/OR CONSTRUCTION MANAGER’S, FIRM OR ENTITY THAT PREPARED SUBMITTAL AND SUBCONTRACTOR, MANUFACTURER, AND SUPPLIER NAMES.
3. NUMBER AND TITLE OF SPECIFICATION SECTION, WITH PARAGRAPH NUMBER AND GENERIC NAME FOR EACH OF MULTIPLE ITEMS
4. MATERIAL OR SYSTEM NAME AND DRAWING NUMBER AND DETAIL REFERENCES, AS APPROPRIATE.
5. IDENTIFY OPTIONS REQUIRING SELECTION BY ARCHITECT.
6. LOCATION(S) WHERE PRODUCT IS TO BE INSTALLED, AS APPROPRIATE AND OTHER NECESSARY INFORMATION.
7. ON EACH SUBMITTAL, CLEARLY INDICATE DEVIATIONS FROM REQUIREMENTS IN THE CONTRACT DOCUMENTS, INCLUDING MINOR VARIATIONS AND LIMITATIONS; INCLUDE RELEVANT ADDITIONAL INFORMATION AND REVISIONS, OTHER THAN THOSE REQUESTED BY ARCHITECT AND CONTRACTOR ON PREVIOUS SUBMITTALS. INDICATE BY HIGHLIGHTING ON EACH SUBMITTAL OR NOTING ON ATTACHED SEPARATE SHEET.
H. INCOMPLETE SUBMITTALS ARE UNACCEPTABLE, WILL BE CONSIDERED NONRESPONSIVE, AND WILL BE RETURNED FOR RESUBMITTAL WITHOUT REVIEW.
I. ARCHITECT'S ACTION: ARCHITECT WILL REVIEW INFORMATION OR DOCUMENTATION NOTIFY CONTRACTOR OF ACCEPTANCE REQUEST FOR MORE INFORMATION OR REJECTION WITHIN 14 DAYS OF RECEIPT. ARCHITECT WILL REVIEW RESUBMITTAL WITHIN 14 DAYS OF RECEIPT.
J. SUBMITTALS NOT REQUIRED BY THE CONTRACT DOCUMENTS WILL BE RETURNED BY ARCHITECT WITHOUT ACTION.
QUALITY REQUIREMENTS:
A. CONFLICTING STANDARDS AND OTHER REQUIREMENTS: IF COMPLIANCE WITH TWO OR MORE STANDARDS OR REQUIREMENTS IS SPECIFIED AND THE STANDARDS OR REQUIREMENTS ESTABLISH DIFFERENT OR CONFLICTING REQUIREMENTS FOR MINIMUM QUANTITIES OR QUALITY LEVELS, INFORM THE ARCHITECT REGARDING THE CONFLICT AND OBTAIN CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK. REFER CONFLICTING REQUIREMENTS THAT ARE DIFFERENT, BUT APPARENTLY EQUAL, TO ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING.
B. PREPARE AND SUBMIT CERTIFIED WRITTEN REPORTS REQUIRED. INCLUDE THE FOLLOWING:
1. PROJECT TITLE AND NUMBER AND DATE OF ISSUE. RECORD OF TEMPERATURE AND WEATHER CONDITIONS AT TIME OF SAMPLE TAKING AND TESTING
AND INSPECTION. NAME AND SIGNATURE OF LABORATORY INSPECTOR.
2. NAME, ADDRESS, TELEPHONE NUMBER, AND EMAIL ADDRESS OF TESTING AGENCY
3. DATES AND LOCATIONS OF SAMPLES AND TESTS OR INSPECTIONS.
4. TEST AND INSPECTION RESULTS AND AN INTERPRETATION OF TEST RESULTS. COMMENTS OR PROFESSIONAL OPINION ON WHETHER TESTED OR INSPECTED WORK COMPLIES WITH THE CONTRACT DOCUMENT REQUIREMENTS. RECOMMENDATIONS ON RETESTING AND REINSPECTING.
C. MANUFACTURER QUALIFICATIONS: A FIRM EXPERIENCED IN MANUFACTURING PRODUCTS OR SYSTEMS SIMILAR TO THOSE INDICATED FOR THIS PROJECT AND WITH A RECORD OF SUCCESSFUL IN-SERVICE PERFORMANCE, AS WELL AS SUFFICIENT PRODUCTION CAPACITY TO PRODUCE REQUIRED UNITS. AS APPLICABLE, PROCURE PRODUCTS FROM MANUFACTURERS ABLE TO MEET QUALIFICATION REQUIREMENTS, WARRANTY REQUIREMENTS, AND TECHNICAL
OR FACTORY-AUTHORIZED SERVICE REPRESENTATIVE REQUIREMENTS.
D. FABRICATOR QUALIFICATIONS: A FIRM EXPERIENCED IN PRODUCING PRODUCTS SIMILAR TO THOSE INDICATED FOR THIS PROJECT AND WITH A RECORD OF SUCCESSFUL IN-SERVICE PERFORMANCE, AS WELL AS SUFFICIENT PRODUCTION CAPACITY TO PRODUCE REQUIRED UNITS.
Colliers Engineering & Design, Architecture, Landscape Architecture, Surveying, CT P.C.
Colliers
Engineering & Design
Colliers
Engineering & Design
GRAND RAPIDS
560 5th St. NW
Suite 305
Grand Rapids, MI 49504
Phone: 616.827.4270
A R
C H
D x
PROJECT MANAGER:
DESIGNER: REVIEWER:
DISCIPLINE LEAD:
DRAWING NUMBER:
DATE ISSUED: PROJECT NUMBER:
SHEET NAME:
Copyright © 2024. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of
Colliers Engineering & Design.
www.colliersengineering.com
NOTE: DO NOT SCALE DRAWING FOR CONSTRUCTION.
MI ARCHITECTURE
FIRM LICENSE # NLP000605
E F
D
CB
A
KEY PLAN
BID PACK 2
/1
/2
:0 :0
P
M
GARDNER ELEMENTARY
FOOD SERVICE - EQUIPMENT
REPLACEMENT &
RENOVATION SO-1852
333 DAHLIA DRIVE
LANSING, MI 48911
C NORRIS
A002
GENERAL
REQUIREMENTS
LANSING SCHOOL
DISTRICT
3/13/26 26000752A
24X60
24X48
24X48
UP
LA
IAFADAAA 7.5AAWURPN
CORRIDOR
D-111
STORAGE
D-118
WEST PLATFORM
PASSAGE
D-122
PASSAGE
D-124
EAST PLATFORM
CORRIDOR
D-123
CORRIDOR
D-147
KITCHEN
DRY STORAGE
OFFICE
D-141
JAN
D-139
TLT.
D-140
LOCKER ROOM
D-138
CORRIDOR
D-142
TEACHERS DINING
D-135
STORAGE
D-126
REMOVE
EXISTING
FREEZER
CMU HALF
WALL TO
REMAIN
STORAGE
EAST SERVING AREA
WEST SERVING AREA
REMOVE
VCT TILE
2D
2D 2D
2D2D
2D
2E
2E 2E
2E
2E 2E
2E2F
1D
2G2G
1E
1E
1E
1E
1F
1G
1H
1H
1H
1H
1H
1G
1H
1H
2H 2H
2I
2J
2K
2K
1I
1I
1J
2L2L
2M 2M
EXIST COLUMNS
TO REMAIN
A. CONTRACTOR SHALL COORDINATE REMOVAL OF FLOORS, WALLS AND
CEILINGS WITH MECHANICAL, ELECTRICAL AND PLUMBING TRADES. ALL
POWER, MECHANICAL AND PLUMBING LINES SHALL BE REMOVED BACK
TO NEAREST MAIN BRANCH LINE OR PANEL.
B. CONTRACTOR SHALL PROTECT EXISTING CONSTRUCTION AND
EQUIPMENT NOTED TO REMAIN FROM DAMAGE RESULTING FROM
DEMOLITION ACTIVITIES. ANY DAMAGE TO EXISTING PROPERTY
RESULTING FROM DEMOLITION SHALL BE REPAIRED IMMEDIATELY AT
THE CONTRACTOR'S EXPENSE.
C. CONTRACTOR SHALL PROTECT ADJACENT SURFACES IN
PREPARATION OF SAW CUTTING REQUIRED FOR DEMOLITION
ACTIVITIES.
D. ALL ELECTRICAL COVER PLATES AT DEVICE LOCATIONS SHALL BE
REMOVED PRIOR TO PAINTING AND REPLACED WITH NEW.
COORDINATE WITH ELECTRICAL DRAWINGS.
E. CONTRACTOR TO VERIFY ACTIVE USE/NEED/FUNCTIONALITY WITH
OWNER FOR ALL WALL ATTACHMENTS (BRACKETS, CONTROLS, ETC)
IN THE CAFETERIA AND REMOVE ANY NON-FUNCTIONAL/
SUPERFLUOUS ITEMS.
GENERAL DEMOLITION NOTES
LAIAFADAAA 7.5AAWURPN
CORRIDOR
D-111
LOCKER ROOM
D-138
JAN
D-139
OFFICE
D-141
TLT.
D-140
CORRIDOR
D-142
KITCHEN
WEST SERVING AREA
DRY STORAGE
CORRIDOR
D-147
TEACHERS DINING
D-135
STORAGE
D-126
EAST PLATFORM
PASSAGE
D-124
PASSAGE
D-122
WEST PLATFORM
STORAGE
D-118
CORRIDOR
D-123
EXISTING
HOOD TO
REMAIN.
REFER TO
ELEC FOR
LIGHTING
REPLACEMENT
BULKHEAD TO REMAIN BULKHEAD TO REMAIN
EAST SERVING AREA
1A
2A
1A 2A
1A
2A
2A 2A 2A 2A
2A2A2A2A
1A
1B
1B
2B
1B
1B 2B
2B
2B
2B 2B
2B2B2B
2B 2B
1C
1C
1C 1C
1C
1C
1C
2C
1C
2A
2B
2A
2B
1C
1C
1C
1C
2E 2E 2E
2E 2E
2F
2F
2E 2E
Colliers Engineering & Design, Architecture, Landscape Architecture, Surveying, CT P.C.
Colliers
Engineering & Design
Colliers
Engineering & Design
GRAND RAPIDS
560 5th St. NW
Suite 305
Grand Rapids, MI 49504
Phone: 616.827.4270
A R
C H
D x
PROJECT MANAGER:
DESIGNER: REVIEWER:
DISCIPLINE LEAD:
DRAWING NUMBER:
DATE ISSUED: PROJECT NUMBER:
SHEET NAME:
Copyright © 2024. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of
Colliers Engineering & Design.
www.colliersengineering.com
NOTE: DO NOT SCALE DRAWING FOR CONSTRUCTION.
MI ARCHITECTURE
FIRM LICENSE # NLP000605
E F
D
CB
A
KEY PLAN
BID PACK 2
/1
/2
:0 :0
P
M
GARDNER ELEMENTARY
FOOD SERVICE - EQUIPMENT
REPLACEMENT &
RENOVATION SO-1852
333 DAHLIA DRIVE
LANSING, MI 48911
C NORRIS
E POST
B HUYLER
AD101
FIRST FLOOR AND
CEILING DEMOLITION
PLANS
LANSING SCHOOL
DISTRICT
3/13/26 26000752A
SCALE : 3/32" = 1'-0"
FIRST FLOOR DEMOLITION PLAN
N
SCALE : 3/32" = 1'-0"
FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN
1A REMOVE EXISTING 2x4 CEILING SYSTEM IN ITS ENTIRETY (UNLESS
NOTED OTHERWISE) INCLUDING ALL TIES, TEES, FASTENERS,
FRAMING, AND HANGERS FOR THAT CEILING SYSTEM. REPAIR ANY
REMAINING CONSTRUCTION DAMAGED TO MATCH EXISTING.
PREPARE AREA FOR NEW CONSTRUCTION.
1B REMOVE EXISTING LIGHT FIXTURES, SMOKE DETECTORS, ALARMS,
ETC. FROM EXISTING CEILING SYSTEM. SEE ELECTRICAL
DRAWINGS FOR MORE INFORMATION. SAVE EXISTING LIGHT
FIXTURES FOR OWNER. REMOVE AND REPLACE EXISTING
SPRINKLER HEADS, STROBES, AND EXIT SIGNS.
1C COMPLETELY REMOVE EXISTING HVAC SYSTEM/UNIT AND
ASSOCIATED DUCTING. PATCH AND REPAIR ADJ SURFACES AS
REQUIRED TO MATCH EXISTING. SEE MECHANICAL DRAWINGS FOR
MORE INFOMRATION. VERIFY CONDITION OF EXIST DECK BEHIND
REMOVAL OF SYSTEM, REPAIR AS REQ'D.
1D REMOVE DOOR AND FRAME. PREP OPENING FOR INFILL
1E REMOVE EXIST CASEWORK
1F REMOVE CONCRETE CURB. EXISTING CMU WALL AND HOOD ABOVE
TO REMAIN
1G REMOVE EXIST SINK AND CAP PLUMBING. REFER TO PLUMBING
DRAWINGS.
1H REMOVE EXIST FOOD SERVICE EQUIPMENT. REFER TO FSE AND
MEP DRAWINGS AS REQUIRED FOR MORE INFORMATION ON