About this file

This is Addendum No. 1 to Bid Pack 2 for the Ebersole Center Food Service Equipment Replacement & Renovations project issued by Lansing School District on April 3, 2026. The project is located at 3400 2nd Street, Wayland, Michigan 49348, with Architect Project #26000750A. The addendum revises the contract documents and specifications for the kitchen renovation work, including modifications to architectural drawings, electrical specifications, and lighting plans. Key changes include reissued sheets A101 (First Floor and Ceiling Plans), E100 (Details, Symbol Legends & Specifications), EL101 (First Floor Plan - Lighting/Photometrics), and EP101 (First Floor Plan - Power). Notable revisions encompass added paint specifications, revised notes regarding column wraps and conduit routing, fixture schedule updates with Columbia manufacturer approval and Watt Stopper lighting control equivalents, modified kitchen and serving area lighting fixtures to Type B, and revised electrical device layouts at the serving line with provision for a rubber ramp to cover surface-mounted floor conduits. Three CM clarifications accompany the addendum addressing painting specifications, flooring division changes, and the separation of mechanical work into distinct plumbing and HVAC divisions for Gardner Elementary.

The addendum includes comprehensive specifications for interior painting utilizing Sherwin Williams products (Benjamin Moore and PPG acceptable alternatives) with detailed preparation and application requirements for various surfaces including gypsum board, plaster, concrete masonry units, hollow metal frames, doors, and wood trim. Paint systems specify primers, intermediate coats, and topcoats with specific mil thickness requirements and color matching to existing conditions. Electrical work specifications detail lighting fixture schedules, symbol legends, power distribution requirements, equipment connections, and safety provisions including tamper-resistant receptacles in areas accessible to children and GFCI circuit breaker protection. The document establishes responsibilities for trades coordination, requiring field verification of equipment locations and connections among food service, mechanical, plumbing, and electrical contractors. Three supporting CM clarifications address resinous flooring allowances, voluntary alternates for painters, and the division of mechanical work into separate plumbing and HVAC contracts with distinct scope definitions for Gardner Elementary's phased project approach (Phase 1 summer 2026, Phase 2 summer 2027).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LSD Ebersole Center – Bid Pack 2, Addendum No. 1 – Narrative of Changes Page 1 | 2

LSD Ebersole Center Food Service Bid Pack 2, Addendum No. 1 Narrative of Changes

Project Name: Ebersole Center Food Service – Equipment Replacement & Renovations SO-1853

Date: April 3, 2026

Project Location:

3400 2nd St Wayland, MI 49348

Architect’s Project #: 26000750A

Owner/Client: Lansing School District Attention: David Beckering

Issued to: Beckering Construction Email: djb@beckering.com City/State: Grand Rapids, MI Zip: 49548

Delivered via:

This Addendum revises the Contract Documents and shall have the same force and effect;

make the following changes to the Specifications and Drawings for this project. The following is a written summary of the changes made by this Addendum. Strict attention should be given to the Drawings and Specifications for area take-off, quantities and items deleted or revised herein. This addendum forms a part of the Contract Documents.

Issued by CED by: Courtney Norris Date Signed: 04/03/2026 Prepared by: Courtney Norris Date Signed: 04/03/2026 Distribution: Refer to Newforma transmittal.

Below is a list of the changes made to our documents in response to the comments, RFIs, or clarifications provided prior to Bid. Please feel free to reach out with any further questions or clarifications in a timely manner.

Sincerely, Courtney Norris

☐ Messenger

☐ Express

☐ Mail

☐ Hand-carried

☐ Pick-up

☐ UPS

Address Sent to:

☐ Newforma

☒ Email

☐ FTP

LSD Ebersole Center – Bid Pack 2, Addendum No. 1 – Narrative of Changes Page 2 | 2

Drawings

• A101 – FIRST FLOOR AND CEILING PLANS (Reissued) o Added paint specifications.

o Revised note regarding column wrap and conduit running inside of column wrap and across the floor.

o Revised note regarding painting of trim

• E100 – DETAILS, SYMBOL LEGENDS & SPECIFICATIONS

o Added new type b in fixture schedule o Added Columbia manufacturer to the schedule as approved o Allow watt stopper as approved equal for lighting controls

• EL101 – FIRST FLOOR PLAN – LIGHTING / PHOTOMETRICS (Reissued) o Changed fixtures in kitchen and serving 108 to type B

• EP101 – FIRST FLOOR PLAN – POWER (Reissued) o Changed keyed note 3 to utilize the column for conduit drops to serving line and provide a rubber ramp to cover surface mounted conduits along the floor.

o Revised device layout and notations at the serving line.

ATTACHMENTS

Reissued Sheets:

A101, E100, EL101, EP101

CM Clarifications 1, 2, 3

END OF ADDENDUM NO. 1

1009A

WALK-IN

COOLER

1009B

WALK-IN

FREEZER

MULTI-PORPOSE

ROOM

KITCHEN

SERVING

DISHWASHING

STORAGE

WC

COORDINATE ALL NEW

EQUIPMENT WITH FOOD

SERVICE AND MEP

DRAWINGS

V

IF

EXIST BULKHEAD ABOVE

EXIST BULKHEAD ABOVE

COORDINATE ALL NEW

EQUIPMENT WITH FOOD

SERVICE AND MEP

DRAWINGS

EXIST

EQUIPMENT TO

REMAIN (LIGHT

GRAY)

A1

A1

A2 A2

A2

A2

A3

A4

A5

A4

A3

A101

A101

Sim

A101

Sim

A101

Sim

REMOVE EXISTING TRACK

AND WOOD TRIM. RUN

CONDUIT DOWN COLUMN

AND WRAP COLUMN WITH

NEW 1x POPULAR TRIM

AND PAINT.

CONDUIT TO RUN ALONG FLOOR.

COORDINATE LOCATION OF BOXES

WITH FOOD SERVICE SHOP

DRAWINGS. PROVIDE RUBBER

RAMP OVER CONDUIT. BASIS OF

DESIGN: RUBBER FORM PIPE &

HOSE RAMP OR SIMILAR

COORDINATE

NEW EQUIPMENT

WITH EXISTING

VENTING TO

ROOF

NEW SURFACE

MOUNTED LIGHT

FIXTURES. REFER TO

ELECTRICAL DWGS

A101

C1

C2C2

C1

C3

C4

C4

C4

NEW SURFACE

MOUNTED LIGHT

FIXTURES. REFER TO

ELECTRICAL DWGS

CEILING LEGEND

NOTE: SEE OTHER DISCIPLINE DRAWINGS (E.G. MECHANICAL, PLUMBING

AND ELECTRICAL DRAWINGS) FOR ASSOCIATED SYSTEMS AND

INFORMATION ABOUT SYMBOLS NOT INDICATED IN THIS LEGEND.

4' x 8' TECTUM CEILING

GYPSUM BOARD CEILING/SOFFIT

OPEN TO DECK

REMOVE PARTITION

AND WOOD TRIM,

ENTIRE EXTENT OF

BULKHEAD EA SIDE

8' - 7 3/4"

B.O. TRIM VIF

(B.O. TRIM

7'-11 1/4" AT

SERVING, VIF)

REPLACE TRIM W/ NEW

NOMINAL 1x10 CONTINUOUS

POPULAR WOOD TRIM,

PAINTED SEMI-GLOSS, COLOR

TO MATCH EXISTING.

PROPOSED CONDUIT

LOCATION, REFER TO

ELEC. DWGS

NEW PAINTED TRIM AT

JAMB, BEYOND

A

REMOVE PARTITION

TRACK FROM WALL

AND EXISTING WOOD

JAMB TRIM, EA SIDE

PROVIDE NEW NOMINAL 1x10

CONTINUOUS POPULAR

WOOD , PAINTED SEMI-GLOSS,

COLOR TO MATCH EXISTING.

TRIM AT JAMB TO BE FLUSH

WITH TRIM AT HEAD

SCALE : 1/8" = 1'-0"

FIRST FLOOR PLAN

SCALE : 1/8" = 1'-0"

FIRST FLOOR REFLECTED CEILING PLAN

Colliers Engineering & Design, Architecture, Landscape Architecture, Surveying, CT P.C.

Colliers

Engineering & Design

Colliers

Engineering & Design

GRAND RAPIDS

560 5th St. NW

Suite 305

Grand Rapids, MI 49504

Phone: 616.827.4270

A R

C H

D x

PROJECT MANAGER:

DESIGNER: REVIEWER:

DISCIPLINE LEAD:

DRAWING NUMBER:

DATE ISSUED: PROJECT NUMBER:

SHEET NAME:

Copyright © 2024. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of

Colliers Engineering & Design.

www.colliersengineering.com

NOTE: DO NOT SCALE DRAWING FOR CONSTRUCTION.

MI ARCHITECTURE

FIRM LICENSE # NLP000605

BID PACK 2

/3

/2

:3 :5

P

M

EBERSOLE CENTER FOOD

SERVICE - EQUIPMENT

REPLACEMENT &

RENOVATIONS SO-1853

3400 2ND STREET

WAYLAND, MI 49348

C NORRIS

E POST

B HUYLER

A101

FIRST FLOOR AND

CEILING PLANS

LANSING SCHOOL

DISTRICT

03/13/26 26000750A

N

SCALE : 1" = 1'-0"

PARTITION HEAD DTL

CEILING PLAN KEYNOTES #

C1 EXISTING CEILING TO REMAIN. PAINT TOUCH UP AS REQUIRED FOR

NEW LIGHT INSTALLATION.

C2 EXISTING TECTUM CEILING TO REMAIN. PAINT TOUCH UP AS

REQUIRED FOR NEW LIGHT INSTALLATION.

C3 EXISTING PLASTERED CEILING TO REMAIN. PATCH AND REPAIR

WATER DAMAGE AREAS AND PAINT ENTIRE CEILING.

C4 EXISTING PLASTERED CEILING TO REMAIN. PATCH AS REQUIRED

AND PAINT TOUCH UP AS REQUIRED FOR NEW LIGHT

INSTALLATION.

FLOOR PLAN KEYNOTES #

A1 EXISTING VCT FLOORING TO REMAIN. NO WORK ANTICIPATED.

A2 BULKHEAD AT FOLDING PARTITIONS TO BE PAINTED BOTH SIDES IN

ITS ENTIRETY. ALL OTHER WALLS TO REMAIN AS IS.

A3 EXISTING MOSAIC FLOOR TILING TO REMAIN. PATCH AS REQUIRED

FOR NEW POWER, DRAINS AND WATER LINES.

A4 PROVIDE PAINT TOUCH UP WHERE EQUIPMENT IS BEING REMOVED.

A5 EXISTING EXPOSED CONCRETE FLOORING TO REMAIN.

REV DATE DESCRIPTION

3 03/13/26 BID PACK 2 - BIDS &PERMITS

4 Date 4 BID PACK 2 - ADDENDUM 1

SCALE : 1" = 1'-0"

PARTITION JAMB DTL

099123 - INTERIOR PAINTING:

A. BASIS OF DESIGN MANUFACTURER: SHERWIN WILLIAMS. ALSO ACCEPTABLE: BENJAMIN

MOORE AND PPG PAINTS.

B. PREPARATION OF SURFACES TO RECEIVE PAINT: CLEAN, DRY, DULL, AND SOUND.

C. PAINT SYSTEMS:

a. GYPSUM BOARD AND PLASTER:

• PRIMER: PROMAR 200 ZERO VOC INTERIOR LATEX PRIMER, B28W2600

1. 4.0 MILS WET, 1.0 MILS DRY.

• INTERMEDIATE COAT: MATCH TOPCOAT.

• TOPCOAT: PROMAR 200 ZERO VOC INTERIOR LATEX EG-SHEL, B20-2600 SERIES.

1. 4.0 MILS WET, 1.6 MILS DRY.

b. GYPSUM BOARD AND PLASTER CEILING:

• PRIMER: LOXON CONCRETE & MASONRY PRIMER AS NEEDED ON NEW PLASTER

• INTERMEDIATE COAT: MATCH TOPCOAT

• TOPCOAT: PRO INDUSTRIAL WATERBORNE ACRYLIC DRY FALL, FLAT, B42-80 SERIES

c. CMU:

• PRIMER: EXTREME BOND PRIMER, B51 SERIES

1. 3.1 MILS WET, .9 MILS DRY.

• ADHESION TEST: USE PRINCIPLES OF ASTM D3359 AFTER MINIMUM 7 DAY CURE TIME

OF PRIMER TO ENSURE 90% OF COATING CONTINUES TO ADHERE, CONTACT

COATINGS MANUFACTURER FOR ASSISTANCE AS NEEDED.

• INTERMEDIATE COAT: MATCH TOPCOAT.

• TOPCOAT: PRO INDUSTRIAL PRE-CAT EPOXY EG-SHEL, K45-2150 SERIES.

1. 4.0 MILS WET, 1.6 MILS DRY PER COAT.

d. HOLLOW METAL FRAMES AND DOORS:

• PRIMER: PRO INDUSTRIAL PRO CRYL UNIVERSAL PRIMER, B66-310 SERIES.

1. 5.0 TO 10 MILS WET, 2.0 TO 4.0 MILS DRY.

• INTERMEDIATE COAT: MATCH TOPCOAT.

• TOPCOAT: PRO INDUSTRIAL ACRYLIC SEMI-GLOSS COAT, B66-650 SERIES.

1. 2.5 TO 4.0 MILS DRY PER COAT.

e. WOOD:

• PRIMER: PREMIUM WALL & WOOD PRIMER.

• INTERMEDIATE COAT: MATCH TOPCOAT.

• TOPCOAT: PRO INDUSTRIAL ACRYLIC SEMI-GLOSS COAT, B66-650 SERIES.

f. ACOUSTIC/TECTUM DECK

• PRO INDUSTRIAL WATERBORNE ACRYLIC DRY FALL, FLAT, B42-80 SERIES. UP TO 6

COATS, SPRAY APPLIED.

1. 3.5 TO 5.0 MILS WET, 1.5 TO 2.0 MILS DRY PER COAT.

D. COLORS: REFER TO BASIS OF DESIGN.

SPECIFICATIONS

SYMBOL NOTES:

1. "AC" DENOTES ABOVE COUNTER. COORDINATE HEIGHT WITH ARCHITECT.

2. "H" DENOTES HORIZONTAL MOUNTING OF DEVICE.

3. "B" DENOTES MOUNTED IN BASE.

4. "F" DENOTES MOUNTED IN FACE OF CABINETS.

D

S

SECURITY INTERCOM

SECURITY DOOR CONTACT

CEILING SPEAKER

AUDIO ONLY ALARM

VISUAL ONLY ALARM

FIRE ALARM CONTROL RELAY

REMOTE ALARM KEY TEST SWITCH

WATER FLOW SWITCH

O,S,&Y TAMPER SWITCH

HEAT DETECTOR

DUCT SMOKE DETECTOR

AREA SMOKE DETECTOR-PHOTOELECTRIC

FIRE ALARM PULL STATION

CEILING SPEAKER

SPEAKER/STROBE LIGHT

LMTG. HT. TO CDESCRIPTIONSYMBOL

SYSTEMS SYMBOL LEGEND

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

F

CO

CR

FS

D

TS

RT

F.A.A.

F.A.C.P.

F.A. NOTES:

1. MATCH EXISTING SYSTEM.

SECURITY DOOR REQUEST TO EXIT

CO

R CARD READER

MAGNETIC DOOR HOLD OPENDH

CARBON MONOXIDE SENSOR. E.C TO ROUGH-IN SINGLE

GANG BOX AND 1/2"C. TO ACCESSIBLE CEILING SPACE.

46"

80"

80"

46"

46"

AT DOOR HEAD

46"

AT DOOR HEAD

TYPICALLY CLG

MOUNTED

SMOKE/HORN BASE

CO-DENOTES COMBO CARBON MONOXIDE/SMOKE

I

C

X

H

FIRE/SMOKE DAMPER

BEAM DETECTOR

F/SD

BD ---

SECURITY CAMERA - "W" DENOTES WALL MOUNTED

CHEVRON INDICATES AIM LINE

WP FIRE ALARM HORN/STROBE LIGHT

(WP-DENOTES WEATHER PROOF)

T THERMOSTAT. E.C TO ROUGH-IN SINGLE GANG BOX AND

1/2"C. TO ACCESSIBLE CEILING SPACE.

TRANSFORMER

SURFACE OR FLUSH MTD. BRANCH CIRCUIT PANELBOARD

THREE PHASE ELECTRIC MOTOR

SINGLE PHASE ELECTRIC MOTOR

MAGNETIC MOTOR STARTER-MS

DIMMER SWITCH

46"

KEY OPERATED SWITCH-SPEC. GRADE

FOUR WAY SWITCH-SPEC. GRADE

T

F

P

F

J

ELECTRICAL SYMBOL LEGEND

S

S

S

WR

D

K

S

SYMBOL DESCRIPTION

MTG. HT. TO CL

SPECIAL OUTLET-CHARACTERISTICS AS NOTED ON PLANS

FLOOR BOX 1 RECEPT, 1 DATA - THOMAS & BETTS-# 664-SC

1-1/4"C TO FLOORBOX FOR DATA

FLOOR BOX 2 RECEPT, 2 DATA THOMAS & BETTS-# 665-SC

1-1/4"C TO FLOORBOX FOR DATA

OS

IRDS IR SWITCH DIMMABLE

OCCUPANCY SENSOR

PUSH BUTTONPB

TV

IRS IR SWITCH

CS CONTROL STATION

C

SPECIAL SINGLE RECEPTACLE

VARIABLE FREQUENCY DRIVEVFD

PC PHOTO CELL

46"

46"

46"

46"

46"

46"

18"

18"

18"

18"

18"

AS NOTED

18"

46"

46"

46"

AT EQUIP.

AS NOTED

AS NOTED

46"

46"

46"

46"

72" TO TOP

18"

SINGLE POLE OR 3-WAY SWITCH-

SPECIFICATION GRADE

SPLIT WIRED RECEPTACLE

C - DENOTES CONTROLLED VIA RELAY OR OCC SENSOR

WATER RESISTANT GROUND FAULT CIRCUIT INTERRUPTER

WR-DENOTES WEATHERPROOF WHILE IN USE COVER

DUPLEX OUTLET-SPEC. GRADE

CIRCLE AROUND SYMBOL= CEILING MOUNTED

DATA OUTLET-4" SQ. BOX W/ 1 GANG RAISED COVER.

1-1/4"C. UP WALL TO CLG. SPACE

CIRCLE AROUND SYMBOL= CEILING MOUNTED

TV OUTLET-4" SQ. BOX W/ 1 GANG RAISED COVER.

1-1/4"C. UP WALL TO CLG. SPACE

CIRCLE AROUND SYMBOL= CEILING MOUNTED

JUNCTION BOX - HUBBELL NSAV62M WITH RECEPTACLE KIT

HUBBELL NSOKP. PROVIDE CONNECTOR PLATE FOR A/V

JUNCTION BOX -4" SQ. BOX W/ 2 GANG RAISED COVER.

1"C. UP WALL TO CLG. SPACE UNLESS OTHERWISE NOTED

FUSED DISCONNECT SWITCH-

FDS-HEAVY DUTY

NON-FUSED DISCONNECT SWITCH-

NFDS-HEAVY DUTY

SW. AND PLUGFUSE HOLDER- BUSSMANN

"SSU" & FUSESTAT FUSE

COMBINATION MAG. STARTER/ FUSED DISC. SWITCH - CS/FDS

COMBINATION MAG. STARTER/NON-FUSED DISC.

SWITCH - CS/NFDS

(2) DUPLEX OUTLET-SPEC. GRADE

CIRCLE AROUND SYMBOL= CEILING MOUNTED

S

PARTIALLY SHADED LUMINAIRE OR WITH "E" SUFFIX ARE

EMERGENCY

BATTERY EMERGENCY LUMINAIRE

REMOTE EMERGENCY HEAD

RECESSED LUMINAIRE 2'x4' OR 2'x2'

RECESSED WALLWASH LUMINAIRE

RECESSED DOWNLIGHT LUMINAIRE

LED ACCENT/UNDER CABINET LUMINAIRE

TRACK LIGHTING LUMINAIRE

SURFACE LUMINAIRE

WALL MOUNTED LUMINAIRE

PENDANT LUMINAIRE

SITE LIGHTING LUMINAIRE

NIGHT LIGHT

STRIP LUMINAIRE

SURFACE LUMINAIRE 2'x4' OR 2'x2'

EXIT SIGN - WALL MOUNTED OR CEILING MOUNTED

ARROWS INDICATE PATH OF EGRESS

NL

EE

H HUMIDISTAT. E.C TO ROUGH-IN SINGLE GANG BOX AND

1/2"C. TO ACCESSIBLE CEILING SPACE. 46"

WN ---

PS SWITCH WITH PILOT LIGHT 46"

18"TELEPHONE OUTLET-4" SQ. BOX W/ 1 GANG RAISED

COVER. 1-1/4"C. UP WALL TO CLG. SPACE

18"TELEPHONE/DATA OUTLET-4" SQ. BOX W/ 1 GANG

RAISED COVER. 1-1/4"C. UP WALL TO CLG. SPACE

M ---ELECTRIC UTILITY METER

P ---POWER POLE - SEE DRAWING FOR POWER -

POWER/DATA SPECIFICATIONS

DS DAYLIGHT SENSOR ---

MS MANUAL MOTOR STARTER SWITCH 46"

ELECTRICAL IDENTIFICATION

N.T.S.

FRONT

REAR SIDE

OF PLATE

FRONT

REAR SIDE OF

PLATE

BPA-15LP2-5

LABEL CKT. NO. OF EACH DEVICE ON REAR

SIDE OF COVER PLATE. USE PERMANENT

MARKER PEN, BRADY MARKING SYSTEM OR

OTHER METHOD APPROVED BY THE ENGINEER

JUNCTION BOXES (EXPOSED

OR CONCEALED ABOVE

ACCESSIBLE CEILING)

LABEL COVERS WITH CKT.'S CONTAINED

WITHIN. USE PERMANENT MARKER PEN

OR OTHER APPROVED METHOD.

FOR J.B.'S CONTAINING OTHER

THAN POWER OR LIGHTING CKT.'S

LABEL COVERS INDICATING

SYSTEM TYPE AND ZONES.

CKT.S

LP4-13,15,17

DUPLEX RECEPTACLE

PLATE

STANDARD TOGGLE

SWITCH PLATE

LABEL EXAMPLES:

"FIRE ALARM-ZONES 2&3"

"P.A. ZONES 4,5,&6" "DATA

CIRCUITS A&B" "EXIT

SIGNS-EMI&2" "EMERG.

CKTS. BPEM-3,4"

E100 A-1

PP POWER PACK ---

EV ---EV CHARGER

F= FUTURE

WIRELESS ROUTER

CIRCLE AROUND SYMBOL= CEILING MOUNTED

SURFACE MOUNT KITCHEN FLOOR BOX DETAIL

N.T.S.

SIMILAR TO HUBBELL SA6685G-2G U.O.N.

DEVICE BOX W/20A-120V DUPLEX RECEPTACLE.

NOTE: FOR 50A,240V PROVIDE HUBBELL

SA6685-4G WITH NEMA 14-50R. COORDINATE

WITH EQUIPMENT.

FLOOR

3/4" RIGID CONDUIT

3/4" DROP

E1.00 A-2

E100

DETAILS, SYMBOL

LEGENDS &

SPECIFICATIONS

1/

/2

4:

:5

P

M

EBERSOLE CENTER FOOD

SERVICE - EQUIPMENT

REPLACEMENT &

3400 2ND STREET

WAYLAND, MI 49348

26000750A

REV DATE DESCRIPTION

Colliers Engineering & Design, Architecture, Landscape Architecture, Surveying, CT P.C.

Colliers

Engineering & Design

Colliers

Engineering & Design

GRAND RAPIDS

560 5th St. NW

Suite 305 Grand Rapids, MI 49504

Phone: 616.827.4270

PROJECT MANAGER:

DESIGNER: REVIEWER:

DISCIPLINE LEAD:

DRAWING NUMBER:

DATE ISSUED: PROJECT NUMBER:

SHEET NAME:

www.colliersengineering.com

NOTE: DO NOT SCALE DRAWING FOR CONSTRUCTION.

MI ARCHITECTURE

FIRM LICENSE # NLP000605

Copyright © 2024. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of Colliers Engineering & Design.

BID PACK 2

DATE DESCRIPTION

100 Cesar E Chavez Ave SW Grand Rapids, Michigan 49503

(616) 742-2810 www.classicengineering.com Project # 2026021

Classic Engineering, LLC

03/16/2026

1 03/16/26 BID PACK 2 - BIDS & PERMITS

2 03/XX/26 BULLETIN #1

LANSING SCHOOL

DISTRICT

3 04/03/26 BID PACK 2 - ADDENDUM 1

RENOVATIONS SO-1853

P :\2

6\

LS

D

E be rs ol e C af et er ia

\W or ki ng

D ra w in gs \2

E

2.

dw g, /3 /2

9:

:5

A M

, m de lo ra

COOLER

1009B

WALK-IN

FREEZER

MULTI-PORPOSE

ROOM

KITCHEN

SERVING

DISHWASHING

STORAGE

WC

A A A A A A A A A A

A A A A A A A A A A

A A A A A A A A A A

A A A A A A A A A A

EM

EM

EM EM

EM

EM

E1 E

E1E E1 E

E1 E

E1 E

E1 EE1E

B B

B

B

B

B

B

B

B

B

B

B

B B

B B

1 1

2 2

C C C

OS

OS C

E1E

B B B

B B B B B B

B B B

3 3

EX. EX.

EX.EX.

EM

E1 E

4 4

4 4

1009A

WALK-IN

COOLER

1009B

WALK-IN

FREEZER

MULTI-PORPOSE

ROOM

KITCHEN

SERVING

DISHWASHING

STORAGE

WC

1.2

1.6

1.7

1.5

1.5

1.9

2.0

1.6

1.4

2.6

3.8

3.0

1.9

2.0

3.3

5.0

4.0

2.2

4.2

3.7

1.9

1.8

3.2

5.5

4.6

2.5

3.5

4.1

2.4

1.4

1.4

2.0

3.1

3.5

1.8

2.3

2.2

1.4

1.0

1.0

1.3

1.6

1.9

0.9

5.6

0.4

0.4

0.4

0.3

0.3

0.5

0.6

0.5

0.4

0.3

0.5

0.7

0.8

0.6

0.4

0.5

0.7

0.9

0.7

0.5

0.4

0.6

0.8

0.7

0.5

0.3

0.4

0.6

0.6

0.4

0.3

0.3

0.3 0.3

0.3

0.3

0.3

0.3

0.3

0.4

0.5

0.6

0.6

0.4

0.5

0.7

0.9

0.9

0.6

0.7

1.0

1.2

1.1

0.8

1.1

1.3

1.4

1.2

1.0

1.7

1.6

1.5

1.4

1.4

2.7

2.4

2.0

2.3

2.3

4.0

3.9

2.9

3.8

3.9

5.3

3.8

5.6

5.3

4.8

5.2

3.9

5.3

5.0

2.4

2.9

2.8

3.0

2.6

1.3

1.6

1.7

1.6

1.4

0.2

0.2

0.2

0.2

0.2

0.2

5.7

0.4

0.5

0.7

0.9

1.3

1.5

1.3

1.1

1.0

0.8

0.7

0.5

0.6

0.8

1.1

1.7

2.2

1.9

1.6

1.3

1.0

0.8

0.7

0.5

0.8

1.1

1.7

2.5

2.7

2.2

1.7

1.3

1.1

0.9

0.6

0.5

1.0

1.4

1.9

2.2

2.2

1.8

1.3

1.1

1.0

0.9

0.7

0.5

1.3

1.6

1.9

1.7

1.4

1.1

1.0

0.9

1.0

1.0

0.8

0.6

1.6

2.7

3.2

2.3

1.5

1.0

0.8

0.8

0.9

1.1

1.0

0.7

1.8

4.0

3.9

2.2

1.1

0.8

0.7

0.7

0.9

0.9

0.7

1.3

2.8

4.3

3.5

2.3

1.3

0.8

0.6

0.6

0.7

0.7

0.5

0.8

1.4

2.1

2.4

1.7

1.2

0.8

0.7

0.6

0.5

0.4

0.3

0.5

0.8

1.0

1.2

1.2

1.0

0.9

0.9

0.8

0.7

0.4

0.3

0.4

0.5

0.7

0.8

0.8

0.9

1.0

1.1

1.0

0.8

0.4

0.3

0.3

0.4

0.5

0.6

0.7

0.8

0.9

0.9

0.8

0.6

0.4

0.2

5.4

1.9

1.9

1.8

1.8

1.6

1.4

1.1

0.9

0.9

0.6

0.4

2.1

0.6

0.7

0.7

0.7

0.4

0.3

0.3

0.3

0.4

0.4

0.4

0.4

0.4

0.4

0.5

0.6

0.9

1.2

1.6

1.6

1.3

1.1

1.0

1.0

0.9

0.8

0.6

0.5

0.5

0.5

0.8

1.0

1.0

0.8

0.5

0.3

0.4

0.6

0.7

0.6

0.6

0.5

0.5

0.5

0.6

0.9

1.4

2.6

3.9

3.1

1.7

1.3

1.4

1.6

1.6

1.3

1.0

0.7

0.6

0.6

0.8

0.9

0.8

0.6

0.4

0.4

0.5

0.8

1.0

1.0

0.8

0.7

0.6

0.7

0.8

1.1

2.1

4.1

3.7

1.7

1.2

1.4

2.0

2.6

2.4

1.7

1.2

0.8

0.7

0.6

0.6

0.6

0.5

0.4

0.4

0.5

0.8

1.2

1.3

1.1

0.9

0.8

0.8

0.9

1.3

2.3

3.3

3.9

2.3

1.3

1.0

1.2

1.7

2.6

2.5

2.0

1.5

1.1

0.8

0.5

0.5

0.5

0.4

0.4

0.5

0.6

0.9

1.2

1.3

1.3

1.1

1.0

0.9

1.0

1.2

1.6

2.2

2.0

1.3

0.9

0.8

1.0

1.3

1.8

2.1

1.8

1.5

1.2

0.9

0.4

0.4

0.5

0.5

0.6

0.7

0.9

1.0

1.2

1.3

1.3

1.3

1.2

1.0

1.0

1.0

1.2

1.2

1.1

0.9

0.8

0.8

0.9

1.0

1.3

1.5

1.6

1.4

1.1

0.9

0.4

0.5

0.5

0.7

0.9

1.2

1.3

1.3

1.3

1.4

1.4

1.5

1.5

1.2

1.0

1.0

0.9

0.9

0.8

0.7

0.7

0.8

0.9

1.0

1.0

1.1

1.2

1.2

1.0

0.9

0.5

0.6

0.8

1.1

1.7

1.9

1.7

1.5

1.4

1.5

1.6

1.7

1.8

1.5

1.2

0.9

0.8

0.8

0.7

0.7

0.8

0.9

1.0

1.0

1.0

1.0

1.0

1.0

0.9

0.8

0.6

0.8

1.2

1.8

2.6

2.4

1.9

1.6

1.4

1.5

1.8

2.0

2.1

1.9

1.4

1.0

0.8

0.8

0.8

0.8

0.9

1.1

1.1

1.0

1.0

0.9

0.9

0.8

0.8

0.8

0.8

1.1

1.6

2.2

2.6

2.3

1.8

1.4

1.2

1.3

1.7

2.2

2.4

2.3

1.6

1.1

0.9

0.8

0.8

0.9

1.1

1.2

1.2

1.1

1.0

0.9

0.8

0.7

0.7

0.7

0.9

1.2

1.5

1.7

1.7

1.5

1.3

1.1

1.0

1.1

1.5

2.2

2.5

2.4

1.7

1.2

0.9

0.9

0.9

1.1

1.3

1.3

1.2

1.1

1.0

0.8

0.7

0.6

0.6

0.6

0.9

1.2

1.4

1.5

1.4

1.2

1.1

1.0

0.9

1.0

1.2

1.7

2.1

2.0

1.5

1.2

1.0

0.9

1.0

1.1

1.3

1.3

1.2

1.0

0.8

0.7

0.6

0.6

0.5

0.5

1.2

1.7

1.8

1.6

1.4

1.2

1.1

1.0

1.0

1.1

1.3

1.5

1.5

1.3

1.1

1.0

0.9

1.0

1.1

1.1

1.0

0.9

0.8

0.7

0.6

0.6

0.5

0.5

0.5

1.8

2.5

2.8

2.3

1.8

1.5

1.2

1.1

1.1

1.1

1.2

1.2

1.1

1.0

1.0

0.9

1.0

0.9

0.9

0.8

0.8

0.7

0.6

0.6

0.5

0.5

0.5

0.5

2.7

3.1

2.9

2.5

2.0

1.6

1.3

1.2

1.1

1.1

1.1

1.1

1.0

1.0

0.9

0.9

0.9

0.8

0.8

0.7

0.6

0.6

0.5

0.5

0.5

0.5

0.5

0.3

2.3

3.3

3.3

2.8

2.2

1.8

1.5

1.4

1.3

1.2

1.1

1.1

1.0

1.0

0.9

0.9

0.9

0.8

0.8

0.7

0.7

0.6

0.5

0.5

0.5

0.5

0.5

1.2

1.8

3.5

3.4

2.8

2.3

1.9

1.7

1.6

1.6

1.5

1.3

1.0

1.0

0.9

0.9

0.9

0.9

1.0

0.9

0.9

0.8

0.7

0.6

0.6

0.5

0.5

0.5

1.0

1.6

2.2

2.7

3.0

2.5

2.1

1.9

1.9

2.2

2.2

1.9

1.4

1.0

0.9

0.9

0.9

1.0

1.0

1.1

1.2

1.1

1.0

0.9

0.7

0.6

0.6

0.5

0.5

0.9

1.2

1.5

1.7

1.7

1.9

1.7

1.7

1.8

2.1

2.5

2.6

2.2

1.4

1.0

0.8

0.8

0.8

0.9

1.0

1.2

1.3

1.2

1.1

1.0

0.8

0.7

0.7

0.6

0.6

0.9

1.2

1.4

1.5

1.4

1.2

1.4

1.5

1.8

2.1

2.3

2.4

2.0

1.2

0.9

0.8

0.7

0.8

0.8

1.0

1.1

1.3

1.2

1.1

1.0

0.9

0.8

0.7

0.7

0.7

0.9

1.2

1.6

1.8

1.6

1.4

1.2

1.4

1.6

1.8

2.0

1.9

1.5

1.0

0.8

0.7

0.7

0.7

0.8

0.9

1.0

1.1

1.1

1.1

1.0

0.9

0.9

0.8

0.8

0.7

0.7

1.2

1.8

2.5

2.6

2.0

1.5

1.4

1.4

1.5

1.6

1.4

1.1

0.8

0.7

0.7

0.7

0.7

0.8

0.8

0.8

0.9

1.0

1.0

1.0

1.0

1.0

0.9

0.8

0.8

0.6

0.9

1.4

2.3

2.6

2.1

1.7

1.4

1.3

1.3

1.2

1.1

0.9

0.7

0.7

0.7

0.7

0.8

0.9

0.9

0.9

0.8

0.9

0.9

1.0

1.1

1.1

1.0

0.9

0.8

0.5

0.7

1.0

1.5

2.0

1.8

1.6

1.4

1.3

1.2

1.1

0.9

0.8

0.7

0.6

0.7

0.8

1.0

1.2

1.3

1.0

0.9

0.9

0.9

1.2

1.4

1.4

1.2

1.0

0.9

0.5

0.6

0.7

0.9

1.2

1.4

1.3

1.3

1.2

1.2

1.1

0.9

0.7

0.6

0.6

0.6

0.9

1.4

2.0

2.2

1.5

1.1

1.0

1.2

1.7

1.8

1.6

1.3

1.1

0.9

0.5

0.6

0.6

0.7

0.8

0.9

1.1

1.1

1.2

1.3

1.2

0.9

0.7

0.6

0.6

0.6

0.9

1.8

3.1

3.7

2.4

1.4

1.3

1.7

2.4

2.2

1.8

1.3

1.0

0.8

0.7

0.7

0.7

0.7

0.6

0.6

0.8

1.1

1.3

1.3

1.0

0.8

0.6

0.5

0.5

0.6

0.8

1.8

3.9

5.2

3.6

1.8

1.6

2.1

2.8

2.4

1.6

1.1

0.8

0.6

0.8

0.9

0.9

0.8

0.6

0.5

0.6

0.9

1.1

1.0

0.8

0.6

0.5

0.5

0.4

0.5

0.7

1.2

2.9

5.0

3.3

1.9

1.6

2.0

2.2

1.7

1.1

0.8

0.6

0.6

0.8

1.0

1.0

0.9

0.6

0.4

0.4

0.6

0.8

0.7

0.6

0.5

0.4

0.4

0.4

0.4

0.5

0.8

1.4

2.2

2.2

1.5

1.4

1.5

1.3

1.0

0.8

0.6

0.5

0.5

0.6

0.7

0.8

0.7

0.5

0.3

0.3

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.6

0.8

1.0

1.2

1.1

1.0

0.9

0.8

0.6

0.5

0.4

0.4

0.4

0.2

5.4

EM1 @ 7.5'

E1 @ 7.5'

E1 @ 7.5'

E1 @ 7.5'

EM1 @ 7.5'

E1 @ 7.5' E1 @ 7.5'

EM1 @ 7.5' EM1 @ 7.5'

EM1 @ 7.5'EM1 @ 7.5'

EM1 @ 12'EM1 @ 12'

EM1 @ 7.5'

Statistics

Description Symbol Avg Max Min Max/Min Avg/Min

MECH 12 2.5 fc 5.6 fc 0.9 fc 6.2:1 2.8:1 MULTI-PURPOSE 8 1.2 fc 5.4 fc 0.2 fc 27.0:1 6.0:1 SERVING 1.5 fc 5.7 fc 0.2 fc 28.5:1 7.5:1 VESTIBULE 3 1.4 fc 2.1 fc 0.4 fc 5.3:1 3.5:1 KITCHEN 3 1.2 fc 5.4 fc 0.2 fc 27.0:1 6.0:1

Schedule

Symbol Label Image QTY Manufacturer Catalog Description Number Lamps

Lamp Output LLF Input

Power Polar Plot

E1

5 Lithonia Lighting LHQM LED QUANTUM LED EMERGENCY COMBO (ONE

HEAD ONLY)

1 Absolute 1 1.5

EM1

9 Lithonia Lighting ELM4L ELM4L SP640L 1 345 1 2.5

EL101

FIRST FLOOR PLAN -

LIGHTING /

PHOTOMETRICS

1/

/2

4:

:5

P

M

EBERSOLE CENTER FOOD

SERVICE - EQUIPMENT

REPLACEMENT &

3400 2ND STREET

WAYLAND, MI 49348

26000750A

REV DATE DESCRIPTION

Colliers Engineering & Design, Architecture, Landscape Architecture, Surveying, CT P.C.

Colliers

Engineering & Design

Colliers

Engineering & Design

GRAND RAPIDS

560 5th St. NW

Suite 305 Grand Rapids, MI 49504

Phone: 616.827.4270

PROJECT MANAGER:

DESIGNER: REVIEWER:

DISCIPLINE LEAD:

DRAWING NUMBER:

DATE ISSUED: PROJECT NUMBER:

SHEET NAME:

www.colliersengineering.com

NOTE: DO NOT SCALE DRAWING FOR CONSTRUCTION.

MI ARCHITECTURE

FIRM LICENSE # NLP000605

Copyright © 2024. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of Colliers Engineering & Design.

BID PACK 2

DATE DESCRIPTION

100 Cesar E Chavez Ave SW Grand Rapids, Michigan 49503

(616) 742-2810 www.classicengineering.com Project # 2026021

Classic Engineering, LLC

03/16/2026

1 03/16/26 BID PACK 2 - BIDS & PERMITS

2 03/XX/26 BULLETIN #1

LANSING SCHOOL

DISTRICT

3 04/03/26 BID PACK 2 - ADDENDUM 1

RENOVATIONS SO-1853

SCALE: 1/8" = 1'-0"

GENERAL LIGHTING NOTES:

1. CONNECT EMERGENCY LIGHTING TO CIRCUIT FEEDING GENERAL LIGHTING IN THAT AREA.

2. EXIT SIGNS TO BE CONNECTED TO UNSWITCHED LIGHTING CIRCUIT OR EMERGENCY LIGHTING

CIRCUIT FEEDING THAT AREA.

3. LIGHTING CONTROL SHALL COMPLY WITH 2021 MICHIGAN ENERGY CODE WHERE APPLICABLE.

4. ALL LIGHTING CIRCUITS WITHIN DWELLINGS TO BE PROTECTED WITH AFCI CIRCUIT BREAKERS.

LIGHTING KEY NOTES:

NO WORK IN THIS AREA.

REPLACE EXISTING LIGHTS ONE-FOR-ONE WITH NEW LED FIXTURES, REFER TO FIXTURE SCHEDULE

ON SHEET E100.

EXISTING PADDLE FANS AND CONTROL TO REMAIN.

REUSE EXISTING SWITCHES FOR NEW LIGHTS UNLESS SHOWN TO BE CONTROLLED WITH

OCCUPANCY SENSOR.

REPLACE EXISTING LIGHTS UNDER HOOD ONE FOR ONE. FIELD VERIFY EXACT SIZE AND COUNTS OF

FIXTURES.

SCALE: 1/8" = 1'-0"

L. WOOD

C. LADEWIG

C. LADEWIG

P :\2

6\

LS

D

E be rs ol e C af et er ia

\W or ki ng

D ra w in gs \2

E

1.

dw g, /3 /2

9:

:5

A M

, m de

COOLER

1009B

WALK-IN

FREEZER

MULTI-PORPOSE

ROOM

KITCHEN

SERVING

DISHWASHING

STORAGE

WC

EX. PANEL

EBPC-02

EX. PANEL

EBPC-03

EX. CEILING FAN EX. CEILING FAN

EX. CEILING FAN EX. CEILING FAN

502A

EX. PANEL MDP

EX. PANEL LP-A

EX. PANEL PP-B

EX EX EX EX

EX

E

EXEX. AC

EX

EX

3 EBCP03-10

EBCP03-2/4

EBCP03-6

EBCP03-8

EQUIPMENT SCHEDULE

Item EQUIPMENT DESCRIPTION VOLTS PH

AMPS

LOAD

DIRECT

BY EC

CORDSET

BY FSEC AFF (in) REMARKS

102 ICE MAKER W/ BIN 208 1 5.9 X 72

301 STEAMER & STAND 208 3 42.0 X

302 CONVECTION OVEN - DOUBLE DECK 208 3 34.0

401 HOT FOOD TABLE 120/208 1 28.4 X 5 PEDESTAL MOUNTED RECEPTACLE BY TRADES

403 COLD FOOD TABLE 120 1 8.6 X 5

405 MILK COOLER - DOUBLE SIDED 120 1 3.3 X 5

502 DISHWASHER

502A DRAIN WATER TEMPERING KIT 120 1 5.0 X 16

PEDESTAL MOUNTED RECEPTACLE BY TRADES

PEDESTAL MOUNTED RECEPTACLE BY TRADES

5 PEDESTAL MOUNTED JUNCTION BOX BY TRADES

5 PEDESTAL MOUNTED RECEPTACLE BY TRADES

208 3 138.9

X

60X

BY TRADES AND STORED OR DISCARDED BY THE FSEC

FOR CONSTRUCTION PURPOSES.

AS DIRECTED BY OWNER.

ANY EXISTING EQUIPMENT AS REQUIRED

EQUIPMENT NOT BEING REUSED TO BE DISCONNECTED

RELOCATED BY THE FSEC AS PER PLANS AND SPECIFICATIONS.

BE DISCONNECTED BY THE TRADES AND

EQUIPMENT DESIGNATED AS RELOCATED SHALL5.

4.

WHERE APPLICABLE.

FSEC SHALL VERIFY ROUGHIN REQUIREMENTS FOR

TRADES TO REUSE EXISTING ROUGHINS

FUTURE, PURVEYOR SUPPLIED, OWNERS RELOCATED

EQUIPMENT, OWNER SUPPLIED EQUIPMENT, ETC.

TRADES SHALL DISCONNECT, REMOVE, STORE & RECONNECT

2.

3.

NOTE:

1.

EP101

FIRST FLOOR PLAN -

POWER

1/

/2

4:

:5

P

M

EBERSOLE CENTER FOOD

SERVICE - EQUIPMENT

REPLACEMENT &

3400 2ND STREET

WAYLAND, MI 49348

26000750A

REV DATE DESCRIPTION

Colliers Engineering & Design, Architecture, Landscape Architecture, Surveying, CT P.C.

Colliers

Engineering & Design

Colliers

Engineering & Design

GRAND RAPIDS

560 5th St. NW

Suite 305 Grand Rapids, MI 49504

Phone: 616.827.4270

PROJECT MANAGER:

DESIGNER: REVIEWER:

DISCIPLINE LEAD:

DRAWING NUMBER:

DATE ISSUED: PROJECT NUMBER:

SHEET NAME:

www.colliersengineering.com

NOTE: DO NOT SCALE DRAWING FOR CONSTRUCTION.

MI ARCHITECTURE

FIRM LICENSE # NLP000605

Copyright © 2024. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of Colliers Engineering & Design.

BID PACK 2

DATE DESCRIPTION

100 Cesar E Chavez Ave SW Grand Rapids, Michigan 49503

(616) 742-2810 www.classicengineering.com Project # 2026021

Classic Engineering, LLC

03/16/2026

1 03/16/26 BID PACK 2 - BIDS & PERMITS

2 03/XX/26 BULLETIN #1

LANSING SCHOOL

DISTRICT

3 04/03/26 BID PACK 2 - ADDENDUM 1

RENOVATIONS SO-1853

NO WORK IN THIS AREA.

PROVIDE NEW WIRING DEVICES IN MULTI-PURPOSE ROOM WITH TAMPER RESISTANT AND

STAINLESS STEEL COVER PLATES AS SHOWN ON PLAN.

ROUTE CIRCUITS FOR SERVING LINE DOWN INSIDE THE COLUMN TO FLOOR AREA. PROVIDE

SURFACE MOUNTED CONDUIT ON FLOOR TO SURFACE MOUNTED BOXES AS SHOWN ON PLAN.

ELECTRICAL CONTRACTOR SHALL PROVIDE A RUBBER RAMP TO COVER THE CONDUITS EQUAL

TO "RUBBER FORM" #RF-RPIF. RUN CONTINUOUS BETWEEN BOXES.

PROVIDE 1" CONDUIT DROP WITH 3-#8 + GROUND AND FLOOR MOUNTED KEYSTONE STYLE

FLOOR BOX WITH 240V/20A NEMA 14/50 RECEPTACLE. VERIFY WITH EQUIPMENT.

REUSE EXISTING CIRCUIT, RECONNECT TO NEW EQUIPMENT, FIELD VERIFY.

PROVIDE GFCI CIRCUIT BREAKER.

PROVIDE NEW CIRCUIT FOR DISHWASHER AND DRAIN TEMPERING KIT.

PROVIDE 3/4" CONDUIT DROP WITH 2-#12 + GROUND TO FLOOR MOUNTED KEYSTONE STYLE

FLOOR BOX WITH 120V/20A NEMA 5-20 RECEPTACLE.

SCALE: 1/8" = 1'-0"

POWER KEYNOTES: GENERAL POWER NOTES:

1. ALL EXISTING 15A & 20A 120V NON-LOCKING RECEPTACLES WITH PUBLIC SPACES WHERE

CHILDREN CAN BE FOUND SHALL BE LISTED TAMPER RESISTANT PER NEC 406.12. THIS

INCLUDES SCHOOLS CORRIDORS, GYM, MUSIC ETC. PROVIDE STAINLESS STEEL COVER

PLATES.

2. MOUNT PANELS, TRANSFORMERS, DISCONNECT SWITCHES, AND COMBINATION MOTOR

STARTERS WITH ADEQUATE CLEARANCES IN ACCORDANCE WITH NEC 110.

3. VERIFY ALL EQUIPMENT REQUIREMENTS, CONNECTION TYPES, AND LOCATIONS WITH

EQUIPMENT SUPPLIER AND NAMEPLATES PRIOR TO ROUGH-IN.

4. FIRE ALARM DEVICES SHOWN FOR REFERENCE ONLY AND DO NOT REPRESENT

COMPREHENSIVE SYSTEMS. ANY NEW DEVICES TO BE ADDED, MATCH EXISTING SYSTEM.

SYSTEM WILL BE REQUIRED TO BE RECERTIFIED.

L. WOOD

C. LADEWIG

C. LADEWIG

P :\2

6\

LS

D

E be rs ol e C af et er ia

\W or ki ng

D ra w in gs \2

E

1.

dw g, /3 /2

9:

:0

A M

, m de

LANSING SCHOOL DISTRICT

2026 SUMMER PROJECTS

KITCHEN REMODEL PROJECTS

BID PACKAGE #2

CM CLARIFICATION #1

CM CLARIFICIATION #1

1. Attwood Elementary:

A. The Tectum Panels will be an accent color and they should be painted before they are installed.

B. The exposed ceiling will be painted with SW Flat Ceiling Paint.

C. The Paint Specification is on Sheet A141.

2. Ebersole Center:

A. Painting notes are on Sheet A101.

B. Wood trim will be painted with SW Semi-Gloss, Color to match existing trim.

C. Walls and ceilings will be painted with SW Eggshell, Color to match existing.

D. The painter will not be required to provide plywood floor protection for Tectum Ceiling touch up paint.

3. Dwight Rich:

A. Paint Specification is on Sheet A101.

4. Gardner Elementary:

A. Paint Specification is on Sheet A141.

B. Any areas where masonry infill is noted will need to be primed and painted, P-1.

C. Masonry infill is located at Passage D122, Passage D124, New Cooler 130B, Dishwash Area A134 and any other location that note new masonry walls.

D. Several HM door frames require paint as noted on Sheet A141. All new doors will be factory finished.

KITCHEN REMODEL PROJECTS

BID PACKAGE #2

CM CLARIFICATION #2

CM CLARIFICIATION #2

1. General note for Attwood Elementary:

Resinous Flooring is removed from the Painting Division ‘D’ and moved to Bid Division ‘C’ Flooring.

The flooring bidders must include an allowance of $5,000.00 for nonstandard prep work.

There will be substantial prep work involved with the Attwood floor project and the flooring contractor will be expected to track the floor prep hours and collect signed T&M slips from the CM Superintendent. When the project is finished the flooring contractor must submit the slips to be billed against the allowance and a change order will be issued to cover the transaction.

2. If painters want to bid on the resinous floor work they should include voluntary alternates on the bid form for the resinous flooring at Attwood and Gardner.

KITCHEN REMODEL PROJECTS

BID PACKAGE #2

CM CLARIFICATION #3

CM CLARIFICIATION #3

1. The current Bid Division E – Mechanical has been divided into two separate divisions. Bid Division E will be “Plumbing” and Bid Division “G” will be HVAC.

2. Bid Division E – Plumbing will include:

Section 024119 Selective Demo 078400 Firestopping 220000 Plumbing

Gardner Phase 1 includes Kitchen Area only to be completed Summer of 2026.

Gardner Phase 2 will proceed in Summer 2027.

All Plumbing demolition detailed on the drawings is included in this contract.

The day these projects start the plumbing contractor must be on site to disconnect kitchen equipment so the food service contractor can remove it.

This division includes labor, material, and equipment to furnish and install all plumbing including all domestic water systems, pipes, pumps, heads, sanitary soil waste and vent systems, storm drain systems, Grease trap and vent system, plumbing fixtures and equipment, traps and supports, insulation for plumbing systems and fixture installation, pipe and valve identification for a complete and operating system as shown and/or specified.

This division includes supply and installation of all gas piping and regulators, supply and installation of stainless-steel sinks in prefabricated casework, water heaters, condensate drains and fireproof sealants where plumbing work penetrates fire rated walls and ceilings.

The plumbing plans detail several new sanitary lines that must be connected to existing UG sanitary piping.

In areas that require cutting, removal and replacement of concrete floors, the General Trades Contractor will remove and replace the concrete. The Plumbing Contractor must perform all required excavation, backfill, compaction and removal of excess dirt.

The drawings detail several new water pipes to connect to new equipment and fixtures and this piping is included in the Plumbing division.

This division includes the following prep work for the Food Service Equipment Contractor.

All required rough-ins and piping with stop valves, elbows, nipples, couplers, traps, waste vents, gas regulators for water, steam, gas, etc. and will also make final connections to the equipment. The plumber will also install all equipment accessories furnished by the FSEC. The plumber will provide the required water heater and piping unless noted otherwise and plumbing, mechanical and electrical subs shall disconnect and reconnect relocated equipment if applicable.

This division includes all required permits and fees as required by state code. Housekeeping and cleanup on a daily basis is included in this division.

KITCHEN REMODEL PROJECTS

BID PACKAGE #2

CM CLARIFICATION #3

This division includes as built drawings, operation and maintenance manuals, owner training and specified attic stock material.

Gardner Phase 1 includes all work in Kitchen Area including Rooms 130A, 134, 136 and 137.

Gardner Phase 2 includes the balance of the Plumbing work including Rooms 131, 132, 129, 133, 121 and

125.

3. Bid Division G – HVAC will include:

Section 024119 Selective Demo 078400 Firestopping

230000 HVAC

Gardner Elementary is the only school that includes HVAC work.

Gardner Phase 1 includes Kitchen Area only to be completed Summer of 2026.

Gardner Phase 2 will proceed in Summer 2027.

Any roof patching must be scheduled with the roofing company that holds the warranties for these projects.

If roof curbs are required, they must be provided with the roof top equipment. Placement of roof top equipment must be approved by the CM. If additional steel is required, the CM will arrange for supply and erection of the steel.

This division includes labor, material and equipment to make the specified revisions to the HVAC system as detailed in the contract documents. The majority of the HVAC work involves revisions to the existing ductwork, grilles, diffusers and dampers, but if the documents specify new equipment such as pumps, stacks, flues, unit heaters, air handling units, unit vents, exhaust fans or furnaces, this contractor must provide and install all of the specified equipment.

Any required connections or adjustments to the ATC / BMS system are included in this contract. All engineering, installation, calibration, software programming and start-up of the ATC / BMS system are included in this contract.

Any specified testing and balance for the HVAC systems is included in this division.

This division includes all required permits and fees as required by state code. Housekeeping and cleanup on a daily basis is included in this division.

This division includes as built drawings, operation and maintenance manuals, owner training and specified attic stock material.

Gardner Phase 1 includes all work in Kitchen Area including Rooms 130A, 134, 136 and 137.

Gardner Phase 2 includes the balance of the HVAC work including Rooms 131, 132, 129, 133, 121 and

125.