SF-424-C-Budget Information Construction Programs.xlsx

Standard Form XLSX spreadsheet 61 KB Posted

Attached to
Bipartisan Infrastructure Law - Carbon Dioxide Transportation Infrastructure Finance and Innovation (CIFIA) Program: Future Growth Grants (Section 40304)
Opportunity number
DE-FOA-0002966
Issued by

About this file

This document is a Request for Application (RFA) for the Bipartisan Infrastructure Law - Carbon Dioxide Transportation Infrastructure Finance and Innovation (CIFIA) Program: Future Growth Grants (Section 40304). The CIFIA program was appropriated $2.1 billion to provide federal government financing to large-scale common-carrier carbon dioxide ("CO2") transportation infrastructure projects. The RFA authorizes the Secretary to provide grants to pay a portion of the cost differential between the cost of constructing the infrastructure asset with the capacity to transport an increased flow rate of carbon dioxide versus the cost of constructing the asset with the capacity to transport carbon dioxide at the initial required flow rate. This opportunity is funded under the Fossil Energy Research and Development program (CFDA 81.089) administered by the Department of Energy's National Energy Technology Lab.

SF-424-C-Budget Information Construction Programs

View the file

Other versions and copies of SF 424

File Revision Posted Attached to
SF424_7.31.2028.pdf Jul 31, 2028 Lewis-Houghton Civics and Democracy Initiative: New Awards for 2027-2029
1. SF424_Individual_ (exp Feb 2026).pdf Feb 2026 Strengthening Bosnia and Herzegovina's Organized Crime Specialized Departments for Organized Crime Through Expert Advisory Support
SF424 2026.pdf 2026 Annual Program Statement
Atch 8 - Standard Form 424.pdf Revision not stated Space Environment Technologies and Science (SETS) Broad Agency Announcement (BAA) Call 004
Atch 8 - Standard Form 424 .pdf Revision not stated Space Environment Technologies and Science (SETS) Broad Agency Announcement (BAA) Call 004
ARC_Form_SF_424_Questions.pdf Revision not stated Affordable Rural Cooperative (ARC) Energy Program
SF424_4_0-V4.0.pdf Revision not stated Egypt Annual Program Statement
SF424.pdf Revision not stated Egypt Annual Program Statement
SF424.pdf Revision not stated Safeguarding U.S. Critical Minerals Supply Chains- Tunisia
SF424.pdf Revision not stated Safeguarding U.S. Critical Minerals Supply Chains- Tunisia
PART_Form_SF_424_Questions-FINAL.pdf Revision not stated Powering Affordable Reliable Technology (PART) Energy Program
SF424_4_0-V4.0.pdf Revision not stated Egypt Annual Program Statement
SF424.pdf Revision not stated Egypt Annual Program Statement
SF424.pdf Revision not stated Safeguarding U.S. Critical Minerals Supply Chains- Tunisia
SF424_2_1-V2.1.pdf Revision not stated Project Constellation: Building a Constellation of Outer Space Partners at the UN
SF424.pdf Revision not stated Safeguarding U.S. Critical Minerals Supply Chains- Tunisia
SF424_4_0-V4.0.pdf Revision not stated American Corners Portugal Operational Funding
SF424_4_0-V4.0-Instructions.pdf Revision not stated NOFO- U.S.-Oman Youth Council Program
SF424_4_0-V4.0.pdf Revision not stated NOFO- U.S.-Oman Youth Council Program
C. Application for Federal Assistance (SF-424).pdf Revision not stated U.S-Nigeria Creative, Digital, & Innovation Economy Initiative
Show all 20

Who attaches SF 424

State Files
California 2
Florida 2
Pennsylvania 1

Other files

File Type Posted
Location(s)_of_Work.xlsx XLSX spreadsheet
Budget Information Construction Programs.xlsx XLSX spreadsheet
Budget Justification 1-5 BP.xlsx XLSX spreadsheet
FundOpp_DE-FOA-0002966_Amd_000005.pdf PDF
Grants.gov FOA URL Instructions.docx DOCX document
Budget Justification 1-5 BP.xlsx XLSX spreadsheet
FundOpp_DE-FOA-0002966_Amd_000004.pdf PDF
FundOpp_DE-FOA-0002966_Amd_000003.pdf PDF
FundOpp_DE-FOA-0002966_Amd_000002.pdf PDF
FundOpp_DE-FOA-0002966_Amd_000001.pdf PDF
SF-424-A Budget Justification.xls XLS spreadsheet
Location(s)_of_Work.xlsx XLSX spreadsheet
FundOpp_DE-FOA-0002966.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

APPLICANT'S NAME___________________________
OMB Approval No. 0348-0041
BUDGET INFORMATION - Construction Programs
NOTE: Certain Federal assistance programs require additional computations to arrive at the Federal share of project costs eligible for participation. If such is the case, you will be notified.
COST CLASSIFICATIONa. Total Costb. Costs Not Allowable for Participationc. Total Allowable Costs (Columns a-b)
1 Administrative and legal expenses$0.00$0.00$0.00
2 Land, structures, rights-of-way, appraisals, etc.$0.00$0.00$0.00
3 Relocation expenses and payments$0.00$0.00$0.00
4 Architectural and engineering fees$0.00$0.00$0.00
5 Other architectural and engineering fees$0.00$0.00$0.00
6 Project inspection fees$0.00$0.00$0.00
7 Site work$0.00$0.00$0.00
8 Demolition and removal$0.00$0.00$0.00
9 Construction$0.00$0.00$0.00
10 Equipment$0.00$0.00$0.00
11 Miscellaneous$0.00$0.00$0.00
12 SUBTOTAL$0.00$0.00$0.00
13 Contingencies$0.00$0.00$0.00
14 SUBTOTAL$0.00$0.00$0.00
15 Project (program) income$0.00$0.00$0.00
16 TOTAL PROJECT COSTS (subtract #15 from #14)$0.00$0.00$0.00
FEDERAL FUNDING
17 Federal assistance requested, calculated as follows: (Consult Federal agency for Federal percentage share.) Enter the resulting Federal share.Enter eligible costs from line 16c Multiply X _____%0

&"Arial,Bold"&9Previous Edition Usable &"Arial,Bold"&9Authorized for Local Reproduction &"Arial,Bold"&8Standard Form 424C (Rev. 7-97) Prescribed by OMB Circular A-102

Sheet2

Sheet3

Microsoft_Word_97_-_2003_Document.doc

INSTRUCTIONS FOR THE SF-424C

SF-424C (Rev. 7-97) Back

This sheet is to be used for the following types of applications: (1) "New" (means a new [previously unfunded] assistance award); (2) "Continuation" (means funding in a succeeding budget period which stemmed from a prior agreement to fund); and (3) "Revised" (means any changes in the Federal Government’s financial obligations or contingent liability from an existing obligation). If there is no change in the award amount, there is no need to complete this form. Certain Federal agencies may require only an explanatory letter to effect minor (no cost) changes. If you have questions, please contact the Federal agency.

Column a. - If this is an application for a "New" project, enter the total estimated cost of each of the items listed on lines 1 through 16 (as applicable) under "COST CLASSIFICATION."

If this application entails a change to an existing award, enter the eligible amounts approved under the previous award for the items under "COST CLASSIFICATION."

Column b. - If this is an application for a "New" project, enter that portion of the cost of each item in Column a. which is not allowable for Federal assistance. Contact the Federal agency for assistance in determining the allowability of specific costs.

If this application entails a change to an existing award, enter the adjustment [+ or (-)] to the previously approved costs (from column a.) reflected in this application.

Column. - This is the net of lines 1 through 16 in columns "a." and "b."

Line 1 - Enter estimated amounts needed to cover administrative expenses. Do not include costs which are related to the normal functions of government. Allowable legal costs are generally only those associated with the purchases of land which is allowable for Federal participation and certain services in support of construction of the project.

Line 2 - Enter estimated site and right(s)-of-way acquisition costs (this includes purchase, lease, and/or easements).

Line 3 - Enter estimated costs related to relocation advisory assistance, replacement housing, relocation payments to displaced persons and businesses, etc.

Line 4 - Enter estimated basic engineering fees related to construction (this includes start-up services and preparation of project performance work plan).

Line 5 - Enter estimated engineering costs, such as surveys, tests, soil borings, etc.

Line 6 - Enter estimated engineering inspection costs.

Line 7 - Enter estimated costs of site preparation and restoration which are not included in the basic construction contract.

Line 9 - Enter estimated cost of the construction contract.

Line 10 - Enter estimated cost of office, shop, laboratory, safety equipment, etc. to be used at the facility, if such costs are not included in the construction contract.

Line 11 - Enter estimated miscellaneous costs.

Line 12 - Total of items 1 through 11.

Line 13 - Enter estimated contingency costs. (Consult the Federal agency for the percentage of the estimated construction cost to use.)

Line 14 - Enter the total of lines 12 and 13.

Line 15 - Enter estimated program income to be earned during the grant period, e.g., salvaged materials, etc.

Line 16 - Subtract line 15 from line 14.

Line 17 - This block is for the computation of the Federal share. Multiply the total allowable project costs from line 16, column "c." by the Federal percentage share (this may be up to 100 percent; consult Federal agency for Federal percentage share) and enter the product on line 17.

image1.emf

File details come from the government source that posted it. Updated .