This document contains a schedule of material submittals and related federal contract opportunity solicitation for the Edwards Air Force Base Simplified Acquisition of Base Engineering Requirements re-compete. The schedule outlines five required submittals for the Seed Project to renovate facility B1212, including construction drawings, fire alarm plans, abatement plans, an exhaust fan submittal, and vinyl flooring submittals. Submittals are due 10 days after notice to proceed, with as-built drawings due at final completion.

The solicitation seeks proposals to provide maintenance, repair, and minor construction services at Edwards AFB, the Air Force Research Laboratory, NASA Armstrong Flight Research Center sites, and Air Force facilities in Palmdale, California. Work includes research, medical, secure, airfield, and other facility types. The minimum guarantee is $10,000 and maximum value is $55 million. A pre-proposal conference will be held on March 18, 2020 to discuss the Seed Project and solicit questions. Registration in the System for Award Management is required to be eligible for award.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER : PROJECT TITLE: SOLICITATION CONTRACT NUMBER

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

BE

R ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D

AT

IO

N

S

M

AN

U

FA

C

TU

R

ER

'S

W

AR

R

AN

TY

C

AT

AL

O

G D

AT

A

O

PE

R

AT

IN

G

ST

R

U C

TI

O

N S

R

EP

O R

T

R

EQ

U

IR

ED

SU

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

EN

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

S

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

APPROVED DIS-APPROVED

1 Construction Drawings x x NTP +

10 Days

2 Fire Alarm Plan x x x NTP + 10 Days

3 Abatement Plan x x x NTP + 10 Days

3 Exhaust Fan x x x NTP + 10 Days

4 Vinyl Flooring x x x NTP + 10 Days

5 As-builts x x At Final

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

18-1311 RPR Renovate Facility, B1212SCHEDULE OF MATERIAL SUBMITTALS

AF Form 66, Oct 89 PREVIOUS EDITION WILL BE USED

15 November 2019

Seed Project Shedule of Material Submittals - RPR Renovate Facility, B1212 Page 1

File details come from the government source that posted it. Updated .