Seed Project Shedule of Material Submittals - RPR Renovate Facility B1212.pdf
PDF 814 KB Posted
- Solicitation number
- FA930120R0002
About this file
This document contains a schedule of material submittals and related federal contract opportunity solicitation for the Edwards Air Force Base Simplified Acquisition of Base Engineering Requirements re-compete. The schedule outlines five required submittals for the Seed Project to renovate facility B1212, including construction drawings, fire alarm plans, abatement plans, an exhaust fan submittal, and vinyl flooring submittals. Submittals are due 10 days after notice to proceed, with as-built drawings due at final completion.
The solicitation seeks proposals to provide maintenance, repair, and minor construction services at Edwards AFB, the Air Force Research Laboratory, NASA Armstrong Flight Research Center sites, and Air Force facilities in Palmdale, California. Work includes research, medical, secure, airfield, and other facility types. The minimum guarantee is $10,000 and maximum value is $55 million. A pre-proposal conference will be held on March 18, 2020 to discuss the Seed Project and solicit questions. Registration in the System for Award Management is required to be eligible for award.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER : PROJECT TITLE: SOLICITATION CONTRACT NUMBER
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
BE
R ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D
AT
IO
N
S
M
AN
U
FA
C
TU
R
ER
'S
W
AR
R
AN
TY
C
AT
AL
O
G D
AT
A
O
PE
R
AT
IN
G
ST
R
U C
TI
O
N S
R
EP
O R
T
R
EQ
U
IR
ED
SU
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
C O
N
TR
AC
TI
N G
D
AT
E
TO
C
IV
IL
EN
G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
S
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
ES
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
APPROVED DIS-APPROVED
1 Construction Drawings x x NTP +
10 Days
2 Fire Alarm Plan x x x NTP + 10 Days
3 Abatement Plan x x x NTP + 10 Days
3 Exhaust Fan x x x NTP + 10 Days
4 Vinyl Flooring x x x NTP + 10 Days
5 As-builts x x At Final
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
18-1311 RPR Renovate Facility, B1212SCHEDULE OF MATERIAL SUBMITTALS
AF Form 66, Oct 89 PREVIOUS EDITION WILL BE USED
15 November 2019
Seed Project Shedule of Material Submittals - RPR Renovate Facility, B1212 Page 1
File details come from the government source that posted it. Updated .