Building 1212 Floor Plan.pdf
PDF 292 KB Posted
- Solicitation number
- FA930120R0002
About this file
This document includes a federal contract solicitation and related facility floor plans. The solicitation is for the Edwards Air Force Base Simplified Acquisition of Base Engineering Requirements (SABER) re-compete contract to provide management, labor, materials, equipment, transportation, supervision and minimal designs for maintenance, repair and minor construction projects at Edwards Air Force Base, the Air Force Research Laboratory, and NASA Armstrong Flight Research Center facilities. The minimum contract value is $10,000 and the maximum is $55,000,000. A pre-proposal conference will be held on March 18, 2020 with a site visit to Building 1212. The conference agenda and record of questions and answers will be provided to prospective offerors, who must register at beta.sam.gov and sam.gov to receive solicitation updates and be eligible for award. The facility floor plans included are for Building 1212.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8'-1" 10'-9" 16'-5" 21'-11"
11'-3"
16'-5"
16'-11"
14'-9"
11'-6"
2'
5'
8'-5"6'
11"
6'-2"
7'-1"
6'-4"
15'-8"
3'-9"
7' 4'-6"
4'-8" 3'-1" 2'-7"
15'-10"
15'-10"19'-2"
Building 1212 First Floor Edwards Air Force Base
January 12, 2017
412 CEG/CENME, Execution Support
Building 1212 Floor 1.dwg
ROOM NUMBER -
SQUARE FOOTAGE -
NOTE: All units are in US Survey Feet
N
1/4" = 1'
AutoCAD SHX Text Drawing no.
AutoCAD SHX Text Date:
AutoCAD SHX Text Document Path: D:\CAD_Updates\CAD\Building 1212 Floor 1.dwg
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text Prepared By:
AutoCAD SHX Text Sheet:
AutoCAD SHX Text Key:
42'-5"
19'-2"
14'-8"
4'
3'-8" 3'-1"12'-5"
11'-4"
9'-4"
9'-4"
4'-5"
15'-9"
3'-2"
Building 1212 Second Floor Edwards Air Force Base
January 12, 2017
412 CEG/CENME, Execution Support
Building 1212 Floor 2.dwg
ROOM NUMBER -
SQUARE FOOTAGE -
NOTE: All units are in US Survey Feet
N
1/4" = 1'
AutoCAD SHX Text Drawing no.
AutoCAD SHX Text Date:
AutoCAD SHX Text Document Path: D:\CAD_Updates\CAD\Building 1212 Floor 2.dwg
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text Prepared By:
AutoCAD SHX Text Sheet:
AutoCAD SHX Text Key:
| Sheets and Views |
| Layout1 |
| Building 1212 Floor 2-Layout1.pdf |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .