Section J_Exhibit B_CDRL (Integration)_Final RFP 5 Feb 21.pdf

PDF 3 MB Posted

Attached to
F-15EX Lots 2+ Propulsion Procurement Federal contract opportunity
Solicitation number
FA8626-21-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This is a solicitation for the procurement of a complete propulsion system for the F-15EX aircraft. The Department of Defense, United States Air Force intends to acquire up to 461 engines and associated components from October 2023 through June 2031. The solicitation package is seeking proposals from offerors due no later than April 7, 2021. Eligible products include a fully integrated engine and components that meet production and delivery schedules for the F-15EX weapon system. The Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to F-15EX Lots 2+ Propulsion Procurement, newest first.
File Type Posted
FA8626-21-R-0002-0001_signed.pdf PDF
Section L_Attach 1_Pricing Workbook_Final Amend 0001_25Mar21.xlsx XLSX spreadsheet
Running Thread of General QandA to Final RFP FA8626-21-R-0002.pdf PDF
FA8626-21-R-0002_Model Contract_Sections A-M_5Feb21.pdf PDF
RFP General Questions and Responses_18Feb21.pdf PDF
Section J_Attach 1_SOW_Final RFP 5 Feb 21.pdf PDF
Section J_Attach 2_F-15EX Propulsion System Spec_Final RFP 5 Feb 21.pdf PDF
Section J_Attach 3_DoD Digital Engineering Strategy_Final RFP 5 Feb 21.pdf PDF
Section J_Attach 10_DD Form 1653_Final RFP 5 Feb 21.pdf PDF
Section L_Instructions to Offerors_Final RFP 5 Feb 21.pdf PDF
Section J_Attach 7_List of Commercial Computer Software_Final RFP 5 Feb 21.xlsx XLSX spreadsheet
Section J_Exhibit A_CDRL (Production)_Final RFP 5 Feb 21.pdf PDF
Section L_Attach 2_CEO Certification Letter Template_Final RFP 5 Feb 21.pdf PDF
Cover Letter for RFP FA8626-21-R-0002_Final RFP 5 Feb 21.pdf PDF
Section M_Evaluation Factors for Award_Final RFP 5 Feb 21.pdf PDF
Section J_Attach 14_Draft Cost and Software Data Reporting Plan_Final RFP 5 Feb 21.XLS XLS spreadsheet
FA8626-21-R-0002_Model Contract_Sections A-M_5Feb21.pdf PDF
Section J_Attach 8_List of Digital Engineering Products_Final RFP 5 Feb 21.xlsx XLSX spreadsheet
Section J_Attach 9_AFMC Form 158_Final RFP 5 Feb 21.pdf PDF
Section J_Attach 11_Proposed GFP Table List_Final RFP 5 Feb 21.xlsx XLSX spreadsheet
Section L_Attach 1_Pricing Workbook_Final RFP 5 Feb 21.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8626-21-R-0002

Section J, Exhibits A and B

Contract Data Requirements List

General Instructions for

F-15EX Propulsion System

Exhibits A and B

21 January 2021

Prepared By Air Force Life Cycle Management Center (AFLCMC)

Propulsion Directorate (LPA) Wright-Patterson AFB, Ohio 45433

CONTRACT DATA REQUIREMENTS LIST (CDRL) MODIFICATION MATRIX

This matrix identifies the CDRL changes as implemented by contract modification.

CHANGE AUTHORITY

(ECP No., Mod No., etc.) CDRL REV NO. DATE CDRL/PAGES

REVISED

Table of Contents

1 SCOPE

2 APPLICABLE DOCUMENTS

3 REFERENCE DOCUMENTS

4 DATA ITEM DELIVERIES

4.1 English Language

4.2 Delivery Dates and Times

4.3 Tailored Data Items

4.4 Approval of Data Items

4.5 Resubmittal of Data Items

4.6 Final Submittal of Data Items

4.7 DD Form 250, Material Inspection and Receiving Report Requirements

4.8 Classified Data Items

5 ELECTRONIC DATA TRANSMISSION

5.1 Procuring Contracting Office Letter (PCOL+)

5.2 Alternative Delivery Formats

5.3 Editable Format Requirements

6 METHOD OF TRANSMITTAL

6.1 Required Format (General)

6.2 Required Format (Paper)

7 MODIFICATION OF DATA REQUIREMENTS

7.1 Administrative Changes to DD Forms 1423

7.2 Changes to Contract Price (Limits & Conditions)

8 MARKING TECHNICAL DOCUMENTATION

8.1 Distribution Marking System

8.2 Marking Technical Data Items

8.3 Distribution Statements

8.4 Export Controlled Warning Statement

8.5 Data Item Destruction

8.6 Restrictions for Distribution Statement A

9 MAILING ADDRESS

10 COMMON ABBREVIATIONS FOUND IN DD FORMS 1423

1 SCOPE

The Contract Data Requirements List (CDRL) establishes the data to be delivered by the Contractor to include the submittal, approval, and distribution requirements of all the data items contained within. The data requirements are listed on the enclosed Department of Defense (DD) Forms 1423, Contract Data Requirements List. The Contractor is legally obligated to meet these requirements because the CDRL is a contractual document and, as such, is binding in and of itself.

2 APPLICABLE DOCUMENTS

The associated Data Item Description (DID) is identified in Block 4 of the enclosed DD Forms 1423. All DIDs are available to the Contractor at the following website http://quicksearch.dla.mil/.

3 REFERENCE DOCUMENTS

• Department of Defense Directive (DoDD) 5230.09, Clearance of DoD Information for Public Release, 25 January 2019

• DoDD 5230.25, Withholding of Unclassified Technical Data From Public Disclosure, 6 November 1984, Incorporating Change 2, 15 October 2018

• DoDD 5400.07, DoD Freedom of Information Act, 5 April 2019

• DoD Instruction (DoDI) 5230.24, Distribution Statements on Technical Documents, 23 August 2012, Incorporating Change 3, 15 October 2018

• DoD Manual (DoDM) 5010.12, Procedures for the Acquisition and Management of

Technical Data, 14 May 1993, Incorporating Change 1, 31 August 2018

• DoDM 5200.01, Volume 3, DoD Information Security Program: Protection Of Classified

Information, 24 February 2012, Incorporating Change 3, 28 July 2020

• DoDM 5220.22, National Industrial Security Program Operating Manual, 28 February

2006, Incorporating Change 2, 18 May 2016

4 DATA ITEM DELIVERIES

4.1 English Language

The Contractor shall prepare all data items using the English Language per FAR 52.214-34, Submission of Offers in the English Language.

4.2 Delivery Dates and Times

The Contractor shall submit data items in accordance with Blocks 10, 11, 12, 13, 14, and 16 of each DD Form 1423, at a minimum. In addition, the Contractor shall submit out-of-cycle updates whenever an update is required due to program activities.

Unless otherwise specified in Block 16 of the DD Form 1423, all references to “days” shall refer to calendar days. The data item must be delivered by 2359 (11:59 pm) Eastern Time (Eastern Standard or Eastern Daylight Time) on the due date in order to be counted as on-time. In the event a data item’s delivery date falls on a Saturday or Sunday, the delivery must be made by the http://quicksearch.dla.mil/

Friday before the weekend to be counted as an on-time delivery. In the event a data item’s delivery date falls on a holiday, the delivery must be made by the last workday before the holiday to be counted as an on-time delivery.

4.3 Tailored Data Items

Tailoring instructions are as described in Block 16 of each DD Form 1423. A letter “T” (e.g., DI-MGMT-80004A/T) added to the end of the DID number in Block 4 of the DD Form 1423 denotes that the DID has been tailored to comply with specific system/program requirements.

The unique tailoring instructions are identified in Block 16 of each affected DD Form 1423.

4.4 Approval of Data Items

An "A" designator in Block 8 of the DD Form 1423 indicates the Government will formally reply to each data item submittal with either (1) an approval, (2) approval with comments, (3) rejection, or (4) disapproval. The Government will respond to all data item deliveries requiring an approval by issuing a Procuring Contracting Officer Letter (PCOL) to, or emailing the Contractor. The Government will respond within sixty (60) calendar days, unless otherwise specified in Block 16. If the Government cannot respond within the sixty (60) calendar days, the Contractor will be notified, and a new suspense date will be established by the Government. If the Government fails to provide a written response to a data item delivery within sixty (60) calendar days of receipt, the data item will be considered approved.

The sixty (60) calendar day response time does not apply to Contract Change Proposals (CCPs).

Any CCP will be reviewed and briefed to the Government Configuration Control Board (CCB) for disposition. After the CCB, a PCOL will be sent apprising the Contractor of the disposition, followed by a contract modification to implement the change, if approved.

The Government will approve a data item with comments if there is a reasonable expectation the data item can be corrected to meet the requirements. The Government will reject a data item if it is determined to be incomplete or inadequate to the point where a comprehensive review cannot occur. The Government will disapprove a data item if, after a comprehensive review, it is determined the data item is not acceptable as prepared.

The Contractor shall submit all data items with conforming marking in accordance with DFARS 252.227-7013, Rights in Technical Data - Noncommercial Items, and DFARS 252.227- 7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation. Section (f) of these clauses contain an inclusive list of authorized marking legends; any marking other than those specified in these clauses is non-conforming. The Contractor shall correct any nonconforming markings within sixty (60) calendar days. If the Contractor fails to remove or correct such markings within sixty (60) calendar days, the

Government will ignore the markings and may remove or correct, at the Contractor’s expense, all non-conforming markings. The Government will track the expenses to remove or correct the non-conforming markings, and, at the Government Contracting Officer’s discretion, apply a withhold and/or request consideration.

For DD Forms 1423 with an “N/A” in Block 8, Government approval of the content is not required; however, the Government retains the right to reject or disapprove any data item submittal not in compliance with requirements of the contract, DD Form 1423, or DID.

For DD Forms 1423 with the word “BLK16” in Block 8, approval requirements shall be as specified in Block 16.

4.5 Resubmittal of Data Items

If resubmittal of a data item is required, the Contractor shall resubmit within thirty (30) calendar days after the date the Government PCOL is sent, unless otherwise specified in the PCOL. If the Contractor disagrees with the proposed resubmittal requirements, it shall submit its comments in writing to the Government PCO within fifteen (15) calendar days of notification.

When resubmission of a data item is required, the Contractor shall submit complete data items unless otherwise specified in the PCOL. The Contractor shall identify all changes made using a standard tool, such as track changes or a vertical change bar along the side of the change. The Contractor shall update the data item revision number and indicate both on the title page of the data item and in the header of each page of the data item.

The Contractor shall insert a “revision history” page in each resubmitted data item, providing a history of changes made to the data item. The page shall include the following, at a minimum:

• contract reference for the revision (e.g., PCOL, CCP, or modification number)

• a brief description of the changes made

• revision identification letter or number

• revision date.

4.6 Final Submittal of Data Items

For the final delivery against each data item required by the contract or delivery order, the Contractor shall clearly state in its Letter of Transmittal (LT) that the last submittal is being made and that all contractual requirements concerning that data item have been fulfilled. The proper format and required information for the Contractor’s LT is covered in Section 6 below.

4.7 DD Form 250, Material Inspection and Receiving Report Requirements

Block 7 of the DD Form 1423 indicates the required submittal method. The Contractor shall submit data items via a DD Form 250 only if indicated in Block 7. The Contractor shall submit all other data items using Procuring Contracting Office Letter Plus (PCOL+).

FA8634-20-D-2704

Section J, Exhibit A and Exhibit B

4.8 Classified Data Items

In the event a classified data item is required, the Contractor shall contact the Government PCO for the appropriate electronic delivery instructions or mailing address. The Contractor shall submit the data item in accordance with the requirements established by the applicable

DD Form 254, Contract Security Classification Specification. In addition, the Contractor shall submit an unclassified Letter Transmittal (LT) using PCOL+.

5 ELECTRONIC DATA TRANSMISSION

5.1 Procuring Contracting Office Letter (PCOL+)

The Contractor shall submit all data items using PCOL+ unless otherwise directed in Block 14 and Block 16 of the individual DD Form 1423. In the event an alternate delivery method is required, the Contractor shall submit an LT using PCOL+.

5.2 Alternative Delivery Formats

The Contractor shall inform the Government PCO, in writing, if any of its data items cannot comply with the electronic formats specified in the DD Forms 1423. In such cases, the Contractor shall recommend an alternative format for Government PCO approval. The Contractor shall submit any request for an alternative format sixty (60) calendar days prior to alternative format need date.

5.3 Editable Format Requirements

When the Contractor is required to deliver data items in editable Microsoft Excel or Microsoft Project format, the Contractor shall also submit a second, identical copy in PDF format at the same time. The PDF file will be considered the formal data item.

6 METHOD OF TRANSMITTAL

6.1 Required Format (General)

At a minimum, the Contractor shall include the following information on each LT:

• letter date and control number

• Contractor’s address and Point of Contact (POC)

• contract number, delivery order number, Contract Line Item Number (CLIN), and program name

• data item date, control number, and revision number

• data item sequence number (e.g., A028)

• DID number

• data item title and subtitle, as applicable

• reason and frequency of submittal (e.g., draft, final, monthly, update, etc.)

• list of all previous and pertinent correspondence relating to the data item being submitted

• list of distribution addressees identified in Block 14 of the DD Form 1423

6.2 Required Format (Paper)

If a paper copy of the data item must be prepared, the Contractor shall place a complete list of addressees at the end of the letter, annotating the recipients (as identified in Block 14 of the

DD Form 1423), including the LT-only recipients. The Contractor shall submit paper copies on standard 8.5 x 11-inch bond paper. Foldouts are permissible for large tables/flow charts.

7 MODIFICATION OF DATA REQUIREMENTS

7.1 Administrative Changes to DD Forms 1423

During the performance of this contract, the Government PCO may unilaterally accomplish changes to Exhibits A and B and the associated CLINs. Subject changes may include, but are not limited to:

• increase or decrease the number of addressees

• increase or decrease the number of paper copies provided

• change the place of delivery

• change the requiring office for the data item

• other administrative and/or clarification changes

7.2 Changes to Contract Price (Limits & Conditions)

a) The US Government (USG) Procuring Contracting Officer (PCO) may unilaterally may change the place of delivery and the technical office for any line item of contract Exhibits (DD Form 1423), at no change in contract price, notwithstanding the provision of the “Changes” clause of the contract. If there is a change to the place of delivery, the Contractor and the PCO may mutually agree to an extension of the data submittal requirement date.

b) The USG PCO unilaterally may increase or decrease the number of addresses and/or number of copies specified for any data item of the CDRL, at no change in price. Provided that either the increase in the total number of copies for an individual line item of data shall not be greater than one hundred-fifty percent (150%) of the total number of copies initially specified in the CDRL or that (in the case of a decrease in delivery requirements) the decrease in the total number of copies for an individual item of data be greater than fifty percent (50%) of the total number of copies initially specified in the CDRL. In the event of an increase greater than such 150% or of a decrease greater than fifty percent (50%), the parties will negotiate any equitable adjustments in accordance with the provision of the “Changes” clause of the contract.

c) Unilateral actions pursuant to paragraphs (a) and (b) above shall be by the issuance of a USG PCOL followed by a Supplemental Agreement to this contract which will reference the appropriate paragraph 7(a) or 7(b) above of these CDRL General Notes as its authority. Any action directed by this clause shall be put into effect by the Contractor beginning with the first submission of the particular data item or items immediately following receipt of the USG PCO’s direction by the Contractor.

d) Any other/subsequent changes to this CDRL package and not specifically pertaining to changes identified in paragraphs (a) and (b) above shall be proposed and submitted to the USG. Upon approval of the request by the USG, incorporate into the contract as part of the corresponding contract modification.

8 MARKING TECHNICAL DOCUMENTATION

8.1 Distribution Marking System

Required distribution statements are annotated in Block 9 of each DD Form 1423. The distribution statements are defined in Section 9.3 below. If the Contractor believes a different distribution statement is appropriate, the Contractor shall notify the Government PCO with its recommendation and justification. The Government will review the request, determine which statement is the most appropriate, and provide the Contractor with either an acceptance of its proposed change or the Government’s reason for not accepting the Contractor’s request for change.

8.2 Marking Technical Data Items

The Contractor shall mark each technical data item, regardless of its medium, with a distribution statement. This marking requirement for each technical data item includes, but is not limited to, technical reports, blueprints, drawings, technical orders, technical manuals, plans, instructions, computer software, film, technical papers, photographs, and CDs/DVDs. If the technical data item contains export-controlled data as described in Section 8.4 below, the Contractor shall also mark it with an export control warning statement.

Certain technical data item types may preclude placing the entire notice on item. To accommodate this issue, each distribution statement contains an authorized abbreviation form.

Abbreviated distribution statements are to be used only when the available space precludes placing the entire notice on the data item. The use and wording of these distribution statements are described in Sections 8.3 through 8.6 below.

8.3 Distribution Statements

In accordance with Block 9 of the DD Form 1423, the Contractor shall place the required distribution statement on the cover and title page of each data item submitted, including the first sheet of each drawing. The distribution statements are as follows:

Distribution Statement A:

DISTRIBUTION A. Approved for public release; distribution unlimited.

Distribution Statement B:

DISTRIBUTION B. Distribution authorized to U.S. Government agencies [reason determined by DoDI 5230.24]; [date pulled from Block 3 of SF 26]. Other requests for this document shall be referred to AFLCMC/LPA, Bldg 28, 2145 Monahan Way, Wright- Patterson AFB, OH 45433-7017.

Distribution Statement C:

DISTRIBUTION C. Distribution authorized to U.S. Government agencies and their contractors (reason) (date of determination). Other requests for this document shall be referred to AFLCMC/LPA, Bldg 28, 2145 Monahan Way, Wright-Patterson AFB, OH 45433-7017.

Distribution Statement D:

DISTRIBUTION D. Distribution authorized to Department of Defense (DoD) and U. S.

DOD contractors only; (justification); (date of determination). All other requests for this document shall be referred to AFLCMC/LPA, Bldg 28, 2145 Monahan Way, Wright- Patterson AFB, OH 45433-7017.

Distribution Statement E:

DISTRIBUTION E. Distribution authorized to the Department of Defense (DoD) components only (reason) (date of determination). Other requests for this document shall be referred to AFLCMC/LPA, Bldg 28, 2145 Monahan Way, Wright-Patterson AFB, OH 45433-7017.

Distribution Statement F:

DISTRIBUTION F. Further dissemination only as directed by AFLCMC/LPA, Bldg 28, 2145 Monahan Way, Wright-Patterson AFB, OH 45433-7017 (date of determination) or higher DoD authority

8.4 Export Controlled Warning Statement

Besides a distribution statement, the Contractor shall use a warning notice on all data items that contain export-controlled technical data. The warning notice may be used in conjunction with Distribution Statements B, C, D, E, and F.

8.5 Data Item Destruction

The Contractor shall handle and destroy all unclassified technical data items marked with Distribution Statements B, C, D, E, or F as “For Official Use Only” or “Controlled Unclassified Information” data items, in accordance with DoDD 5400.07, DoD Freedom of Information Act Program. The Contractor shall handle and destroy all classified data items in accordance with the procedures in DoDM 5200.01, Volume 3, DoD Information Security Program: Protection Of Classified Information, and DoDM 5220.22, National Industrial Security Program Operating Manual.

8.6 Restrictions for Distribution Statement A

Distribution Statement A, which denotes public release, cannot be used in conjunction with the

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act Of 1979 (Title 50, U.S.C., App. 2401, et seq.), as amended.

Violations of these export laws are subject to severe criminal penalties.

Disseminate in accordance with provisions of DOD Directive 5230.25.

export-control warning notice. The Contractor shall submit data items marked with a Distribution Statement A for Government approval prior to public release in accordance with DoDM 5220.22. The Contractor shall handle data intended for public release as Distribution Statement D until approved for release; at which point, the Contractor shall update the markings to Distribution Statement A.

9 MAILING ADDRESS

The mailing address for all data items will be as follows:

AFLCMC/LPA

Bldg 28, 2145 Monahan Way Wright-Patterson AFB, Ohio 45433-7109

10 COMMON ABBREVIATIONS FOUND IN DD FORMS 1423

Block 7

Abbreviation Inspection Acceptance

SS Source (DD Form 250) Source (DD Form 250)

DD Destination (DD Form 250) Destination (DD Form 250)

SD Source (DD Form 250) Destination (DD Form 250)

DS Destination (DD Form 250) Source (DD Form 250)

LT Letter of Transmittal Only

NO No inspection or acceptance required

Block 8

Abbreviation Meaning

A Approval

N/A Approval Not Required

BLK16 See Block 16 for further instructions

Blocks 10-13

Abbreviation Meaning

ANNLY Annually

ASREQ As required

BLK16 Block 16

DAILY Daily

DAC Days After Contract Award

EOC End of Contract

EOM End of Month

EOQ End of Quarter

MTHLY Monthly

ONE/P One-time Preliminary Draft

ONE/R Once with Revisions

OTIME One Time

QTRLY Quarterly

2/4/2021 1:01:32 PM CST

CDRL Table of Contents

CONTRACT #:

CONTRACTOR:

SET NAME: F-15EX SYSTEM ITEM:

PROGRAM: Propulsion-F-15EX

DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH

B001 AFLCMC/WAQE DI-SESS-81248B/T SOW 3.3.5.4

Interface Control Document (ICD)

N/A

B002 AFLCMC/WAQE DI-DRPR-81961B/T SOW 3.3.12.3

Engineering Drawing Tree

N/A

B003 AFLCMC/WAQ DI-SESS-82238A/T SOW 3.3.12.3

Technical Data Package List (TDPL)

N/A

B004 AFLCMC/WAQE DI-SESS-81000F/T SOW 3.3.12.3; 3.3.14.4.1

Product Engineering Design Data and Associated Lists

N/A

B005 AFLCMC/WAQE DI-IPSC-81442A/T SOW 3.3.1

Software Version Description (SVD)

N/A

B006 AFLCMC/WAQE DI-EMCS-80200C/T SOW 3.3.7.1

Electromagnetic Interface Test Report (EMITR)

N/A

B007 AFLCMC/WAQE DI-AVCS-80700A/T SOW 3.3.11.2

Computer Software Product End Items

Source, Build, and Object Media

B008 AFLCMC/WAQE DI-MISC-81454D/T SOW 3.3.4.3

Computer Program Identification Number (CPIN) Catalog Information

N/A

B009 AFLCMC/WAQE DI-SESS-81254C/T SOW 3.3.4.3

Request for Nomenclature (DD Form 61)

N/A

B010 AFLCMC/WAQE DI-SESS-81785A/T SOW 3.3.5.1

System Engineering Management Plan (SEMP)

B011 AFLCMC/WAQE DI-AVCS-80700A/T SOW 3.3.1

Computer Software Product End Items

N/A

B012 AFLCMC/WAQ DI-MISC-81562/T SOW 3.3.14.4.2

Temporary Non-Standard Modification Documentation and Marking Requirements for Test Equipment in Aerospace

B013 AFLCMC/WAQE DI-ADMN-81306/T SOW 3.3.10.1

Program Protection Implementation Plan (PPIP)

N/A

B014 AFLCMC/WAQE DI-EMCS-81541B/T SOW 3.3.7.6

Electromagnetic Environmental Effects (E3) Verification Procedures (E3VP)

B016 AFLCMC/WAQ DI-SESS-81768 SOW 3.3.6.1

Airworthiness Certification Criteria Report

TACC Compliance Report (CR)

B017 AFLCMC/WAQE DI-SAFT-80101C/T SOW 3.3.11.2

System Safety Hazard Analysis Report (SSHAR)

N/A

B018 AFLCMC/WAQE DI-MISC-81832 SOW 3.3.10.4

Counterfeit Prevention Plan

N/A

B019 AFLCMC/WAQE DI-MGMT-81889A/T SOW 3.3.15

Manufacturing Plan

Manufacturing Management Plan

B021 AFLCMC/WAQE DI-EMCS-81540B/T SOW 3.3.7; 3.3.7.3

Electromagnetic Environmental Effects (E3) Integration and Analysis Report (E31AR)

B022 AFLCMC/WAQE DI-EMCS-81542B/T SOW 3.3.7.2

Report (E3VR)

B023 AFLCMC/WAQ DI-MGMT-81804A/T SOW 3.3.4.4

Item Unique Identification (IUID) Marking Activity, Validation and Verification Report

B024 AFLCMC/WAQE DI-SESS-81495B/T SOW 3.3.11.2; 3.3.12.2.1

Failure Modes, Effects, and Criticality Analysis (FMECA)

B025 AFLCMC/WAQ DI-ILSS-80872/T SOW 3.3.13.3.1

Training Materials

N/A

B026 AFLCMC/WAQT DI-MISC-80564B/T SOW 3.3.12.4

Survivability Analysis Report

N/A

B027 AFLCMC/WAQE DI-MGMT-82256 SOW 3.3.10.3

Supply Chain Risk Management (SCRM) Plan

N/A

B028 AFLCMC/WAQ DI-ENVR-82121/T SOW 3.3.8

Vibration and Acoustic Analyses Reports – Air Vehicle

N/A

B029 AFLCMC/WAQ DI-MISC-81390A/T SOW 3.3.2.2

Flutter Analysis Report

N/A

B030 AFLCMC/WAQE DI-SESS-82007A/T SOW 3.3.4.3

Configuration Item (CI) Documentation Recommendation

N/A

B031 AFLCMC/WAQ DI-SESS-82123/T SOW 3.3.2.1

Strength Summary and Operating Restrictions (SSOR) Report

B032 AFLCMC/WAQ DI-MGMT-81501A/T SOW 3.3.2.3

Weight and Balance Report for Aircraft

N/A

B033 AFLCMC/WAQE DI-SESS-82177/T SOW 3.3.5.5

Specification Tree

N/A

B034 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.2.5

Technical Report-Study/Services

Size, Weight, and Power-Cooling

B035 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.11.2

Technical Report - Study/ Services

Safety-Critical Function (SCF) List

B036 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.10.2

Technical Report-Study/Services

Mission-Critical Function and Criticality Analysis

B037 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.10.5

Technical Report-Study/Services

Anti-Tamper Plan

B038 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.10.6

Technical Report-Study/Services

Software Assurance Plan and Report

B039 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.10.7

Technical Report-Study/Services

Security Controls Traceability Matrix (SCTM)

B040 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.10.7

Technical Report-Study/Services

Risk Assessment Report (RAR)

B041 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.10.8

Technical Report-Study/Services

Loadable Software Validation Report

B042 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.10.8

Technical Report-Study/Services

Interface Authentication Report

B043 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.12.1

Technical Report-Study/Services

Fault Code Logic

B044 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.10.7

Technical Report-Study/Services

Architecture Analysis Report (AAR)

B045 AFLCMC/WAQ DI-MISC-80508B/T SOW 3.3.10.7

Technical Report-Study/Services

Security Concept of Operations (CONOPS)

B046 AFLCMC/WAQE DI-NDTI-80603A/T SOW 3.3.10.5

Test Procedures

Anti-Tamper Verification Procedures

B047 AFLCMC/WAQE DI-NDTI-80809B/T SOW 3.3.10.5

Test/Inspection Report

Anti-Tamper Verification Report

B048 AFLCMC/WAQ DI-NDTI-80809B/T SOW 3.3.5.6

Specification Requirements Verification Matrix Verification

B049 AFLCMC/WAQE DI-NDTI-80566A/T SOW 3.3.10.5

Test Plan

Anti-Tamper Verification Plan

B050 AFLCMC/WAQ DI-QCIC-81536A/T SOW 3.3.14.1.2

Test Information Sheet (TIS)

N/A

B051 AFLCMC/WAQ DI-MGMT-80004A/T SOW 3.3.6.1

Management Plan

Contractor Airworthiness Plan

B052 AFLCMC/WAQ DI-MISC-80508B/T SOW 3.3.2.3

Technical Report-Study/Services

Weight and Balance Handbook

B053 AFLCMC/WAQ DI-SESS-80198B/T SOW 3.3.2.1

Internal Loads and Static Strength Analysis Report

N/A

B054 AFLCMC/WAQ DI-SESS-81983/T SOW 3.3.2.4

Durability and Damage Tolerance (DADT) Analysis Report

N/A

B055 AFLCMC/WAQ DI-SESS-82039/T SOW 3.3.2.4

Force Structural Maintenance Plan (FSMP)

N/A

B056 AFLCMC/WAQ DI-SESS-82271 SOW 3.3.2.2

Aircraft External Loads Analysis Report

N/A

B057 AFLCMC/ WAQ DI-NDTI-80566A/T SOW 3.3.7.6

Test Plan

High Altitude Electromagnetic Pulse (HEMP) Test Plan

B058 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.10.3

Technical Report-Study/Services

Logic Bearing Components List

B059 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.10.3

Technical Report-Study/Services

Letter of Volatility (LOV)

B060 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.11.2

Technical Report-Study/Services

Safety Critical Function (SCF) Thread Analysis Report

B061 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.11.2

Technical Report-Study/Services

Horizontal Testing Report

B062 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.11.2

Technical Report-Study/Services

F-15EX Architecture Document

B063 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.11.2

Technical Report - Study/Services

System Integration Laboratory (SIL) Assessment

B064 AFLCMC/WAQE DI-MISC-80508B/T SOW 3.3.11.2

Technical Report-Study/Services

F-15EX Deterministic Operation Report

B065 AFLCMC/WAQE DI-NDTI-80566A/T SOW 3.3.11.2; 3.3.12.2.2

Test Plan

Failure Modes Effects Testing (FMET) Plan/Process

B066 AFLCMC/WAQE DI-NDTI-80603A/T SOW 3.3.11.2; 3.3.12.2.2

Test Procedure

Failure Modes Effects Testing (FMET) Procedures

B067 AFLCMC/WAQE DI-NDTI-80809B/T SOW 3.3.11.2; 3.3.12.2.2

Test/Inspection Report

Failure Modes Effects Testing (FMET) Report

B069 AFLCMC/WAQE DI-MGMT-80368A/T SOW 3.3.1

Status Report

Hardware and Software Metrics

B070 AFLCMC/WAQ TM-86-01Q/T SOW 3.3.13.2; 3.3.14.4.1

Technical Manual Contract Requirements

TMCR

B071 AFLCMC/WAQE DI-IPSC-81431A/T SOW 3.3.5.3

System/Subsystem Specification (SSS)

N/A

B072 AFLCMC/WAQE DI-MISC-81283/T SOW 3.3.5.3

Specification Requirement Verification Matrix (SRVM)

B073 AFLCMC/WAQE DI-SESS-81253E/T SOW 3.3.4.2

Configuration Status Accounting (CSA) Information

CSA Information

B074 AFLCMC/WAQ DI-NDTI-80566A/T SOW 3.3.14.1.2

Test Plan

Propulsion System Integration Test Execution Plan

B075 AFLCMC/WAQ DI-MISC-80508B/T SOW 3.3.1

Technical Report - Study/Services

Flight Control Modification Description and Analysis Report

B076 AFLCMC/WAQ DI-MISC-80508B/T SOW 3.3.1

Technical Report - Study/Services

Auto Pilot Control Authority Assessment Report

B077 AFLCMC/WAQ DI-MISC-80508B/T SOW 3.3.1

Technical Report - Study/Services

Substantiation Data Report for Flying/Handling Qualities

B078 AFLCMC/WAQ DI-NDTI-80603A/T SOW 3.3.1

Test Procedure

F-15EX ADCP II Manned Flight Hardware Simulation (MFHS) Regression Test Procedures

B079 AFLCMC/WAQ DI-NDTI-80809B/T SOW 3.3.1

F-15EX ADCP II MFHS Regression Test Report

B080 AFLCMC/WAQ DI-MISC-80508B/T SOW 3.3.1

Technical Report - Study/Services

Flight Control System, Control Power Assessment Analysis

B081 AFLCMC/WAQE DI-EMCS-81542B/T SOW 3.3.7.4

External Radio Frequency Electromagnetic Environment Test Report

B082 AFLCMC/WAQE DI-EMCS-81542B/T SOW 3.3.7.5

Lightning Protection Test Report

B083 AFLCMC/WAQE DI-EMCS-81542B/T SOW 3.3.7.6

HEMP Test Report

B084 AFLCMC/WAQE DI-NDTI-80809B/T SOW 3.3.14.2.2

F-15EX Propulsion System Integration Test Report

B085 AFLCMC/WAQ DI-MISC-80508B/T SOW 3.3.14

Technical Report - Study/Services

Bailed Engines

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Interface Control Document (ICD)

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81248B/T

5. CONTRACT REFERENCE

SOW 3.3.5.4

6. REQUIRING OFFICE

AFLCMC/WAQE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

Draft

Final

Reg Repro

16. REMARKS

Block 4: DI-SESS-81248B is tailored as follows:

a) Paragraph 3a: Change to read, "All released/approved interface information (to include system, subsystem, CI, and CSCI) for the F-

15EX Program.

Blocks 10, 12, & 13:

a) The Contractor shall submit initial 30 calendar days prior to IDR for information.

b) The Contractor shall submit final 30 calendar days after IDR for approval.

Note: Exhibit A - General Instructions are tailored as follows:

a) Section 4.4: delete the following:

1) “The Government will respond within sixty (60) calendar days, unless otherwise specified in Block 16. If the Government cannot respond within the sixty (60) calendar days, the Contractor will be notified, and a new suspense date will be established by the

Government. If the Government fails to provide a written response to a data item delivery within sixty (60) calendar days of receipt, the data item will be considered approved.”

b) Section 4.5:

1) Replace: “If resubmittal of a data item is required, the

Contractor shall resubmit within thirty (30) calendar days after the date the Government PCOL is sent, unless otherwise specified in the

PCOL.”

2) With: “If resubmittal of a data item is required, the

Contractor shall resubmit within sixty (60) calendar days after the date the Government PCOL is sent, unless otherwise specified in the

PCOL.”

Block 14: The Contractor shall submit CDRL deliveries using

Procuring Contracting Office Letter (PCOL+). See General

Instructions for detailed requirements.

AFLCMC/LPA 1

15. TOTAL 0 0 1

G. PREPARED BY

Sandra Chaffolds, AFLCM/LPA

Configuration Data Manager

Specialist

H. DATE

2020/11/22

I. APPROVED BY

John Houck, AFLCMC/LPA

Program Manager

J. DATE

2020/11/22

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 9 of 100 Pages

17. PRICE GROUP

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

B002

2. TITLE OF DATA ITEM

Engineering Drawing Tree

3. SUBTITLE

N/A

DI-DRPR-81961B/T

SOW 3.3.12.3

6. REQUIRING OFFICE

AFLCMC/WAQE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

BLk16

Reg Repro

Block 4: DI-DRPR-81961B is tailored as follows:

a) Paragraph 2: Change to read, "The Engineering Drawing Tree shall be structured in top-down breakdown order, at the lowest level of assembly (i.e., lowest repairable unit) or the lowest component or piece part. Each basic drawing number included on the Engineering

Drawing Tree shall be shown as an individual entry on the indentured list. Each authorized variation in configuration of the End item shall be identified by a separate tree. The Engineering Drawing Tree shall be in indentured tabular format (i.e. Microsoft Excel or CSV).

Contractor format is allowed."

b) Paragraph 2.1: Delete

c) Paragraph 3: Change to read, "The Engineering Drawing Tree shall identify all basic engineering drawing numbers that define the End

Item being described."

d) Paragraph 3.1a: Change to read, "Drawing number"

e) Paragraph 3.1b: Change to read, "Title of the drawing"

f) Paragraph 3.1c: Change to read, "Latest revision of the drawing"

g) Paragraph 3.1d: Change to read, "Drawing Commercial and Government

Entity (CAGE) Code"

h) Paragraph 3.1e: Change to read, "Next Higher Assembly"

I) Paragraph 3.1f: Delete

Block 12:

a) The Contractor shall submit initial no later than 60 calendar days prior to IDR.

b) The Contractor shall submit final no later than 60 calendar days after IDR.

Block 13:

a) The Contractor shall submit updates no later than 45 calendar days after each audit to address any identified deficiencies.

b) The Contractor shall submit final no later than 30 calendar days prior to SVR.

c) The Contractor shall submit updates as required.

AFLCMC/LPA

15. TOTAL 0 0 0

Sandra Chaffolds, AFLCMC/LPA

Configuration Data Manager

Specialist

H. DATE

2020/11/22

I. APPROVED BY

John Houck

Program Manager

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 10 of 100

16. REMARKS (Continued)

Block 14: The Contractor shall submit CDRL deliveries using Procuring Contracting Office Letter (PCOL+).

See General Instructions for detailed requirements.

Note: These deliverables are necessary for installations, operation, maintenance, or training purposes.

1) “The Government will respond within sixty (60) calendar days, unless otherwise specified in Block

16. If the Government cannot respond within the sixty (60) calendar days, the Contractor will be notified, and a new suspense date will be established by the Government. If the Government fails to provide a written response to a data item delivery within sixty (60) calendar days of receipt, the data item will be considered approved.”

1) Replace: “If resubmittal of a data item is required, the Contractor shall resubmit within thirty

(30) calendar days after the date the Government PCOL is sent, unless otherwise specified in the PCOL.”

2) With: “If resubmittal of a data item is required, the Contractor shall resubmit within sixty (60) calendar days after the date the Government PCOL is sent, unless otherwise specified in the PCOL.”

DD FORM 1423-1, FEB 2001 Page 11 of 100 Pages

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

B003

2. TITLE OF DATA ITEM

Technical Data Package List (TDPL)

3. SUBTITLE

N/A

DI-SESS-82238A/T

SOW 3.3.12.3

6. REQUIRING OFFICE

AFLCMC/WAQ

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

Block 4: DI-SESS-82238A is tailored as follows:

a) Paragraph 3.2 SECTION B: Change to read, "PRODUCT ENGINEERING

DESIGN DATA AND ASSOCIATED LIST-This section shall include a listing of engineering design data which defines the authorized configuration of the equipment/system. Each entry shall include the document number, document CAGE code, the latest authorized document revision, document date, the document title, distribution code, document type and any special codes, file type, and any associated notes. In addition, this section shall identify all system, subsystem, and component design data to be delivered as part of the TDP and the design data previously delivered that are applicable to the current program. This section shall also identify design data as specified in

3.1.18 and 3.1.40 of MIL-STD-31000B to include: models, 3-Dimensional

Intelligent (3Di) viewable, engineering drawings, associated lists, specifications, standards, quality assurance provisions, packaging details, commercial drawings, computer software documentation, Source

Control Drawings and Vendor Item Control document (or specification control document)."

Block 10, 12, & 13:

a) The Contractor shall submit draft 30 calendar days prior to IDR.

b) The Contractor shall submit final 30 calendar days after IDR.

Block 14: The Contractor shall submit CDRL deliveries using Procuring

Contracting Office Letter (PCOL+). See General Instructions for detailed requirements.

Note: These deliverables are necessary for installations, operation, maintenance, or training purposes.

unless otherwise specified in Block 16. If the Government cannot respond within the sixty (60) calendar days, the Contractor will be notified, and a new suspense date will be established by the

Government. If the Government fails to provide a written response to a data item delivery within sixty (60) calendar days of receipt, the data item will be considered approved.”

b) Section 4.5:

1) Replace: “If resubmittal of a data item is required, the

Contractor shall resubmit within thirty (30) calendar days after the

Sandra Chaffolds, AFLCMC/LPA

Configuration Data Manager

Specialist

H. DATE

2020/11/22

I. APPROVED BY

John Houck, AFLCMC/LPA

Program Manager

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 12 of 100

DD FORM 1423-1, FEB 2001 Page 13 of 100 Pages

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

B004

2. TITLE OF DATA ITEM

Product Engineering Design Data and Associated Lists

3. SUBTITLE

N/A

DI-SESS-81000F/T

SOW 3.3.12.3; 3.3.14.4.1

6. REQUIRING OFFICE

AFLCMC/WAQE

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

Block 4: DI-SESS-81000F is tailored as follows:

a) Paragraph 3: Change to read, “Format. Product Engineering Design

Data and Associated Lists shall be in the Government’s format as specified on the attached Tech Data Package (TDP) Option Selection

Worksheets.”

b) Para 4.m shall read: MIL-STD-130N Item Unique Identification

(IUID) hardware marking requirements shall be shown on detail, assembly and installation drawings within Product Design Data and

Associated Lists. Contractor shall identify the UID and UII marking method utilized and applied. The contractor shall also identify the exact location and the information contained within the marking.

Commercial items already marked with IUID shall only require the contractor to define the current IUID marking location and their respective IUID marking method utilized with annotation onto the appropriate Product Design Data and Associated Lists.

Block 12:

a) The Contractor shall submit initial no later than 60 calendar days prior to IDR for approval.

Initial Content - The Contractor shall include all data except for Quality Assurance Provisions (QAP) data. Contractor format and markings are acceptable for this submission.

Block 13:

a) The Contractor shall submit subsequent 365 calendar days after contract award.

Subsequent Content - The Contractor shall include all data except for QAP data. The Contractor shall deliver data in the format and with markings as specified in this CDRL item and the TDP Option

Selection Worksheets.

b) If any deficiencies are found during the FCA/PCA, the Contractor shall resubmit no later than 45 days after the FCA/PCA for approval.

The Contractor shall deliver data in the format and with markings as specified in this CDRL item and the TDP Option Selection Worksheets.

Procuring Contracting Office Letter (PCOL+). The Contractor shall deliver Product Design Data and Associated Lists digitally via USAF approved media (e.g. external hard drive) to the following:

1) All data delivered under this CDRL shall be forwarded to

AFLCMC/WAQ

2725 C Street

Wright-Patterson AFB OH 45433-7424

SEE BLK 16

Sandra Chaffolds, AFLCMC/LPA

Configuration Data Manager

Specialist

H. DATE

2021/02/04

I. APPROVED BY

John Houck, AFLCMC/LPA

Program Manager

2021/02/04

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 14 of 100

a) All data submittals shall contain a delivery letter. The delivery letter shall specify whether it is an update, final, or make-up. The delivery letter shall containing the following as a minimum.

1) Contract Number

2) Delivery Order

3) List of work products and associated revisions

1) “The Government will respond within sixty (60) calendar days, unless otherwise specified in

Block 16. If the Government cannot respond within the sixty (60) calendar days, the Contractor will be notified, and a new suspense date will be established by the Government. If the Government fails to provide a written response to a data item delivery within sixty (60) calendar days of receipt, the data item will be

(30) calendar days after the date the Government PCOL is sent, unless otherwise specified in the PCOL.”

2) With: “If resubmittal of a data item is required, the Contractor shall resubmit within sixty

(60) calendar days after the date the Government PCOL is sent, unless otherwise specified in the PCOL.”

c) The Contractor shall flow down the requirements within CDRL B004 to its subcontractors requiring delivery of technical data.

d) These deliverables are necessary for installations, operation, maintenance, or training purposes.

DD FORM 1423-1, FEB 2001 Page 15 of 100 Pages

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

B005

2. TITLE OF DATA ITEM

Software Version Description (SVD)

3. SUBTITLE

N/A

DI-IPSC-81442A/T

SOW 3.3.1

6. REQUIRING OFFICE

AFLCMC/WAQE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK 16

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

BLK 16

Reg Repro

16. REMARKS

Block 4: This DID is tailored as follows: Contractor format is acceptable.

At a minimum, the following items shall be submitted under this CDRL:

1) PACS

2) ADCP II

3) SIU

4) Flight Control Computer

5) The following Support Equipment/Test Sets:

a) Secondary Power System Test Set (SPSTS)

b) Environmental Control System Test Set (ECSTS)

c) Inertial Boresight Adapter Set (IBAS)

d) Radio Frequency Cable Sweep Test Program Interface Hardware

Blocks 10, 12, & 13: The SVD shall be delivered concurrent with the final computer software product end item delivery (REFERENCE CDRL

B011)

a) The Contractor shall submit 7 calendar days prior to each release.

detailed requirements.

a) The completed SVD shall be included on the "documentation" or "D" disk IAW (reference same CDRL as above paragraph)

b) CDRL Distribution in Block 14 for alternate use only. Contract

CDRLs shall be delivered electronically to USAF via use SharePoint

Center Access or as requested by the Government. If SharePoint

Center Access is not available, contractor will deliver the required data through agreed-to media.

unless otherwise specified in Block 16. If the Government cannot respond within the sixty (60) calendar days, the Contractor will be notified, and a new suspense date will be established by the

Government. If the Government fails to provide a written response to

Sandra Chaffolds, AFLCMC/LPA

Configuration Data Manager

Specialist

H. DATE

2020/11/22

I. APPROVED BY

John Houck, AFLCMC/LPA

Program Manager

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 16 of 100

(30) calendar days after the date the Government PCOL is sent, unless otherwise specified in the PCOL.”

DD FORM 1423-1, FEB 2001 Page 17 of 100 Pages

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

B006

2. TITLE OF DATA ITEM

Electromagnetic Interface Test Report (EMITR)

3. SUBTITLE

N/A

DI-EMCS-80200C/T

SOW 3.3.7.1

6. REQUIRING OFFICE

AFLCMC/WAQE

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Blocks 12, & 13:

a) The Contractor shall submit final 60 calendar days after completion of test.

Blocks 14: The Contractor shall submit CDRL deliveries using

AFLCMC/LPA 0 0 1

Sandra Chaffolds, AFLCMC/LPA

Configuration Data Manager

Specialist

H. DATE

2020/10/30

I. APPROVED BY

John Houck, AFLCMC/LPA

Program Manager

2020/10/30

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 18 of 100

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A

B007

2. TITLE OF DATA ITEM

Computer Software Product End Items

3. SUBTITLE

Source, Build, and Object Media

DI-AVCS-80700A/…

This is the start of the file's text. The full file is on GovTribe.