Section J_Attach 14_Draft Cost and Software Data Reporting Plan_Final RFP 5 Feb 21.XLS

XLS spreadsheet 138 KB Posted

Attached to
F-15EX Lots 2+ Propulsion Procurement Federal contract opportunity
Solicitation number
FA8626-21-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This document package includes a cost and software data reporting plan and related federal contract solicitation. The cost and software data reporting plan outlines reporting requirements for a contract to procure F-15EX propulsion systems, including 461 engines to be delivered from October 2023 through June 2031. The plan specifies work breakdown structure elements, technical parameters, and submission events for cost, software, and quantity data reports.

The attached federal contract solicitation seeks to acquire a complete propulsion system fully integrated into the F-15EX weapon system. Proposals are due by April 7, 2021. The Department of Defense and United States Air Force intend to award a contract for propulsion system delivery using full and open competition. The solicitation package provides additional details on the opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to F-15EX Lots 2+ Propulsion Procurement, newest first.
File Type Posted
FA8626-21-R-0002-0001_signed.pdf PDF
Section L_Attach 1_Pricing Workbook_Final Amend 0001_25Mar21.xlsx XLSX spreadsheet
Running Thread of General QandA to Final RFP FA8626-21-R-0002.pdf PDF
RFP General Questions and Responses_18Feb21.pdf PDF
FA8626-21-R-0002_Model Contract_Sections A-M_5Feb21.pdf PDF
Section J_Attach 7_List of Commercial Computer Software_Final RFP 5 Feb 21.xlsx XLSX spreadsheet
Section J_Exhibit A_CDRL (Production)_Final RFP 5 Feb 21.pdf PDF
Section L_Attach 2_CEO Certification Letter Template_Final RFP 5 Feb 21.pdf PDF
Section J_Attach 1_SOW_Final RFP 5 Feb 21.pdf PDF
Section J_Attach 2_F-15EX Propulsion System Spec_Final RFP 5 Feb 21.pdf PDF
Section J_Attach 3_DoD Digital Engineering Strategy_Final RFP 5 Feb 21.pdf PDF
Section J_Attach 10_DD Form 1653_Final RFP 5 Feb 21.pdf PDF
Section L_Instructions to Offerors_Final RFP 5 Feb 21.pdf PDF
Cover Letter for RFP FA8626-21-R-0002_Final RFP 5 Feb 21.pdf PDF
Section J_Exhibit B_CDRL (Integration)_Final RFP 5 Feb 21.pdf PDF
Section M_Evaluation Factors for Award_Final RFP 5 Feb 21.pdf PDF
FA8626-21-R-0002_Model Contract_Sections A-M_5Feb21.pdf PDF
Section J_Attach 8_List of Digital Engineering Products_Final RFP 5 Feb 21.xlsx XLSX spreadsheet
Section J_Attach 9_AFMC Form 158_Final RFP 5 Feb 21.pdf PDF
Section J_Attach 11_Proposed GFP Table List_Final RFP 5 Feb 21.xlsx XLSX spreadsheet
Section L_Attach 1_Pricing Workbook_Final RFP 5 Feb 21.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1 (METADATA)

COST AND SOFTWARE DATA REPORTING PLANOMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1a. PROGRAM NAME
F-15EX
1b. PHASE/MILESTONE (check all that apply)
Pre-A
A
B
C-LRIP
XC-FRP
O&S
1c. PRIME MISSION PRODUCT
Engine
1d. ACQUISITION CATEGORY (ACAT)
Pre-ACAT
ACAT I (MDAP)
ACAT IA (MAIS)
ACAT II
ACAT III
XOther
2. COMMODITY TYPE
Engine Subsystems
3. PLAN ITERATION TYPE
XINITIAL
REVISION
4. CURRENT SUBMISSION DATE (YYYYMMDD)
20210301
5. LAST APPROVED PLAN DATE (YYYYMMDD)
N/A
6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)
Shoemaker, John R.
6b. ADDRESS (Include ZIP Code)
2145 Monahan Way, Bldg 28, Wright Patterson AFB OH. 45433-7017
6c. TELEPHONE NUMBER (Include Area Code)
937-255-7839
6d. E-MAIL ADDRESS
john.shoemaker@us.af.mil
7. PLAN TYPE
GOVERNMENT
XCONTRACT (PRIME)
CONTRACT (SUB)
8. PLAN GOVERNMENT PREPARING ORGANIZATION
AFLCMC/LPA
9a. CONTRACTOR NAME/ADDRESS
i. REPORTING ORGANIZATION NAME
TBD
ii. DIVISION NAME
TBD
iii. LOCATION
TBD
iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:
XCBDR REQUIRED FOR THIS ORGANIZATION
9b. CONTRACT NUMBER (List all that apply, separated by commas)
9c. APPROPRIATION (check all that apply)
RDT&E
XPROCUREMENT
O&M
FMS
WCF
OTHER
10a. APPROVED PLAN NUMBER
AF-19-R-C2
10b. APPROVED PLAN REVISION NUMBER
10c. APPROVED PLAN REQUIREMENTS
XAT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy)
XAT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)
XTECHNICAL DATA REQUIRED
10d. COST REPORT TYPE
XFLEXFILE
LEGACY DD 1921 SERIES
DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

john.shoemaker@us.af.mil

DD Form 2794, Pg 2 (REPORTING)

COST AND SOFTWARE DATA REPORTING PLANCOST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN
11. WORK BREAKDOWN STRUCTURE (WBS)12. COST13. TECHNICAL DATA
a. WBS
CODEb. WBS
LEVELc. WBS ELEMENT NAMEa. ACTUALS TO
DATE (ATD)b. LEGACY
1921-1c. LEGACY
1921-2d. LEGACY
1921-5e. EAC/FAC
(See item 10d)a. QUANTITYb. SRDR
FORMATSc.

MAINT. &

REPAIR

PARTS

i. QUANTITY
DATAii. GFE

QUANTITY

1.01Propulsion SystemX
1.12Prime Mission Product (Engine)XX
1.1.13PMP Integration, Assembly, Test, and CheckoutX
1.1.1.14Integration and AssemblyXX
1.1.1.24Test and CheckoutXX
1.1.1.34Rate ToolingXX
1.1.23FanXXX
1.1.33CompressorXXX
1.1.43Diffuser/CombusterXXX
1.1.53High Pressure TurbineXXX
1.1.63Low Pressure TurbineXXX
1.1.73Tec/Augmentor/DuctsXXX
1.1.83Exhaust NozzleXXX
1.1.93Bearings, Seals, Drives, and AccessoriesXXX
1.1.103Controls and Diagnostic SystemsX
1.1.10.14Controls and Diagnostic System Hardware Integration, Assembly, Test, and CheckoutXX
1.1.10.24Controls and Diagnostic System Hardware 1..n (Specify)XX
1.1.113Externals and Power TransferXXX
1.1.123CrankshaftXXX
1.1.133Propulsion Software Release 1...n (Specify)XX
1.22Platform Integration, Assembly, Test, and CheckoutXX
1.32Systems EngineeringXX
1.42Program ManagementXX
1.52System Test and EvaluationXX
1.62TrainingXX
1.72Data
1.7.13Data Deliverables 1...n (Specify)XX
1.7.23Data RepositoryXX
1.7.33Data Rights 1...n (Specify)XX
1.82Peculiar Support EquipmentX
1.8.13Test and Measurement EquipmentXX
1.8.23Support and Handling EquipmentXX
1.92Common Support Equipment
1.9.13Test and Measurement EquipmentXX
1.9.23Support and Handling EquipmentXX
1.102Operational/Site Activation by Site 1...n (Specify)XX
1.112Contractor Logistics Support (CLS)XX
1.122Industrial FacilitiesXX
1.132Initial Spares and Repair Parts
1.13.13PMP Spare and Repair 1...n (Specify)XXX
1.13.23Support Equipment Spare and Repair PartsXXX
1.13.33Training Equipment Spare and Repair PartsXXX
1.13.43Packaging, Handling, Storage, and Transportation (PHS&T)
1.13.4.14ContainersXXX
1.13.4.24TransportationXXX
Subtotal CostXX
Reporting Contractor G&AXX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor FCCMXX
Total CostXX
Reporting Contractor Profit/Loss or FeeXX
DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019

DD Form 2794, Pg 3 (EVENTS)

COST AND SOFTWARE DATA REPORTING PLAN
14. CSDR SUBMISSION EVENTS
a.
EVENT IDb.
DATA REPORT(S)c.
SUBMISSION EVENT NAMEd.
REPORT CYCLEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1Cost and Hour Report (FlexFile), Quantity Data ReportContract AwardInitial2020033120200531
2Technical Data ReportContract AwardInitial2020033120200531
3Cost and Hour Report (FlexFile), Quantity Data ReportCost and Hours (FlexFile) FY21Interim2021093020211130
4Technical Data ReportTechnical Data Report FY21Interim2021093020211130
5Cost and Hour Report (FlexFile), Quantity Data ReportCost and Hours (FlexFile) FY22Interim2022093020221130
6Technical Data ReportTechnical Data Report FY22Interim2022093020221130
7Cost and Hour Report (FlexFile), Quantity Data ReportCost and Hours (FlexFile) FY23Interim2023093020231130
8Technical Data ReportTechnical Data Report FY23Interim2023093020231130
9Cost and Hour Report (FlexFile), Quantity Data ReportCost and Hours (FlexFile) FY24Interim2024093020241130
10Technical Data ReportTechnical Data Report FY24Interim2024093020241130
11Cost and Hour Report (FlexFile), Quantity Data ReportCost and Hours (FlexFile) FY25Interim2025093020251130
12Technical Data ReportTechnical Data Report FY25Interim2025093020251130
13Cost and Hour Report (FlexFile), Quantity Data ReportCost and Hours (FlexFile) FY26Interim2026093020261130
14Technical Data ReportTechnical Data Report FY26Interim2026093020261130
15Cost and Hour Report (FlexFile), Quantity Data ReportCost and Hours (FlexFile) FY27Interim2027093020271130
16Technical Data ReportTechnical Data Report FY27Interim2027093020271130
17Cost and Hour Report (FlexFile), Quantity Data ReportCost and Hours (FlexFile) FY28Interim2028093020280930
18Technical Data ReportTechnical Data Report FY28Interim2028093020280930
19Cost and Hour Report (FlexFile), Quantity Data ReportCost and Hours (FlexFile) FY29Interim2029093020291130
20Technical Data ReportTechnical Data Report FY29Interim2029093020291130
21Cost and Hour Report (FlexFile), Quantity Data ReportCost and Hours (FlexFile) FY30Interim2030093020300930
22Technical Data ReportTechnical Data Report FY30Interim2030093020300930
23Cost and Hour Report (FlexFile), Quantity Data ReportContract Completion (Total Contract Actuals)Final2030113020310130
24Technical Data ReportContract Completion (Total Contract Actuals)Final2030113020310130
DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DRAFT

DD Form 2794, Pg 4 (REMARKS)

COST AND SOFTWARE DATA REPORTING PLAN
15. REMARKS
1. FAC/EAC
The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as "Forecast at Completion" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes.
2. NON-RECURRING/RECURRING DEFINITIONS
Recurring and Non-Recurring Costs required for all levels:
Recurring costs. Repetitive elements of development, investment or sustainment costs that may vary with the quantity being produced or maintained, irrespective of system life cycle phase and appropriation. Recurring cost categories include procurement, and production and maintenance activities; acceptance testing; maintenance and support equipment, training, and data; test articles built to an operational configuration; and certain elements of systems engineering and program management.
Examples of Prime Mission Product activities include repetitive costs incurred when building prototype, test systems, or production units to an operational configuration. Examples of Prime Mission Product Hardware activities include Fabrication and assembly of partial/full prototype, test, or production units whether for customer or contractor use; Raw material, purchased parts, equipment associated with the fabrication and assembly of partial/full prototype or test units whether for customer or contractor use; Touch labor, integration and assembly, installation and check out; Engineering support for production unit fabrication, assembly and check out.
Examples of Prime Mission Product Software activities include Procurement of stand-alone or bundled COTS software licenses used in an operational system and installation and checkout of developed software into production units. Examples of Systems Engineering activities include Sustaining engineering, logistics support, planning, organizing, monitoring and reporting activities, document maintenance. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of production unit fabrication, assembly and check out; meetings & efforts in support of supplier, manufacturing & production activities.
Nonrecurring costs. Non-repetitive elements of development, investment or sustainment costs that generally do not vary with the quantity being produced or maintained, irrespective of system life cycle phase and the appropriation. Nonrecurring cost categories include product design and development (PD&D) activities, including those for modifications; system test and evaluation (ST&E) including ST&E for modifications; tooling; pre-production or pre-maintenance activities; design and development of support equipment, training, and data; and certain elements of systems engineering and program management.
Examples of Prime Mission Product PD&D activities are: Requirements definition, engineering design, analysis & development; Redesign, rework & retest due to design flaws & first time corrective actions; test articles built for testing purposes only (i.e., units that are not production-representative) such as wind tunnel models, and bench and coupon test articles; structural development, static, fatigue, software, and ballistics testing; stress analysis; flight, ground, or sea testing of system properties; redesign as a result of testing; and retesting efforts; All configuration, quality, and data management efforts supporting release activity for first article configuration, delivery & certification; System safety plan, manuals, tech services, & maintenance manual development in support of first article delivery.
Examples of hardware design and development activities include material, purchased parts and labor associated with engineering models, operational models, bench, lab articles or partially built units (i.e. units that are not production representative), tooling, and ground support equipment for qualification, structural, static, fatigue or stress testing, and refurbishment of test units; and engineering support including manufacturing engineering, quality engineering, and tool engineering for development unit fabrication, assembly & tests.
Examples of software design and development activities include design and development of all software; delivered operational software and software developed to correct deficiencies and add capabilities; Initial integration of COTS and GOTS products into operational configuration; Support for HW-SW integration and test, system level testing; initial integration of COTS and GOTS products into operational configuration; and commercial software licenses for development facilities. System Engineering, Program Management, and Data activities occur throughout the system life cycle and are supportive in nature; as such, these costs take on the characteristics of the underlying activities being performed.
Examples of Systems Engineering activities include installation plans or quality inspection plans; requirements definition, allocation and flow-down; creation of specification and Interface Control Documents (ICDs); design and implementation of system security; top level design trade-offs; analyses, studies, and simulations for system performance and effectiveness, reliability, availability, maintainability or survivability; internal & external design review, IPT coordination & integration meetings; Certification & Control documentation; and supplier selection & coordination. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of development, design & testing efforts.
Examples of System Test and Evaluation activities include development of test plans/procedures; subsystem and system level test and integration for developmental articles; test equipment in support of development including for static & fatigue testing, test stands, wind tunnel models, stress analysis, ballistics testing, flight, ground or sea testing of system, redesign from testing, retesting; System/Software Integration Laboratory (SIL) development; and analysis to support verification, validation & certification. Examples of Training activity include initial courseware development and simulator development. Examples of Initial Spares and Repair Parts activity include spare parts and material in support of the nonrecurring subsystem/system level articles.
Examples of Support Equipment activity include initial equipment design and test efforts, and test program sets development. Examples of Tooling activity include special test equipment, special tooling, procurement of initial & rate tooling, tool replacement (with the exact same tool) & tool modification (to accommodate product configuration changes). Examples of Operational/Site Activation activity include site planning efforts.
3. WBS INDEX AND DICTIONARY
The WBS Dictionary is a living document and must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The dictionary shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. The dictionary shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element.

The reporting entity must maintain and update the WBS Dictionary throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the “As of Date” of the submitted FlexFile report and indicate the changes to the WBS Index and Dictionary Definitions.

For WBS elements identified in block 11 of the CSDR plan that is not within the contract's scope of work, the reporting entity shall report in the dictionary that “This CSDR WBS element is not associated with this contract’s scope of work”, and zero costs will be associated for ATD and FAC for these WBS elements.

4. COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES
Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
5. 1921-3 CONTRACTOR BUSINESS DATA REPORT
a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing RateProposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.

b. Reports are submitted annually at the end of the contractor's fiscal year.

c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA.If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.

d. The existing 1921-3 requires strictly formatted data and necessitates mappings to a government standard, the new DRAFT 1921-3 may be submitted in the contractor’s own format and according to the contractor’s own rate structure, so long as it meets the data requirements in the DRAFT 1921-3 Data Item Description DI-FNCL-81765.

6. END ITEMS/ORDER LOTS SCOPE IDIQ
Block 16 Orders/Lots is meant to capture the discrete Delivery Orders/Task Orders exercised on the contract. If a Delivery Order/Task Order is exercised on the contract and the CSDR plan has not been updated, it is the Reporting Entity's responsibility to still submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders/Task Orders. The CSDR plan will be revised accordingly to include all exercised Delivery Orders/Task Orders.
7. COST AND HOUR REPORT UNIT/SUBLOT REPORTING
The Reporting Entity is required to provide unit or sublot (specify) reporting for any given Order/Lot and End Item as outlined in block 18 of the DD Form 2794. If Unit Reporting is selected in item 18c (Unit Reporting), it is expected that all touch labor costs and hours that are associated with the discrete units or sublots be tagged as Touch Manufacturing or Touch Maintenance as defined in Data Group E, Item 7.
8. QUANTITY REPORTING
a. If the quantity for a given element differs from the quantity reported for the full system, provide a comment in the WBS Element Remarks section.

b. The Reporting Entity shall provide meaningful quantity information lower than the summary level in the remarks for WBS elements Peculiar Support Equipment, Common Support Equipment, and Initial Spares and Repair Parts, if applicable.

9. FINAL COST REPORT
Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total costs for each Order/Lot (see Block 16) and each End Item (see Block 17) has been incurred.
10. POST AWARD CONFERENCE (PAC)
The Reporting Entity shall attend and participate in a post award CSDR conference which will be held with the Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoDM 5000.04-M-1 (CSDR Manual). During this meeting, the CWIPT and contractor will review the Reporting Entity's process for data collection and reporting to ensure it satisfies the guidelines outlined in the DoDM 5000.04-M-1, CSDR Manual, the approved CSDR plan reporting requirement, and the Resource Distribution Table. The Reporting Entity shall demonstrate how costs will be based, to the maximum extent possible, upon actual cost transactions and not cost allocations; describe how recurring vs. nonrecurring costs will be segregated; demonstrate how the data from its accounting system will be mapped into the reporting categories in the approved CSDR plan. The Reporting Entity shall present the methodologies used for mapping internal cost accounts to the agreed upon WBS, specifically illustrating how individual WBS elements and functional element codes will be populated. The review shall include any reporting issue corrections and identify proposed changes to the approved CSDR Plan as necessary.
11. RESOURCE DISTRIBUTION TABLE (RDT)
The Reporting Entity is instructed to provide a Resource Distribution Table upon contract award, which identifies the value and work assigned to the Reporting Entity and its subcontractors. The Reporting Entity shall provide an updated RDT when additional quantities/scope are added to the contract to ensure that no major sub-contract(s) breach the direct CSDR reporting threshold specified in DoDI 5000.02 and DoDM 5000.04-M-1.
12. PERIOD OF PERFORMANCE (POP)
If contract Period of Performance is extended, the contractor shall submit an additional cost report for each additional year of extension. The final report will be moved to the revised end of the Period of Performance.
13. The contractor is instructed to report costs for all CLINs including Over and Above, Advance Procurement, Long Lead Materials, Multi-year Procurement, Inter-Division or Inter-Company Work Orders (IWOs), Foreign Military Sales (FMS), Warranty, etc. on the contract regardless of CLIN structure types. This approach is required in order to capture the entire contract cost.
14. The "As of Dates" and "Due Dates" are notional and subject to change. The CSDR plan uses the submission event names as the driving mechanism for the submittal of the cost reports, not the "as of date." In the event of a programmatic schedule slip, the reporting entity shall notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a date change request in the CADE system for the event-driven submission for CAPE approval. CAPE will not issue an updated approved CSDR plan for revisions based solely on date changes.
15. IRAD Effort: The contractor will report Internal Research and Development (IRAD) dollars and hours in the "Remarks" section for WBS elements that have IRAD efforts. If there are IRAD efforts that don't correspond to WBS elements, the contractor will report the total dollars and total hours for those efforts in the "Remarks" section under WBS 1.0.
16. Block 16 Orders/Lots is meant to capture the discrete Delivery Orders/Task Orders exercised on the contract. If a Delivery Order/Task Order is exercised on the contract and the CSDR plan has not been updated, it is the reporting entity's responsibility to still submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders/Task Orders. The CSDR plan will be revised accordingly to include all exercised Delivery Orders/Task Orders.
DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 5 (SCOPE DEF)

COST AND SOFTWARE DATA REPORTING PLAN
INTRA-CONTRACT SCOPE REPORTING DEFINITION
16. ORDERS/LOTS
a. IDb. NAMEc. PHASE/MILESTONE
1Lot 2C-LRIP
2Lot 3C-LRIP
3Lot 4C-LRIP
4Lot 5C-FRP
5Lot 6C-FRP
6Lot 7C-FRP
7Lot 8C-FRP
8Lot 9C-FRP
9Delivery Order 1...n
17. END ITEMS
a. IDb. NAME
1Provide Engime Model Number Here
18. OPTIONAL REQUIREMENTS
a. ORDER/LOT IDb. END ITEM IDc. UNIT REPORTING (X if applicable)d. SEQUENCING

(X if applicable)

21XX
31XX
41XX
51XX
61XX
71XX
81XX
91XX
101XX
DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019

DD Form 2794, Pg 6 (SRDR DEV)

COST AND SOFTWARE DATA REPORTING PLAN - SRDR DEVELOPMENT
19. RELEASES
a. IDb. NAMEc. DATE
20. CSCI'S
a. IDb. NAME
21. PRODUCT SIZE REPORTING ELEMENTS
a. CODEb. NAMEc. RELEASE IDd. CSCI ID
22. PRODUCT SIZE SUBMISSIONSc. RELEASE ID:
a. NUMBERb. NAMEIncluded?Included?Included?
DRAFT DD FORM 2794 (PAGE 6), SRDR DEVELOPMENT, JANUARY 2019

DD Form 2794, Pg 7 (SRDR MX)

COST AND SOFTWARE DATA REPORTING PLAN - SRDR MAINTENANCE
23. RELEASES
a. IDb. NAMEc. DATE
24. PRODUCT SIZE REPORTING ELEMENTS
a. CODEb. NAMEc. RELEASE ID
25. PRODUCT SIZE SUBMISSIONSc. RELEASE ID:
a. NUMBERb. NAMEIncluded?Included?Included?
DRAFT DD FORM 2794 (PAGE 7), SRDR MAINTENANCE, JANUARY 2019

DD Form 2794, Pg 8 (TECH RQTS)

COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS
26. WBS ELEMENT CODE27. WBS ELEMENT NAME28. ITEM TYPE29. TECHNICAL PARAMETER
a. PARAMETER NAMEb. UNIT OF MEASUREc. UNIT OF MEASURE QUALIFIERd. REPEATABLEe. REMARKS
1.1Prime Mission Product (Engine)EngineTurbinePressure Ratio - EngineDimensionless
1.1Prime Mission Product (Engine)EngineTurbineFuel Mass FlowPounds per Second
1.1Prime Mission Product (Engine)EngineTurbinePressure Ratio - EngineDimensionless
1.1Prime Mission Product (Engine)EngineTurbineFuel Mass FlowPounds per Second
1.1.1PMP Integration, Assembly, Test, and CheckoutIAT&CONumber of Electrical ConnectionsQuantityElectrical Connections
1.1.1PMP Integration, Assembly, Test, and CheckoutIAT&CONumber of Mechanical ConnectionsQuantityMechanical Connections
1.1.2FanPhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.2FanPhysicalStrucVolumeCubic Inches
1.1.2FanPhysicalStrucWeightPounds
1.1.3CompressorPhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.3CompressorPhysicalStrucVolumeCubic Inches
1.1.3CompressorPhysicalStrucWeightPounds
1.1.4Diffuser/CombusterPhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.4Diffuser/CombusterPhysicalStrucVolumeCubic Inches
1.1.4Diffuser/CombusterPhysicalStrucWeightPounds
1.1.5High Pressure TurbinePhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.5High Pressure TurbinePhysicalStrucVolumeCubic Inches
1.1.5High Pressure TurbinePhysicalStrucWeightPounds
1.1.6Low Pressure TurbinePhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.6Low Pressure TurbinePhysicalStrucVolumeCubic Inches
1.1.6Low Pressure TurbinePhysicalStrucWeightPounds
1.1.7Tec/Augmentor/DuctsPhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.7Tec/Augmentor/DuctsPhysicalStrucVolumeCubic Inches
1.1.7Tec/Augmentor/DuctsPhysicalStrucWeightPounds
1.1.8Exhaust NozzlePhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.8Exhaust NozzlePhysicalStrucVolumeCubic Inches
1.1.8Exhaust NozzlePhysicalStrucWeightPounds
1.1.9Bearings, Seals, Drives, and AccessoriesPhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.9Bearings, Seals, Drives, and AccessoriesPhysicalStrucVolumeCubic Inches
1.1.9Bearings, Seals, Drives, and AccessoriesPhysicalStrucWeightPounds
1.1.10Controls and Diagnostic SystemsPhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.10Controls and Diagnostic SystemsPhysicalElecWeightPounds
1.1.10Controls and Diagnostic SystemsPhysicalElecWeight - StructuralPounds
1.1.10Controls and Diagnostic SystemsPhysicalElecWeight - ElectronicsPounds
1.1.10Controls and Diagnostic SystemsPhysicalElecPower - Maximum Consumption RateKilowatts
1.1.10Controls and Diagnostic SystemsPhysicalElecVolumeCubic Inches
1.1.10.1Controls and Diagnostic System Hardware Integration, Assembly, Test, and CheckoutIAT&CONumber of Electrical ConnectionsQuantityElectrical Connections
1.1.10.1Controls and Diagnostic System Hardware Integration, Assembly, Test, and CheckoutIAT&CONumber of Mechanical ConnectionsQuantityMechanical Connections
1.1.10.2Controls and Diagnostic System Hardware 1..n (Specify)PhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.10.2Controls and Diagnostic System Hardware 1..n (Specify)PhysicalElecWeightPounds
1.1.10.2Controls and Diagnostic System Hardware 1..n (Specify)PhysicalElecWeight - StructuralPounds
1.1.10.2Controls and Diagnostic System Hardware 1..n (Specify)PhysicalElecWeight - ElectronicsPounds
1.1.10.2Controls and Diagnostic System Hardware 1..n (Specify)PhysicalElecPower - Maximum Consumption RateKilowatts
1.1.10.2Controls and Diagnostic System Hardware 1..n (Specify)PhysicalElecVolumeCubic Inches
1.1.11Externals and Power TransferPhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.11Externals and Power TransferPhysicalStrucVolumeCubic Inches
1.1.11Externals and Power TransferPhysicalStrucWeightPounds
1.1.12CrankshaftPhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.12CrankshaftPhysicalStrucVolumeCubic Inches
1.1.12CrankshaftPhysicalStrucWeightPounds
1.2Platform Integration, Assembly, Test, and CheckoutIAT&CONumber of Electrical ConnectionsQuantityElectrical Connections
1.2Platform Integration, Assembly, Test, and CheckoutIAT&CONumber of Mechanical ConnectionsQuantityMechanical Connections
1.3Systems EngineeringSysEngNumber of Requirement Document - "Shalls"QuantityShallsYG
1.3Systems EngineeringSysEngNumber of Platforms - IntegratedQuantityPlatforms
1.4Program ManagementProgMgmtFrequency of Government Program ReviewsQuantityReviews per Year
1.4Program ManagementProgMgmtNumber of Contract Line Item Number (CLIN)sQuantityCLINs
1.4Program ManagementProgMgmtNumber of SubcontractorsQuantitySubcontractors
1.4Program ManagementProgMgmtNumber of Customer StakeholdersQuantityStakeholders
1.7.1Data Deliverables 1...n (Specify)DataData Rights CategoryList
1.7.2Data RepositoryDataDepositoryStorage FootprintSquare FeetData storage size
1.7.3Data Rights 1...n (Specify)DataData Rights CategoryList
1.8.1Test and Measurement EquipmentSupportEquipmentQuantity of Support EquipmentQuantitySupport Equipment
1.8.1Test and Measurement EquipmentSupportEquipmentNumber of LocationsQuantityLocations
1.8.1Test and Measurement EquipmentSupportEquipmentSupport Equipment LocationsDescriptor
1.8.2Support and Handling EquipmentSupportEquipmentQuantity of Support EquipmentQuantitySupport Equipment
1.8.2Support and Handling EquipmentSupportEquipmentNumber of LocationsQuantityLocations
1.8.2Support and Handling EquipmentSupportEquipmentSupport Equipment LocationsDescriptor
1.9.1Test and Measurement EquipmentSupportEquipmentQuantity of Support EquipmentQuantitySupport Equipment
1.9.1Test and Measurement EquipmentSupportEquipmentNumber of LocationsQuantityLocations
1.9.1Test and Measurement EquipmentSupportEquipmentSupport Equipment LocationsDescriptor
1.9.2Support and Handling EquipmentSupportEquipmentQuantity of Support EquipmentQuantitySupport Equipment
1.9.2Support and Handling EquipmentSupportEquipmentNumber of LocationsQuantityLocations
1.9.2Support and Handling EquipmentSupportEquipmentSupport Equipment LocationsDescriptor
1.10Operational/Site Activation by Site 1...n (Specify)OpSiteActivationAmplifying Descriptive TextDescriptor
1.10Operational/Site Activation by Site 1...n (Specify)OpSiteActivationFacility DescriptionDescriptor
1.10Operational/Site Activation by Site 1...n (Specify)OpSiteActivationOrganic Site ActivationList
DD FORM 2794 (PAGE 8), TECHNICAL PARAMETER REQUIREMENTS, JANUARY 2019

Pg 8a (TECH RQTS Definitions)

COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS
TECHNICAL PARAMETER REQUIREMENTS (Definitions)
26. WBS
ELEMENT CODE27. WBS ELEMENT NAME29. TECHNICAL PARAMETERTECHNICAL PARAMETER (Definintions and Choice List)
a. PARAMETER NAMEb. UNIT OF MEASUREDEFINITIONList Item #1List Item #2List Item #3List Item #4List Item #5List Item #6List Item #7List Item #8List Item #9List Item #10List Item #n
1.1Prime Mission Product (Engine)Pressure Ratio - EngineDimensionlessThe Propulsion Engine Pressure Ratio.
1.1Prime Mission Product (Engine)Fuel Mass FlowPounds per SecondThe Fuel Mass Flow is the mass of the fuel which passes per unit of time. Specify the fuel's Fuel Mass Flow.
1.1Prime Mission Product (Engine)Pressure Ratio - EngineDimensionlessThe Propulsion Engine Pressure Ratio.
1.1Prime Mission Product (Engine)Fuel Mass FlowPounds per SecondThe Fuel Mass Flow is the mass of the fuel which passes per unit of time. Specify the fuel's Fuel Mass Flow.
1.1.1PMP Integration, Assembly, Test, and CheckoutNumber of Electrical ConnectionsQuantityThe number of electrical and electronic connections at this level of assembly.
1.1.1PMP Integration, Assembly, Test, and CheckoutNumber of Mechanical ConnectionsQuantityThe number of mating surfaces, fasteners, or other non-electrical attach points at the level of assembly.
1.1.2FanMaterial Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.2FanVolumeCubic InchesPhysical volume of the item.
1.1.2FanWeightPoundsPhysical weight of the item.
1.1.3CompressorMaterial Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.3CompressorVolumeCubic InchesPhysical volume of the item.
1.1.3CompressorWeightPoundsPhysical weight of the item.
1.1.4Diffuser/CombusterMaterial Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.4Diffuser/CombusterVolumeCubic InchesPhysical volume of the item.
1.1.4Diffuser/CombusterWeightPoundsPhysical weight of the item.
1.1.5High Pressure TurbineMaterial Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.5High Pressure TurbineVolumeCubic InchesPhysical volume of the item.
1.1.5High Pressure TurbineWeightPoundsPhysical weight of the item.
1.1.6Low Pressure TurbineMaterial Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.6Low Pressure TurbineVolumeCubic InchesPhysical volume of the item.
1.1.6Low Pressure TurbineWeightPoundsPhysical weight of the item.
1.1.7Tec/Augmentor/DuctsMaterial Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.7Tec/Augmentor/DuctsVolumeCubic InchesPhysical volume of the item.
1.1.7Tec/Augmentor/DuctsWeightPoundsPhysical weight of the item.
1.1.8Exhaust NozzleMaterial Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.8Exhaust NozzleVolumeCubic InchesPhysical volume of the item.
1.1.8Exhaust NozzleWeightPoundsPhysical weight of the item.
1.1.9Bearings, Seals, Drives, and AccessoriesMaterial Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.9Bearings, Seals, Drives, and AccessoriesVolumeCubic InchesPhysical volume of the item.
1.1.9Bearings, Seals, Drives, and AccessoriesWeightPoundsPhysical weight of the item.
1.1.10Controls and Diagnostic SystemsMaterial Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.10Controls and Diagnostic SystemsWeightPoundsPhysical weight of the item.
1.1.10Controls and Diagnostic SystemsWeight - StructuralPoundsThe item's mechanical/structural weight.
1.1.10Controls and Diagnostic SystemsWeight - ElectronicsPoundsThe item's electronics weight.
1.1.10Controls and Diagnostic SystemsPower - Maximum Consumption RateKilowattsMaximum rate of power consumption by the item.
1.1.10Controls and Diagnostic SystemsVolumeCubic InchesPhysical volume of the item.
1.1.10.1Controls and Diagnostic System Hardware Integration, Assembly, Test, and CheckoutNumber of Electrical ConnectionsQuantityThe number of electrical and electronic connections at this level of assembly.
1.1.10.1Controls and Diagnostic System Hardware Integration, Assembly, Test, and CheckoutNumber of Mechanical ConnectionsQuantityThe number of mating surfaces, fasteners, or other non-electrical attach points at the level of assembly.
1.1.10.2Controls and Diagnostic System Hardware 1..n (Specify)Material Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.10.2Controls and Diagnostic System Hardware 1..n (Specify)WeightPoundsPhysical weight of the item.
1.1.10.2Controls and Diagnostic System Hardware 1..n (Specify)Weight - StructuralPoundsThe item's mechanical/structural weight.
1.1.10.2Controls and Diagnostic System Hardware 1..n (Specify)Weight - ElectronicsPoundsThe item's electronics weight.
1.1.10.2Controls and Diagnostic System Hardware 1..n (Specify)Power - Maximum Consumption RateKilowattsMaximum rate of power consumption by the item.
1.1.10.2Controls and Diagnostic System Hardware 1..n (Specify)VolumeCubic InchesPhysical volume of the item.
1.1.11Externals and Power TransferMaterial Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.11Externals and Power TransferVolumeCubic InchesPhysical volume of the item.
1.1.11Externals and Power TransferWeightPoundsPhysical weight of the item.
1.1.12CrankshaftMaterial Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.12CrankshaftVolumeCubic InchesPhysical volume of the item.
1.1.12CrankshaftWeightPoundsPhysical weight of the item.
1.2Platform Integration, Assembly, Test, and CheckoutNumber of Electrical ConnectionsQuantityThe number of electrical and electronic connections at this level of assembly.
1.2Platform Integration, Assembly, Test, and CheckoutNumber of Mechanical ConnectionsQuantityThe number of mating surfaces, fasteners, or other non-electrical attach points at the level of assembly.
1.3Systems EngineeringNumber of Requirement Document - "Shalls"QuantityThe number of requirements cited in the system's requirements documents.
1.3Systems EngineeringNumber of Platforms - IntegratedQuantityThe number of platforms (e.g. aircraft) on which the system will be qualified.
1.4Program ManagementFrequency of Government Program ReviewsQuantityThe Frequency of Government Program Reviews in the contract.
1.4Program ManagementNumber of Contract Line Item Number (CLIN)sQuantityThe number of Contract CLINs in the contract.
1.4Program ManagementNumber of SubcontractorsQuantityThe number of major subcontractors/suppliers in the program.
1.4Program ManagementNumber of Customer StakeholdersQuantityThe number of customers and stakeholders that may require management accommodation. Stakeholders consist of any group or organization with a related or subsequent responsibility that is directly related to the outcome of an action or result. Generally speaking they can influence the outcome or are the recipient of the results. The range of personnel selected to participate as stakeholders is based on the outcome and processes involved. Typical stakeholders are: users or operators, acquisition commands, test communities, depots, manpower, personnel & training communities, maintainers, and suppliers
1.6.1.1Operator Instructional EquipmentTraining Device NameDescriptorTraining equipment name.
1.7.1Data Deliverables 1...n (Specify)Data Rights CategoryListCategory of Data Rights PurchasedUnlimited RightsGovernment Purpose RightsLimited RightsRestricted RightsNegotiated License RightsSBIR Data RightsCommercial Technical Data License RightsCommercial Computer Software Licenses
1.7.2Data RepositoryStorage FootprintSquare FeetThe area required for data storage.
1.7.3Data Rights 1...n (Specify)Data Rights CategoryListCategory of Data Rights PurchasedUnlimited RightsGovernment Purpose RightsLimited RightsRestricted RightsNegotiated License RightsSBIR Data RightsCommercial Technical Data License RightsCommercial Computer Software Licenses
1.8.1Test and Measurement EquipmentQuantity of Support EquipmentQuantityTotal number of support equipment used on the program
1.8.1Test and Measurement EquipmentNumber of LocationsQuantityNumber of locations support equipment is utilized
1.8.1Test and Measurement EquipmentSupport Equipment LocationsDescriptorList of all locations support equipment is utilized.
1.8.2Support and Handling EquipmentQuantity of Support EquipmentQuantityTotal number of support equipment used on the program
1.8.2Support and Handling EquipmentNumber of LocationsQuantityNumber of locations support equipment is utilized
1.8.2Support and Handling EquipmentSupport Equipment LocationsDescriptorList of all locations support equipment is utilized.
1.9.1Test and Measurement EquipmentQuantity of Support EquipmentQuantityTotal number of support equipment used on the program
1.9.1Test and Measurement EquipmentNumber of LocationsQuantityNumber of locations support equipment is utilized
1.9.1Test and Measurement EquipmentSupport Equipment LocationsDescriptorList of all locations support equipment is utilized.
1.9.2Support and Handling EquipmentQuantity of Support EquipmentQuantityTotal number of support equipment used on the program
1.9.2Support and Handling EquipmentNumber of LocationsQuantityNumber of locations support equipment is utilized
1.9.2Support and Handling EquipmentSupport Equipment LocationsDescriptorList of all locations support equipment is utilized.
1.10Operational/Site Activation by Site 1...n (Specify)Amplifying Descriptive TextDescriptorAdditional text as needed regarding the description of the amplification.
1.10Operational/Site Activation by Site 1...n (Specify)Facility DescriptionDescriptorDescribes each facility and quantifies to the extent possible in terms of square feet, number of installations, power, etc.
1.10Operational/Site Activation by Site 1...n (Specify)Organic Site ActivationListDenotes if the site activation is a Government activityYesNo
DD FORM 2794 (PAGE 8a), TECHNICAL PARAMETER REQUIREMENTS, JANUARY 2019

&R&P of &N