Section J_Exhibit A_CDRL (Production)_Final RFP 5 Feb 21.pdf
PDF 2 MB Posted
- Attached to
- F-15EX Lots 2+ Propulsion Procurement Federal contract opportunity
- Solicitation number
- FA8626-21-R-0002
About this file
This is a solicitation package for the procurement of a complete propulsion system for the F-15EX aircraft. The United States Air Force intends to acquire up to 461 engines and associated components from October 2023 through June 2031 for full integration into the weapon system. Proposals are due no later than April 7, 2021. The Air Force Life Cycle Management Center and Propulsion Acquisition Division will manage the contract. The solicitation includes attachments covering statement of work, data requirements, and other standard contract terms.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8626-21-R-0002
Section J, Exhibits A and B
Contract Data Requirements List
General Instructions for
F-15EX Propulsion System
Exhibits A and B
21 January 2021
Prepared By Air Force Life Cycle Management Center (AFLCMC)
Propulsion Directorate (LPA) Wright-Patterson AFB, Ohio 45433
CONTRACT DATA REQUIREMENTS LIST (CDRL) MODIFICATION MATRIX
This matrix identifies the CDRL changes as implemented by contract modification.
CHANGE AUTHORITY
(ECP No., Mod No., etc.) CDRL REV NO. DATE CDRL/PAGES
REVISED
Table of Contents
1 SCOPE
2 APPLICABLE DOCUMENTS
3 REFERENCE DOCUMENTS
4 DATA ITEM DELIVERIES
4.1 English Language
4.2 Delivery Dates and Times
4.3 Tailored Data Items
4.4 Approval of Data Items
4.5 Resubmittal of Data Items
4.6 Final Submittal of Data Items
4.7 DD Form 250, Material Inspection and Receiving Report Requirements
4.8 Classified Data Items
5 ELECTRONIC DATA TRANSMISSION
5.1 Procuring Contracting Office Letter (PCOL+)
5.2 Alternative Delivery Formats
5.3 Editable Format Requirements
6 METHOD OF TRANSMITTAL
6.1 Required Format (General)
6.2 Required Format (Paper)
7 MODIFICATION OF DATA REQUIREMENTS
7.1 Administrative Changes to DD Forms 1423
7.2 Changes to Contract Price (Limits & Conditions)
8 MARKING TECHNICAL DOCUMENTATION
8.1 Distribution Marking System
8.2 Marking Technical Data Items
8.3 Distribution Statements
8.4 Export Controlled Warning Statement
8.5 Data Item Destruction
8.6 Restrictions for Distribution Statement A
9 MAILING ADDRESS
10 COMMON ABBREVIATIONS FOUND IN DD FORMS 1423
1 SCOPE
The Contract Data Requirements List (CDRL) establishes the data to be delivered by the Contractor to include the submittal, approval, and distribution requirements of all the data items contained within. The data requirements are listed on the enclosed Department of Defense (DD) Forms 1423, Contract Data Requirements List. The Contractor is legally obligated to meet these requirements because the CDRL is a contractual document and, as such, is binding in and of itself.
2 APPLICABLE DOCUMENTS
The associated Data Item Description (DID) is identified in Block 4 of the enclosed DD Forms 1423. All DIDs are available to the Contractor at the following website http://quicksearch.dla.mil/.
3 REFERENCE DOCUMENTS
• Department of Defense Directive (DoDD) 5230.09, Clearance of DoD Information for Public Release, 25 January 2019
• DoDD 5230.25, Withholding of Unclassified Technical Data From Public Disclosure, 6 November 1984, Incorporating Change 2, 15 October 2018
• DoDD 5400.07, DoD Freedom of Information Act, 5 April 2019
• DoD Instruction (DoDI) 5230.24, Distribution Statements on Technical Documents, 23 August 2012, Incorporating Change 3, 15 October 2018
• DoD Manual (DoDM) 5010.12, Procedures for the Acquisition and Management of
Technical Data, 14 May 1993, Incorporating Change 1, 31 August 2018
• DoDM 5200.01, Volume 3, DoD Information Security Program: Protection Of Classified
Information, 24 February 2012, Incorporating Change 3, 28 July 2020
• DoDM 5220.22, National Industrial Security Program Operating Manual, 28 February
2006, Incorporating Change 2, 18 May 2016
4 DATA ITEM DELIVERIES
4.1 English Language
The Contractor shall prepare all data items using the English Language per FAR 52.214-34, Submission of Offers in the English Language.
4.2 Delivery Dates and Times
The Contractor shall submit data items in accordance with Blocks 10, 11, 12, 13, 14, and 16 of each DD Form 1423, at a minimum. In addition, the Contractor shall submit out-of-cycle updates whenever an update is required due to program activities.
Unless otherwise specified in Block 16 of the DD Form 1423, all references to “days” shall refer to calendar days. The data item must be delivered by 2359 (11:59 pm) Eastern Time (Eastern Standard or Eastern Daylight Time) on the due date in order to be counted as on-time. In the event a data item’s delivery date falls on a Saturday or Sunday, the delivery must be made by the http://quicksearch.dla.mil/
Friday before the weekend to be counted as an on-time delivery. In the event a data item’s delivery date falls on a holiday, the delivery must be made by the last workday before the holiday to be counted as an on-time delivery.
4.3 Tailored Data Items
Tailoring instructions are as described in Block 16 of each DD Form 1423. A letter “T” (e.g., DI-MGMT-80004A/T) added to the end of the DID number in Block 4 of the DD Form 1423 denotes that the DID has been tailored to comply with specific system/program requirements.
The unique tailoring instructions are identified in Block 16 of each affected DD Form 1423.
4.4 Approval of Data Items
An "A" designator in Block 8 of the DD Form 1423 indicates the Government will formally reply to each data item submittal with either (1) an approval, (2) approval with comments, (3) rejection, or (4) disapproval. The Government will respond to all data item deliveries requiring an approval by issuing a Procuring Contracting Officer Letter (PCOL) to, or emailing the Contractor. The Government will respond within sixty (60) calendar days, unless otherwise specified in Block 16. If the Government cannot respond within the sixty (60) calendar days, the Contractor will be notified, and a new suspense date will be established by the Government. If the Government fails to provide a written response to a data item delivery within sixty (60) calendar days of receipt, the data item will be considered approved.
The sixty (60) calendar day response time does not apply to Contract Change Proposals (CCPs).
Any CCP will be reviewed and briefed to the Government Configuration Control Board (CCB) for disposition. After the CCB, a PCOL will be sent apprising the Contractor of the disposition, followed by a contract modification to implement the change, if approved.
The Government will approve a data item with comments if there is a reasonable expectation the data item can be corrected to meet the requirements. The Government will reject a data item if it is determined to be incomplete or inadequate to the point where a comprehensive review cannot occur. The Government will disapprove a data item if, after a comprehensive review, it is determined the data item is not acceptable as prepared.
The Contractor shall submit all data items with conforming marking in accordance with DFARS 252.227-7013, Rights in Technical Data - Noncommercial Items, and DFARS 252.227- 7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation. Section (f) of these clauses contain an inclusive list of authorized marking legends; any marking other than those specified in these clauses is non-conforming. The Contractor shall correct any nonconforming markings within sixty (60) calendar days. If the Contractor fails to remove or correct such markings within sixty (60) calendar days, the
Government will ignore the markings and may remove or correct, at the Contractor’s expense, all non-conforming markings. The Government will track the expenses to remove or correct the non-conforming markings, and, at the Government Contracting Officer’s discretion, apply a withhold and/or request consideration.
For DD Forms 1423 with an “N/A” in Block 8, Government approval of the content is not required; however, the Government retains the right to reject or disapprove any data item submittal not in compliance with requirements of the contract, DD Form 1423, or DID.
For DD Forms 1423 with the word “BLK16” in Block 8, approval requirements shall be as specified in Block 16.
4.5 Resubmittal of Data Items
If resubmittal of a data item is required, the Contractor shall resubmit within thirty (30) calendar days after the date the Government PCOL is sent, unless otherwise specified in the PCOL. If the Contractor disagrees with the proposed resubmittal requirements, it shall submit its comments in writing to the Government PCO within fifteen (15) calendar days of notification.
When resubmission of a data item is required, the Contractor shall submit complete data items unless otherwise specified in the PCOL. The Contractor shall identify all changes made using a standard tool, such as track changes or a vertical change bar along the side of the change. The Contractor shall update the data item revision number and indicate both on the title page of the data item and in the header of each page of the data item.
The Contractor shall insert a “revision history” page in each resubmitted data item, providing a history of changes made to the data item. The page shall include the following, at a minimum:
• contract reference for the revision (e.g., PCOL, CCP, or modification number)
• a brief description of the changes made
• revision identification letter or number
• revision date.
4.6 Final Submittal of Data Items
For the final delivery against each data item required by the contract or delivery order, the Contractor shall clearly state in its Letter of Transmittal (LT) that the last submittal is being made and that all contractual requirements concerning that data item have been fulfilled. The proper format and required information for the Contractor’s LT is covered in Section 6 below.
4.7 DD Form 250, Material Inspection and Receiving Report Requirements
Block 7 of the DD Form 1423 indicates the required submittal method. The Contractor shall submit data items via a DD Form 250 only if indicated in Block 7. The Contractor shall submit all other data items using Procuring Contracting Office Letter Plus (PCOL+).
FA8634-20-D-2704
Section J, Exhibit A and Exhibit B
4.8 Classified Data Items
In the event a classified data item is required, the Contractor shall contact the Government PCO for the appropriate electronic delivery instructions or mailing address. The Contractor shall submit the data item in accordance with the requirements established by the applicable
DD Form 254, Contract Security Classification Specification. In addition, the Contractor shall submit an unclassified Letter Transmittal (LT) using PCOL+.
5 ELECTRONIC DATA TRANSMISSION
5.1 Procuring Contracting Office Letter (PCOL+)
The Contractor shall submit all data items using PCOL+ unless otherwise directed in Block 14 and Block 16 of the individual DD Form 1423. In the event an alternate delivery method is required, the Contractor shall submit an LT using PCOL+.
5.2 Alternative Delivery Formats
The Contractor shall inform the Government PCO, in writing, if any of its data items cannot comply with the electronic formats specified in the DD Forms 1423. In such cases, the Contractor shall recommend an alternative format for Government PCO approval. The Contractor shall submit any request for an alternative format sixty (60) calendar days prior to alternative format need date.
5.3 Editable Format Requirements
When the Contractor is required to deliver data items in editable Microsoft Excel or Microsoft Project format, the Contractor shall also submit a second, identical copy in PDF format at the same time. The PDF file will be considered the formal data item.
6 METHOD OF TRANSMITTAL
6.1 Required Format (General)
At a minimum, the Contractor shall include the following information on each LT:
• letter date and control number
• Contractor’s address and Point of Contact (POC)
• contract number, delivery order number, Contract Line Item Number (CLIN), and program name
• data item date, control number, and revision number
• data item sequence number (e.g., A028)
• DID number
• data item title and subtitle, as applicable
• reason and frequency of submittal (e.g., draft, final, monthly, update, etc.)
• list of all previous and pertinent correspondence relating to the data item being submitted
• list of distribution addressees identified in Block 14 of the DD Form 1423
6.2 Required Format (Paper)
If a paper copy of the data item must be prepared, the Contractor shall place a complete list of addressees at the end of the letter, annotating the recipients (as identified in Block 14 of the
DD Form 1423), including the LT-only recipients. The Contractor shall submit paper copies on standard 8.5 x 11-inch bond paper. Foldouts are permissible for large tables/flow charts.
7 MODIFICATION OF DATA REQUIREMENTS
7.1 Administrative Changes to DD Forms 1423
During the performance of this contract, the Government PCO may unilaterally accomplish changes to Exhibits A and B and the associated CLINs. Subject changes may include, but are not limited to:
• increase or decrease the number of addressees
• increase or decrease the number of paper copies provided
• change the place of delivery
• change the requiring office for the data item
• other administrative and/or clarification changes
7.2 Changes to Contract Price (Limits & Conditions)
a) The US Government (USG) Procuring Contracting Officer (PCO) may unilaterally may change the place of delivery and the technical office for any line item of contract Exhibits (DD Form 1423), at no change in contract price, notwithstanding the provision of the “Changes” clause of the contract. If there is a change to the place of delivery, the Contractor and the PCO may mutually agree to an extension of the data submittal requirement date.
b) The USG PCO unilaterally may increase or decrease the number of addresses and/or number of copies specified for any data item of the CDRL, at no change in price. Provided that either the increase in the total number of copies for an individual line item of data shall not be greater than one hundred-fifty percent (150%) of the total number of copies initially specified in the CDRL or that (in the case of a decrease in delivery requirements) the decrease in the total number of copies for an individual item of data be greater than fifty percent (50%) of the total number of copies initially specified in the CDRL. In the event of an increase greater than such 150% or of a decrease greater than fifty percent (50%), the parties will negotiate any equitable adjustments in accordance with the provision of the “Changes” clause of the contract.
c) Unilateral actions pursuant to paragraphs (a) and (b) above shall be by the issuance of a USG PCOL followed by a Supplemental Agreement to this contract which will reference the appropriate paragraph 7(a) or 7(b) above of these CDRL General Notes as its authority. Any action directed by this clause shall be put into effect by the Contractor beginning with the first submission of the particular data item or items immediately following receipt of the USG PCO’s direction by the Contractor.
d) Any other/subsequent changes to this CDRL package and not specifically pertaining to changes identified in paragraphs (a) and (b) above shall be proposed and submitted to the USG. Upon approval of the request by the USG, incorporate into the contract as part of the corresponding contract modification.
8 MARKING TECHNICAL DOCUMENTATION
8.1 Distribution Marking System
Required distribution statements are annotated in Block 9 of each DD Form 1423. The distribution statements are defined in Section 9.3 below. If the Contractor believes a different distribution statement is appropriate, the Contractor shall notify the Government PCO with its recommendation and justification. The Government will review the request, determine which statement is the most appropriate, and provide the Contractor with either an acceptance of its proposed change or the Government’s reason for not accepting the Contractor’s request for change.
8.2 Marking Technical Data Items
The Contractor shall mark each technical data item, regardless of its medium, with a distribution statement. This marking requirement for each technical data item includes, but is not limited to, technical reports, blueprints, drawings, technical orders, technical manuals, plans, instructions, computer software, film, technical papers, photographs, and CDs/DVDs. If the technical data item contains export-controlled data as described in Section 8.4 below, the Contractor shall also mark it with an export control warning statement.
Certain technical data item types may preclude placing the entire notice on item. To accommodate this issue, each distribution statement contains an authorized abbreviation form.
Abbreviated distribution statements are to be used only when the available space precludes placing the entire notice on the data item. The use and wording of these distribution statements are described in Sections 8.3 through 8.6 below.
8.3 Distribution Statements
In accordance with Block 9 of the DD Form 1423, the Contractor shall place the required distribution statement on the cover and title page of each data item submitted, including the first sheet of each drawing. The distribution statements are as follows:
Distribution Statement A:
DISTRIBUTION A. Approved for public release; distribution unlimited.
Distribution Statement B:
DISTRIBUTION B. Distribution authorized to U.S. Government agencies [reason determined by DoDI 5230.24]; [date pulled from Block 3 of SF 26]. Other requests for this document shall be referred to AFLCMC/LPA, Bldg 28, 2145 Monahan Way, Wright- Patterson AFB, OH 45433-7017.
Distribution Statement C:
DISTRIBUTION C. Distribution authorized to U.S. Government agencies and their contractors (reason) (date of determination). Other requests for this document shall be referred to AFLCMC/LPA, Bldg 28, 2145 Monahan Way, Wright-Patterson AFB, OH 45433-7017.
Distribution Statement D:
DISTRIBUTION D. Distribution authorized to Department of Defense (DoD) and U. S.
DOD contractors only; (justification); (date of determination). All other requests for this document shall be referred to AFLCMC/LPA, Bldg 28, 2145 Monahan Way, Wright- Patterson AFB, OH 45433-7017.
Distribution Statement E:
DISTRIBUTION E. Distribution authorized to the Department of Defense (DoD) components only (reason) (date of determination). Other requests for this document shall be referred to AFLCMC/LPA, Bldg 28, 2145 Monahan Way, Wright-Patterson AFB, OH 45433-7017.
Distribution Statement F:
DISTRIBUTION F. Further dissemination only as directed by AFLCMC/LPA, Bldg 28, 2145 Monahan Way, Wright-Patterson AFB, OH 45433-7017 (date of determination) or higher DoD authority
8.4 Export Controlled Warning Statement
Besides a distribution statement, the Contractor shall use a warning notice on all data items that contain export-controlled technical data. The warning notice may be used in conjunction with Distribution Statements B, C, D, E, and F.
8.5 Data Item Destruction
The Contractor shall handle and destroy all unclassified technical data items marked with Distribution Statements B, C, D, E, or F as “For Official Use Only” or “Controlled Unclassified Information” data items, in accordance with DoDD 5400.07, DoD Freedom of Information Act Program. The Contractor shall handle and destroy all classified data items in accordance with the procedures in DoDM 5200.01, Volume 3, DoD Information Security Program: Protection Of Classified Information, and DoDM 5220.22, National Industrial Security Program Operating Manual.
8.6 Restrictions for Distribution Statement A
Distribution Statement A, which denotes public release, cannot be used in conjunction with the
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act Of 1979 (Title 50, U.S.C., App. 2401, et seq.), as amended.
Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DOD Directive 5230.25.
export-control warning notice. The Contractor shall submit data items marked with a Distribution Statement A for Government approval prior to public release in accordance with DoDM 5220.22. The Contractor shall handle data intended for public release as Distribution Statement D until approved for release; at which point, the Contractor shall update the markings to Distribution Statement A.
9 MAILING ADDRESS
The mailing address for all data items will be as follows:
AFLCMC/LPA
Bldg 28, 2145 Monahan Way Wright-Patterson AFB, Ohio 45433-7109
10 COMMON ABBREVIATIONS FOUND IN DD FORMS 1423
Block 7
Abbreviation Inspection Acceptance
SS Source (DD Form 250) Source (DD Form 250)
DD Destination (DD Form 250) Destination (DD Form 250)
SD Source (DD Form 250) Destination (DD Form 250)
DS Destination (DD Form 250) Source (DD Form 250)
LT Letter of Transmittal Only
NO No inspection or acceptance required
Block 8
Abbreviation Meaning
A Approval
N/A Approval Not Required
BLK16 See Block 16 for further instructions
Blocks 10-13
Abbreviation Meaning
ANNLY Annually
ASREQ As required
BLK16 Block 16
DAILY Daily
DAC Days After Contract Award
EOC End of Contract
EOM End of Month
EOQ End of Quarter
MTHLY Monthly
ONE/P One-time Preliminary Draft
ONE/R Once with Revisions
OTIME One Time
QTRLY Quarterly
2/4/2021 1:23:10 PM CST
CDRL Table of Contents
CONTRACT #:
CONTRACTOR:
SET NAME: F-15EX SYSTEM ITEM:
PROGRAM: Propulsion-F-15EX
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
A001 AFLCMC/LPA DI-ADMN-81250B/T SOW 3.2.2; Appendix B
Conference Minutes
N/A
A002 AFLCMC/LPA DI-ADMN-81373 SOW 3.2.2; Appendix B
Presentation Materials
N/A
A003 AFLCMC/LPA DI-SESS-80640E/T SOW 3.1.2.3
Request for Variance (RFV)
N/A
A004 AFLMC/LPA DI-SESS-81732/T SOW 3.1.2.3
Request for Waiver (RFW)
N/A
A005 AFLCMC/LPAK DI-QCIC-80125B/T SOW 3.1.4.2
Government Industry Data Exchange Program (GIDEP) Alert/State - Alert Report
N/A
A006 AFLCMC/LPAK DI-QCIC-80126B/T SOW 3.1.4.2
Government Industry Data Exchange Program (GIDEP) Alert Response
A007 AFLCMC/LPAK DI-QCIC-80127A/T SOW 3.1.4.2
Government Industry Data Exchange (GIDEP) Annual Progress Report
A008 AFLCMC/LPA DI-SAFT-80970A/T SOW 3.1.1.6
Critical Safety Item (CSI) Characteristic and Critical Defect Report
Critical Safety Item List
A009 AFLCMC/LPA DI-QCIC-80553A/T SOW 3.1.1.5.1
Acceptance Test Plan
N/A
A010 AFLCMC/LPA DI-MISC-80508B/T SOW 3.1
Technical Report - Study Services
Engine Specification
A011 AFLCMC/LPA DI-SESS-80643E/T SOW 3.1.2.2
Specification Change Notice (SCN)
N/A
A012 AFLCMC/LPA DI-MISC-80508B/T SOW 3.1.1.2
Technical Report-Study Services
PSIP Master Plan
A013 AFLCMC/LPA DI-MGMT-81334D/T SOW 3.2.3
Contractor Work Breakdown Structure (CWBS)
N/A
A014 AFLCMC/LPA DI-QCIC-81187 SOW 3.1.6.2
Quality Assessment Report
N/A
A015 AFLCMC/LPA DI-ADMN-81401C/T SOW 3.1.2.1
Contract Change Proposals (CCPs)
N/A
A016 AFLCMC/LPA TM-86-01Q/T SOW 3.1.7.2
Technical Manual Contract Requirements
TMCR
A021 AFLCMC/LPA DI-SESS-81000F/T SOW 3.1.7.3.1
Product Engineering Design Data and Associated List
Existing Data Items
A022 AFLCMC/LPA DI-SESS-80294B/T SOW 3.1.3.5
Maintenance Test and Support Equipment Requirements List
A023 AFLCMC/LPA DI-SESS-81000F/T SOW 3.1.7.5
Product Engineering Design Data and Associated Lists
Newly-Developed Data Items
A024 AFLCLMC/LPA DI-ADMN-81249B/T APPENDIX B
Conference Agenda
N/A
A025 AFLCMC/LPA DI-MSSM-81966A/T SOW 3.1.1.1
Gas Turbine Steady State and Transient Performance Presentation for Computer Programs
A032 AFLCMC/LPA DI-MISC-80508B/T SOW 3.1.1.3
Technical Report - Study/Services
Verification Matrix Report
A033 AFLCMC/LPA DI-MGMT-81861B/T SOW 3.2.5
Integrated Program Management Data & Analysis Report
(IPMDAR)
A034 AFLCMC/LPA DI-MGMT-80004A/T SOW 3.1.1.4.1
Management Plan
Engine Airworthiness Certification Plan
A035 AFLCMC/LPA DI-SESS-81768 SOW 3.1.1.4.2
Airworthiness Certification Criteria Report
N/A
A036 AFLCMC/LPA DI-MGMT-81797/T SOW 3.2.5
Program Management Plan
Integrated Master Plan
A038 AFLCMC/LPA DI-FNCL-81765B/T SOW 3.2.4
Contractor Business Data Report (DD Form 1921-3)
Contractor Cost Data Reporting (CCDR)
A039 AFLCMC/LPA DI-FNCL-82162 SOW 3.2.4
Cost and Hour Report (Flex File)
Contractor Cost Data Reporting (CCDR)
A040 AFLCMC-LPA DI-MGMT-82165 SOW 3.2.4
Technical Data Report
N/A
A041 AFLCMC/LPA DI-MGMT-82164 SOW 3.2.4
Quantity Data Report
Contractor Cost Data Reporting (CCDR)
A042 AFLCMC/LPA DI-MGMT-81808 SOW 3.2.9
Contractor's Risk Management Plan
N/A
A044 AFLCMC/LPA DI-MGMT-81948 SOW 3.1.3.3
Diminishing Manufacturing Sources & Material Shortages (DMSMS) Management Plan
A045 AFLCMC/LPA DI-MISC-81454D/T SOW 3.1.7.4.1
Automated Computer Program ID Number (ACPIN) Data & Control Record
Air Force Resource Inventory Data
A046 AFLCMC/LPA DI-IPSC-81434A/T SOW 3.1.7.4.6
Interface Requirements Specification (IRS)
Data Definition Report
A047 AFLCMC/LPA DI-NDTI-80809B/T SOW 3.1.7.3.4
Test/Inspection Report
Digital Inspection Records
A049 AFLCMC/LPA DI-IPSC-81434A/T SOW 3.1.7.4.3; 3.1.7.4.5
Interface Requirements Specification (IRS)
N/A
A050 AFLCMC/LPA DI-SESS-81359B/T SOW 3.1.7.2
Parts List
N/A
A051 AFLCMC/LPA DI-IPSC-81435A/T SOW 3.1.7.4.4
Software Design Specification (SDD)
N/A
A052 AFLCMC/LPA DI-IPSC-81427B/T SOW 3.1.7.4.1; 3.1.7.4.2
Software Development Plan (SDP)
N/A
A053 AFLCMC/LPA DI-IPSC-81433A/T SOW 3.1.7.4.3; 3.1.7.4.5
Software Requirements Specification (SRS)
N/A
A054 AFLCMC/LPA DI-IPSC-81439A/T SOW 3.1.7.4.1
Software Test Description (STD)
N/A
A055 AFLCMC/LPA DI-IPSC-81438A/T SOW 3.1.7.4.1
Software Test Plan (STP)
N/A
A056 AFLCMC/LPA DI-IPSC-81440A/T SOW 3.1.7.4.1
Software Test Report (STR)
N/A
A057 AFLCMC/LPA DI-IPSC-81442A/T SOW 3.1.7.4.7
Software Version Description (SVD)
CBM+ Fault Algorithms
A058 AFLCMC/LPA DI-IPSC-81433A/T SOW 3.1.7.4.6
Software Requirements Specification (SRS)
Data Decoder
A059 AFLCMC/LPA DI-AVCS-80700A/T SOW 3.1.7.4.7
Computer Software Product End Item
CBM+ Fault Algorithms Software
A060 AFLCMC/LPA DI-AVCS-80700A/T SOW 3.1.7.4.6
Computer Software Product End Item
Data Decoder Software
A061 AFLCMC/LPA DI-MISC-80508B/T SOW 3.1.7.4.7
Technical Report - Study/Services
Engine Trending & Diagnostics
A063 AFLCMC/LPA DI-IPSC-81442A/T SOW 3.1.7.4.1
Software Version Description (SVD)
N/A
A064 AFLCMC/LPA DI-AVCS-80700A/T SOW 3.1.7.4.1
Computer Software Product End Item
N/A
A065 AFLCMC/LPA DI-MGMT-81453B/T SOW 3.1.7.1.1
Data Accession List (DAL)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP X TM OTHER
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Conference Minutes
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250B/T
5. CONTRACT REFERENCE
SOW 3.2.2; Appendix B
6. REQUIRING OFFICE
AFLCMC/LPA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
Block 4: DI-ADMN-81250B/T tailored as follows:
a) Contractor format and content is acceptable.
The Contractor shall include the following statement as a separate paragraph on all minutes submitted:
"The agreements and/or action items stated in these minutes are not to be construed as contractual direction. The Contractor will inform the Government Contracting Officer of any items that are not currently authorized or required by the contract, and will not proceed with any additional work until contractual direction is received."
Block 10 & 12:
a) The Contractor shall submit 10 calendar days after each event.
Block 14: The Contractor shall submit CDRL deliveries using Procuring
Contracting Office Letter (PCOL+). See General Instructions for detailed requirements.
AFLCMC/LPA
15. TOTAL 0 0 0
G. PREPARED BY
Sandra Chaffolds, AFLCMC/LPA
Configuration Data Manager
Specialist
H. DATE
2020/11/20
I. APPROVED BY
John Houck, AFLCMC/LPA
Program Manager
J. DATE
2020/11/20
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 6 of 59 Pages
17. PRICE GROUP
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A002
2. TITLE OF DATA ITEM
Presentation Materials
3. SUBTITLE
N/A
DI-ADMN-81373
SOW 3.2.2; Appendix B
6. REQUIRING OFFICE
AFLCMC/LPA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
BLOCK 4: Contractor Format Acceptable.
BLOCK 8: Approval is automatic unless the contractor is notified in writing by the Government within 3 working days after the presentation is submitted or unless otherwise agreed upon in writing.
BLOCKS 10 & 12:
a) The contractor shall submit presentation materials 5 calendar days before the scheduled event.
b) The contractor shall submit the final version no later than 10 days after each event.
BLOCK 14: The Contractor shall submit CDRL deliveries using
Procuring Contracting Office Letter (PCOL+). See General
Instructions for detailed requirements.
Sandra Chaffolds, AFLCMC/LPA
Configuration Data Manager
Specialist
H. DATE
2020/11/20
I. APPROVED BY
John Houck, AFLCMC/LPA
Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 7 of 59 Pages
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A003
2. TITLE OF DATA ITEM
Request for Variance (RFV)
3. SUBTITLE
N/A
DI-SESS-80640E/T
SOW 3.1.2.3
6. REQUIRING OFFICE
AFLCMC/LPA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
ASREQ
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: This DID is tailored as follows:
Format and content shall be consistent with the contractor's approved
Configuration Management Plan.
BLOCKS 10, 11, 12, & 13: Deviations shall be submitted as soon as a situation arises which requires procuring activity approval prior to
Government acceptance of an item.
Sandra Chaffolds, AFLCMC/LPA
Configuration Data Management
Specialist
H. DATE
2021/01/15
I. APPROVED BY
John Houck, AFLCMC/LPA
Program Manager
2021/01/15
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 8 of 59 Pages
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A004
2. TITLE OF DATA ITEM
Request for Waiver (RFW)
3. SUBTITLE
N/A
DI-SESS-81732/T
SOW 3.1.2.3
6. REQUIRING OFFICE
AFLMC/LPA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
ASREQ
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: This DID is tailored as follows: Format and content shall be consistent with the contractor's approved Configuration Management
Plan (CMP).
BLOCKS 10, 11, 12, & 13: Waivers shall be submitted as soon as a situation arises which requires procuring activity approval prior to
Government acceptance of an item.
Sandra Chaffolds, AFLCMC/LPA
Configuration Data Manager
Specialist
H. DATE
2021/01/15
I. APPROVED BY
John Houck, AFLCMC/LPA
Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 9 of 59 Pages
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A005
2. TITLE OF DATA ITEM
Government Industry Data Exchange Program (GIDEP)
Alert/State - Alert Report
3. SUBTITLE
N/A
DI-QCIC-80125B/T
SOW 3.1.4.2
6. REQUIRING OFFICE
AFLCMC/LPAK
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: DID is tailored as follows: Contractor format is acceptable.
BLOCK 10, 11, &12: Alerts shall be submitted upon identification of deficiencies.
Sandra Chaffolds, AFLCMC/LPA
Configuration Data Manager
Specilaist
H. DATE
2021/01/15
I. APPROVED BY
John Houck, AFLCMC/LPA
Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 10 of 59 Pages
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A006
2. TITLE OF DATA ITEM
Government Industry Data Exchange Program (GIDEP) Alert
Response
3. SUBTITLE
N/A
DI-QCIC-80126B/T
6. REQUIRING OFFICE
AFLCMC/LPAK
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
180 DAC
13. DATE OF SUBSEQUENT
Reg Repro
BLOCK 4: Contractor format is acceptable.
DID is tailored as follows:
10.1 Format. The GIDEP Response format shall be at the contractors’ discretion.
10.2 Content. The Response to a failure experience report shall contain the following information, complete to the extent by usage of the part, component, material, process or equipment, or to the extent dictated by the safety condition.
10.2.1 For nonconforming parts or service, the response shall identify the contract number, specific lots, manufacturing dates, and locations.
10.2.2 The effect of the failure on systems/equipment function, mission, or process.
10.2.3 Identification of date, destination, serial number(s), etc., of any units shipped containing the identified supplies part or service.
10.2.4 Identification of any inspection or failure records of the identified supplies or services and whether they were encountered in the use of these supplies or services.
10.2.5 Reports of any analysis that may have been accomplished on these supplies or services.
10.2.6 Recommendations as to corrective action or disposition of the identified supplies or services.
10.2.7 Identification of the contractor/manufacturer’s contact point and organization. Source: https://assist.dla.mil -- Downloaded:
2016-10-14T17:14Z -- Check the source to verify that this is the current version before use.
10.2.8 DISTRIBUTION STATEMENT D: Approved for public release;
distribution is unlimited.
BLOCKS 10, 12, &13: Response and corrective action to incoming alert will be submitted when impact is determined by the Contractor
Sandra Chaffolds, AFLCMC/LPA
Configuration Data Manager
Specialist
H. DATE
2021/01/15
I. APPROVED BY
John Houck, AFLCMC/LPA
Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 11 of 59
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A007
2. TITLE OF DATA ITEM
Government Industry Data Exchange (GIDEP) Annual
Progress Report
3. SUBTITLE
N/A
DI-QCIC-80127A/T
6. REQUIRING OFFICE
AFLCMC/LPAK
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: This DID is tailored as follows: Contractor format is
BLOCKS 10, 11, 12, & 13:
a) Draft report due 30 days after contract award.
b) Final submittal of the GIDEP Annual Progress Report shall be NLT
30 calendar days following the incorporation of approved changes to report format.
c)Subsequent submittal of this GIDEP Annual Progress Report shall be annually, NLT 20 November or by Government request.
Sandra Chaffolds, AFLCMC/LPA
Configuration Data Management
Specialist
H. DATE
2021/01/15
I. APPROVED BY
John Houck, AFLCMC/LPA
Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 12 of 59
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A008
2. TITLE OF DATA ITEM
Critical Safety Item (CSI) Characteristic and Critical
Defect Report
3. SUBTITLE
Critical Safety Item List
DI-SAFT-80970A/T
SOW 3.1.1.6
6. REQUIRING OFFICE
AFLCMC/LPA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
90 DAC
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
Block 4: DI-SAFT-80970A is tailored as follows:
a) Paragraph 2: Delete, "Hard copy submittals shall be on 8½ by 11-inch bond paper. Electronic/computer generated reports approved by the procuring activity shall be printable in the same format."
b) Paragraph 3.3: Delete, "Characteristics"
c) Paragraph 3.3.a: Add, ", if exists" after National Stock Number
d) Paragraphs 3.3.b, 3.3.d, and 3.3.e: will be for new or redesigned parts only
e) Paragraph 3.3.g: Delete
Blocks 10, & 13:
a) The Contractor shall submit final 30 days after Government comments are received.
b) The Contractor shall submit subsequent updates as required to reflect changes.
Note: These deliverables are necessary for installations, operation, maintenance, or training purposes.
Sandra Chaffolds, AFLCMC/LPA
Configuration Data Management
Specialist
H. DATE
2021/01/15
I. APPROVED BY
John Houck. AFLCMC/LPA
Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 13 of 59
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A009
2. TITLE OF DATA ITEM
Acceptance Test Plan
3. SUBTITLE
N/A
DI-QCIC-80553A/T
SOW 3.1.1.5.1
6. REQUIRING OFFICE
AFLCMC/LPA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
OTIME
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: This DID is tailored as follows: Contractor format is
Block 11, &12:
1 submittal 60 days prior to first Acceptance Test.
Block 14: The Contractor shall submit CDRL deliveries using
Sandra Chaffolds, AFLCMC/LPA
Configuration Data Manager
Specialist
H. DATE
2021/01/15
I. APPROVED BY
John Houck, AFLCMC/LPA
Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 14 of 59
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A010
2. TITLE OF DATA ITEM
Technical Report - Study Services
3. SUBTITLE
Engine Specification
DI-MISC-80508B/T
SOW 3.1
6. REQUIRING OFFICE
AFLCMC/LPA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
OTIME
12. DATE OF FIRST SUBMISSION
30 DAC
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
Block 4: DI-MISC-80508B is tailored as follows:
a) Contractor format is acceptable.
b) Contractor shall deliver the Engine Specification, as referenced in Contract Section C.
Procuring Contacting Office Letter (PCOL+). See General Instructions for detailed requirements.
Sandra Chaffolds, AFLCMC/LPA
Configuration Data Management
Specialist
H. DATE
2021/01/15
I. APPROVED BY
John Houck. AFLCMC/LPA
Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 15 of 59
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A011
2. TITLE OF DATA ITEM
Specification Change Notice (SCN)
3. SUBTITLE
N/A
DI-SESS-80643E/T
SOW 3.1.2.2
6. REQUIRING OFFICE
AFLCMC/LPA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: The Contractor shall submit CDRL deliveries using Procuring
Sandra Chaffolds, AFLCMC/LPA
Configuration Data Management
Specialist
H. DATE
2021/01/15
I. APPROVED BY
John Houck. AFLCMC/LPA
Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 16 of 59
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
TDP TM OTHER ADMN
A012
2. TITLE OF DATA ITEM
Technical Report-Study Services
3. SUBTITLE
PSIP Master Plan
DI-MISC-80508B/T
SOW 3.1.1.2
6. REQUIRING OFFICE
AFLCMC/LPA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
Block 4: DI-MISC-80508B tailored as follows:
a) Contractor format is acceptable.
Block 10, 12, & 13:
a) Initial submittal as draft 60 days after contract award.
b) Updates quarterly throughout the integration effort.
c) Final submission 60 days after completion of Flight Test.
Instructions for detailed requirements
Sandra Chaffolds, AFLCMC/LPA
Configuration Data Manager
Specialist
H. DATE
2021/01/15
I. APPROVED BY
John Houck, AFLCMC/LPA
Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 17 of 59
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A013
2. TITLE OF DATA ITEM
Contractor Work Breakdown Structure (CWBS)
3. SUBTITLE
N/A
DI-MGMT-81334D/T
SOW 3.2.3
6. REQUIRING OFFICE
AFLCMC/LPA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: The Contractor shall prepare the CWBS in accordance with DI-
MGMT-81334D and the OSD Deputy Director, Cost Assessment (DDCA) -approved contract Cost and Software Data Reporting (CSDR) Plan. This
DID is tailored as follows: Contractor format is acceptable.
BLOCK 8: Approval applies to submissions as described below.
BLOCKS 12 & 13: Cost and Software Data Reporting Plan shall be delivered no later than 30 days after contract award. After
Government approval, Contractor shall submit subsequent revisions to address Contractor/Government proposed changes.
BLOCK 14: The Contractor shall submit CDRL deliveries using Procuring
The contractor shall be responsible for flowing down CSDR requirements contained in the contract to…