About this file

This is a table of contents document from Section II of WSSC Standard Details, prepared by the Washington Suburban Sanitary Commission (WSSC Water) in Maryland in September 2021. The document serves as a reference guide for miscellaneous construction and infrastructure details applicable to water and wastewater projects throughout Prince George's and Montgomery Counties. The standard details cover forty-one distinct specifications ranging from trench erosion checks and pipeline anchoring systems to tunnel boring and jacking operations, safety features including guardrails and handrails, and specialized components such as fuel tank monitoring pipes and aluminum platform grating for vaults. These details apply to the WSSC Water's Indefinite Delivery/Indefinite Quantity (IDIQ) and requirements contract for urgent repairs, rehabilitation, and replacement of water and wastewater assets with nominal diameters up to thirty inches, for which sealed responses were solicited with a submission deadline of 2:00 pm on Monday, September 21, 2026.

The document itself does not address pricing terms, set-asides, funding sources, or contract award information. Rather, it functions as a technical specification document that contractors responding to WSSC Water solicitations must reference and comply with when performing repair, rehabilitation, replacement, and relocation work on water and sewer mains, valves, valve vaults, house connections, meter housings, manholes, fire hydrants, curb boxes, cleanouts, and lamp holes. WSSC Water intended to make multiple awards under the solicitation to ensure sufficient contractor capacity, pricing competition, and timely responsiveness for both planned and emergency work, with task orders to be issued on an as-needed basis.

View the file

Other files

File Type Posted
Urgent_Repairs,_Rehabilitation,_and_or_Replacement_of_Water_and_Wastewater_Assets_(Addendum_#7_Revision).pdf PDF
Prince_George's_County_Wage_Determinatio.pdf PDF
Montgomery_County_Wage_Determination_8.25.26.pdf PDF
Exhibit_A_-_Company_Experience_Statement.pdf PDF
Section_VI_-_Corrosion_Details.pdf PDF
Section_VIII_-_Sediment_Control_Details.pdf PDF
WSSC_Construction_IDIQ_Terms_and_Conditions.pdf PDF
OSHA_Recordkeeping_Forms_(PDF_Fillable).pdf PDF
Section_IV_-_Water_Details.pdf PDF
Section_III_-_Sewer_Details.pdf PDF
SCENARIO_2_Watermain_Replacement_Pkg_R.pdf PDF
SCENARIO_1_Valve_Replacement_Pkg_R.pdf PDF
SCENARIO_3_Sewer_Replacement_and_SHC_Pkg_R.pdf PDF
Section_I_-_General_Notes_0.pdf PDF
03300_Cast-in-Place_Concrete_2026.pdf PDF
02958_Pipe_Bursting_2026.pdf PDF
13110_Cathodic_Protection_2026.pdf PDF
04200_Masonry_2026.pdf PDF
02510_Water_Distribution_System_2026.pdf PDF
05500_Metal_Fabrications_2026.pdf PDF
Section_VII_-_Pressure_Sewer.pdf PDF
03400_Precast_Concrete_Underground_Structures_2026.pdf PDF
Section_IX_-_Procurment_and_Manufacturing_Details_(1).pdf PDF
02315_Earthwork_for_Pipeline_Construction_2026.pdf PDF
02955_Sewer_Mains_Lateral_Rehabilitation_by_Lining_2026.pdf PDF
13112_Impressed_Current_Cathodic_Protection_for_Water_Sewer_Pipelines_2026.pdf PDF
02957_Sewer_Manhole_Rehabilitation_2026.pdf PDF
02530_Sanitary_Sewage_System_2026.pdf PDF
02960_Temporary_Bypass_Pumping_System_2026.pdf PDF
02920_Lawns-Grasses_2026.pdf PDF
02370_Slope-Watercourse_Protection_2026.pdf PDF
02441_Microtunneling_2026.pdf PDF
Sol_Urgent_Repairs_Exmaple_Invoice.xlsx XLSX spreadsheet
01330_Submittal_Procedures_2026.pdf PDF
02820_Fences-Gates_2026.pdf PDF
02930_Exterior_Plants_2026.pdf PDF
02950_Paving_Requirements_2026.pdf PDF
02533_Pressure_Sewer_System_2026.pdf PDF
02956_CCTV_Inspection_of_Sewer_Mains,_Manholes_and_Laterals_2026.pdf PDF
02959_Sewer_Main_and_Lateral_Connection_Sealing_2026.pdf PDF
02230_Site_Clearing_2026.pdf PDF
02512_Cleaning-Lining_Water_Mains_2026.pdf PDF
ESC_Minor_Utility_Permit,_Health_and_Safety_Qualification_Questionaire,_and_Example_Health_and_Safety_Plan_outline.pdf PDF
02510_Water_Distribution_System_Contractor_Furnishes_All_Materials_2026.pdf PDF
02511_Chlorination_and_Dechlorination_2026.pdf PDF
02446_Horiz_Directional_Drilling_2026.pdf PDF
01500_Temp_Facilities_Controls_2026.pdf PDF
02445_Boring-Jacking_2026.pdf PDF
01110_Summary_of_Work_2026.pdf PDF
00600_TOC_Specs_2026.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION II

MISCELLANEOUS

DETAILS

SEPTEMBER 2021

Page M-1

Table of Contents WSSC STANDARD DETAILS

SECTION II - MISCELLANEOUS DETAILS

TABLE OF CONTENTS

TITLE NUMBER

Trench Erosion Check M/3.0

Concrete Anchor for 24-inch and Smaller Pipelines M/4.0

Repair for Concrete and Composite Pavement in Areas Without Jurisdictional Requirements M/5.0

Repair for Concrete and Bituminous Asphalt Driveways M/5.1

Repair for Hot Mix Asphalt (HMA) Pavements in Areas Without Jurisdictional Requirements M/5.2

General Guidelines for Repairing Concrete/Composite Pavement in Areas With Jurisdictional Requirements M/5.3

Caution Sign for Steel Plates M/6.0

Earth Tunnel Subsurface Settlement Indicator M/7.0

Settlement Plate Detail for Fill M/7.1

Slope Movement Indicator Inclinometer M/7.2

Trench Detail - Rigid Pipe Gravity RCP Sewers M/8.0

Trench Detail - Flexible Pipe (Ductile Iron 24-inch and Smaller and PVC AWWA C900/905) M/8.1a

Trench Detail - Flexible Pipe (Ductile Iron 30-inch and Larger) and Open-Cut Casing Pipes M/8.1b

Trench Detail - Flexible Pipe Gravity PVC Sewer SDR 35) M/8.1c

Existing WSSC Pipeline Crossing Trench Details M/8.3

Concrete Encasement and Cradle Details for Sewer Mains M/9.0

Contractor's Construction Stake-Out Record M/10.0

SEPTEMBER 2021

Page M-2

Table of Contents WSSC STANDARD DETAILS

Access Road Gate M/11.0

Marker Stakes for Manholes, Valve Boxes and Vents M/12.0

Drywell Access Grab Bar (for Package Pumping Station) M/13.0

Drywell Access Step (for Package Pumping Station) M/14.0

Aluminum Grab Bar M/15.0

Aluminum Ladder M/16.0

Ladder Extension M/16.1

Tunnel/Bore and Jack Details for Sewers M/17.0

Tunnel/Bore and Jack Details for Water Mains, Force Mains and Pressure Sewers M/17.1

Hold Down Assembly for Bore and Jack Steel Casing Pipes M/17.2

Hold Down Assembly for Steel Casing Pipe M/17.3

Hold Down Assembly for RCP Casing Pipe M/17.4

Tunnel Access Manhole M/17.5

Casing and Casing Spacer Details M/17.6

Spacer Spacing and Pipe Layout at Ends of Tunnel M/17.7

Minimum Clearance of Water Parallel to Sewer M/18.0

Chain Link Fence Details M/19.0

Monitoring Pipe of Fuel Tank M/20.0

Guardrail (All Areas) M/21.0

Handrail on Stairs M/21.1

Stair Rail M/21.2

Stair Rail M/21.3

Aluminum Platform Grating for Vaults M/22.0

Aluminum Platform Grating for Vaults M/22.1

1 - M 3.0
2 - M 4.0
3 - M 5.0
4 - M 5.1
5 - M 5.2
6 - M 5.3
7 - M 6.0
8 - M 7.0
9 - M 7.1
10 - M 7.2
11 - M 8.0
12 - M 8.1a
13 - M 8.1b
14 - M 8.1c
15 - M 8.3
16 - M 9.0
17 - M 10.0
18 - M 11.0
19 - M 12.0
20 - M 13.0
21 - M 14.0
22 - M 15.0
23 - M 16.0
24 - M 16.1
25 - M 17.0
26 - M 17.1
27 - M 17.2
28 - M 17.3
29 - M 17.4
30 - M 17.5
31 - M 17.6
32 - M 17.7
33 - M 18.0
34 - M 19.0
35 - M 20.0
36 - M 21.0
37 - M 21.1
38 - M 21.2
39 - M 21.3
40 - M 22.0
41 - M 22.1