04200_Masonry_2026.pdf

PDF 101 KB Posted

Attached to
Urgent Repairs, Rehabilitation, and/or Replacement of Water and Wastewater Assets
Solicitation number
115581
Issued by
Prince George's County, Maryland

About this file

This is a 2026 Standard Specification Section 04200 for Masonry work prepared by the Washington Suburban Sanitary Commission (WSSC Water) in Maryland, detailing the requirements for masonry construction above and below grade. The specification establishes comprehensive requirements for sewer and manhole brick, concrete blocks, mortar, and grout materials, along with submittals including sample approval of at least four bricks and four blocks of each type before purchase and delivery. Key material specifications include sewer brick Grade SM per ASTM C32, manhole brick Grade MS, concrete blocks per ASTM C139, mortar types (Type M for below-grade work and Type S for above-grade work), and grout with minimum compressive strength of 2000 psi at 28 days. The specification restricts masonry placement when air temperatures fall below 40 degrees Fahrenheit and requires protective measures, including maintaining temperatures above 40 degrees Fahrenheit for 72 hours after placement and protecting work from direct sun and drying conditions during hot weather when ambient temperatures exceed 95 degrees Fahrenheit.

The specification establishes detailed execution requirements including preparation, mortar mixing procedures (minimum five minutes in a mechanical drum mixer with a maximum 45-minute usable period), and placement standards requiring uniform joint thickness of 3/8 to 1/2 inch with proper breaking of joints between courses. Approved manufacturers for sewer and manhole brick include General Shale Products Corp. and Glen-Gery Brick, with "or Equal" alternatives permitted subject to engineer approval. All materials must be accompanied by Certificates of Compliance, and delivery, handling, and storage requirements specify that materials be protected from moisture, foreign materials, and damage. The specification notes that measurement and payment for masonry work will not be made under this section, as masonry is considered essential material required in the construction of specific items measured and paid under various other line items or lump sum categories in the bid schedule.

View the file

Other files

File Type Posted
Urgent_Repairs,_Rehabilitation,_and_or_Replacement_of_Water_and_Wastewater_Assets_(Addendum_#7_Revision).pdf PDF
Prince_George's_County_Wage_Determinatio.pdf PDF
Montgomery_County_Wage_Determination_8.25.26.pdf PDF
Exhibit_A_-_Company_Experience_Statement.pdf PDF
Section_VI_-_Corrosion_Details.pdf PDF
Section_VIII_-_Sediment_Control_Details.pdf PDF
WSSC_Construction_IDIQ_Terms_and_Conditions.pdf PDF
OSHA_Recordkeeping_Forms_(PDF_Fillable).pdf PDF
Section_IV_-_Water_Details.pdf PDF
Section_III_-_Sewer_Details.pdf PDF
Section_II_-_Miscellaneous_Details.pdf PDF
SCENARIO_2_Watermain_Replacement_Pkg_R.pdf PDF
SCENARIO_1_Valve_Replacement_Pkg_R.pdf PDF
SCENARIO_3_Sewer_Replacement_and_SHC_Pkg_R.pdf PDF
Section_I_-_General_Notes_0.pdf PDF
03300_Cast-in-Place_Concrete_2026.pdf PDF
02958_Pipe_Bursting_2026.pdf PDF
13110_Cathodic_Protection_2026.pdf PDF
02510_Water_Distribution_System_2026.pdf PDF
05500_Metal_Fabrications_2026.pdf PDF
Section_VII_-_Pressure_Sewer.pdf PDF
03400_Precast_Concrete_Underground_Structures_2026.pdf PDF
Section_IX_-_Procurment_and_Manufacturing_Details_(1).pdf PDF
02315_Earthwork_for_Pipeline_Construction_2026.pdf PDF
02955_Sewer_Mains_Lateral_Rehabilitation_by_Lining_2026.pdf PDF
13112_Impressed_Current_Cathodic_Protection_for_Water_Sewer_Pipelines_2026.pdf PDF
02957_Sewer_Manhole_Rehabilitation_2026.pdf PDF
02530_Sanitary_Sewage_System_2026.pdf PDF
02960_Temporary_Bypass_Pumping_System_2026.pdf PDF
02920_Lawns-Grasses_2026.pdf PDF
02370_Slope-Watercourse_Protection_2026.pdf PDF
02441_Microtunneling_2026.pdf PDF
Sol_Urgent_Repairs_Exmaple_Invoice.xlsx XLSX spreadsheet
01330_Submittal_Procedures_2026.pdf PDF
02820_Fences-Gates_2026.pdf PDF
02930_Exterior_Plants_2026.pdf PDF
02950_Paving_Requirements_2026.pdf PDF
02533_Pressure_Sewer_System_2026.pdf PDF
02956_CCTV_Inspection_of_Sewer_Mains,_Manholes_and_Laterals_2026.pdf PDF
02959_Sewer_Main_and_Lateral_Connection_Sealing_2026.pdf PDF
02230_Site_Clearing_2026.pdf PDF
02512_Cleaning-Lining_Water_Mains_2026.pdf PDF
ESC_Minor_Utility_Permit,_Health_and_Safety_Qualification_Questionaire,_and_Example_Health_and_Safety_Plan_outline.pdf PDF
02510_Water_Distribution_System_Contractor_Furnishes_All_Materials_2026.pdf PDF
02511_Chlorination_and_Dechlorination_2026.pdf PDF
02446_Horiz_Directional_Drilling_2026.pdf PDF
01500_Temp_Facilities_Controls_2026.pdf PDF
02445_Boring-Jacking_2026.pdf PDF
01110_Summary_of_Work_2026.pdf PDF
00600_TOC_Specs_2026.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

04200-1 2026

STANDARD SPECIFICATION

SECTION 04200

MASONRY

PART 1 GENERAL

1.1 DESCRIPTION

A. Section includes requirements for providing masonry work above and below grade.

1.2 QUALITY ASSURANCE

A. Engineered Masonry: ACI 530.1/ASCE 6.

1.3 SUBMITTALS

A. Submit following Section 01330.

1. Sewer and Manhole Brick Samples.

a. Submit at least 4 bricks before purchase and delivery of each type required.

1) Do not purchase brick until Engineer has approved samples.

2. Concrete Block Samples.

a. Submit at least 4 blocks of each type required before purchase and delivery.

1) Do not purchase blocks until Engineer has approved samples

B. Submit following Section 01450 before delivery to site.

1. Certificates of Compliance:

a. Bricks.

b. Concrete blocks.

c. Prepackaged mortar mix.

d. Portland cement.

e. Masonry cement.

1.4 DELIVERY, HANDLING, AND STORAGE

A. Deliver cement, lime, and other cementitious materials to site and store in unbroken bags, barrels, or other approved containers, plainly marked and labeled with manufacturers' names and brands.

B. Handle masonry units to avoid chipping and breakage, and store off ground on wood blocks, pallets, or other means.

C. Store mortar materials in dry, weather tight sheds or enclosures, to prevent inclusion of foreign materials and damage by water or dampness.

04200-2 2026

1.5 PROJECT CONDITIONS

A. Masonry Placement:

1. Do not place masonry when air temperature falls below 40 degrees F. or when temperatures below 40 degrees F. are likely within 72 hours after mortar is placed, unless Engineer approves adequate means for protecting work from freezing.

2. Heat and maintain temperature of masonry materials at not less than 40 degrees F.

but not more than 160 degrees F. and maintain air temperature above 40 degrees F.

on both sides of masonry for not less than 72 hours.

a. Do not work with or on frozen materials.

3. Protect new work against freezing weather for period of 72 hours after masonry is placed.

B. During hot weather, protect masonry from direct rays of sun.

1. Cover or wet all finished work for period of 3 days after placing.

2. When ambient air temperature is warmer than 95 degrees F. or when it appears probable that temperatures above 95 degrees F. will be encountered, protect work from sun and prevent drying out for not less than 72 hours after masonry is placed.

PART 2 PRODUCTS

2.1 MATERIALS

A. Brick.

1. Match approved brick samples.

2. Sewer and Manhole Brick: ASTM C32.

3. Bricks Used for Channel Lining: Sewer brick Grade SM.

4. All Other Brick Used in Water, and Sewer, Structures and Manholes: Manhole brick, Grade MS.

5. Approved Manufacturers and Type of Sewer and Manhole Bricks:

a. General Shale Products Corp., modular size sewer and manhole brick.

b. Glen-Gery Brick, 213 Y solid standard modular, Harvard modular, AA Matt and

Prince William Red Solid.

c. Or Equal.

B. Concrete Block.

1. Masonry Units for Manholes and Structures: ASTM C139.

2. Admixtures: Not allowed without Engineer’s approval.

C. Mortar.

1. Mortar Proportions for Placing Concrete Block, Bricks, and Unit Masonry Structures:

a. ASTM C270 and ASTM C91 for foundation walls, and work below grade, Type

M.

04200-3 2026

b. For all other masonry work, Type S.

2. Mortar for Parging Masonry Walls below Grade: Composed of 1 part Portland cement, 1/4 part hydrated lime, and 3 parts sand.

3. Sewer and Water Main Construction: Unless otherwise shown on Drawings, 1 part

Type II cement and 3 parts masonry sand meeting ASTM C144.

4. Prepackaged Mortar Mix: Meet requirements of mortar depending on use specified above.

5. Cement for Mortar: ASTM C150.

D. Grout: ASTM C476 with minimum compressive strength of 2000 psi at 28 days, tested following ASTM C1019.

E. Water for Mixing Mortar and Grout: See Section 03300.

PART 3 EXECUTION

3.1 PREPARATION

A. General.

1. Clean dirt, debris, oil, grease and other foreign substances which would affect bond of mortar, from surfaces to receive masonry.

2. Ascertain location of chases and openings for pipes.

3.2 MORTAR

A. Measuring Materials for Mortar: Method that will control and maintain specified proportions during entire progress of Work.

B. Mixing Mortar.

1. Mix mortar in mechanically operated batch mixer of drum type.

2. Hand mixing will be permitted if quantities of materials and water are accurately measured and if Engineer approves method of mixing.

3. Mix cement, lime, and sand, add water and mix for at least 5 minutes.

4. Do not use mortar that has obtained its initial set or has been mixed for longer than

45 minutes.

5. Do not add water to mortar that has started to stiffen.

C. Grout.

1. Add water in sufficient quantity to produce fluid mixture.

2. Place fine grout in spaces less than 2 inches in any horizontal dimension and where clearance between reinforcing and masonry is less than 3/4 inch.

3. Place coarse grout in spaces 2 inches or greater in any horizontal dimension and where clearance between reinforcing and masonry is not less than 3/4 inch.

04200-4 2026

3.3 PLACING

A. Workmanship.

1. Place masonry plumb, true to line, with level and accurately spaced courses, and each course breaking joint with course below.

a. Make joints uniform in thickness with average thickness of any 3 consecutive joints 3/8 to 1/2 inch.

2. Remove mortar splashed or smeared on finished surfaces with stiff bristle brushes as work progresses.

B. Parging: Follow Standard Details.

C. Brick: Drenched with water just before laying.

1. Joints: Filled between bricks completely with mortar.

a. Form bed joints with thick layer of mortar, smoothed.

b. Buttering at corners of brick and then throwing mortar or scrapings into empty joints will not be permitted.

2. Brick Placement.

a. Place brickwork in common bond.

b. Place brick carefully without disturbing brick previously placed.

c. Dry or butt joints will not be permitted.

d. Grout where indicated.

3.4 PROTECTION OF WORK

A. Cover completed work each day to prevent rain or melting snow from penetrating mortar.

PART 4 MEASUREMENT AND PAYMENT

4.1 Measurement of masonry work for payment will not be made under this Section and is considered essential material required in construction of specific items of work that will be measured and paid for under various items or lump sum listed in Bid Schedule.

**WSSC**

1.1 DESCRIPTION
1.2 QUALITY ASSURANCE
1.3 SUBMITTALS
1.4 DELIVERY, HANDLING, AND STORAGE
1.5 PROJECT CONDITIONS
2.1 MATERIALS
3.1 PREPARATION
3.2 MORTAR
3.3 PLACING
3.4 PROTECTION OF WORK
4.1 Measurement of masonry work for payment will not be made under this Section and is considered essential material required in construction of specific items of work that will be measured and paid for under various items or lump sum listed in Bid ...