Summary
This is a Scope of Work document prepared by Black and Veatch Corporation for the Washington Suburban Sanitary Commission (WSSC Water) in Montgomery County, Maryland, detailing the replacement of a 14-inch division valve and associated water main infrastructure at 1500 University Boulevard West in Silver Spring. The project involves excavation, removal, and replacement of the 14-inch division valve (VV14D02117), five feet of eight-inch water main pipe (WS00087675), five feet of twelve-inch water main pipe (WS00087795), and twenty-one feet of fourteen-inch water main pipes (WS00087673/WS00087672). The contractor must provide traffic control, temporary water bypass service for affected customers, post "No Parking" signs two business days prior to work, call Miss Utility at least four business days in advance, perform compaction testing on fill material, conduct hydrostatic and bacteriological testing at 200 PSI for two hours prior to connection, and restore all removed sidewalk, curb, and gutter according to WSSC Water Standard Specifications. The project is subject to sediment control requirements, tree protection measures, and environmental compliance with Maryland regulations, including disinfection per AWWA Standard C651 and compliance with lead reduction standards. All replacement water mains must be Ductile Iron Pipe with zinc coating and V-BIO enhanced polyethylene encasement.
The scope requires the contractor to obtain all necessary permits and approvals at no additional cost to WSSC Water, including staging area coordination, and to maintain a minimum of 42 inches cover for replacement water mains and 48 inches for relocated mains unless otherwise noted. WSSC Water will be responsible for the 2-inch mill and overlay work following completion and acceptance of underground utility work. The project includes a suggested construction sequence specifying closure of twenty specific valves necessary for shutdown and depressurization of the main, with all valve closures requiring submission to the WSSC Water Construction Manager for verification and approval. An MDOT State Highway Administration utility permit (SHA-3-MO-0234-22) has been issued with an expiration date of March 3, 2023, and requires Traffic Control Permit approval from SHA District 3 at least 48 hours prior to closure, with notification to MDOT SHA 48 hours before commencement of activities. The project is part of a broader IDIQ requirements contract for urgent repairs, rehabilitation, and replacement of water and wastewater assets up to 30 inches nominal diameter throughout Prince George's and Montgomery Counties, with responses due by 2:00 p.m. on Monday, September 21, 2026.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCENARIO 1
1500 UNIVERSITY BOULEVARD WEST
SCOPE OF WORK
I. GENERAL
A. This Scope of Work (SOW) outlines the necessary work effort pertaining to the 14”
Division Valve replacement associated with the 20” Cast Iron pipe located at the intersection of University Boulevard and Inwood Avenue.
B. The Contractor must ensure full conformance with requirements and amendments of this Contract.
C. The design drawings and permit letters are attached.
II. DESCRIPTION OF WORK
A. ITEM 1 - VALVE EXCAVATION AND REPLACEMENT
The location of the valve planned for excavation will be marked above ground by the
WSSC Utility Services.
1. The Contractor must excavate, remove, and replace fourteen-inch (14”) division valve.
2. The Contractor must excavate, remove, and replace five feet (5’) of eight-inch
(8”) watermain pipe ID WS00087675 and appurtenances.
3. The Contractor must excavate, remove, and replace five feet (5’) of twelve-inch
(12”) water main pipe IDWS00087795 and appurtenances.
4. The Contractor must excavate, remove, and replace twenty-one feet (21’) of fourteen-inch watermain pipe IDs WS00087673/WS00087672 and appurtenances.
5. The Contractor must excavate to expose the full depth of the entire valve and expose an additional two feet ± (2’) on each side. In addition, impacted sidewalk shall be removed joint to joint.
6. The Contractor must call in Miss Utility Ticket minimum four (4) business days in advance excluding ticket creation days of Work in vicinity of existing utility structures and appurtenances.
7. The Contractor must identify and verify by test pit or other means to locate the actual locations of existing utility structures and appurtenances before construction in their vicinity.
8. The Contractor must provide traffic control.
9. The Contractor must provide temporary water bypass service.
10. The Contractor must post “No Parking” signs two (2) business days prior to performing any Work. These signs must be weather resistant poster board sign
11 inches x 17 inches, 6 ply, poly coated 2 sides. WSSC will provide these signs.
11. The Contractor must replace all removed sidewalk, curb and gutter according to
WSSC Water Standard Specifications.
12. WSSC will isolate and recharge pipe, open valves, disinfect, and return the main to service following the rehabilitation effort.
13. The Contractor must support and protect utility structures and appurtenances that known, but not shown on drawings, which occupy same space as facility to be constructed at no additional cost to WSSC.
14. The Contractor must obtain all necessary approval(s) and/or permit(s) for any staging area. The Contractor must provide all necessary staging area(s) at no additional cost to WSSC.
ENGINEER:
MONTGOMERY CO.
ADEQUATE SURVEY
NO
200'S OF
CONTRACT
DATE STARTED
DATE FINALED
Drawing No.
FINALED BY
DATE COMPLETED
TYPE MANHOLES
TYPE PIPE W.
TC-1 - TC-2
1. thru
Temporary Traffic Control Details Plans/Profiles/Details
Description
P.G.CO.DPIE
SED. CONTROL
CONTRACT MANAGER
INSPECTOR
CONTRACTOR
L & G
AS BUILT DATA
TOWN NOTIFICATION
STATE HGWY. ADM.
STATE BD. HEALTH
PERMIT REQUIREMENTS
M.N.C.P.&P.C.
WETLANDS / WATERWAYS
TREE
DATE REVISIONS
PAGECo. GRID
VICINITY MAP
SCALE
ON PROP. R/W REQ'D
OFF PROP. R/W REQ'D
S.
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT
BE REDISTRIBUTED WITHOUT
PRIOR WSSC APPROVAL
NAME: BLACK VEATCH
ADDRESS: 18310 MONTGOMERY VILLAGE AVE., SUITE 750
PHONE: (301) 556-4400
CONTACT : ISMAIL HANIEH
FOR LOCATION OF UTILITIES CALL 8-1-1 OR 1-800-257-7777
OR LOG ON TO www.call811.com or www.missutility.net 48
HOURS IN ADVANCE OF ANY WORK IN THIS VICINITY
OTHER UTILITIES
*TO BE ACQUIRED BY APPLICANT
1"=2,000'
MONTGOMERY 5286 E05
DRAWING INDEX
NOT REQUIRED
NOT REQUIRED
NOT REQUIRED
IS REQUIRED
NOT REQUIRED
IS REQUIRED
IS REQUIRED
NOT REQUIRED
DRAWN
CHECK
XXX
XXX
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IN
G
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
M.D. D.O.E. - WMA NOT REQUIRED
5/19/2022 3:01 PM - PLOT DATE
PA
TH
P
:\P ro je ct s\
\1
0.
\C iv il\
D W
G \S ite
\G -0
Ite m
.d w g
BT7328D22
214NW02
WHEATON ELECTION DISTRICT NO. 13
14" VALVE (VV14D02117) REPLACEMENT
1500 UNIVERSITY BOULEVARD WEST
SILVER SPRING, MONTGOMERY COUNTY, MARYLAND
HHG: 530'/660'
LHG: 460'/600'
PRESSURE ZONE= 495A/660A
1500 UNIVERSITY BOULEVARD WEST
SILVER SPRING, MONTGOMERY COUNTY, MARYLAND
CONTRACT NO. BT7328D22
ITEM NO. 7
(VV14D02117)
M.D.E. CONST. NOT REQUIRED
14" VALVE (VV14D02117) REPLACEMENT
INDEX OF SHEETS
SHEET NO. DESCRIPTION
1 TITLE SHEET, GENERAL NOTES
2 BLOCKING NOTES, SEDIMENT
CONTROL NOTES, SPECIAL
CONSTRUCTION NOTES,
SEQUENCE OF CONSTRUCTION
3 SITE PLAN AND PROFILE
TC-1 - TC-2 TEMPORARY TRAFFIC
CONTROLS DETAILS
SC-1 SEDIMENT CONTROL DETAILS
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE
OF MARYLAND.
NAME: ISMAIL HANIEH
LICENSE NO.: 30167
EXP. DATE: 5/17/2024
S.C.1. Sediment Control Details
EXISTING WATER MAINS TO BE REPLACED/ RELOCATED
(SHEETS 3)
SHEET
NO. STREET EX. WATER
MAIN SIZE
NEW WATER
MAIN SIZE LENGTH RENEWAL
METHOD FROM TO PIPE ID
3 UNIVERSITY
BLVD WEST 8" 8" 5' REPLACEMENT - - WS00087675
3 UNIVERSITY
BLVD WEST 12" 12" 5' REPLACEMENT - - WS00087795
3 UNIVERSITY
BLVD WEST 14" 14" 21' REPLACEMENT - - WS00087673 /
WS00087672
TOTAL REPLACEMENT= 31'
TOTAL REPLACEMENT = 21' = 0.005 MILES
DATE
PIPELINE INFRASTRUCTURE
STRATEGIC PLANNING DIVISION
DATE DIVISION MANAGER
SECTION MANAGER
GENERAL NOTES
1. AT THE END OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL LANDSCAPING,
CHANNELS, SWALES, DITCHES, ETC. TO THE ORIGINAL CONDITION (PRIOR TO
CONSTRUCTION.
2. ALL WATER MAINS TO BE DUCTILE IRON PIPE, SIZE AS SHOWN ON PLANS WITH ZINC
COATING CLASS 54 MIN.
3. ALL DUCTILE IRON WATER MAINS AND FITTINGS TO BE V-BIO ENHANCED POLYETHYLENE
ENCASED IN ACCORDANCE WITH THE LATEST REVISION OF AWWA STANDARD C105,
METHOD A AND FIELD COAT UP TO 5 FEET ON EITHER SIDE OF CONNECTION, AS FIELD
EXPOSURE PERMITS AND OVERLAP POLYWRAP FROM NEW DUCTILE IRON PIPE.
4. ALL DUCTILE IRON FITTINGS TO BE FUSION BONDED EPOXY COATED.
5. LICENSED GEOTECHNICAL ENGINEER TO PERFORM COMPACTION TESTING FOLLOWING
ASTM D1556, ASTM D6938 OR ASTM D2937 AT A MINIMUM RATE OF 1 TEST FOR EVERY 100
FEET OF FILL ALONG MAIN TRENCH AND AT EVERY LATERAL TRENCH, STRUCTURE AND
VALVE BOX IN TYPE I AREAS.
6. CONTRACTOR SHALL TEST PIT EXISTING WATER MAIN CONNECTION LOCATIONS AND ALL
UTILITY CROSSINGS PRIOR TO BEGINNING CONSTRUCTION OF WATER MAIN, AND MAKE
ANY ADJUSTMENTS AS NECESSARY WITH PRIOR APPROVAL OF WSSC.
7. ALL PIPE WORK TO BE TESTED AT 200 PSI FOR 2 HOURS AND PASSING TEST FOR
HYDROSTATIC AND BACTERIAL PRIOR TO CONNECTION.
8. NEW 14" VALVE MUST BE TESTED ABOVE GROUND PRIOR TO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY THE TYPE, SIZE AND LOCATION OF EXISTING FITTINGS ON
THE WATER MAIN TO BE REPLACED.
10. CONTRACTOR SHALL NOTIFY MISS UTILITY AT LEAST 48 HOURS IN ADVANCE OF ANY
WORK IN THIS AREA, SO APPROPRIATE MARKING OF EXISTING UTILITIES CAN BE MADE.
CALL 811 OR 1-800-257-7777 OR LOG ON TO WWW.CALL811.COM OR
HTTP://WWW.MISSUTILITY.NET
11. 1"=10' SCALE DRAWINGS ARE BASED ON TOPOGRAPHIC SURVEY DATA COLLECTED BY
CV, INC. DURING OCTOBER 2021. HORIZONTAL DATUM = NAD 83/91 AND VERTICAL DATUM
= NGVD 29.
12. CONTRACTOR SHALL NOT STOCKPILE MATERIALS OR EQUIPMENT WITHIN THE DRIP-LINE
OF ANY TREES.
13. PROVIDE TREE TRUNK PROTECTION FOR ALL TREES WITHIN 15 FEET OF ANY WORK. SEE
STANDARD DETAIL SC/19.0, EXCEPT NOMINAL 2"X10" OR 2"X12"; PINE BOARDS MAY BE
USED.
14. CONTRACTOR SHALL LOCATE ALL WHC'S IN THE FIELD. THE CONTRACTOR, AT NO COST
TO WSSC, SHALL REPAIR ANY DAMAGE TO HOUSE CONNECTIONS AND WATER MAINS
THEY MAY CAUSE.
15. RELOCATED AND/OR REPLACED WHC'S SHALL BE PLACED IN LOCATIONS THAT MINIMIZE
IMPACT TO TREES. WHC'S TO BE RECONNECTED SHALL BE THE SAME SIZE AS THE
EXISTING WHC. CONTRACTOR SHALL LOCATE WATER METER BOXES AND CURB STOPS
AND ADJUST TO EXISTING GRADE.
16. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING STAGING AREA(S) AND FOR
MOBILIZATION TO AND FROM SUCH AREA(S) AT NO ADDITIONAL COST TO THE WSSC.
17. TO DETERMINE THE INVERT ELEVATION OF THE REPLACEMENT WATER MAINS FOR
HYDROSTATIC PRESSURE TESTING, USE THE AS-BUILT DRAWINGS.
18. CONTRACTOR SHALL PROVIDE STAKEOUT FOR THE PROPOSED RELOCATIONS.
19. PROVIDE TEMPORARY WATER SERVICE DURING CONSTRUCTION FOR WATER SERVICES
AFFECTED BY THE WATER MAIN REPLACEMENTS. TEMPORARY WATER SERVICE
CONNECTIONS SHALL BE AS PER STANDARD DETAILS W/5.16 AND W/5.16a. ALL
TEMPORARY SHUTDOWNS SHALL BE LIMITED TO NO LONGER THAN 8 HOURS. NO VALVES
ARE TO BE OPERATED WITHOUT A WSSC INSPECTOR ON SITE.
20. INSTALL REPLACEMENT WATER MAINS WITH A MINIMUM OF 42" COVER, AND RELOCATED
WATER MAINS WITH MINIMUM OF 48" COVER UNLESS OTHERWISE NOTED ON THE
DRAWING.
21. WSSC SHALL BE RESPONSIBLE FOR 2-INCH MILL AND OVERLAY. MILL AND OVERLAY
WORK WILL BE DONE BY WSSC PAVING CONTRACTOR AFTER COMPLETION AND
ACCEPTANCE OF UNDERGROUND UTILITY WORK.
22. ALL VALVE EXTENSIONS ARE TO BE INSTALLED PER STD. DETAIL W/2.2.
23. ANY YARD WITH ZOYSIA GRASS THAT IS DISTURBED MUST BE REPLACED WITH ZOYSIA
GRASS. FOLLOW RECOMMENDED TIME FOR PLANTING ZOYSIA GRASS.
24. IN ACCORDANCE WITH CODE OF MARYLAND REGULATIONS (COMAR) 26.04.01.33, DIRECT
AND INDIRECT ADDITIVES, SUPPLIERS OF WATER SHALL ONLY USE PRODUCTS (AND
MATERIALS THAT COME IN CONTACT WITH WATER INTENDED FOR USE IN PUBLIC WATER
SUPPLY) THAT MEET THE APPLICABLE AMERICAN NATIONAL STANDARDS INSTITUTE / NSF
INTERNATIONAL (ANSI/NSF) STANDARDS FOR DIRECT OR INDIRECT DRINKING WATER
ADDITIVES. THE PRODUCTS CAN ALSO BE CERTIFIED BY AN ORGANIZATION ACCREDITED
BY THE ANSI FOR SUCH TESTING (I.E., INTERNATIONAL ASSOCIATION OF PLUMBING AND
MECHANICAL OFFICIALS RESEARCH AND TESTING, ONTARIO CA, UNDERWRITERS
LABORATORY, NORTHBROOK IL, AND WATER QUALITY ASSOCIATION, LISLE IL).
25. IN COMPLIANCE WITH COMAR 09.20.01.03 AND THE SAFE DRINKING WATER ACT (SECTION
1417(A)(4)(8), MATERIALS THAT COME IN CONTACT WITH WATER INTENDED FOR USE IN
PUBLIC WATER SUPPLY SHALL COMPLY WITH THE REDUCTION OF LEAD IN DRINKING
WATER ACT, WHICH WENT INTO EFFECT IN MARYLAND IN JANUARY 2012.
26. SEE NOTIFICATION REQUIREMENTS IN THE EXISTING PCCP SHUTDOWN NOTES ON
SHEET 2. IN ADDITION, CONTRACTOR MUST CONTACT THE FOLLOWING
PERSONS/AGENCIES AT LEAST SEVEN (7) DAYS PRIOR TO START OF ANY WORK UNDER
THIS CONTRACT:
A. KEVIN LETHBRIDGE, CONSTRUCTION MANAGER, PIPELINE CONSTRUCTION
DIVISION OF WSSC, LYTTONSVILLE DEPOT AT (301) 206-7339.
B. SHA, SEE PERMIT FOR CONTACT INFORMATION
DESIGNED BY: _______________________________________ DATE: ________________________
FIELD REVIEW BY: ____________________________________ DATE: ________________________
SLIGO CREEK MINI DRAINAGE BASIN NO. 006-033
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE
OF MARYLAND.
NAME: WILLIAM C. ENGMAN
LICENSE NO.: 38630
EXP. DATE: 4/08/2024
17830 NEW HAMPSHIRE AVE., SUITE 200
ASHTON, MARYLAND 20861
(301) 260-0090
RESTORATION SCHEDULE
(SHEETS 3)
LOCATION GRADING
TYPE RESTORATION TYPE
ALL AREAS 1 PAVING
WSSC Erosion and Sediment Control Approval Note This plan has been approved per requirements in the:
Standard Procedures of the WSSC Regulations for Utility Erosion and Sediment Control, Section V, Paragraph A.
Reviewed by:_________________________________________
Date:__________________ Plan No.______________________BT7328D22Contract No.
SCENARIO 1
Jamey Campbell Highlight
Jamey Campbell Highlight
Jamey Campbell Highlight
Jamey Campbell Highlight
BLOCKING NOTES
1. RESTRAIN ALL PIPE JOINTS AND FITTINGS, SEE SPECIFICATIONS.
ENVIRONMENTAL SEDIMENT CONTROL NOTES
1. UTILITY CONTRACTOR TO CONTACT WSSC ENVIRONMENTAL PROGRAMS UNIT
AT (301) 206-8075 AND AT ALEXANDER.VITLIN@WSSCWATER.COM 48 HOURS
PRIOR TO STARTING ANY WORK UNDER THIS CONTRACT.
2. ANY GROUND OR SURFACE WATER THAT IS PUMPED DURING THIS PROJECT
SHALL BE DISCHARGED THROUGH A DEWATERING DEVICE APPROVED BY WSSC
PRIOR TO BEING DISCHARGED OFFSITE.
3. STREETS AND PAVED WALKWAYS SHALL BE KEPT IN BROOM SWEPT CONDITION
AT ALL TIMES.
4. INSTALL CURB INLET PROTECTION, AT-GRADE INLET PROTECTION AS NEEDED
OR AS DIRECTED BY WSSC ENVIRONMENTAL STAFF. SEE STANDARD DETAIL
SC/16.0.
5. CONTRACTOR SHALL PROVIDE TEMPORARY STABILIZATION FOR ALL
NON-PAVED DISTURBED AREAS BY THE CLOSE OF EACH WORK DAY.
6. ANY EXCAVATED OR STOCKPILE MATERIAL LEFT OVERNIGHT SHALL BE
COVERED WITH IMPERMEABLE MATERIAL. PROVIDE SEDIMENT CONTROL FOR
ALL OFFSITE STAGING/STOCKPILE AREAS.
7. WHEN WORKING IN PAVED SURFACES, PLACE EXCAVATED MATERIAL ON HIGH
SIDE OF TRENCH.
8. INSTALL SILT FENCE AS NEEDED ON LOW SIDE OF EXCAVATED TRENCH WHEN
WORKING IN NON-PAVED AREAS, OR AS SHOWN ON PLANS, OR AS DIRECTED BY
WSSC ENVIRONMENTAL STAFF IN FIELD. SEE WSSC STANDARD DETAIL SC/1.0.
9. SLURRY GENERATED BY PAVEMENT SAWING SHALL BE CONTAINED BY
CONTRACTOR; TO PREVENT SLURRY FROM ENTERING STORM DRAIN SYSTEM
OR WATERWAY; USING APPROVED METHODS, DEVICES OR AS DIRECTED BY
WSSC ENVIRONMENTAL STAFF. CONTRACTOR SHALL REMOVE AND DISPOSE OF
CONTAINED SLURRY PROPERLY AT THE END OF EACH WORK DAY.
10. CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF CONTAINED SLURRY
AT THE END OF EACH WORK DAY
11. CONTRACTOR SHALL PROVIDE ANY NECESSARY METHODS OR DEVICES TO
PREVENT SLURRY FROM ENTERING THE EXISTING STORM DRAIN SYSTEM OR
WATERWAY.
MDE NOTES
1. IN ACCORDANCE WITH TEN STATE STANDARDS, A MINIMUM OF TEN (10) FOOT
HORIZONTAL AND EIGHTEEN (18) INCH VERTICAL SEPARATION MUST BE
MAINTAINED BETWEEN WATER MAINS AND SANITARY SEWER. WHEN IT IS
IMPOSSIBLE TO OBTAIN THE MINIMAL HORIZONTAL 10 FOOT HORIZONTAL
SEPARATION AND/OR 18 INCH VERTICAL SEPARATION BETWEEN WATER MAINS
AND SANITARY SEWER, MDE MUST SPECIFICALLY APPROVE ANY VARIANCE
SUPPORTED BY DATA FROM THE DESIGN ENGINEER.
2. ALL WATER LINES SHALL BE DISINFECTED ACCORDING TO AWWA STANDARD
C651. BACTERIOLOGICAL TESTS SHALL BE PERFORMED PRIOR TO PLACING THE
MAIN INTO SERVICE.
TREE NOTES
1. CONTRACTOR SHALL NOT STOCKPILE MATERIAL OR EQUIPMENT UNDER THE
DRIPLINE OF ANY TREE.
2. PROVIDE TREE PROTECTION AS DIRECTED BY WSSC ENVIRONMENTAL
PROGRAMS SECTION (301)206-8074. SEE WSSC STD. DETAILS SC/18.0 AND
SC/19.0.
3. SEE CONDITIONS SECTION OF ROADSIDE TREE PERMIT FOR ROOT AND LIMB
PRUNING STANDARDS AND GUIDELINES.
4. 20" DIAMETER ELM IS VULNERABLE TO DUTCH ELM DISEASE - A FUNGAL
DISEASE SPREAD BY ELM BARK BEETLES. CONSTRUCTION SHOULD BE
CONDUCTED DURING WINTER MONTHS (NOVEMBER THRU MARCH) WHEN
BEETLES AND SPORES ARE DORMANT TO BEST AVOID TREE INFECTION
POTENTIAL.
5. PRIVATE WHITE PINE TO BE REMOVED IS ALSO TO HAVE STUMP GROUND.
PRIVATE LANDSCAPING REMOVED OR DAMAGED BY CONSTRUCTION TO BE
REIMBURSED TO OWNERS (GREENBLATT'S).
6. ALL LANDSCAPING AND DRAINAGE IMPROVEMENTS TO BE RESTORED IN KIND
OR REIMBURSED TO HOMEOWNERS (GREENBLATT'S).
SUGGESTED SEQUENCE OF CONSTRUCTION
A. REPLACE EXISTING 14” VALVE
1. SETUP REQUIRED MAINTENANCE OF TRAFFIC FOR CONSTRUCTION.
2. INSTALL TEMPORARY WATER SERVICE BYPASS PER THE BYPASS SCHEDULE
BELOW FOR ALL AFFECTED CUSTOMERS.
3. CLOSE VALVES VV14D02119, VV14D02120, VV14D02075, VV14D02076,
VV14D02115, VV14D02112, VV14D02113, VV14D02110, VV14D02065, VV14D02056,
VV14D02057, VV14D02058, VV14D02150, VV14D02154, VV14D02152, VV14D02151,
VV14D02123, VV14D02183, VV14D02126, NECESSARY TO SHUT DOWN AND
DEPRESSURIZE THE MAIN. ALL VALVE CLOSURES SHALL BE SUBMITTED TO
THE WSSC WATER'S CONSTRUCTION MANAGER FOR VERIFICATION AND
APPROVAL.
4. REMOVE AND SALVAGE EXISTING 14” VALVE (V118).
5. INSTALL NEW 14” DIP WITH NEW 14” VALVE AND CONNECT TO EXISTING TEES.
6. OPEN VALVES CLOSED IN STEP 3.
7. REMOVE TEMPORARY WATER SERVICE BYPASS.
8. BACKFILL SITE AND REPAIR SIDEWALK, CURB AND PAVEMENT
9. MILL AND OVERLAY PAVEMENT (BY OTHERS).
10. APPLY SEED AND STRAW TO DISTURBED GRASS AREAS.
BT7328D22
DATE REVISIONS
CONTRACT
DATE DIVISION MANAGER
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
HHG: 530'/670'
LHG: 460'/600'
PRESSURE ZONE = 495A/660A
5/23/2022 11:20 AM - PLOT DATE
PA
TH
P
:\P ro je ct s\
\1
0.
\C iv il\
D W
G \S ite
\G -0
Ite m
.d w g
DATE SECTION MANAGER
200'S 221NW09 SHEET
NO OF 5
WHEATON ELECTION DISTRICT NO. 13
NAME: BLACK AND VEATCH CORPORATION
ADDRESS: 18310 MONTGOMERY VILLAGE AVE, STE 750
GAITHERSBURG, MARYLAND, 20879
PHONE: (301) 556-4400
CONTACT : ISMAIL HANIEH
ENGINEER:THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT
BE REDISTRIBUTED WITHOUT
PRIOR WSSC APPROVAL
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
14" VALVE (VV14D02117) REPLACEMENT
1500 UNIVERSITY BOULEVARD WEST
SILVER SPRING, MONTGOMERY COUNTY, MARYLAND
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE
OF MARYLAND.
NAME: WILLIAM C. ENGMAN
LICENSE NO.: 38630
EXP. DATE: 4/08/2024
BYPASS SCHEDULE
10. APPLY SEED AND STRAW TO DISTURBED GRASS AREAS.
BYPASS SCHEDULESCENARIO 1
W
O O
D
AVEN
U E
UNIVERSITY BOULEVARD WEST
BT7328D22
DATE REVISIONS
CONTRACT
DATE DIVISION MANAGER
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
HHG: 530'/670'
LHG: 460'/600'
PRESSURE ZONE = 495A/660A
5/23/2022 11:22 AM - PLOT DATE
PA
TH
P
:\P ro je ct s\
\1
0.
\C iv il\
D W
G \S ite
\C -0
Ite m
.d w g
DATE SECTION MANAGER
200'S 221NW09 SHEET
NO OF 5
WHEATON ELECTION DISTRICT NO. 13
NAME: BLACK AND VEATCH CORPORATION
ADDRESS: 18310 MONTGOMERY VILLAGE AVE, STE 750
GAITHERSBURG, MARYLAND, 20879
PHONE: (301) 556-4400
CONTACT : ISMAIL HANIEH
ENGINEER:THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT
BE REDISTRIBUTED WITHOUT
PRIOR WSSC APPROVAL
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
14" VALVE (VV14D02117) REPLACEMENT
1500 UNIVERSITY BOULEVARD WEST
SILVER SPRING, MONTGOMERY COUNTY, MARYLAND
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE
OF MARYLAND.
NAME: WILLIAM C. ENGMAN
LICENSE NO.: 38630
EXP. DATE: 4/08/2024
SITE PLAN
PROFILE - 20" W VALVE REPLACEMENT
N
AD
N
G
VD
01020 5 10 15 20
SCALE 1"=10'
PAGECo. GRID
VICINITY MAP
SCALE 1"=2,000'
MONTGOMERY 5286 E05
ITEM NO. 7
(VV14D02117)
NEXT VALVES#V058 APPROX. 2000 LF(UNIVERSITY BLVD W)
NEXT VALVES
#V126 APPROX. 1730' LF
(UNIVERSITY BLVD W)
N
EXT VALVES
#V076 APPR
O
X. 1010 LF
(IN
W O
O D
AVEN
U
E)
N
EXT VALVES
#V151 APPR
O
X. 1230' LF
(IN
W
O O
D
AVEN
U E)
RESTRAIN ALL
JOINTS AND FITTINGS
PROPOSED WATER
EX. RIGHT-OF-WAY LINE
EXISTING WSSC EASEMENT
TEST PIT SOIL BORING
PAVEMENT CORE
EXISTING GAS
EXISTING ELECTRIC
EXISTING TELE COMMUNICATION
LIGHT POLE
PEPCO POLE
LIGHT POST
IRRIGATION HANDBOX
CONCRETE
REPLACEMENT
PAVEMENT
MILL & OVERLAY
EXISTING SEWER
EXISTING STORM DRAIN
EXISTING WATER
EXISTING FIBER OPTIC
LIMITS OF DISTURBANCE
NOTE:
SYSTEM CONTROL DIVISION SHOULD BE CONTACTED
BEFORE THE REPLACEMENT OF THIS VALVE
PAVEMENT
SAWCUT & REPLACE
BT7328D22
DATE REVISIONS
CONTRACT
DATE DIVISION MANAGER
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
HHG: 685'
LHG: 625'
PRESSURE ZONE = 660A
5/17/2022 9:34 PM - PLOT DATE
PA
TH
X
:\6
W
SS
C
P C
C P
En g.
S vc s.
B
O A
C on tra ct
(B la ck &V ea tc
h) \T as k
O rd er
5\ _C
AD
\V al ve
7\
TC
-1
Ite m
.d w g
DATE SECTION MANAGER
200'S 214NW02 SHEET
NO OF 5
NAME: BLACK AND VEATCH CORPORATION
ADDRESS: 18310 MONTGOMERY VILLAGE AVE, STE 750
GAITHERSBURG, MARYLAND, 20879
PHONE: (301) 556-4400
CONTACT : ISMAIL HANIEH
ENGINEER:THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT
BE REDISTRIBUTED WITHOUT
PRIOR WSSC APPROVAL
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
WHEATON ELECTION DISTRICT NO. 13
" VALVE (VV14D02117) REPLACEMENT
1500 UNIVERSITY BOULEVARD W
SILVER SPRING, MONTGOMERY COUNTY, MARYLAND
Est. 1978
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE
STATE OF MARYLAND.
LICENSE NO.:
EXPIRATION DATE:
N
AD
N
G
VD
03060 15 30 45 60
SCALE 1"=30'
TRAFFIC CONTROL PLAN
CHANNELIZING DEVICES
SIGN SUPPORT
EXISTING DIRECTION
OF TRAFFIC
WORK SITE
FACE OF SIGN
LEGEND
PROPOSED DIRECTION
OF TRAFFIC
TC-1
FLAGGER
REMOVE AND REPLACE
EXISTING SIDEWALK TO
NEAREST JOINT.
IN
W
O O
D
AVE
SPEED
LIM
IT 25 M
PH
UNIVERSITY BLVD WSPEED LIMIT 35 MPH
M
AY
HE
W
D R
SP
EE
D
LI
M
IT
M
PH
IN
W
O O
D
AV
E
SP
EE
D
LI
M
IT
M
PH
BU
FFER
120'
300'
300'
300'
ROAD
WORK
900 FT
ONE LANE
ROAD
600 FT
W20-148"x48"
W20-7a (1) 48"x48"
W20-448"x48"
ROAD WORK 900 FT
ONE LANE ROAD 600 FT
W
-1
"x
W
-7 a
(1
"x
W
-4
"x
BU
FF
ER
0'
0'
0'
O N
E LAN
E
R O
AD
600 FT
W20-7a (1)
48"x48"
W20-4
48"x48"
O N
E
LA
N E
R O
AD
FT
W
-7 a (
1)
"x
W
-4
"x
ROADWORKAHEAD
W 20-1
48"x48"
300'
300'
300'
300'
0'
BIKE PATH
BIKE PATH
BIKE PATH
BIKE PATH
BIKE PATH
BIKE PATH
BIKE PATH
BIKE PATH
SI
DE
W
AL
K
SI
DE
W
AL
K
SIDEWALK
SID
EW
ALK
SID
EW
ALK
SID
EW
ALK
SID
EW
ALK
SIDEWALK
SIDEWALK
CROSSWALK
C R
O
SSW
ALK
CROSSWALK
SIDEWALKSIDEWALK
SIDEWALK
SIDEWALK
SI
DE
W
AL
K
SIDEWALK
SI
DE
W
AL
K
0+06
REPLACE EX. 14" VALVE
WITH NEW 14" VALVE
UNIVERSITY BLVD W
SPEED LIMIT 35 MPH
G R
ASS
G R
ASS
TC-2
BT7328D22
DATE REVISIONS
CONTRACT
DATE DIVISION MANAGER
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
HHG: 685'
LHG: 625'
PRESSURE ZONE = 660A
5/17/2022 9:36 PM - PLOT DATE
PA
TH
X
:\6
W
SS
C
P C
C P
En g.
S vc s.
B
O A
C on tra ct
(B la ck &V ea tc
h) \T as k
O rd er
5\ _C
AD
\V al ve
7\
TC
-2
Ite m
.d w g
DATE SECTION MANAGER
200'S 214NW02 SHEET
NO OF 5
NAME: BLACK AND VEATCH CORPORATION
ADDRESS: 18310 MONTGOMERY VILLAGE AVE, STE 750
GAITHERSBURG, MARYLAND, 20879
PHONE: (301) 556-4400
CONTACT : ISMAIL HANIEH
ENGINEER:THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT
BE REDISTRIBUTED WITHOUT
PRIOR WSSC APPROVAL
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
WHEATON ELECTION DISTRICT NO. 13
" VALVE (VV14D02117) REPLACEMENT
1500 UNIVERSITY BOULEVARD W
SILVER SPRING, MONTGOMERY COUNTY, MARYLAND
Est. 1978
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE
STATE OF MARYLAND.
LICENSE NO.:
EXPIRATION DATE:
TRAFFIC CONTROL PLAN NOTES
1. All proposed lane closures shall occur between the hours of 9 AM and 3 PM, unless otherwise coordinated with the permitting agency.
2. Roadway must be fully restored at end of each workday.
3. A minimum of 10’ lanes must be maintained through the work zone.
4. Access to all driveways must be maintained.
5. If steel plates are used to temporarily restore the roadway, then steel plate warning signs shall be installed on all approaches.
6. During the period between November 15 of each year and March 15 of the following year, steel plates are not permitted except in emergency cases. When any steel plate is installed, the permittee shall notify DPWT’s dispatcher by phone, at (301) 324-2710 and the DPIE Inspector, within the first 4 hours of installation of said When installed, steel plates shall be appropriately identified by permittee for traffic and pedestrian safety. In addition, a minimum of four 4-foot tall wooden survey stakes (painted bright pink) placed behind the face of curb, or in rural areas, placed beyond road shoulder, shall be required to denote beginning and end of steel plates.
7. Any conflicting pavement markings shall be covered and temporary pavement markings installed as necessary.
8. Any removal of pavement markings must be done with mill and overlay. Grinding is not permitted.
9. Traffic control devices must be in compliance with the latest edition of the MUTCD and the MD SHA Book of Standards.
10. All warning signs not in use shall be fully covered with opaque material.
11. Traffic signs shall not be placed where they will impede the path of pedestrians or motorists.
12. All excavation which results in a pavement edge drop-off shall be in accordance with MD STD nos. MD 104.06-15 to MD 104.06-19. On County roads, concrete barrier is to be used when the drop-off is greater than 5 inches and the roadways where work is taking place is classified as a collector, major collector or arterial. Water filled or sand filled barrier is to be used when the drop-off is greater than 5 inches and the roadways where work is taking place is classified as an industrial, primary residential or secondary residential roadway. Only MDSHA approved water/sand filled barriers should be used.
Channelizing drums may be used when the drop-off is greater than 5 inches and the roadways where work is taking place are classified as primary residential or secondary residential roadways AND the work zone is controlled by a flagger.
13. This plan approval is only for County maintained roadways. The road work should be coordinated, reviewed and approved by any other jurisdiction impacted.
14. Any physical or operational impacts to a traffic signal must be addressed and coordinated with the County DPW&T Signal Shop.
15. If the road work impacts the operation of a traffic signal, the contractor may be required to provide additional detection devices to facilitate the maintenance of traffic operations. This shall be determined by the permitting agency and/or the County DPW&T Signal Shop.
16. Pedestrian facilities must be maintained or a clear, detectable, traversable, safe and handicap accessible alternative path must be provided.
17. Flaggers shall be Maryland State Highway Administration or ATSSA approved/certified flaggers.
Radio communication shall be required between flaggers if the flaggers cannot see each other or if the lane closure exceeds 200 feet.
18. During construction, the contractor shall provide advance notice to property owners with reference to impact to existing parking one week in advance prior to construction.
19. All parking shall be opened during non-working hours.
Contractors shall not store any material or equipment on roadways, parking or sidewalk during non-working hours.
THE MARYLAND DEPARTMENT OF TRANSPORTATION
STATE HIGHWAY ADMINISTRATION (MDOT SHA)
9300 Kenilworth Avenue Greenbelt, Maryland 20770
Utility Permit
Permit Number: SHA-3-MO-0234-22 U.C. Ref or Job ID#: W14D02117 Project Number:
Route No.: MD 193 Route Name (optional): UNIVERSITY
BLVD W - MD 193
to Limits : INWOOD AVE - CO 1270 INWOOD AVE - CO
, Mile Point : 2.420 2.420
Issue Date : 3/3/2022 Expiration Date : 3/3/2023
So far as the MDOT State Highway Administration has the right and power to grant same, permission is hereby given to:
Permittee : Attention :
Washington Suburban Sanitary Commission Clayton R. Stewart 14501 Sweitzer Lane Phone#: (301) 206-7352
Email: clayton.stewart@wsscwater.com Laurel, MD 20707
Description of Work:
This permit is to allow for signage for a detour plan at University Blvd and Inwood Ave. No work will be done in the state's right of way.
The following Special Conditions apply to this permit.
Roadway excavation is prohibited.
You must apply for a Traffic Control Permit for the above referenced road from the SHA, District 3 Utilities, at least two days (48 hours) prior to closure and it must be approved before starting work.
Weekend and Monday requests must be in by Thursday.
If existing sidewalk must be closed as part of the permit work, the permittee is responsible for posting a sidewalk closure notice at the work site at least two weeks in advance of the closure. The above notice must specify the expected period of time during which the sidewalk will be closed, and the contact information of the Permit Holder and/or Contractor and MDOT SHA. The posted notice must remain in place during the sidewalk closure period.
The permittee shall coordinate with the Utility Inspector and the Community Relations Manager to send out a notice to the Public and Elected Officials regarding this work. The notice must be sent out two
By: _________________________
ERICA RIGBY
District Engineer MDOT State Highway Administration weeks before work is scheduled to begin. The Community Relations Manager will provide final approval on the notice as well as email contact groups that the notice should be sent to.
Notifications:
a. Permittee must notify , the MDOT State Highway Administration CONSTANCE BEULAH District , at , 48 hours prior to commencement of any activities related to thisPermit Inspector (301) 513-7355 permit.
b. The permittee will designate the Traffic Manager for this permit and a 24 hour emergency number at the pre-construction meeting.
c. All work for this permit shall be in conformance with the above referenced documentation supplied by the utility company.
THIS PERMIT IS ISSUED WITH THE REQUIREMENT THAT IT WILL BE ENFORCED WITH THE
UTILITY PERMIT GENERAL PROVISIONS. A COPY OF THE UTILITY PERMIT GENERAL
PROVISIONS SHALL BE ATTACHED TO EACH AND EVERY INDIVIDUAL WORK ORDER
PERMIT ALONG WITH ANY SPECIAL PROVISIONS, ATTACHMENTS, PLANS, AND ADDENDA IN
ORDER TO CONSTITUTE A COMPLETE AUTHORIZED UTILITY PERMIT. THE COMPLETE
AUTHORIZED UTILITY PERMIT OR DISTRICT OFFICE PERMIT WHICH MUST BE FOUND ON
THE JOB SITE AT ALL TIMES.