This document is a Section E Supplemental Specifications file for road and street construction issued by Pinellas County, Florida, specifically for the Countywide Mast Arms – Group 3 project (P.I.D. No. 004183A, 004183D, 004183E, 004183F). The specifications supplement the Pinellas County Standard Technical Specifications for Roadway and Related Construction (April 2022 Edition) and the Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction (July 2021). The project involves improvements at three intersections: US 19 at Tarpon Avenue, Lake St George Drive at Tampa Road, and West Lake Road at Tampa Road, with work aimed at meeting ADA guidelines.

The document provides special provisions for survey and construction layout, requiring right-of-way staking every 100 feet and protection of property corners. It also outlines detailed requirements for clearing and grubbing, including contractor responsibilities for notifying property owners about item removal, managing irrigation systems, and handling conflicting items within the County Right-of-Way. The survey and construction layout work is to be paid as a single Lump Sum (LS) quantity, with all associated costs for capping, removing irrigation systems, and other item removals to be included in the Clearing and Grubbing payment item.

View the file

Other files

File Type Posted
Appendix_6-UWS_(004183F).pdf PDF
Appendix_4_-SPECIAL_NOTICES_-_Revised.pdf PDF
Appendix_6-UWS_(004183D).pdf PDF
Attachment_A_(FDEM_Agreement).pdf PDF
Appendix1-Permits-revs.pdf PDF
Appendix_6-UWS_(004183E).pdf PDF
Attachment_C.pdf PDF
ITB-signed_23-0131.pdf PDF
SECTION_F-Bid_Submittal_Sheet_(PROTECTED).xls XLS spreadsheet
Section_I-Agreement.pdf PDF
Appendix_6-Geotechnical_Report.pdf PDF
004183A_FINAL_PLANS-11-8-2022_SS.pdf PDF
Attachment_B.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION E SUPPLEMENTAL SPECIFICATIONS

ROAD AND STREET CONSTRUCTION

P.I.D. No. 004183A (004183D, 004183E, 004183F)

Countywide Mast Arms – Group 3

In Pinellas County, Florida

TO ACCOMPANY PINELLAS COUNTY STANDARD TECHNICAL SPECIFICATIONS FOR ROADWAY

AND RELATED CONSTRUCTION (APRIL 2022 EDITION), AND FLORIDA DEPARTMENT OF

TRANSPORTATION (FDOT) STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE

CONSTRUCTION – DIVISIONS II AND III ONLY (JULY 2021):

SPECIAL PROVISIONS

Section 005-0701 of the Pinellas County Roadway Std. Tech. Specs. Survey and Layout The specification for Survey, Construction Layout shall be amended to include:

• The right of way shall be staked out with a stake or marker every 100 feet on both sides of the road.

• All property corners and section corners shall be protected through the contract period by the contractor, if a property corner is damaged, they will be restored by a Florida registered Professional Land Surveyor at no additional cost to the County.

PAY ITEM NO. 005-0701, SURVEY, Construction Layout the work specified under this Section must be one Lump Sum (LS) quantity.

Section 110 of the Pinellas County Road Std Tech. Specs. Clearing and Grubbing The specification for Clearing and Grubbing shall be amended with the following:

B. Items in County Right-of-Way:

The Contractor must notify in writing all property owners to remove any items (landscaping, signs, lighting, etc.) from the County Right-of-Way that owners wish to salvage a minimum of fourteen (14) calendar days in advance of construction activities. After the notification period, it is the Contractor’s responsibility to remove said items that conflict with construction activities prior to construction. The contractor must place a temporary cap on the pipe that feeds into the irrigation system conflicting with construction activities within County Right of Way. The price and payment for capping and removal of irrigation systems, and removal of other items must be included in the payment item of Clearing and Grubbing.