Appendix_6-UWS_(004183D).pdf

PDF 913 KB Posted

Attached to
Countywide Mast Arms - Group 3
Solicitation number
23-0131-ITB CONSTRUCTION
Issued by
Pinellas County, Florida

About this file

The image is an Adobe PDF portfolio opening screen instructing users to open the document in Acrobat X or Adobe Reader X or later, with an Adobe PDF logo and a "Get Adobe Reader Now!" button. It appears to be a standard software compatibility prompt for viewing a PDF document.

View the file

Other files

File Type Posted
Appendix_6-UWS_(004183F).pdf PDF
Appendix_4_-SPECIAL_NOTICES_-_Revised.pdf PDF
Section_I-Agreement.pdf PDF
Attachment_A_(FDEM_Agreement).pdf PDF
Appendix1-Permits-revs.pdf PDF
Appendix_6-UWS_(004183E).pdf PDF
Attachment_C.pdf PDF
ITB-signed_23-0131.pdf PDF
SECTION_F-Bid_Submittal_Sheet_(PROTECTED).xls XLS spreadsheet
Appendix_6-Geotechnical_Report.pdf PDF
004183A_FINAL_PLANS-11-8-2022_SS.pdf PDF
Section_E-Specifications_(Group_3).pdf PDF
Attachment_B.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Page 2 of 3 PINELLAS COUNTY 10/15//2019

UTILITY WORK SCHEDULE

COUNTY PROJECT #: 004183D PROJECT TITLE #: US 19 / E TARPON AVE

UTILITY AGENCY/OWNER (UAO): Knology Broadband of Florida D.B.A. WOW! (Wide Open West)

B. Special Conditions / Constraints

1: WOW! field inspector Dave Hamlin will be field point of contact for WOW! during construction duration of the project.

2: WOW! Working Days are during normal business hours, Monday – Friday, 7:30 am – 5:00 pm (excluding Holidays). WOW! will arrange any works after hour with an advance notice through WOW! field representative Dave Hamlin. Please call 48 hours prior to schedule any after hours work if needed. After hours emergency contact please call Richard LaGanga @ 727-422-8040 UAO project representative.

3: WOW! is to have access throughout the duration of the project to monitor and maintain WOW! facilities for the ability to provide service.

4: WOW! does not anticipate any prior to or during construction work at this time.

5: Where WOW is attached as joint user to Duke Energy poles, and the duct it leases with Frontier both have provided zero-day work schedules at the time of review and do not appear to have any conflicts.

Page 3 of 3 PINELLAS COUNTY 10/15//2019

COUNTY PROJECT #: 004183D PROJECT TITLE #: US 19 / E TARPON AVE

UTILITY AGENCY/OWNER (UAO): Knology Broadband of Florida D.B.A. WOW! (Wide Open West)

SECTION C: UAO’s WORK ACTIVITIES

Action

Utility Facility (Type, Size, Material, Status)

From Station/ Offset

To

Utility Work Description Dependent Activity TCP Phase

Consecutive Days

Prior To During

Summary of Utility Work and Execution

NON-CONSTRUCTION ITEMS

Prior to Pinellas County Project Construction

During Pinellas County Project Construction

Special Conditions / Constraints

2022-08-19T07:34:47-0400

Scott Baird

Page 1 of 3 PINELLAS COUNTY 07/20//2022

COUNTY PROJECT #: 004183D

PROJECT TITLE: COUNTRYWIDE MAST ARM SIGNAL HARDENING AND

INTERSECTION IMPROVEMENT - Intersection of E Tarpon Ave at US 19

UTILITY AGENCY/OWNER (UAO): DUKE DISTRIBUTION

A. Summary of Utility Work and Execution

NON-CONSTRUCTION ITEMS

ESTIMATED *CALENDAR

DAYS

CONSTRUCTION ITEMS

Total Preliminary 0 Prior to Pinellas County Project Construction 0

Total Material Procurement 0 During Pinellas County Project Construction 0

Total Right-of-Way Permitting 0

Total NON-Construction Time 0 * Calendar Days = UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part “C” of this Schedule

This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Pinellas County, the roadway contractor and other right-of-way users, the location, relocation, adjustment, installation and/or protection of their facilities on this Pinellas County project.

The following data is based on Pinellas County final design phase construction plans dated 12/2021 . Any deviation by Pinellas County or its contractor from the plans, as provided, may require assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond their control and that could not be reasonably anticipated and avoided with the exercise of due diligence. The UAO agrees to notify Pinellas County in writing prior to starting, stopping, resuming or completing work.

UAO Project Representative: Bill Ruland Telephone Number: 727-820-4641

UAO Field Representative: Bill Ruland Telephone Number: 727-820-4641

No changes to forms document.

Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.

Authorized Utility Agent: Engineer of Record: Acceptance by Pinellas County:

(Signature) (Signature) (Signature)

William Ruland

(Printed Name) (Printed Name) (Printed Name)

Senior Engineering Technologist

(Title) (Title) (Title)

7/26/2022

(Date) (Date) (Date)

Benjamin Rodgers

Traffic Engineer

8/12/2022

Page 2 of 3 PINELLAS COUNTY 07/20//2022

• This is based on plans provided by the County dated 12/2021

• Any “Found Conflicts” during construction, or any modification to the plans provided by the County, will be addressed per the 2017 UAM section 5 and the 337.4 State Statute.

Page 3 of 3 PINELLAS COUNTY 07/20//2022

Material, Status)

Utility Work Description Dependent Activity

TCP

During

Overhead and underground

12.47kv distribution facilities along and across the right-of-way at various locations from begin to end project limits.

To remain in place and in service Duration of project construction N/A 0 0

2022-08-15T07:19:20-0400

Scott Baird

Page 1 of 3 PINELLAS COUNTY 07/20//2022

COUNTY PROJECT #: PROJECT TITLE: 004183D - Countywide Mast Arm Hardening U.S. 19 at Tarpon Avenue

UTILITY AGENCY/OWNER (UAO):

A. Summary of Utility Work and Execution

NON-CONSTRUCTION ITEMS

CONSTRUCTION ITEMS

Total Preliminary 0 Prior to Pinellas County Project Construction 0

Total Material Procurement 0 During Pinellas County Project Construction 0

Total Right-of-Way Permitting 0

Total NON-Construction Time 0 * Calendar Days = UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part “C” of this Schedule

This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Pinellas County, the roadway contractor and other right-of-way users, the location, relocation, adjustment, installation and/or protection of their facilities on this Pinellas County project.

The following data is based on Pinellas County final design phase construction plans dated . Any deviation by Pinellas County or its contractor from the plans, as provided, may require assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond their control and that could not be reasonably anticipated and avoided with the exercise of due diligence. The UAO agrees to notify Pinellas County in writing prior to starting, stopping, resuming or completing work.

UAO Project Representative: Kyle Perkins Telephone Number: 727-313-6167

UAO Field Representative: Seve Theodosis (Vince) Telephone Number: 727-9428326

No changes to forms document.

Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.

Authorized Utility Agent: Engineer of Record: Acceptance by Pinellas County:

(Signature) (Signature) (Signature)

Kyle Perkins

(Printed Name) (Printed Name) (Printed Name)

Engineer

(Title) (Title) (Title)

8-8-2022

(Date) (Date) (Date)

Frontier

004183D

Traffic Engineer

Benjamin Rodgers

8/12/2022

Page 2 of 3 PINELLAS COUNTY 07/20//2022

Page 3 of 3 PINELLAS COUNTY 07/20//2022

Material, Status)

Utility Work Description Dependent Activity

TCP

During

2022-08-15T07:19:52-0400