This is an Invitation to Bid (ITB) for construction services issued by Pinellas County, Florida, for the Countywide Mast Arms - Group 3 project. The project involves replacing existing signalization with mast arms at three intersections: US 19 at Tarpon Avenue, Lake St George Drive at Tampa Road, and West Lake Road at Tampa Road, with improvements to meet ADA guidelines. The total construction budget is $2,250,000, with bids processed through a two-step process. Step 1 submissions were due by December 6, 2022, and Step 2 submissions were due by December 22, 2022, with a public Microsoft Teams meeting scheduled for the same day. Bidders must be pre-qualified with the Florida Department of Transportation (FDOT) in the Traffic Signal work class or submit additional qualification documentation.
The solicitation requires a bid bond guarantee of 5% of the base bid and performance and payment bonds for 100% of the contract amount. The contract term is 270 consecutive calendar days from the Notice to Proceed, with no renewal options specified. There is a 0% Small Business Enterprise (SBE) project goal, and bidders must comply with various requirements including insurance, E-Verify, and specific technical specifications. Liquidated damages are set at $1,172.00 per calendar day for failure to complete the project within the specified timeframe. The bid documents indicate that the project will be funded through the county's standard budgetary processes, with no specific external funding sources mentioned.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
23-0131-ITB-CONSTRUCTION
Countywide Mast Arms - Group 3 Page 1 of 80
PINELLAS COUNTY INVITATION TO BID CONSTRUCTION TWO-STEP Revised 07/2022
Merry Celeste, CPPB
Division Director
Purchasing and Risk Management
January 2022
Notice to Pinellas County Prequalified Contractors, Thank you for your participation over the years in becoming a Pre-qualified Construction Contractor with Pinellas County.
In January 2021, Pinellas County suspended the construction prequalification process allowing contractors to participate in a two-step bid process. With the success of this two-step process the County has determined to suspend the Pinellas County prequalification process indefinitely and will no longer be renewing contractors who previously prequalified through the prequalification committee. For contractors previously prequalified with Pinellas County, you must now either be prequalified with Florida Department of Transportation (FDOT) or submit the prequalification requirements for each new construction bid opportunity.
As pre-qualified construction contractors with Pinellas County your prequalification status has now expired on December 31st, 2021 and is no longer valid. Step 1 submissions will require FDOT prequalification in the appropriate work class or prequalification forms for step 1 submissions. Contractors who are not prequalified with FDOT will need to submit the additional prequalification requirements outlined in the bid documents.
The prequalification process was previously established by the Board of County Commissioners (Board) requiring major construction and renovation purchases in the amount of 100,000 or greater be provided by firms applying, submitting specific financial and experience criteria for review and approval by the Prequalification Committee. The Committee's role was to recommend to the County Administrator the category and dollar limit for which applicants may provide their services, with the County Administrator as final approval. The Prequalification was generally sixty (60) days or more with the Committee meeting four times per year, to provide recommendations for County Administrator approval prior to contractors being notified of placement on the prequalified listing, allowing participation in bidding on Pinellas County projects.
The two-step process removes the need for the prequalification process and allows for contractors to be prequalified during step-1 of the bid process each time a bid is advertised.
If you have questions or seek further information, please contact Merry Celeste, Division Director of Purchasing and Risk Management at (727)464-3559.
Thank you.
PLEASE ADDRESS REPLY TO:
400 South Ft. Harrison, Sixth Floor
Clearwater, Florida 33756
Phone: 727) 464-3311
Website: www.pinellascounty.org/purchase http://www.pinellascounty.org/purchase
Countywide Mast Arms - Group 3 Page 2 of 80
PINELLAS COUNTY BOARD OF COUNTY COMMISSIONERS
400 S. FT. HARRISON AVENUE
ANNEX BUILDING – 6TH FLOOR
CLEARWATER, FL 33756
INVITATION TO BID
ITB - CONSTRUCTION TWO-STEP
SUBMITTALS ARE OPENED PUBLICLY AND
ARE ACCEPTED VIA OPENGOV
THE MISSION OF PINELLAS COUNTY
Pinellas County Government is committed to progressive public policy, superior public service, courteous public contact, judicious exercise of authority and sound management of public resources to meet the needs and concerns of our citizens today and tomorrow.
ISSUE DATE: Friday, November 18, 2022
SOLICITATION NUMBER: 23-0131-ITB-CONSTRUCTION
SOLICITATION TITLE: Countywide Mast Arms - Group 3 Total Construction Budget: $2,250,000.00
PLANS PREPARED BY: HNTB, Inc.
ENGINEER/PROJECT MANAGER IS: Robert Meador, P.E.
DEADLINE FOR WRITTEN QUESTIONS: Friday, December 2, 2022 by 3:00 PM Eastern Time
SUBMIT QUESTIONS: ALL QUESTIONS MUST BE SUBMITTED IN OPENGOV WITHIN THE Q&A SECTION.
ALL SUBMITTALS ARE DUE BY FOR STEP 1 Tuesday, December 6, 2022 by 3:00 PM Eastern Time
ALL SUBMITTALS ARE DUE BY FOR STEP 2 Thursday, December 22, 2022 by 3:00 PM Eastern Time
STEP 2 PUBLIC MICROSOFT TEAMS MEETING Thursday, December 22, 2022 by 3:30 PM Eastern Time https://teams.microsoft.com/l/meetup-join/
You can also dial in using your phone. (Call in – Audio Only)
United States +1(813)644-3116
Phone Conference ID Password: 380457334#
PRE-CONFERENCE INFORMATION: NOT APPLICABLE
SITE VISIT INFORMATION: NOT APPLICABLE
SOLICITATION CONTACT INFORMATION:
NAME: Michelle Jurek
EMAIL: mjurek@co.pinellas.fl.us
SUBMITTALS MAY NOT BE WITHDRAWN FOR 120 DAYS AFTER OPENING DATE.
https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzRiOTdhODEtN2FkOS00ZWRjLTlkZmMtNDM1OWUxNWIwNmM3%40thread.v2/0?context=%7b%22Tid%22%3a%22c32ee18f-a4c7-46ff-af40-8ed605642745%22%2c%22Oid%22%3a%223e736db8-3a26-462f-8881-1c51ecdaa954%22%7d mailto:mjurek@co.pinellas.fl.us
Countywide Mast Arms - Group 3 Page 3 of 80
Please Note:
From time to time, addenda may be issued to this solicitation. Any such addenda will be posted on the same Web site, www.pinellascounty.org/purchase/Current_Bids1.htm , from which you obtained this solicitation.
Before submitting, you should check our Web site to download any addenda that may have been issued. Please remember to sign and return Addenda Acknowledgement Form with completed bid package if applicable.
AUTHORIZED BY:
Merry Celeste, CPPB
Division Director of Purchasing and Risk Management http://www.pinellascounty.org/purchase/Current_Bids1.htm
Countywide Mast Arms - Group 3 Page 4 of 80
VENDORS MUST COMPLETE THE FOLLOWING
VENDORS ARE CAUTIONED THAT THE POLICY OF THE BOARD OF COUNTY COMMISSIONERS, PINELLAS COUNTY, IS TO ACCEPT THE LOWEST RESPONSIVE AND RESPONSIBLE SUBMITTAL RECEIVED MEETING SPECIFICATIONS. NO CHANGES REQUESTED BY A VENDOR DUE TO AN ERROR IN PRICING WILL BE CONSIDERED AFTER THE SOLICITATION OPENING DATE AS ADVERTISED. BY SIGNING THIS SUBMITTAL FORM, VENDORS ARE ATTESTING TO THEIR AWARENESS OF THIS POLICY AND ARE AGREEING TO ALL OTHER SOLICITATION TERMS AND CONDITIONS, INCLUDING ANY INSURANCE REQUIREMENTS CONTAINED
HEREIN.
VENDOR NAME: ______________________________________________ (As shown on W-9)
DBA: ______________________________________________ (If applicable)
MAILING ADDRESS: ______________________________________________ (As shown on W-9)
CITY / STATE / ZIP: ______________________________________________ (As shown on W-9)
VENDOR EMAIL: ______________________________________________ (Primary Company Email Address)
REMIT TO NAME: ______________________________________________ (As Shown on Vendor Invoice)
FEIN#: ______________________________________________ (As shown on W-9)
PAYMENT TERMS: ____% ___DAYS, NET 45 (PER F.S. 218.73)
DEPOSIT, IF REQUIRED, IS ATTACHED IN THE AMOUNT OF $ _____________
Proper Corporate Identity is needed when you submit your quote, especially how your firm is registered with the Florida Division of Corporations. Please visit dos.myflorida.com/sunbiz/ for this information. It is essential to return a copy of your W-9 with your quote. Thank you.
VENDOR CONTACT INFORMATION
CONTACT NAME: _______________________
PHONE NUMBER: _______________________
FAX NUMBER: _______________________
EMAIL ADDRESS: _______________________
I HEREBY AGREE TO ABIDE BY ALL CONDITIONS OF THIS SOLICITATION, INCLUDING ALL INSURANCE REQUIREMENTS, AND CERTIFY THAT I AM AUTHORIZED TO SIGN THIS SOLICITATION FOR THE VENDOR.
AUTHORIZED SIGNATURE: _______________________
PRINT NAME: _______________________
TITLE: _______________________
SEE SECTION F FOR PRICING SUMMARY
THIS FORM MUST BE RETURNED WITH YOUR RESPONSE
https://dos.myflorida.com/sunbiz/
Countywide Mast Arms - Group 3 Page 5 of 80
TABLE OF CONTENTS
TABLE OF CONTENTS
DEFINITIONS
SECTION A - GENERAL CONDITIONS
1. PREPARATION OF SUBMITTAL
2. DESCRIPTION OF GOODS/SERVICES/SUPPLIES
3. ALTERNATES
4. VENDOR SUBMISSION
5. REJECTION OF SUBMISSION
6. WITHDRAWAL OF SUBMITTAL
7. LATE SUBMISSION OR MODIFICATIONS
8. PUBLIC REVIEW AT OPENING
9. TABULATION INQUIRIES
10. AWARD OF CONTRACT
11. SUBMITTALS FROM RELATED PARTIES OR MULTIPLE SUBMITTALS RECEIVED FROM ONE VENDOR
12. LOCAL, STATE, AND FEDERAL COMPLIANCE REQUIREMENTS
13. PROVISION FOR OTHER AGENCIES
14. PUBLIC RECORDS/TRADE SECRETS
15. COLLUSION
16. CONTRACTOR LICENSE REQUIREMENT
17. MATERIAL SAFETY DATA SHEETS REQUIREMENTS
18. RIGHT TO AUDIT
19. STATEMENT RELATIVE TO "PUBLIC ENTITY CRIMES"
20. COUNTY INDEMNIFICATION
21. VARIANCE FROM STANDARD TERMS & CONDITIONS
22. ADA REQUIREMENT FOR PUBLIC NOTICES
23. "OR EQUAL" DETERMINATION
24. INSURANCE
25. PROCUREMENT POLICY FOR RECYCLED MATERIALS
26. ASBESTOS MATERIALS
27. PAYMENT/INVOICES
28. TAXES
29. TERMINATION
30. CONTRACTOR CAPABILITY/REFERENCES
31. DELIVERY/CLAIMS
32. MATERIAL QUALITY
33. WRITTEN REQUESTS FOR INTERPRETATIONS/CLARIFICATIONS
34. ASSIGNMENT/SUBCONTRACTING/CORPORATE ACQUISITIONS AND/OR MERGERS
35. EXCEPTIONS
36. NON-EXCLUSIVE CONTRACT
37. LOBBYING
38. ADDITIONAL REQUIREMENTS
39. ADD/DELETE LOCATIONS SERVICES
40. INTEGRITY OF SOLICITATION DOCUMENTS
41. PUBLIC EMERGENCIES
42. JOINT VENTURES
43. CONFLICT OF INTEREST
44. PROTEST PROCEDURE
45. DISPUTE RESOLUTION FOR PAYMENT REQUEST OR INVOICE
46. LUMBER PRODUCED IN STATE OF FLORIDA
47. PUBLIC RECORDS – CONTRACTOR’S DUTY
48. E-VERIFY
49. INDEPENDENT CONTRACTOR STATUS AND COMPLIANCE WITH THE IMMIGRATION REFORM AND CONTROL ACT
OF 1986
50. TRUTH IN NEGOTIATIONS
SECTION B – SPECIAL CONDITIONS
1. SMALL BUSINESS ENTERPRISE (SBE) PARTICIPATION REQUIREMENTS
2. PRE-QUALIFICATION OF BIDDER
3. PRICING/PERIOD OF CONTRACT
4. TERM EXTENSION(S) OF CONTRACT - NOT APPLICABLE
5. PRE-CONFERENCE - NOT APPLICABLE
6. SITE VISIT - NOT APPLICABLE
7. PRE-COMMENCEMENT MEETING
8. BID BOND GUARANTEE
9. CONTRACT SECURITY
Countywide Mast Arms - Group 3 Page 6 of 80
10. LICENSES, PERMITS, FEES, AND TAXES
11. COMPLIANCE WITH LAWS
12. QUANTITIES
13. QUANTITIES REFLECTED IN PERMITTING DOCUMENTS
14. AWARD OF CONTRACT
15. AFTER NOTICE OF AWARD TO CONTRACTOR
16. INTENT OF THE CONTRACT DOCUMENTS
17. STORAGE OF MATERIALS
18. SANITATION
19. ERRORS AND OMISSIONS
20. CONTRACTORS AND SUBCONTRACTORS
21. AUTHORITY OF THE DESIGN PROFESSIONAL/ENGINEER/PROJECT MANAGER AND DESIGN
PROFESSIONAL/ENGINEER/PROJECT MANAGER'S DESIGNEES/REPRESENTATIVES
22. CONTRACT TIME AND TIME EXTENSIONS
23. PROSECUTION OF WORK ON SATURDAYS, SUNDAYS AND RECOGNIZED HOLIDAYS
24. LIQUIDATED DAMAGES
25. PINELLAS COUNTY’S COMMITMENT TO SAFETY
26. CHANGES IN THE WORK
27. CLAIMS AND DISPUTES
28. MEASUREMENT AND PAYMENT
29. PAYMENTS TO CONTRACTOR
30. ACCEPTANCE AND FINAL PAYMENT
31. PAYMENTS WITHHELD
32. COVENANT AGAINST CONTINGENT FEES
33. LANDS FOR WORK AND ACCESS THERETO
34. SITE INVESTIGATION
35. PROTECTION OF EXISTING STRUCTURES, UTILITIES, WORK AND VEGETATION
36. OTHER WORK
37. TERMINATION
38. SUBSTITUTIONS/ APPROVED EQUAL(S) PRIOR TO BID OPENING
39. SUBMITTALS AFTER AWARD
40. RIGHT TO AUDIT
41. INTEREST ON JUDGMENTS
42. DRAINAGE
43. SURVEY AND LAYOUT
44. CONFORMITY OF WORK WITH PLANS
45. LABORATORY TESTING
46. GUARANTEE OF WORK
47. WARRANTY
48. EQUAL OPPORTUNITY / GIFT & GRATUITY POLICY
49. SUBMISSION OF BIDS
SECTION C – INSURANCE REQUIREMENTS
SECTION D – CONTRACTOR REFERENCES
SECTION E – SPECIFICATIONS
SECTION F – BID SUMMARY
FLORIDA TRENCH SAFETY ACT
ELECTRONIC PAYMENT (EPAYABLES)
W-9 REQUEST FOR TAXPAYER ID NUMBER AND CERTIFICATION
SECTION G – ADDENDUM
SECTION H – STATEMENT OF NO BID
SECTION I – AGREEMENT
SECTION J – BONDS
SECTION K – AFFIDAVIT OF RELEASE AND GUARANTEE
APPENDIX 1 - PERMITS
APPENDIX 2 – SAMPLE CHANGE ORDER
APPENDIX 3 – SAMPLE APPLICATION FOR PAYMENT
APPENDIX 4 – SPECIAL NOTICES
APPENDIX 5 – OTHER UTILITIES
APPENDIX 6 – REPORTS
APPENDIX 7 – SBE COMPLIANCE FORM
APPENDIX 8 – E-VERIFY AFFIDAVIT
Countywide Mast Arms - Group 3 Page 7 of 80
DEFINITIONS
Whenever the following terms, or pronouns used in place of them, are used in these Contract Documents they shall have the meanings given below:
Addendum: A modification, revision or clarification of the Plans or other Contract Documents, issued by the Purchasing Department and distributed to prospective Bidders before the bid opening.
Approved Equal: An approved equivalent item that is approved in writing, (via an Addendum to the Agreement), prior to the Bid Opening. Bidder must submit their proposed equivalent item no later than question deadline date on page
1. Any information received after this deadline will not be considered.
Bid Publication: The date on which public notice is made to request a bid/request for proposal for this Project.
Bid/Request for Proposal: The offer to perform the Work described in the Contract Documents at a specified cost.
Architect/Design Professional/Engineer of Record: The Professional Architect/Design Professional/Engineer or Architectural/Design Professional/Engineering Firm contracted by the County and registered in the State of Florida who develops criteria and concept for the Project, performs the analysis and is responsible for the preparation of the Contract Plans and Specifications. The Architect/Design Professional/Engineer of Record will be a Consultant retained by the County or a county in-house staff member.
Board of County Commissioners: Governing body of Pinellas County hereinafter referred to as the Board.
Calendar Day: Every day shown on the calendar, ending and beginning at Midnight.
Change Order: A written order authorized by the Board or County Administrator, issued by the Design Professional/Engineer/Project Manager, and accepted by the Contractor directing certain changes, additions or reductions in the Work or in the materials used.
Commencement Date: Date established in the Notice to Proceed. Contractor shall commence the Work within fifteen
(15) consecutive calendar days or as mutually agreed by the Parties, from the date of the Notice to Proceed.
Consultant: The Professional Engineer/Design Professional or Engineering Firm registered in the State of Florida who performs Professional Engineering Services for the County, other than County personnel. The Consultant may be the Design Professional/Engineer of Record or may provide services through and be subcontracted to the Design Professional/Engineer of Record or maybe providing construction engineering and inspection (CEI) services, as applicable.
Contractor: The General Contractor, the Individual, Partnership or Corporation agreeing to do the Work for the County as Prime Contractor. The Contractor may be refereed to interchangeably as Vendor and/or Bidder in this document pending on the contracting phase governed herein.
Contract Documents: All documents referred to herein in addition to all duly executed and issued addenda, legal advertisements and change orders.
Design Professional: A collective term intended to apply to “Architect/Engineer of Record”, licensed and registered in the State of Florida, the prime party responsible for the design, engineering, and construction documentation of the project and contracted directly with the Owner.
Engineer: The Engineer, a staff member of the County or his duly authorized representative, acting on behalf of the County.
FDOT: The Florida Department of Transportation.
FDOT Specifications: Florida Department of Transportation, “STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION”, (latest edition at time of advertisement), and all supplemental specifications thereto.
Final Acceptance: Whenever the Work provided for under the Agreement has been completely performed by the Contractor, and the final inspection has been made by the Design Professional/Engineer/Project Manager.
Countywide Mast Arms - Group 3 Page 8 of 80
Final Completion: The point in which all Work is complete and all other Agreement requirements have been satisfied.
Inspector: An authorized representative of the Design Professional/Engineer/Project Manager, assigned to make any or all necessary inspections of the Work performed, and materials furnished by the Contractor.
Man Day: A unit of measure for work by one person in a calendar day.
Notice of Award: The formal document informing the Contractor of its successful selection to construct the Project.
Notice to Proceed: Formal written document informing the Contractor to begin the Work, and notifying the Contractor of the architect, project engineer and other agency or person to which the Contractor may submit its payment request or invoice.
Owner: Is Pinellas County, a political subdivision of the State of Florida, herein after referred to as the County.
PCU - Standard Specifications: Pinellas County Utilities (PCU) “Material Specification Manual”, “Technical Specifications”, “Pump Station Standard Details” and “Standard Details” as described and defined on the Utility Department’s website at www.pinellascounty.org/utilities under the Engineering header. Contractor’s bid must be based on those standards that are in place as of the Bid Publication date.
PC Special Provisions: Specifications approved by Pinellas County that modify or amend the Pinellas County Standard Technical Specifications for Roadway and General Construction (latest edition) (“Standard Specifications”), setting forth conditions that vary from the Standard Specifications and are applicable to a specific type of Project, or a specific set of conditions.
PC Std. Tech. Spec.: Pinellas County Standard Technical Specifications for Roadway and General Construction (latest edition at time of advertisement) shown on the Pinellas County website.
PC Supplemental Specifications: Specifications approved by Pinellas County that are in addition to the Pinellas County Standard Technical Specifications for Roadway and General Construction (latest edition) (“Standard Specifications”) setting forth conditions that are additional to the Standard Specifications and are applicable to a specific type of Project, or a specific set of conditions.
Plans: Approved drawings or reproductions thereof, showing the location, character, dimension and details of the work to be done as issued by the Design Professional/Engineer.
Project: All Work, materials or equipment (whether or not specifically called for) required to produce the intended result as described within the Contract Documents.
Project Manager: The individual designated by the Owner to represent the owner on all administrative matters related to the Project.
Proposal and Bid Submittal Sheets: Form, as required in Section E.
Punch List: The written compilation of those items identified by the Design Professional/Engineer/Project Manager after Substantial Completion is achieved, which are required to render complete, satisfactory and acceptable the Project (or phase of a Project).
Record Drawings: Record Drawings are a set of signed/sealed CONTRACT PLANS that are maintained by the Contractor for the express use of recording AS-BUILT INFORMATION.
Regular Workday or Business Day: Any calendar day from 7:00 AM to 7:00 PM except a Saturday, Sunday or recognized holiday.
Schedule of Values: The individual values as set forth by the Contractor as payment for the bid quantity units identified on the bid submittal sheets. The total of the extended units in the Schedule of Values determines the Agreement Amount. The Agreement Amount may only be modified by Change Order approved by the Board, or County Administrator.
http://www.pinellascounty.org/utilities
Countywide Mast Arms - Group 3 Page 9 of 80
Scope of Work: The general intent of the Work to be accomplished as defined by the Project Plans and Specifications.
Special Notices: Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications, for a specific Project.
Specifications: The directions, provisions and requirements contained herein, together with all stipulations contained in the plans or Contract Documents, setting out or relating to the method and manner of performing the Work, or to the quantities and qualities of materials and labor to be furnished under the Agreement.
Substantial Completion: The date of “Substantial Completion” of the Work (or designated portions thereof) is the date certified by the Consultant and approved by the Design Professional/Engineer/Project Manager when construction is sufficiently complete, in accordance with the Contract Documents, so the county can occupy or utilize the Work (or designated portions thereof) for the use for which it was intended.
Survey Crew Day: A unit of measurement for Work by a survey crew in a calendar day.
Survey and Layout Plan: See Section B.
Technical Special Provisions: Specifications prepared, signed and sealed by the Consultant. These would be listed in the document hierarchy (shown in Section E) ahead of any other “Standard Specifications”, if applicable.
Unforeseen Work: Conditions encountered during the performance of the Work, sub-surface or otherwise concealed, or of an unusual nature, which differ materially from those indicated in the Contract Documents.
Unspecified: A pay item included for usage as directed by the County, and for usage under conditions or circumstances unforeseen at the time of Agreement.
Work: All labor, materials & incidentals required for the construction of the improvement for which the Agreement is made, including superintendence, use of equipment & tools, and all services & responsibilities prescribed or implied, which are necessary for the complete performance by the Contractor of his obligations under the contact. Unless otherwise specified herein or in the Agreement, all costs of liability and of performing the Work shall be at the Contractor's expense.
Countywide Mast Arms - Group 3 Page 10 of 80
SECTION A - GENERAL CONDITIONS
1. PREPARATION OF SUBMITTAL
Submittal will be prepared in accordance with the following:
a. Submittals shall be uploaded on forms furnished, utilizing OpenGov procurement website. Failure to comply could result in the submission being rejected.
b. If price is factor, unit prices shall be shown and where there is an error in extension of price, the unit price shall govern.
c. Alternate submittals will not be considered unless authorized by the solicitation.
d. Proposed delivery time must be shown and shall include weekends and holidays.
e. Contractor is advised that exceptions to any terms and conditions contained in this solicitation or the agreement must be stated with specificity in its response to the solicitation as provided herein and in Section A, AGREEMENT. Contractor is deemed to have accepted and to be bound by the solicitation and agreement terms and conditions that contractor does not take exception to in its response. The County reserves the right to modify or add terms and conditions based upon the exceptions stated by the contractor, or to declare any terms and conditions non-negotiable, as determined by the County in its sole discretion.
f. Contractors shall thoroughly examine the drawings, specifications, schedule, instructions and/or all other solicitation documents.
g. Contractors shall make all investigations necessary to thoroughly inform themselves regarding plant and facilities for delivery of material and equipment as required by the solicitation. Plea of ignorance by the contractor of conditions that exist or that may hereafter exist as a result of failure or omission on the part of the contractor to make the necessary examinations and investigations, or failure to fulfill in every detail the requirements of the solicitation documents, will not be accepted as a basis for varying the requirements of the County or the compensation to the contractor.
h. Contractors are advised that all County solicitations are subject to all legal requirements provided for in the Purchasing Ordinance and/or State and Federal Statutes.
2. DESCRIPTION OF GOODS/SERVICES/SUPPLIES
a. Any manufacturer's names, trade names, brand name, or catalog numbers used in specifications are for the purpose of describing and establishing general quality levels. Such references are not intended to be restrictive.
Submittals will be considered for all brands which meet the quality of the specifications listed for any items.
b. Contractors are required to state exactly what they intend to furnish otherwise they shall be required to furnish the items as specified.
c. Contractor submission shall include all data necessary to evaluate and determine the quality of the item(s) they intend to furnish.
3. ALTERNATES
Unless otherwise provided in the solicitation, alternatives may be included in the plans, specifications, and/or solicitation. When the County includes alternates in the solicitation, the contractor shall indicate on the submittal the cost of said alternate and sum to be deducted or added to the base pricing. Such alternates may or may not be accepted by the County. If approved, it is at the County’s discretion to accept said alternate(s) in any sequence or combination therein. If the contractor is proposing an alternate that is not provided in the solicitation, alternate(s) must be submitted within the OpenGov Q & A section prior to the question deadline, and receive approval prior to the solicitation opening date in order to be considered for award.
Countywide Mast Arms - Group 3 Page 11 of 80
4. VENDOR SUBMISSION
Submittals shall be uploaded utilizing OpenGov procurement website (https://secure.procurenow.com/portal/pinellasfl
a. Failure to comply could result in the submittal being rejected.
b. Submittals must be on the forms furnished. Submittals sent via email will not be considered.
5. REJECTION OF SUBMISSION
a. The County may reject a submittal if:
1. The contractor incorrectly states or conceals any material fact in the solicitation.
2. The solicitation does not strictly conform to the law or requirements of solicitation including insurance requirements.
3. The solicitation is conditional, except that the contractor may qualify its submittal for acceptance by the County on an "all or none" basis, or a "low item" basis. An "all or none" basis submittal must include all items upon which the contractor was invited.
b. The respective constitutional officer, County Administrator, on behalf of the Board of County Commissioners or within their delegated financial approval authority, or Director of Purchasing, within their delegated financial approval authority, shall have the authority when the public interest will be served thereby to reject all submittals or parts of submittals at any stage of the procurement process through the award of an agreement.
c. The County reserves the right to waive minor informalities or irregularities in any submittal.
6. WITHDRAWAL OF SUBMITTAL
The submittal may be withdrawn prior to the bid opening date, however, a submittal may not be withdrawn for a period of time as specified in this solicitation document.
7. LATE SUBMISSION OR MODIFICATIONS
a. Submittals and modifications received after the time set for the submission will not be considered. This upholds the integrity of the process.
b. Modifications in writing received prior to the time set for the submittal will be accepted.
8. PUBLIC REVIEW AT OPENING
Pursuant to Florida Statute, Section 119.071(1)(b)2, all submittals shall be subject to review as public records after 30-days from opening, or earlier if an intended decision is reached before the thirty-day period expires.
Unless a specific exemption exists, all documents submitted will be released pursuant to a valid public records request. All trade secrets claims shall be dispositively determined by a court of law prior to trade secret protection being granted.
9. TABULATION INQUIRIES
Inquiries relating to the results of this solicitation, prior to the official award by the Pinellas County Board of County Commissioners may be made by visiting OpenGov or calling the Purchasing Office after 30 days to comply with Florida Statute, Section 119.071(1)(b)2.
10. AWARD OF CONTRACT
a. The contract will be awarded to the lowest responsive, responsible bidder whose bid, conforming to the Invitation to Bid, is most advantageous to Pinellas County, price and other factors considered. For Invitation to Bid for Sale of Real or Surplus Property, award will be made to the highest and most advantageous bid including price and other factors considered.
b. The County reserves the right to accept and award item by item, and/or by group, or in the aggregate, unless the bidder qualifies his bid by specified limitations. See Rejection of Bids.
c. If two or more bids received are for the same total amount or unit price or in the case of proposals, the qualifications, quality and service are equal then the contract shall be awarded by drawing lots in public.
d. Prices quoted must be FOB Pinellas County with all transportation charges prepaid unless otherwise specified in the Invitation to Bid.
https://secure.procurenow.com/portal/pinellasfl
Countywide Mast Arms - Group 3 Page 12 of 80
e. A written award of acceptance (Purchase Order), mailed or otherwise furnished to the successful bidder, shall result in a binding contract without further action by either party.
11. SUBMITTALS FROM RELATED PARTIES OR MULTIPLE SUBMITTALS RECEIVED FROM ONE VENDOR Where two (2) or more related parties each upload a submittal, or multiple submittals are received from one (1) contractor, for any solicitation, such submittals shall be judged non-responsive. Related parties mean contractors or the principles thereof, which have a direct or indirect ownership interest in another contractor for the same solicitation or in which a parent company or the principles thereof of one (1) contractor have a direct or indirect ownership interest in another contractor for the same solicitation.
12. LOCAL, STATE, AND FEDERAL COMPLIANCE REQUIREMENTS
The laws of the State of Florida apply to any purchase made under this solicitation. contractors shall comply with all local, state, and federal directives, orders and laws as applicable to this solicitation and subsequent agreement(s) including but not limited to Americans with Disabilities Act (ADA), Section 504 of the Rehabilitation Act of 1973, Equal Employment Opportunity (EEO), Minority Business Enterprise (MBE), and OSHA as applicable to this agreement.
13. PROVISION FOR OTHER AGENCIES
Unless otherwise stipulated by the contractor(s), the contractor(s) agree to make available to all Government agencies, departments, and municipalities the prices submitted in accordance with said terms and conditions therein, should any said governmental entity desire to buy under this solicitation. Eligible users shall mean all State of Florida Agencies, the legislative and judicial branches, political subdivisions (counties, local district school boards, community colleges, municipalities, or other public agencies or authorities), which may desire to purchase under the terms and conditions of the Agreement.
14. PUBLIC RECORDS/TRADE SECRETS
Pinellas County Government is subject to the Florida Public Records law (Chapter 119, Florida Statutes), and all documents, materials, and data submitted to any solicitation as part of the response are governed by the disclosure, exemption and confidentiality provisions relating to public records in Florida Statutes. Except for materials that are “trade secrets” or “confidential” as defined by applicable Florida law, ownership of all documents, materials, and data submitted in response to the solicitation shall belong exclusively to the County.
To the extent that contractor desires to maintain the confidentiality of materials that constitute trade secrets pursuant to Florida law, trade secret material submitted must be identified by some distinct method that the materials that constitute a trade secret, and contractor shall provide an additional copy of the contractors submittal that redacts all designated trade secrets. By submitting materials that are designated as trade secrets and signature of the contractor signature page, contractor acknowledges and agrees:
i. That after notice from the County that a public records request has been made for the materials designated as a trade secret, the contractor shall be solely responsible for defending its determination that submitted material is a trade secret that is not subject to disclosure at its sole cost, which action shall be taken immediately, but no later than ten (10) calendar days from the date of notification or contractor will be deemed to have waived the trade secret designation of the materials;
ii. That to the extent that the contractor with trade secret materials is evaluated, the County and it officials, employees, agents, and representatives in any way involved in processing, evaluating, negotiating agreement terms, approving any agreement based on the contractor, or engaging in any other activity relating to the competitive selection process are hereby granted full rights to access, view, consider, and discuss the materials designated as trade secrets through the final agreement award;
iii. To indemnify and hold the County, and its officials, employees, agents and representatives harmless from any actions, damages (including attorney’s fees and costs), or claims arising from or related to the designation of trade secrets by the contractor, including actions or claims arising from the County’s non-disclosure of the trade secret materials.
iv. That information and data it manages as part of the services may be public record in accordance with Chapter 119, Florida Statutes and Pinellas County public record policies. contractor agrees prior to providing goods/services it will implement policies and procedures to maintain, produce, secure and retain public
Countywide Mast Arms - Group 3 Page 13 of 80 records in accordance with applicable laws, regulations, and County policies, which are subject to approval by the County, including but limited to the Section 119.0701, Florida Statutes.
Notwithstanding any other provision in the solicitation, the classification as trade secret of the entire submission document, line item and/or total contractor prices, the work, services, project, goods, and/or products to be provided by contractor, or any information, data, or materials that may be part of or incorporated into an agreement between the County and the contractor is not acceptable to the County and will result in a determination that the contractor submittal is nonresponsive; the classification as trade secret of any other portion of a submittal document may result in a determination that the submittal is nonresponsive.
15. COLLUSION
The contractor, by affixing his signature to this proposal, agrees to the following: "Contractor certifies that its submittal is made without previous understanding, agreement, or connection with any person, firm or corporation making a submittal for the same item(s) and is in all respects fair, without outside control, collusion, fraud, or otherwise illegal action."
16. CONTRACTOR LICENSE REQUIREMENT
All contractor performing construction and related work in Pinellas County must comply with our regulatory legislation, Chapter 75-489, Laws of Florida, as amended. Failure to have a competency license in a regulated trade will be cause for rejection of any submittal and/or award.
17. MATERIAL SAFETY DATA SHEETS REQUIREMENTS
If any chemicals, materials, or products containing toxic substances, in accordance with OSHA Hazardous Communications Standards, are contained in the products purchased by the County as a result of this solicitation, the successful contractor shall provide a Safety Data Sheet (SDS) at the time of each delivery.
18. RIGHT TO AUDIT
Pinellas County reserves the privilege of auditing a contractor's records as such records relate to purchases between Pinellas County and said contractor. Such audit privilege is provided for within the text of the Pinellas County Code §2-187. Records should be maintained for five (5) years from the date of final payment.
19. STATEMENT RELATIVE TO "PUBLIC ENTITY CRIMES"
Contractor is directed to the Florida Public Entity Crime Act, Fla. Stat. 287.133, and Fla. Stat. 287.135 regarding Scrutinized Companies, and contractor agrees that its submittal and, if awarded, its performance of the agreement will comply with all applicable laws including those referenced herein. contractor represents and certifies that contractor is and will at all times remain eligible to submit for and perform the services subject to the requirements of these, and other applicable, laws. contractor agrees that any agreement awarded to contractor will be subject to termination by the County if contractor fails to comply or to maintain such compliance.
20. COUNTY INDEMNIFICATION
a. Unless otherwise provided in the special provisions, special conditions and Specifications, to assume liability for all damage to Work under construction or completed, whether from fire, water, winds, vandalism, or other causes, until final completion and acceptance by the County and notwithstanding the fact that partial payments may have been made during construction.
b. No subcontract or transfer of Agreement shall in any case release either the Contractor or its surety of any liability under the Agreement and bonds. The County reserves the right to reject any subcontractors or equipment.
c. Unless specifically prohibited by Florida law, the Contractor shall defend, indemnify and hold harmless the County, FDEM, FEMA and its officers and employees from any and all liabilities, claims, damages, penalties, demands, judgments, actions, proceedings, losses or costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, or by, or on account of, any claim or amounts recovered under the "Workers' Compensation Law" or of any other laws, by-laws, ordinance, order or decree, including but not limited to any violation of requirements of the Americans with Disabilities Act of 1990, as may be amended, and all rules and regulations issued pursuant thereto (collectively the “ADA”) whether resulting from any claimed breach of this Agreement by the Contractor or from personal injury, property damage, direct or consequential damages, or
Countywide Mast Arms - Group 3 Page 14 of 80 economic loss, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of the Contractor or anyone employed or utilized by the Contractor in the performance of this Agreement. The duty to defend under this paragraph is independent and separate from the duty to indemnify, and the duty to defend exists regardless of any ultimate liability of the Contractor, the County and any indemnified party. The duty to defend arises immediately upon presentation of a claim by any party and written notice of such claim being provided to the Contractor. The Contractor's obligation to indemnify and defend under this Article will survive the expiration or earlier termination of this Agreement until it is determined by final judgment that an action against the County or an indemnified party for the matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. The Contractor shall guarantee the payment of all just claims for materials, supplies, tools, labor or other just claims against it or any subcontractor in connection with this Agreement; and its bonds will not be released by final acceptance and payment by the County unless all such claims are paid or released.
21. VARIANCE FROM STANDARD TERMS & CONDITIONS
All standard terms and conditions stated in this section apply to this Agreement except as specifically stated in the subsequent sections of the document, which take precedence over this section, and should be fully understood by contractors prior to submitting on this requirement.
22. ADA REQUIREMENT FOR PUBLIC NOTICES
Persons with disabilities requiring reasonable accommodation to participate in this proceeding/event, should call 727- 464-4062 (voice/tdd) fax 727-464-4157, not later than seven days prior to the proceeding.
23. "OR EQUAL" DETERMINATION
Where submitting other than specified, the determination of equivalency will be at the sole discretion of Pinellas County and its specialized personnel.
24. INSURANCE
Notice: The contractor must provide a certificate of insurance and endorsement in accordance with the insurance requirements listed in the insurance section below. Failure to provide the required insurance within a ten (10) day period following the determination or recommendation of lowest responsive, responsible submitter may result in the County to vacate the original determination or recommendation and proceed with recommendation to the second lowest, responsive, responsible submitter.
25. PROCUREMENT POLICY FOR RECYCLED MATERIALS
a. Pinellas County wishes to encourage its contractors to use recycled products in fulfilling contractual obligations to the County and that such a policy will serve as a model for other public entities and private sector companies.
b. When awarding a purchase or recommending a purchase for products, materials, or services, the Director of Purchasing and Risk Management may allow a preference to a responsive contractor who certifies that their product or material contains the greatest percentage of postconsumer material. If solicitation includes paper products, contractor must certify that their materials and/or products contain at least the content recommended by the EPA guidelines.
c. On all quotes over fifty thousand dollars ($50,000) and informal quotes under fifty thousand dollars ($50,000), or as required by law, the Director of Purchasing and Risk Management shall require vendors to specify which products have recycled materials, what percentage or amount is postconsumer material, and to provide certification of the percentages of recycled materials used in the manufacture of goods and commodities procured by the County.
d. Price preference is not the preferred practice the County wishes to employ in meeting the goals of this resolution.
If a price preference is deemed to serve the best interest of the County and further supports the purchase of recycled materials, the Director of Purchasing will make a recommendation that a price preference be allowed up to an amount not to exceed 10% above the lowest complying submittal received.
Definitions for Recycled Materials:
Recovered Materials: Materials that have recycling potential, can be recycled, and have been diverted or removed from the solid waste stream for sale, use or reuse, by separation, collection, or processing.
Countywide Mast Arms - Group 3 Page 15 of 80
Recycled Materials: Materials that contain recovered materials. This term may include internally generated scrap that is commonly used in industrial or manufacturing processes, waste or scrap purchased from another manufacturer and used in the same or a closely related product.
Postconsumer Materials: Materials which have been used by a business or a consumer and have served their intended end use, and have been separated or diverted from the solid waste stream for the purpose of recycling, such as; newspaper, aluminum, glass containers, plastic containers, office paper, corrugated boxes, pallets or other items which can be used in the remanufacturing process.
26. ASBESTOS MATERIALS
a. The contractor shall perform all Work in compliance with Federal, State and local laws, statutes, rules, regulations and ordinances, including but not limited to the Department of Environmental Protection (DEP)'s asbestos requirements, 40 CFR Part 61, Subpart M, and OSHA Section 29 CFR 1926.58. Additionally, the contractor shall be properly licensed and/or certified for asbestos removal as required under Federal, State and local laws, statutes, rules, regulations and ordinances.
b. The County shall be responsible for filing all DEP notifications and furnish a copy of the DEP notification and approval for demolition to the successful contractor. The County will furnish a copy of the asbestos survey to the successful contractor. The contractor must keep this copy on site at all times during the actual demolition.
27. PAYMENT/INVOICES
Contractor shall submit invoices for payment as provided herein with such documentation as required by Pinellas County and all payments shall be made in accordance with the requirements of Section 218.70 et. Seq, Florida Statutes, “The Local Government Prompt Payment Act.” Invoices shall be submitted to the address below unless instructed otherwise on the purchase order, or if no purchase order, by the ordering department:
Finance Division Accounts Payable
Pinellas County Board of County Commissioners
P.O. Box 2438
Clearwater, FL 33757
Email: FinanceAccountsPay@MyPinellasClerk.org
Each invoice shall include, at a minimum, the contractor's name, contact information and the standard purchase order number. In order to expedite payment, it is recommended the contractors also include the information shown in below. The County may dispute any payments invoiced by contractor in accordance with the County’s Dispute Resolution Process for Invoiced Payments, established in accordance with Section 218.76, Florida Statutes, and any such disputes shall be resolved in accordance with the County’s Dispute Resolution Process.
Remit To: Billing address to which you are requesting payment be sent
Invoice Date: Creation date of the invoice
Contractor Information: Company name, mailing address, phone number, contact name and email address as provided on the purchase order
Invoice Number: Company tracking number
Shipping Address: Address where goods and/or services were delivered
Ordering Department: Name of ordering department, including name and phone number of contact person
Purchase order Number: Standard purchase order number
Ship Date: Date the goods/services were sent/provided
Quantity: Quantity of goods or services billed
Description: Description of services or goods delivered
Countywide Mast Arms - Group 3 Page 16 of 80
Unit Price: Unit price for the quantity of goods/services delivered
Line Total Amount due by line item
Invoice Total: Sum of all line totals for the invoice
Pinellas County offers a credit card payment process (ePayables) through Bank of America. Pinellas County does not charge contractor to participate in the program; however, there may be a charge by the company that processes your credit card transactions. For more information please visit Pinellas County purchasing website at:
www.pinellascounty.org/purchase.
28. TAXES
a. The County is exempt from all state and federal sales, use, transportation and excise taxes. The Laws of the
State of Florida provide that sales and use taxes are payable by the contractor upon the tangible personal property incorporated in the work and such taxes shall be paid by the contractor and be deemed to have been included in the solicitation.
b. Payments to Pinellas County are subject to applicable Florida taxes.
29. TERMINATION
a. Pinellas County reserves the right to terminate this agreement, without cause by giving thirty (30) days prior written notice to the Contractor of the intention to terminate or with cause if at any time the Contractor fails to fulfill or abide by any of the terms or conditions specified.
b. Failure of the Contractor to comply with any of the provisions of this Agreement shall be considered a material breach of Agreement and shall be cause for immediate termination of the Agreement at the sole discretion of Pinellas County.
c. In addition to all other legal remedies available to the Pinellas County, the Pinellas County reserves the right to terminate and obtain from another source any services which have not been provided within the period of time stated in the proposal, or if no such time is stated, within a reasonable period of time from the date of request, as determined by the Pinellas County.
d. In the event that sufficient budgeted funds are not available for a new fiscal period, the Pinellas County shall notify the Contractor of such occurrence and the Agreement shall terminate on the last day of the then current fiscal year period without penalty or expense to the Pinellas County.
30. CONTRACTOR CAPABILITY/REFERENCES
Prior to agreement award, any contractor may be required to show that the company has the necessary facilities, equipment, ability and financial resources to perform the work specified in a satisfactory manner and within the time specified. In addition, the company must have experience in work of the same or similar nature, and can provide references, which will satisfy the County. Contractors must furnish a reference list of at least four (4) customers for whom they have performed similar services.
31. DELIVERY/CLAIMS
Prices quoted shall be FOB Destination, freight included and unloaded to location(s) within Pinellas County. Actual delivery address(s) shall be identified at time of order. Successful contractor(s) will be responsible for making any and all claims against carriers for missing or damaged items.
32. MATERIAL QUALITY
All materials purchased and delivered against this Agreement will be of first quality and not damaged and/or factory seconds. Any materials damaged or not in first quality condition upon receipt will be exchanged within twenty-four (24) hours of notice to the contractor at no charge to the County.
https://www.pinellascounty.org/purchase
Countywide Mast Arms - Group 3 Page 17 of 80
33. WRITTEN REQUESTS FOR INTERPRETATIONS/CLARIFICATIONS
No oral interpretations will be made to any firms as to the meaning of specifications or any other contractor documents. All questions pertaining to the terms and conditions or scope of work of this solicitation must be sent in writing (electronically) to the Purchasing and Risk Management Division and received by the date specified in solicitation. Responses to questions may be handled as an addendum if the response would provide clarification to requirements of the solicitation. All such addenda shall become part of the agreement documents. The County will not be responsible for any other explanation or interpretation of the proposed solicitation made or given prior to the award of the agreement. The Purchasing and Risk Management Division will be unable to respond to questions received after the specified time frame.
34. ASSIGNMENT/SUBCONTRACTING/CORPORATE ACQUISITIONS AND/OR MERGERS
The contractor shall perform this agreement. If a contractor intends to subcontract a portion of this work,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .