J-2-1_Bidding_charts.xls

XLS spreadsheet 79 KB Posted

Attached to
To construct one metallic tower in Gorgona Federal contract opportunity
Solicitation number
SAQMMA16R0508
Issued by
Department of State Office of Acquisition Management

About this file

J-2-1 Solicitation Bidding charts

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown Price by division

UNITED STATES DEPARTMENT OF STATE
BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS
123456
DIVISION/DESCRIPTIONLABORMATERIALSOVERHEADPROFITTOTAL
1. General Requirements/Mobilization
2. Site Work
3. Concrete
4. Masonry
5. Metals
6. Wood and Plastic
7. Thermal and Moisture
8. Doors and Windows
9. Finishes
10. Specialties
11. Equipment
12. Furnishings
13. Special Construction
14. Conveying Systems
15. Mechanical
16. Electrical
TOTAL
Colombian Pesos
Allowance Items:
PROPOSAL PRICE TOTAL:
Alternates (list separately do not total)
Offeror: Date

Summary of Activities

OFICIAL BREAKDOWN CHART
PROJECT:METALLIC RADAR TOWER AND SHELTER
Place:NAVY BASES AT GORGONA - CERRO TRINIDAD
Date:May-16
BASE CONTRACT
ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTAL COSTSUB TOTALTOTAL COST BY CHAPTER
1RADAR TOWER AT GORGONA$ 0.00
1.01GENERAL REQUIREMENTS$ 0.00
1.01.01Location and LayoutGBL1.00
1.01.02Temporary Facilities (Including enclousure)GBL1.00
1.01.03Removal of surface layerGBL1.00
1.02SITE WORK$ 0.00
1.02.01ExcavationsGBL1.00
1.02.02Compacting of the foundation levelGBL1.00
1.02.03Filling in compacted granular materialGBL1.00
1.03CONCRETE STRUCTURES$ 0.00
1.03.01Cyclopean concrete SupportGBL1.00
1.03.02Reinforcement steelGBL1.00
1.03.03Structural concrete (foundation)GBL1.00
1.03.04Sub-floor concrete slab E=20 cm.GBL1.00
1.04METALLIC TOWER$ 0.00
1.04.01Fabrication, supply and installation of 55 m. metallic towerGBL1.00
1.04.02Supply and installation of the metallic support platform for the radar transceiver, including supportGBL1.00
1.04.03Supply and installation of metallic radar support for the radarGBL1.00
1.04.04Supply and installation Metallic crane for radar upliftingGBL1.00
1.04.05Horizontal raceway for connectivity guide, Mecano system including accessoriesGBL1.00
1.04.06Vertical safety line ROHN LOCK type, including accessoriesGBL1.00
1.04.07Painting of metallic towerGBL1.00
1.05TOWER SHELTER AND ENCLOUSURES$ 0.00
1.05.01Shelter in RBS systemGBL1.00
1.05.02Chain link Fence for enclousureGBL1.00
1.05.03Roof Cover Acesco type or similarGBL1.00
1.05.04Supply and installation of floor tiles along the shelterGBL1.00
1.06ELECTRICAL WORKS$ 0.00
1.06.01Main circuit branches – Low Voltage (LV)GBL1.00
1.06.02Concrete pad with metallic fenceGBL1.00
1.06.03Raceway for LV systemGBL1.00
1.06.04Metallic enclosure - TPGBL1.00
1.06.04.01Control systemGBL1.00
1.06.04.02Power quality analyzerGBL1.00
1.06.04.03TVSSGBL1.00
1.06.05General panel board with breakersGBL1.00
1.06.06Duplex receptacle 120VAC/15A with grounding pinGBL1.00
1.06.07Duplex receptacle 120VAC/15A, outdoor installationGBL1.00
1.06.08Air ExtractorsGBL1.00
1.06.09AC receptacles for battery rectifiersGBL1.00
1.06.10Air Conditioning SystemGBL1.00
1.06.11Supply and installation of the illumination system for the working points and the different platformsGBL1.00
1.06.12Fluorescent LampsGBL1.00
1.06.13Obstruction lightsGBL1.00
1.06.14Ladder Cable TrayGBL1.00
1.06.15Supply and installation of stainless steel and rubber sleeves (Boot type) for the transition from the ladder outside shelter to the cable tray inside the shelterGBL1.00
1.06.16Lighting Protection SystemGBL1.00
1.06.17Installation and startup of the main 15 KW Generator supplied by the Colombian NavyGBL1.00
1.06.18Grounding SystemGBL1.00
1.06.19MarkingGBL1.00
1.07TRANSPORTATION AND LOGISTICS$ 0.00
1.07.01Lodging for installation processGBL1.00
1.07.02Helicopter HarnessGBL1.00
1.07.03Transportation Bogota - BuenaventuraGBL1.00
1.07.04Transportation of personnelGBL1.00
1.07.05Material for packing tower materialGBL1.00
1.08FUEL SYSTEM FOR GENERATORS$ 0.00
1.08.01Supply and installation of stainless steel pipeline for the fuel system (30 m. approx.)GBL1.00
1.08.02Supply and installation of decanter filter (4 Units)GBL1.00
1.08.03Supply and installation of Close valves (24 Units)GBL1.00
1.08.04Supply and installation of Flex Hose (5 m approx.)GBL1.00
1.08.05Installation of 450 Gl Fuel Tank, including fuel (50 Gl for tests)GBL1.00
1.08.06Chain Link FenceGBL1.00
1.09ENVIRONMENTAL CONSIDERATIONS ON SITE$ 0.00
1.09.01Construction of Access Road to Project SiteGBL1.00
1.09.02Solid Waste HandlingGBL1.00
1.09.03Liquid Waste HandlingGBL1.00
1.09.04Temporary Bathroom facilitiesGBL1.00
1.09.05Protection of Existing VegetationGBL1.00
1.09.06Noise MitigationGBL1.00
1.09.07Material for Environmental Training PlanGBL1.00
1.09.08Contingency PlanGBL1.00
1.09.09Forestry Engineer:GBL1.00
1.09.10BiologistGBL1.00
1.09.11Environmental SuperintendentGBL1.00
1.09.12ArchaeologistGBL1.00
1.09.13Safety InspectorGBL1.00
1.10OTHERS$ 0.00
1.10.01Supply of complete equipment for working on high (2 Units)GBL1.00
VALUE DIRECT COSTS$ 0.00
A.I.U. - VAT$ 0.00
$ 0.00
A . I . U$ 0.00
Administration%
Unforenseens%
Profit%
VAT(Over the profit total value)%
TOTAL PROJECT(COLOMBIAN PESOS)$ 0.00
PERFORMANCE TIME (in calendar days)
BID OPTION #1
ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTAL COSTSUB TOTALTOTAL COST BY CHAPTER
BID OPTION #1TRANSPORTATION GUAPI PORT – PROJECT SITE (GORGONA-CERRO TRINIDAD)$ 0.00
BO-1TRANSPORTATION AND LOGISTICS$ 0.00
BO-1.1Transportation of materials - HelicopterGBL1.00
VALUE DIRECT COSTS$ 0.00
A.I.U. - VAT$ 0.00
$ 0.00
A . I . U$ 0.00
Administration%
Unforenseens%
Profit%
VAT(Over the profit total value)%
TOTAL PROJECT(COLOMBIAN PESOS)$ 0.00
PERFORMANCE TIME (in calendar days)
BID OPTION #2
ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTAL COSTSUB TOTALTOTAL COST BY CHAPTER
BID OPTION #2TRANSPORTATION BUENAVENTURA – GUAPI$ 0.00
BO-2TRANSPORTATION AND LOGISTICS$ 0.00
BO-2.1Transportation Buenaventura - GuapiGBL1.00
VALUE DIRECT COSTS$ 0.00
A.I.U. - VAT$ 0.00
$ 0.00
A . I . U$ 0.00
Administration%
Unforenseens%
Profit%
VAT(Over the profit total value)%
TOTAL PROJECT(COLOMBIAN PESOS)$ 0.00
PERFORMANCE TIME (in calendar days)

Detailed Bidding Chart

DETAILED BIDDING CHART - Guide-
ItemDescriptionUnitQuantityUnit PriceTotal Price
These are examples of how to present this chart. Note this is a guide and just some few examples were included and are not referenced to this specific project.
Civil works
Excavations for pipingm335
Excavations for foundationsm3150
Back fill for slabm3100
Plaster for wallsM250
Electrical and Cabling works
110 OutletsUn20
Voice and data outletsUn14
Electrical channelingMl80
Furniture
Interlocutor ChairsUn18
Work stations 1.50Un18
Floor to ceiling panelsMl60
DIRECT COST
Admin costs%
Unforeseen
Profit%
SUBTOTAL
Taxes IVA
TOTAL

MBD02A036C2