J-2-1_Bidding_charts.xls
XLS spreadsheet 79 KB Posted
- Attached to
- To construct one metallic tower in Gorgona Federal contract opportunity
- Solicitation number
- SAQMMA16R0508
About this file
J-2-1 Solicitation Bidding charts
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Breakdown Price by division
| UNITED STATES DEPARTMENT OF STATE | |||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | |||||
| 1 | 2 | 3 | 4 | 5 | 6 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL |
| 1. General Requirements/Mobilization | |||||
| 2. Site Work | |||||
| 3. Concrete | |||||
| 4. Masonry | |||||
| 5. Metals | |||||
| 6. Wood and Plastic | |||||
| 7. Thermal and Moisture | |||||
| 8. Doors and Windows | |||||
| 9. Finishes | |||||
| 10. Specialties | |||||
| 11. Equipment | |||||
| 12. Furnishings | |||||
| 13. Special Construction | |||||
| 14. Conveying Systems | |||||
| 15. Mechanical | |||||
| 16. Electrical | |||||
| TOTAL | |||||
| Colombian Pesos | |||||
| Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | |||||
| Offeror: Date |
Summary of Activities
| OFICIAL BREAKDOWN CHART | |||||||
| PROJECT: | METALLIC RADAR TOWER AND SHELTER | ||||||
| Place: | NAVY BASES AT GORGONA - CERRO TRINIDAD | ||||||
| Date: | May-16 | ||||||
| BASE CONTRACT | |||||||
| ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL COST | SUB TOTAL | TOTAL COST BY CHAPTER |
| 1 | RADAR TOWER AT GORGONA | $ 0.00 | |||||
| 1.01 | GENERAL REQUIREMENTS | $ 0.00 | |||||
| 1.01.01 | Location and Layout | GBL | 1.00 | ||||
| 1.01.02 | Temporary Facilities (Including enclousure) | GBL | 1.00 | ||||
| 1.01.03 | Removal of surface layer | GBL | 1.00 | ||||
| 1.02 | SITE WORK | $ 0.00 | |||||
| 1.02.01 | Excavations | GBL | 1.00 | ||||
| 1.02.02 | Compacting of the foundation level | GBL | 1.00 | ||||
| 1.02.03 | Filling in compacted granular material | GBL | 1.00 | ||||
| 1.03 | CONCRETE STRUCTURES | $ 0.00 | |||||
| 1.03.01 | Cyclopean concrete Support | GBL | 1.00 | ||||
| 1.03.02 | Reinforcement steel | GBL | 1.00 | ||||
| 1.03.03 | Structural concrete (foundation) | GBL | 1.00 | ||||
| 1.03.04 | Sub-floor concrete slab E=20 cm. | GBL | 1.00 | ||||
| 1.04 | METALLIC TOWER | $ 0.00 | |||||
| 1.04.01 | Fabrication, supply and installation of 55 m. metallic tower | GBL | 1.00 | ||||
| 1.04.02 | Supply and installation of the metallic support platform for the radar transceiver, including support | GBL | 1.00 | ||||
| 1.04.03 | Supply and installation of metallic radar support for the radar | GBL | 1.00 | ||||
| 1.04.04 | Supply and installation Metallic crane for radar uplifting | GBL | 1.00 | ||||
| 1.04.05 | Horizontal raceway for connectivity guide, Mecano system including accessories | GBL | 1.00 | ||||
| 1.04.06 | Vertical safety line ROHN LOCK type, including accessories | GBL | 1.00 | ||||
| 1.04.07 | Painting of metallic tower | GBL | 1.00 | ||||
| 1.05 | TOWER SHELTER AND ENCLOUSURES | $ 0.00 | |||||
| 1.05.01 | Shelter in RBS system | GBL | 1.00 | ||||
| 1.05.02 | Chain link Fence for enclousure | GBL | 1.00 | ||||
| 1.05.03 | Roof Cover Acesco type or similar | GBL | 1.00 | ||||
| 1.05.04 | Supply and installation of floor tiles along the shelter | GBL | 1.00 | ||||
| 1.06 | ELECTRICAL WORKS | $ 0.00 | |||||
| 1.06.01 | Main circuit branches – Low Voltage (LV) | GBL | 1.00 | ||||
| 1.06.02 | Concrete pad with metallic fence | GBL | 1.00 | ||||
| 1.06.03 | Raceway for LV system | GBL | 1.00 | ||||
| 1.06.04 | Metallic enclosure - TP | GBL | 1.00 | ||||
| 1.06.04.01 | Control system | GBL | 1.00 | ||||
| 1.06.04.02 | Power quality analyzer | GBL | 1.00 | ||||
| 1.06.04.03 | TVSS | GBL | 1.00 | ||||
| 1.06.05 | General panel board with breakers | GBL | 1.00 | ||||
| 1.06.06 | Duplex receptacle 120VAC/15A with grounding pin | GBL | 1.00 | ||||
| 1.06.07 | Duplex receptacle 120VAC/15A, outdoor installation | GBL | 1.00 | ||||
| 1.06.08 | Air Extractors | GBL | 1.00 | ||||
| 1.06.09 | AC receptacles for battery rectifiers | GBL | 1.00 | ||||
| 1.06.10 | Air Conditioning System | GBL | 1.00 | ||||
| 1.06.11 | Supply and installation of the illumination system for the working points and the different platforms | GBL | 1.00 | ||||
| 1.06.12 | Fluorescent Lamps | GBL | 1.00 | ||||
| 1.06.13 | Obstruction lights | GBL | 1.00 | ||||
| 1.06.14 | Ladder Cable Tray | GBL | 1.00 | ||||
| 1.06.15 | Supply and installation of stainless steel and rubber sleeves (Boot type) for the transition from the ladder outside shelter to the cable tray inside the shelter | GBL | 1.00 | ||||
| 1.06.16 | Lighting Protection System | GBL | 1.00 | ||||
| 1.06.17 | Installation and startup of the main 15 KW Generator supplied by the Colombian Navy | GBL | 1.00 | ||||
| 1.06.18 | Grounding System | GBL | 1.00 | ||||
| 1.06.19 | Marking | GBL | 1.00 | ||||
| 1.07 | TRANSPORTATION AND LOGISTICS | $ 0.00 | |||||
| 1.07.01 | Lodging for installation process | GBL | 1.00 | ||||
| 1.07.02 | Helicopter Harness | GBL | 1.00 | ||||
| 1.07.03 | Transportation Bogota - Buenaventura | GBL | 1.00 | ||||
| 1.07.04 | Transportation of personnel | GBL | 1.00 | ||||
| 1.07.05 | Material for packing tower material | GBL | 1.00 | ||||
| 1.08 | FUEL SYSTEM FOR GENERATORS | $ 0.00 | |||||
| 1.08.01 | Supply and installation of stainless steel pipeline for the fuel system (30 m. approx.) | GBL | 1.00 | ||||
| 1.08.02 | Supply and installation of decanter filter (4 Units) | GBL | 1.00 | ||||
| 1.08.03 | Supply and installation of Close valves (24 Units) | GBL | 1.00 | ||||
| 1.08.04 | Supply and installation of Flex Hose (5 m approx.) | GBL | 1.00 | ||||
| 1.08.05 | Installation of 450 Gl Fuel Tank, including fuel (50 Gl for tests) | GBL | 1.00 | ||||
| 1.08.06 | Chain Link Fence | GBL | 1.00 | ||||
| 1.09 | ENVIRONMENTAL CONSIDERATIONS ON SITE | $ 0.00 | |||||
| 1.09.01 | Construction of Access Road to Project Site | GBL | 1.00 | ||||
| 1.09.02 | Solid Waste Handling | GBL | 1.00 | ||||
| 1.09.03 | Liquid Waste Handling | GBL | 1.00 | ||||
| 1.09.04 | Temporary Bathroom facilities | GBL | 1.00 | ||||
| 1.09.05 | Protection of Existing Vegetation | GBL | 1.00 | ||||
| 1.09.06 | Noise Mitigation | GBL | 1.00 | ||||
| 1.09.07 | Material for Environmental Training Plan | GBL | 1.00 | ||||
| 1.09.08 | Contingency Plan | GBL | 1.00 | ||||
| 1.09.09 | Forestry Engineer: | GBL | 1.00 | ||||
| 1.09.10 | Biologist | GBL | 1.00 | ||||
| 1.09.11 | Environmental Superintendent | GBL | 1.00 | ||||
| 1.09.12 | Archaeologist | GBL | 1.00 | ||||
| 1.09.13 | Safety Inspector | GBL | 1.00 | ||||
| 1.10 | OTHERS | $ 0.00 | |||||
| 1.10.01 | Supply of complete equipment for working on high (2 Units) | GBL | 1.00 | ||||
| VALUE DIRECT COSTS | $ 0.00 | ||||||
| A.I.U. - VAT | $ 0.00 | ||||||
| $ 0.00 | |||||||
| A . I . U | $ 0.00 | ||||||
| Administration | % | ||||||
| Unforenseens | % | ||||||
| Profit | % | ||||||
| VAT(Over the profit total value) | % | ||||||
| TOTAL PROJECT(COLOMBIAN PESOS) | $ 0.00 | ||||||
| PERFORMANCE TIME (in calendar days) | |||||||
| BID OPTION #1 | |||||||
| ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL COST | SUB TOTAL | TOTAL COST BY CHAPTER |
| BID OPTION #1 | TRANSPORTATION GUAPI PORT – PROJECT SITE (GORGONA-CERRO TRINIDAD) | $ 0.00 | |||||
| BO-1 | TRANSPORTATION AND LOGISTICS | $ 0.00 | |||||
| BO-1.1 | Transportation of materials - Helicopter | GBL | 1.00 | ||||
| VALUE DIRECT COSTS | $ 0.00 | ||||||
| A.I.U. - VAT | $ 0.00 | ||||||
| $ 0.00 | |||||||
| A . I . U | $ 0.00 | ||||||
| Administration | % | ||||||
| Unforenseens | % | ||||||
| Profit | % | ||||||
| VAT(Over the profit total value) | % | ||||||
| TOTAL PROJECT(COLOMBIAN PESOS) | $ 0.00 | ||||||
| PERFORMANCE TIME (in calendar days) | |||||||
| BID OPTION #2 | |||||||
| ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL COST | SUB TOTAL | TOTAL COST BY CHAPTER |
| BID OPTION #2 | TRANSPORTATION BUENAVENTURA – GUAPI | $ 0.00 | |||||
| BO-2 | TRANSPORTATION AND LOGISTICS | $ 0.00 | |||||
| BO-2.1 | Transportation Buenaventura - Guapi | GBL | 1.00 | ||||
| VALUE DIRECT COSTS | $ 0.00 | ||||||
| A.I.U. - VAT | $ 0.00 | ||||||
| $ 0.00 | |||||||
| A . I . U | $ 0.00 | ||||||
| Administration | % | ||||||
| Unforenseens | % | ||||||
| Profit | % | ||||||
| VAT(Over the profit total value) | % | ||||||
| TOTAL PROJECT(COLOMBIAN PESOS) | $ 0.00 | ||||||
| PERFORMANCE TIME (in calendar days) |
Detailed Bidding Chart
| DETAILED BIDDING CHART - Guide- | |||||
| Item | Description | Unit | Quantity | Unit Price | Total Price |
| These are examples of how to present this chart. Note this is a guide and just some few examples were included and are not referenced to this specific project. | |||||
| Civil works | |||||
| Excavations for piping | m3 | 35 | |||
| Excavations for foundations | m3 | 150 | |||
| Back fill for slab | m3 | 100 | |||
| Plaster for walls | M2 | 50 | |||
| Electrical and Cabling works | |||||
| 110 Outlets | Un | 20 | |||
| Voice and data outlets | Un | 14 | |||
| Electrical channeling | Ml | 80 | |||
| Furniture | |||||
| Interlocutor Chairs | Un | 18 | |||
| Work stations 1.50 | Un | 18 | |||
| Floor to ceiling panels | Ml | 60 | |||
| DIRECT COST | |||||
| Admin costs | % | ||||
| Unforeseen | |||||
| Profit | % | ||||
| SUBTOTAL | |||||
| Taxes IVA | |||||
| TOTAL |