S02 - Solicitation - 36C77623R0039.pdf
PDF 679 KB Posted
- Attached to
- 36C77623R0039 - Y1DZ - New Mental Health Building Phase 2 Minor Construction - Providence, RI
- Solicitation number
- 36C77623R0039
About this file
This is a solicitation for a firm-fixed-price construction contract to complete Phase 2 of the New Mental Health Building project at the Providence VA Medical Center in Providence, Rhode Island. The Department of Veterans Affairs, through the Veterans Health Administration's Program Contracting Activity Central, is seeking a general contractor to provide all labor, materials, equipment, supervision, and construction services required based on the provided drawings and specifications. This includes general construction, alterations, civil site work, finishes, HVAC, electrical, plumbing, fire protection, security, and other work. Proposals are due by March 29, 2023. Award will be made to the lowest priced technically acceptable offeror. This procurement is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The contract period is for 455 calendar days from notice to proceed.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C77623R0039
X
02-22-2023
650-347
36C776
Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
Christopher Yong Department of Veterans Affairs Program Contract Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131
Christopher Yong 561-422-1456
In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside.
The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion of the "Phase 2 of the New Mental Health Building" construction project, in accordance with the attached Specifications and Drawings.
The project is located at the:
830 Chalkstone Avenue Providence, RI 02908
VAAR Magnitude of Construction: $5,000,000 to $10,000,000
Contractor is required to fill in Unique Identifier in Block No. 14 on Standard Form (SF) 1442.
All references in the Specs and Drawings to CLIN shall be replaced with the term Line Item.
PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.
10 455
X X 52.211-10
X 10
0 3:00 PM EST
03-29-2023
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
See Price Schedule
36C776
Department of Veterans Affairs Program Contract Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
VAFSC
Department of Veterans Affairs Financial Services Center Invoices to be Submitted Electronically https://www.fsc.va.gov/einvoice.asp e-Invoice Setup Info Phone 877-489-6135 877-353-9791 512-460-5429
Katherine Gibney
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
INFORMATION REGARDING PROPOSAL MATERIAL, BID GUARANTEE AND BONDS
1.1 BID MATERIAL:
1.2 BID GUARANTEE:
1.3 PAYMENT & PERFORMANCE BONDS:
INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO OFFERORS
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS
2.2 REQUEST FOR PROPOSAL:
2.3 SDVOSB SET-ASIDE
2.4 PRE-PROPOSAL SITE VISIT:
2.5 TECHNICAL QUESTIONS:
2.6 AMENDMENTS
2.7 PREPARATION OF PROPOSALS
2.8 PROPOSAL REQUIREMENTS
2.10 DETERMINATION OF RESPONSIBILITY
2.11 VETS 4212
2.12 SYSTEM FOR AWARD MANAGEMENT (SAM)
2.13 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE
ASSESSMENT REPORTING SYSTEM (CPARS)
2.14 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS
2.15 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, OR PROJECT
MANAGER
2.16 52.216-1 TYPE OF CONTRACT (APR 1984)
2.17 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY
SITE OF THE WORK (MAY 2014)
2.18 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
2.19 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
2.20 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.21 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB
1995)
2.22 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
2.23 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE
RESOLUTION (OCT 2018)
2.24 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2022) ...24
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—
CERTIFICATION (NOV 2021)
GENERAL CONDITIONS
4.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
4.2 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(OCT 2022)
4.3 52.223-20 AEROSOLS (JUN 2016)
4.4 52.223-21 FOAMS (JUN 2016)
4.5 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE
AGREEMENTS (DEC 2022)
4.6 52.236-4 PHYSICAL DATA (APR 1984)
4.7 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.8 MANDATORY WRITTEN DISCLOSURES
4.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.10 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)
4.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
4.12 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (MAY 2020)
4.13 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE OF VERIFIED SERVICE-
DISABLED VETERAN-OWNED SMALL BUSINESSES (NOV 2022)
4.14 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING —
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022)
4.15 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)
4.16 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
4.17 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)
4.18 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
4.19 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
4.20 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.21 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
4.22 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
4.23 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ..63
4.24 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
?.## CONTRACTING OFFICER‘S REPRESENTATIVE (DEC 2022)
4.25 LIST OF ATTACHMENTS
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00 JB __________________ __________________
Line Item 0001, (General Construction): Work includes general construction, electrical, mechanical, structural, architectural and civil work to be performed consistent with the attached Specifications and Drawings
The contractor shall complete the entire project no later than 455 calendar days after receipt of the NOTICE TO PROCEED Contract Period: Base POP Begin:
POP End:
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Y1DZ - Construction of Other Hospital Buildings
Line Item 0002, Deduct Alternate No. 1: Base Bid minus:
a. Remove wood look texture wall from waiting rooms 033, 130 and 203. Provide standard accent paint and wall protection instead to match adjacent corridors
b. Remove epoxy flooring EPY from mechanical room 215
c. Remove all wall protection WP-1 from project.
d. Remove all corner guards CG1 and EWG-1 from project
All work shall be performed consistent with Specifications and Drawings.
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction
Line Item 0003, Deduct Alternate No. 2: Base Bid minus deduct alternate No. 1 and
a. Remove (3) storefront windows, associated window shades and solid surface sills, and brick inset along CMU wall at grid 2- 2. CMU to be continuous at elevation where windows and brick are removed.
b. Remove Light Glass Clearstory light fixtures from basement rooms 037, 039, 040, 041, 042 and 043.
c. Remove wall tile in all restrooms on all walls other than wet walls behind sinks and toilets, replace with paint finish.
d. Remove 2 trees and 20 deciduous shrubs from project.
e. Replace all glazed interior door types G and FG with Type
All work shall be performed consistent with the Specifications and Drawings.
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction
Line Item 0004, Deduct Alternate No. 3: Base Bid Minus Deduct Alternate No. 1 and 2 and
a. Remove spray foam insulation in exterior wall. Exterior wall to maintain U-0.064 max assembly u-factor.
b. Provide blast resistant storefront system in lieu of blast resistant curtain wall system at both sides of waiting rooms 033, 130 and 203. Storefront system to have matching metal panel and insulation at slab edges.
c. Reduce under slab insulation from under the entire slab, to under a 48” slab perimeter only.
d. Remove roof access hatch and access stair from mechanical room 215.
All work shall be performed consistent with Specifications and Drawings.
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction
Line Item 0005, Deduct Alternate No. 4: Base Bid minus Deduct Alternate No. 1, 2 and 3 and
a. Do not install Chiller 3 to provide N+1 redundancy. Cap and valve piping at existing Phase 1 Chiller to allow for installation at a future date.
b. Similar interior zones to be combined to reduce the number of VAV boxes. VAV boxes shall be grouped together to serve similar zones & functions (ie – offices). Provide one thermostat and one VAV per every 3 spaces to be grouped together. Increase ductwork and piping to serve new larger VAV box. Locate thermostat in middle space.
All work shall be performed consistent with Specifications and Drawings.
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction
Line Item 0006, Deduct Alternate No. 5: Base Bid minus Deduct Alternate No. 1, 2, 3 and 4 and Remove all occupied rooms from the second floor and create shell space as follows: Remove all interior partitions (including walls, wall finishes, power and data) and doors from rooms: 209, 210, 211, 212, 213, 214, 218, 219, 220, 221, 222 and 223. Remove all interior partitions (including walls, wall finishes, power and data), plumbing fixtures, accessories and doors from rooms: 207 and 208. Exterior walls to receive GWB, wall base, power and data as shown. All floors and ceilings to remain.
All work shall be performed consistent with Specifications and Drawings.
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction
GRAND TOTAL __________________
NOTICE
1. LINE ITEM 0001 (Base) contains all the work for this project.
2. Offerors must provide a lump sum price for all line items. Failure to do so may render their offeror as unacceptable.
3. If adequate funds are available, it is the intent of VA-PCAC to award the base LINE ITEM
0001 to the lowest priced technically acceptable offeror. If funds are not available, VA- PCAC will move on to LINE ITEM 0002 (Deduct Alternate 1). VA-PCAC will award LINE ITEM 0002 (Deduct Alternate 1) to the lowest priced technically acceptable offeror if funds are available. If funds are not available, VA-PCAC will move on to LINE ITEM 0003 (Deduct Alternate 2). VA-PCAC will award LINE ITEM 0003 (Deduct Alternate 2) to the lowest priced technically acceptable offeror if funds are available. If funds are not available, VA-PCAC will move on to LINE ITEM 0004 (Deduct Alternate 3). VA-PCAC will award LINE ITEM 0004 (Deduct Alternate 3) to the lowest priced technically acceptable offeror if funds are available.
If funds are not available, VA-PCAC will move on to LINE ITEM 0005 (Deduct Alternate 4).
VA-PCAC will award LINE ITEM 0005 (Deduct Alternate 4) to the lowest priced technically acceptable offeror if funds are available. If funds are not available, VA-PCAC will move on to LINE ITEM 0006 (Deduct Alternate 5). VA-PCAC will award LINE ITEM 0006 (Deduct Alternate 5) to the lowest priced technically acceptable offeror if funds are available.
4. Pricing shall be submitted in whole dollar values. Please do NOT include pricing in cents.
INFORMATION REGARDING PROPOSAL MATERIAL, BID GUARANTEE AND BONDS
1.1 BID MATERIAL:
Proposal materials consisting of drawings, specifications, and contract forms are included and/or attached as part of this Request for Proposal (RFP). The VA will not provide printed copies of drawings or specifications. It is the responsibility of the offeror to obtain the proposal materials in a time and manner sufficient to respond to this solicitation by the specified due date.
1.2 BID GUARANTEE:
A Bid Guarantee, Standard Form 24 (SF 24), is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for receipt of proposals, may result in the proposal being deemed unacceptable. Copies of the SF 24 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.
1.3 PAYMENT & PERFORMANCE BONDS:
The offeror to whom award is made will be required to furnish two bonds. A Payment Bond shall be provided on Standard Form 25A (SF 25A) and a Performance Bond shall be provided on Standard Form 25 (SF 25). Both bonds shall be submitted in accordance with FAR 52.228-15 Performance and Payment Bonds - Construction, which can be located under FAR 52.252-2 Clauses Incorporated by Reference. Copies of SFs 25A and 25 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.
http://www.gsa.gov/portal/forms/type/TOP http://www.gsa.gov/portal/forms/type/TOP
INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO OFFERORS
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS
All solicitation-related documents will be published to Contract Opportunities at https://sam.gov/.
2.2 REQUEST FOR PROPOSAL:
This is a Request for Proposal (RFP) in accordance with FAR Part 15. Award will be made to the offeror whose proposal represents the “best value” to the Government Utilizing the Lowest Price Technically Acceptable (LPTA) method of evaluation. In order to receive consideration for award, a rating of ACCEPTABLE must be achieved for both Factor 1 – Specialized Experience (Technical/Non-Price) and Factor 2 - Project Schedule (Technical/Non-Price). A responsibility determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors.
All proposals shall be subject to evaluation by a team of Government personnel. The Government reserves the right to award without discussions based upon the initial evaluation of the proposals.
Evaluations will be based on the following evaluation factors:
1. Specialized Experience (Technical/Non-Price)
2. Project Schedule (Technical/Non-Price)
3. Price
2.3 SDVOSB SET-ASIDE
This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Business concerns. Offers received from other than Service-Disabled Veteran-Owned Small Business concerns will not be considered. All Service-Disabled Veteran-Owned Small Businesses must be listed as “verified” by the VA’s Center for Veterans Enterprises (CVE) http://www.vetbiz.gov. Offerors must be verified by CVE and visible in the Vendor Information Pages (VIP) database at TIME OF SUBMISSION OF PROPOSALS AND TIME OF AWARD.
Failure to be BOTH visible and verified at the time of proposal submission and time of award will result in the offeror’s proposal being deemed unacceptable and ineligible for award.
2.4 PRE-PROPOSAL SITE VISIT:
A formal site visit has been scheduled for this project. This will be the only opportunity for potential offerors to visit the site. All potential offerors, subcontractors, and suppliers are strongly encouraged to attend this site visit.
The time and location of the organized site visit is:
Construction Trailer T38, 830 Chalkstone Avenue, Providence, RI 02908 at 9AM EST on Wednesday 1 March 2023.
NOTE: Although not required, it is highly recommended that those who attend the pre-proposal site visit for this project, review the drawings ahead of time. Due to the continued care of our veterans, there may be areas that cannot be accessed during the pre-proposal site visit. Any questions regarding these areas can be addressed during the technical question period of the solicitation.
See FAR 52.236-27 of this solicitation for further information.
2.5 TECHNICAL QUESTIONS:
Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Christopher Yong and Katherine Gibney. Questions shall be submitted https://sam.gov/ http://www.vetbiz.gov/ only via e-mail to: christopher.yong@va.gov and katherine.gibney@va.gov. The subject line must read: Construct Mental Health Phase 2 - Providence - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS March 8, 2023, at 3:00 PM ET.
2.6 AMENDMENTS
Amendments to this solicitation will be posted at https://sam.gov/. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your proposal being considered unacceptable.
2.7 PREPARATION OF PROPOSALS
The Government will not pay for any costs incurred in the preparation and submission of proposals.
2.8 PROPOSAL REQUIREMENTS
A. General:
1. Proposal Submission: Offerors shall submit their proposals via email to christopher.yong@va.gov and Katherine.gibney@va.gov. Proposals shall be based on solicitation document issued for RFP number 36C77623R0039.
Proposals will be in the format stipulated in this document. Proposals shall be received on or before the date and time specified in Block 13 of the SF 1442.
There will be no public opening of the proposals. Only e-mail proposals will be accepted. Hard-copy proposals will not be accepted.
B. Proposal Format:
1. Technical, Price and Administrative sections of the Offerors proposals will be evaluated independently; therefore, the Offeror shall submit the proposal in three
(3) Volumes: Volume I Technical, Volume II Price and Volume III Administrative.
In order that the Volume I Technical may be evaluated strictly on the merit of the material submitted, the contractor shall include NO price information in Volume I.
Offeror shall separate Volumes I, II and III. Each volume must be labeled with the Offeror's organization, business address, and VA Solicitation Number. The volumes shall be submitted in electronic format as searchable PDF documents.
The proposal, in its entirety, shall not exceed three (3) emails (one email for each volume) of 5MB each. Include page numbers and the company name in the header or footer of each page.
2. Volume I Technical: Offerors shall format the Volume I Technical proposal as listed below. The specific evaluation criteria and methodology for Volume I is contained in Sections C(1), (2) and Section D
a. The offer, including title page, detailed table of contents, preface shall be submitted in one (1) PDF document for Volume I Technical and shall not exceed a total of FIFTEEN (15) pages (title page, table of contents and preface are excluded from the page limits) in Microsoft Times New Roman 12 font. The Offeror shall not include any price or price related material in the Volume I proposal. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.
b. A page is defined as each face of an 8.5 X 11-inch sheet of paper with 1-inch margins around the page perimeter containing information. Note, submission of the project schedule only, can be mailto:christopher.yong@va.gov mailto:christopher.yong@va.gov submitted by utilizing larger paper (11 X 17 inch). All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. Note, this does not apply for the submission of the project schedule. The background color of each page of the submission shall be white or ivory stock only and each page shall count as one (1) page. Excess pages will not be evaluated. Text lines will be single-spaced, and proposals shall be submitted using Times New Roman, with font no smaller than 12 point with normal proportional spacing. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Times New Roman are permissible in the presentation of graphic material only.
c. The Offeror’s responses shall clearly address each evaluation factor listed in this solicitation. Failure to submit in the format required and clearly address those factors may result in this offer being rated unacceptable.
3. Volume II Price: Offerors shall format the Volume II Price proposal as listed below. The specific evaluation criteria and methodology for Volume II is contained in Sections D and E.
a. Volume II Price shall not exceed a total of TEN (10) pages in Times New Roman size 12 font.
b. Offerors shall complete the Price Schedule in part A of this solicitation.
c. The Offeror shall submit their price information on the Price Schedule provided in this Solicitation. The Offeror shall submit a bid guarantee as stipulated in the solicitation. The prices shall be Firm Fixed Price.
C. Volume I - Technical Proposal Requirements: The proposal shall address the following submission requirements for Factor 1 Specialized Experience (Technical/Non-Price) & Factor 2 Project Schedule (Technical/Non-Price).
1. Factor 1, Specialized Experience (Technical/Non-Price):
The offeror shall demonstrate experience on projects with similar features, magnitudes, and complexities. Specialized experience for the offeror should be submitted to show experience in following areas/disciplines: experience regarding driven piles, deep and shallow foundations, slope stability, earth retention, and support of excavation. Submit a minimum of one (1) and a maximum of five (5) construction projects that best demonstrates the offeror’s specialized experience and technical competence in the type of work required above. Provide a description of the project(s) completed and include a detailed explanation of the type(s) of experience referenced above. For the projects submitted under specialized experience, provide the point of contact for the owner of the project. The VA may use this information to confirm performance of the project.
2. Factor 2, Project Schedule (Technical/Non-Price):
Prepare and submit a practicable construction schedule showing all necessary work elements to complete the project identified under this solicitation for CLIN 0001 Base Bid and the applicable period of performance pertaining to CLIN 0001. (Do not include the Deduct Alternate CLINS as part of the Project Schedule.) This schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period.
The submitted schedule must be developed using project scheduling software such as MS Project, Primavera, or any other comparable form.
Each Offeror's construction schedule must address the following:
• Order of work elements to include project phasing
• Number of days for each work element
• Identification of long lead time materials
• Identification of separate work elements
The proposed schedule must include the activities which are consistent with those described within the project specifications and drawings and must not exceed the Government's maximum allowable performance period, as noted in Block 11 of the SF 1442. The project will start at the issuance of the Notice to Proceed. For scheduling purposes, assume the Notice to Proceed will be issued thirty (30) calendar days after the award date. (Note that there is no guarantee the Notice to Proceed will be issued within this timeframe.)
*The schedule submitted with the offer should not be construed as the agreed upon schedule as per FAR 52.236-15.
D. Volume II – Price Proposal Requirements
a. Carefully follow “Instructions, Conditions, and Notices to Offerors”. Standard form (SF) 1442 Solicitation Offer and Award (Construction, Alteration, or Repair) and the Pricing Schedule when submitting price offers. Submit a bid guarantee as stipulated in the solicitation.
b. The prices shall be Firm Fixed Price. The Offeror shall take care not to include remarks that take exception to the Government’s Specifications/Drawings or pricing requirements or otherwise preclude the Government from evaluating the offer, which will render the offer unacceptable.
c. Bid Bond: The bid bond shall be submitted as part of the electronic submission.
Failure to provide electronic copy of the bid bond with your proposals at the time of submittal may deem the proposal UNACCEPTABLE. An original hard copy of the bid bond will be requested by the VA during the responsibility determination.
Failure to furnish the required bid guarantee on the proper form and for the proper amount by the time specified in Block 13 of SF 1442, may result in rejection of the proposal. See FAR Provision 52.228-1, Bid Guarantee, contained in the solicitation.
E. Volume III Administrative Information: Offerors shall include the following in Volume III. All of the below information must be provided. Failure to provide the requested information may deem the proposal UNACCEPTABLE.
i. Representations & Certifications:
As the provision at FAR 52.204-7 is included in the solicitation, FAR 52.204-8 (d) applies and the fill-in for FAR 52.204-8 (b)(2) does not need to be completed. The offeror is required to complete the annual representations and certifications electronically at https://www.sam.gov.
ii. Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment:
Offeror shall provide their response to FAR 52.204-24 (d) Representation.
iii. Information Regarding Responsibility Matters:
Offeror shall provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.
iv. Violation of Arms Controls Treaties or Agreements:
Offeror shall provide their response to FAR 52.209-13 (b) Violation of Arms Controls Treaties or Agreements.
v. Tax on Certain Foreign Procurements – Notice and Representation:
The offeror shall provide their response to FAR 52.229-11 (d).
vi. Post Award Small Business Program Representations:
Offeror shall provide their response to FAR 52.219-28 items (h)(1), (h)(6), and (h)(7).
vii. Limitations on Subcontracting:
The offeror shall complete and sign the VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction required in VAAR 852.219-75 and return it with their proposal submission is attached as a separate document (Limitations on Subcontracting). The completed and signed form will become part of the official award documentation.
viii. Experience Modification Rate:
The Offeror shall include the Safety of Environmental Violations and Experience Modification Rating (EMR) Information, including filling out the attached document Contractor Safety and Environmental Record Evaluation Form.
(1) Provide offeror’s information pertaining to their past Safety and Environmental record. The information must contain a certification that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
(2) Provide offeror’s information regarding their current EMR. This information shall be obtained from the Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an Offeror’s EMR is above 1.0, Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.
https://www.sam.gov/
(3) Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.
(4) If the NCCI cannot issue an EMR because the Offeror lacks insurance history, Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead, and include a letter from the NCCI indicating that is has assigned Offeror a Unity Rating of 1.0.
(5) The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
(6) This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.
(7) Failure to provide the above EMR documentation, may result in a determination that an Offerors proposal is unacceptable.
(8) Offerors shall ensure the Signed Standard Form (SF) 1442 is provided. The Offeror’s signature on the SF 1442 must be a hand signature and not an electronic signature.
(9) Offerors shall acknowledge receiving amendments by filling out section 19 of the SF 1442.
(10) Offerors shall ensure the Signed Standard Form (SF) 1442 is provided. Offerors shall acknowledge receiving amendments by filling out section 19 of the SF 1442.
F. Evaluation Methodology:
All Offerors are advised that, in the interest of efficiency, the Government reserves the right to conduct the evaluation in the most effective manner.
Specifically, the Government may first evaluate the total proposed price of all Offerors. Thereafter, the Government will evaluate the technical proposal of the lowest priced Offeror only. If the lowest priced Offeror’s technical proposal is determined to be rated as Acceptable, the Government may make award to that Offeror without further evaluation of the remaining Offerors’ technical proposals.
If the lowest priced Offeror’s technical proposal is determined to be rated as Unacceptable, then the Government may evaluate the next lowest priced technical proposal, and so forth and so on, until the Government reaches the lowest priced technical proposal that is determined to be rated as Acceptable.
However, the Government reserves the right to evaluate all Offerors’ technical proposals should it desire to conduct discussions, or otherwise determine it to be in the Government’s best interest.
Factor 1, Specialized Experience – Information submitted will be reviewed to determine if the offeror’s Specialized Experience is ACCEPTABLE or
UNACCEPTABLE.
An offeror’s Specialized Experience shall be deemed ACCEPTABLE if submitted projects demonstrate performance of a minimum of four (4) out of the five (5) earthwork activities (driven piles, deep and shallow foundations, slope stability, earth retention, and support of excavation). Experience in these areas may span several projects or may be demonstrated within the confines of a single project.
Thus, an offeror may submit one project containing all five (5) requested activities or it may proffer several projects each containing one (1) activity. No additional consideration shall be given for instances of experience that exceed the requisite minimum level. An offeror’s specialized experience shall be rated UNACCEPTABLE if it fails to demonstrate completion of at least four (4) out of the five (5) specified activities.
Factor 2, Project Schedule - Information submitted will be reviewed to determine if the offeror’s Project Schedule is ACCEPTABLE or UNACCEPTABLE.
An offeror’s Project Schedule shall be deemed ACCEPTABLE if it (1) properly identifies all elements of work along the critical path; (2) all items identified are properly linked and (3) makes reasonable efforts to ensure that the project is phased in such a way as to minimize disruption to VA services. An offeror’s Project Schedule shall be deemed UNACCETPABLE if it (1) fails to identify all elements of work along the critical path; (2) fails to link all critical path work elements or (3) makes no reasonable efforts to ensure continuity of VA services.
Factor 3, Price:
VA-PCAC will award CLIN 0001 (Base Bid) to the lowest priced technically acceptable offeror if funds are available. If funds are not available, VA-PCAC will move on to CLIN 0002 (Deduct Alternate 1). VA-PCAC will award CLIN 0002 (Deduct Alternate 1) to the lowest priced technically acceptable offeror if funds are available. If funds are not available, VA-PCAC will move on to CLIN 0003 (Deduct Alternate 2). VA-PCAC will award CLIN 0003 (Deduct Alternate 2) to the lowest priced technically acceptable offeror if funds are available. If funds are not available, VA-PCAC will move on to CLIN 0004 (Deduct Alternate 3). VA- PCAC will award CLIN 0004 (Deduct Alternate 3) to the lowest priced technically acceptable offeror if funds are available. If funds are not available, VA-PCAC will move on to CLIN 0005 (Deduct Alternate 4). VA-PCAC will award CLIN 0005 (Deduct Alternate 4) to the lowest priced technically acceptable offeror if funds are available. If funds are not available, VA-PCAC will move on to CLIN 0006 (Deduct Alternate 5). VA-PCAC will award CLIN 0006 (Deduct Alternate 5) to the lowest priced technically acceptable offeror if funds are available.
Please note: If all Deduct Alternates have been applied and no offerors are within the available funding limitation, the VA reserves the right to enter into discussions with those offerors who are determined to be within the competitive range, if a competitive range is determined in the interest of the VA, otherwise discussion will be with all offerors.
If the Offeror communicates in its proposal any qualifications, exceptions, exclusions, or conditions to the proposed prices, the Contracting Officer may reject the proposal and exclude the Offeror from further consideration for award.
2.9 Use of Advisors
Contractors are advised that VA contractor personnel may assist the Government during the Government’s evaluation of Proposals. The persons shall be authorized access to only those portions of the proposal and discussions that are necessary to enable them to provide specific technical advice on specialized matters or on particular problems. These individuals will be required to protect the confidentiality of any specifically identified trade secrets and/or privileged or confidential commercial or financial information obtained as a result of their participation in this evaluation. They shall be expressly prohibited from scoring, ranking or recommending the selection of an Offeror.
2.10 DETERMINATION OF RESPONSIBILITY
A Determination of Responsibility will be conducted for the apparent successful offeror prior to award of the project. The above information, along with other information obtained from Government systems, such as, but not limited to the OSHA and EPA online inspection history databases, as well as any other information the Contracting Officer has determined to be valid, will be used to make the Determination of Responsibility. NOTE: Any information received by the Government that would be cause for a negative Determination of Responsibility may make the offeror ineligible for award.
2.11 VETS 4212
Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at:
http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification prior to awarding the project.
2.12 SYSTEM FOR AWARD MANAGEMENT (SAM)
Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at https://sam.gov/ and enter all mandatory information into the system. Offerors are required to be registered in SAM at the time an offer is submitted in order to comply with the annual representations and certifications requirements (see FAR 52.204-7).
2.13 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE
ASSESSMENT REPORTING SYSTEM (CPARS)
As prescribed in Federal Acquisition Regulation (FAR) Part 42.1502(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $750,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement, VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS is available to all Federal agencies and is the system used to collect and retrieve performance assessment reports used in source selection determinations. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.
http://www.dol.gov/vets/vets4212.htm
Each contractor whose contract award is estimated to exceed $750,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help in registering can be obtained by contacting Customer Support Desk @ DSN: 684-1690 or COMM: 207- 438- 1690. Registration should occur no later than thirty days after contract award and must be kept current should there be any change to the contractor’s registered representative.
For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.
Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.
2.14 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS
All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation is commensurate with the level of access needed to perform all work as identified in the solicitation documents. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor. Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements.
2.15 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, OR PROJECT MANAGER
Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager,” or their abbreviations shall be replaced with “Contracting Officer’s Representative (COR).”
2.16 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.17 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF
THE WORK (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
http://www.cpars.gov/
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.18 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
3.0 % 6.9 %
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
Providence, RI
(End of Provision)
2.19 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, other than designated country construction material, that is not listed…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .