Attachment 24 - Sheet P-001.pdf
PDF 304 KB Posted
- Attached to
- 36C77623R0039 - Y1DZ - New Mental Health Building Phase 2 Minor Construction - Providence, RI
- Solicitation number
- 36C77623R0039
About this file
This document package includes a federal construction contract solicitation and related technical specifications. The solicitation seeks proposals for a firm-fixed-price design-build contract to construct Phase 2 of a new Mental Health building at the Providence VA Medical Center in Providence, Rhode Island. Work includes general construction, site work, finishes, HVAC, electrical, plumbing, fire protection and alarm, security, and other items defined in the construction documents. Proposals are due based on the solicitation number 36C77623R0039 issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas. The technical specifications provide plumbing details for the project, including general notes, symbols, legends, and plans for gravity and pressure systems at various levels.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH THE RHODE ISLAND PLUMBING CODE
AND VA FACILITY STANDARDS.
2. LOCATE VALVES IN ACCESSIBLE AREAS WHERE NECESSARY. (12"X12" MIN.)
3. COORDINATE ACTUAL LOCATIONS OF MECHANICAL FLOOR DRAINS WITH FINAL EQUIPMENT
LOCATIONS ON SHOP DRAWINGS.
4. VENT PIPING SHOWN IS ONLY FOR DIAGRAMMATIC PURPOSES. COORDINATE FINAL VTR
LOCATIONS AND MAINTAIN A MINIMUM CLEARANCE OF 25'-0" WITH ALL HVAC AIR INTAKES
AND WINDOW OPENINGS. TERMINATE VTR A MINIMUM OF 18" AND A MAXIMUM OF 24" ABOVE
THE ROOF.
5. PROVIDE PIPE MARKER FOR ALL PIPING ABOVE THE CEILING SPACES IN ACCORDANCE WITH
SPECIFICATIONS.
6. PROVIDE AND INSTALL WATER WATER HAMMER ARRESTORS IN ACCORDANCE WITH PDI-
WH201 IN ALL HW AND CW SUPPLY PIPING WITH QUICK CLOSING VALVES AS REQUIRED. AIR
CHAMBERS ARE NOT ACCEPTABLE SUBSTITUTIONS.
7. PROVIDE THERMAL INSULATION FOR HOT WATER AND HOT WATER RETURN PIPING IN
ACCORDANCE WITH THE VA PLUMBING DESIGN MANUAL AND PER SPECIFICATIONS.
8. THE MANUFACTURERS OF EQUIPMENT SHOWN ARE THE BASIS OF DESIGN AND ARE THE
OWNER'S PREFERRED MANUFACTURER OF CHOICE. SEE SPECIFICATION FOR OTHER
ACCEPTABLE MANUFACTURER'S.
9. FIRE CAULK AND SLEEVE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. REFER TO
LIFE SAFETY PLANS FOR RATED ASSEMBLY LOCATIONS. REFER TO ARCHITECTURAL SHEETS
FOR DETAILS AND UL ASSEMBLY NUMBERS.
10. REFER TO ARCHITECTURAL SHEETS FOR FIXTURE MOUNTING.
11. COORDINATE UNDERGROUND PIPING INVERT ELEVATIONS WITH STRUCTURAL FOOTING
ELEVATIONS AND CIVIL INVERT CONNECTIONS PRIOR TO ANY UNDERGROUND PIPING
INSTALLATIONS. IF FOOTINGS ARE IN CONFLICT AND WHERE A PIPING ROLL DOWN IS NOT
POSSIBLE, COORDINATE WITH GENERAL CONTRACTOR FOR DROPS IN FOOTING AS
REQUIRED.
12. COORDINATE CEILING PIPING AND ELEVATIONS IN SHOP DRAWINGS WITH ALL OTHER
TRADES (I.E. HVAC, FIRE PROTECTION, ELECTRICAL, TELECOMM, STRUCTURAL, ETC.) PRIOR
TO ANY INSTALLATION TO ENSURE PROPER CLEARANCES AND PENETRATIONS.
13. SLOPE SANITARY PIPING 2-1/2" OR LESS AT 1/4" PER FOOT. SLOPE SANITARY PIPING 3" AND
LARGER AT 1/8" PER FOOT.
14. VALVES AND FITTINGS SHALL BE THE SAME SIZE AS THE PIPING WHERE THEY ARE LOCATED
UNLESS NOTED OTHERWISE.
15. PROVIDE ALL NECESSARY SUPPORTING DEVICES FOR FIXTURES PER MANUFACTURER
INSTALLATION INSTRUCTIONS.
16. ROUGH-IN WASTE AND WATER SUPPLIES FOR FIXTURES AND PERFORM FINAL
CONNECTIONS PER MANUFACTURER RECOMMENDATIONS.
17. ROUGH IN FLUSH VALVE WATER CLOSETS SO THAT THE FLUSH VALVE HANDLE IS TO THE
WIDE SIDE OF THE ROOM.
18. COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) ACCESSIBILITY GUIDELINES
FOR BUILDINGS AND FACILITIES.
19. ALL AUTOMATIC CONTROL, PROTECTIVE OR SIGNAL DEVICES REQUIRED FOR THE
OPERATION SPECIFIED, SHALL BE PROVIDED WITH ANY CONTROL WIRING AND INSTALLED
PER MANUFACTURERS REQUIREMENTS.
20. THE PRIMARY ROOF DRAIN SYSTEM HAVE BEEN DESIGNED TO HANDLE 3 INCHES OF HEAD
OVER THE PRIMARY ROOF DRAIN. THE ROOF DRAIN BASIS OF DESIGN IS JAY R SMITH,
MODEL NUMBER 1010-C-U-CID.
21. PROVIDE AN AIR GAP, WHEN REQUIRED BY CODE, SERVING INDIVIDUAL FIXTURES, DEVICES, APPLIANCES AND APPARATUS.
22. SHOP DRAWING SUBMITTALS SHALL BE FULLY COORDINATED PRIOR TO SUBMITTAL.
23. USE OF PRESS-CONNECT TYPE FITTINGS IS PROHIBITED.
PLUMBING ABBREVIATIONSPLUMBING SYMBOL LEGEND
SYMBOL DESCRIPTION
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT
MED AIR PIPINGMA
110° HOT WATER PIPINGHW
HOT WATER RETURN PIPINGHWR
STO STORM OVERFLOW (SECONDARY)
ST STORM (PRIMARY)
SANITARY DRAINAGE PIPING (UNDERGROUND)S U/G
SANITARY DRAINAGE PIPING (ABOVE SLAB)S
V VENT PIPING
GATE VALVE
PRESSURE GAUGE
THERMOMETER
CHECK VALVE
BALL VALVE CIRCULATING PUMP
PIPE END CAP
PIPE TURNING DOWN
PIPE TURNING UP
PIPE TURNING DOWN (TEE)
NATURAL GAS PIPING
CLEANOUTS
CW COLD WATER PIPING
CND CONDENSATE PIPING
CIRCUIT SETTER VALVE
OR
PDI-"A" WATER HAMMER ARRESTER & SIZE
THERMOSTATIC MIXING VALVE
HB-1 OR WHY-1 HOSE BIBB / WALL HYDRANT
FLOW ARROW
P-TRAP
ROLL DOWN
PIPING TEE
ST U/G STORM PIPING (UNDERGROUND)
G
PRESSURE REGULATING VALVE
BUTTERFLY VALVE
SYMBOL DESCRIPTIONSYMBOL DESCRIPTION
AS ABOVE SLAB
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AP ACCESS PANEL
ASTM AMERICAN STANDARDS TESTING MATERIALS
AWWA AMERICAN WATER WORKS ASSOCIATION
BFP BACKFLOW PREVENTER
BS BELOW SLAB
BF BELOW FLOOR
BG BELOW GRADE
CA COMPRESSED AIR
CD CONDENSATE
CO CLEANOUT
CONN CONNECTION
CONT CONTINUOUS
CP CONDENSATE PUMP
CW COLD WATER
DF DRINKING FOUNTAIN
DFU DRAINAGE FIXTURE UNITS
DIA DIAMETER
DN DOWN
DWG DRAWING
DW DOMESTIC WATER
E EXISTING
ECO EXTERIOR CLEANOUT
ELEV ELEVATION
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
ºF DEGREES FAHRENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FIN FINISH
FL FLOOR
FPS FEET PER SECOND
FT FEET
FU FIXTURE UNITS
G NATURAL GAS
GAL GALLON(S)
GPM GALLONS PER MINUTE
GR GREASE WASTE
HB HOSE BIBB
HP HORSEPOWER
HR HOUR
HWR HOT WATER RETURN
HZ HERTZ
IE INVERT ELEVATION
ID INTERNAL DIAMETER
IN INCHES
IPS INTERNATIONAL PIPE STANDARD
IRR IRRIGATION WATER
KW KILOWATT
LAV LAVATORY
LF LINEAR FEET
MA MED AIR
MAX MAXIMUM
MIN MINIMUM
MNTG MOUNTING
MS MOP SINK
MV MED VACUUM
N NEW
NA NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NSF NATIONAL SANITATION FOUNDATION
NTS NOT TO SCALE
O2 OXYGEN
OD OUTSIDE DIAMETER
ORWL OVERFLOW RAIN WATER LEADER
PDI PLUMBING DRAINAGE INSTITUTE
PH PHASE
PPP PRECISION PLUMBING PRODUCTS
PSI POUNDS PER SQUARE INCH
RP RECIRCULATION PUMP
RPM REVOLUTIONS PER MINUTE
RWL RAIN WATER LEADER
S SANITARY
SAN SANITARY
SH SHOWER
SK SINK
SL SODA LINE
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
ST STORM
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TET THERMAL EXPANSION TANK
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
U/G UNDERGROUND
UNO UNLESS NOTED OTHERWISE
UR URINAL
V VENT
VTR VENT THROUGH ROOF
VIV VALVE IN VERTICAL
VLV VALVE
VOL VOLUME
W WATTS
W/ WITH
WC WATER CLOSET
WCO WALL CLEANOUT
WHA WATER HAMMER ARRESTOR
WHY WALL HYDRANT
WFU WATER SUPPLY FIXTURE UNITS
A
B
SIM
A
SECTION SYMBOL:
A = IDENTIFYING LETTER
B = SHEET WHERE SECTION IS SHOWN
SIM =
(ONLY NOTED IF IT APPLIES)
PLUMBING RISER DESIGNATION:
A = RISER IDENTIFYING SYSTEM TYPE
1 =
REVISION CLOUD AND
REVISION NUMBER
SHEET NOTE CALLOUT
A
TITLE SYMBOL ON SHEET WHERE SHOWN
A = IDENTIFYING NUMBER/LETTER
POINT OF CONNECTION
RISER IDENTIFYING SYSTEM NUMBER
SIMILAR
XX
ABBR. DESCRIPTION ABBR. DESCRIPTION
PLUMBING GENERAL NOTES
WATER HAMMER ARRESTOR
SYMBOL
1/2"
PIPE SIZE PDI STANDARD FIXTURE UNIT CAP.
3/4"
1"
1-1/4"
A
B
C
D
1 TO 11
12 TO 32
33 TO 60
61 TO 113
MED VACUUM PIPINGMV
OXYGEN PIPINGO2
EXISTING PIPING
NEW PIPING
DEMOLISHED PIPING
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/1
/2
:2
:2
A M
B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
P-001
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
ADL AJZFEB 04 2022
CONSTRUCTION
DOCUMENTS
PLUMBING LEGENDS, SYMBOLS, &
GENERAL NOTES
FULLY SPRINKLERED
Allen D. Lantz, P.E.
MD License #41513
PLUMBING DRAWING INDEX
Sheet Number Sheet Name
P-001 PLUMBING LEGENDS, SYMBOLS, & GENERAL NOTES
PS101 PLUMBING GRAVITY - LEVEL B UNDERSLAB PLAN
PS111 PLUMBING GRAVITY - LEVEL B PLAN
PS121 PLUMBING GRAVITY - LEVEL 1 PLAN
PS131 PLUMBING GRAVITY - LEVEL 2 PLAN
PS141 PLUMBING GRAVITY - ROOF PLAN
PP111 PLUMBING PRESSURE - LEVEL B PLAN
PP121 PLUMBING PRESSURE - LEVEL 1 PLAN
PP131 PLUMBING PRESSURE - LEVEL 2 PLAN
PP132 PLUMBING - LEVEL 2 PH1 PLAN
P-401 PLUMBING ENLARGED PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING ISOMETRICS - PRESSURE
P-602 PLUMBING ISOMETRICS - GRAVITY
P-801 PLUMBING SCHEDULES
Revisions: Revision Description Date:
File details come from the government source that posted it. Updated .