Attachment 24 - Sheet P-001.pdf

PDF 304 KB Posted

Attached to
36C77623R0039 - Y1DZ - New Mental Health Building Phase 2 Minor Construction - Providence, RI
Solicitation number
36C77623R0039
Issued by

About this file

This document package includes a federal construction contract solicitation and related technical specifications. The solicitation seeks proposals for a firm-fixed-price design-build contract to construct Phase 2 of a new Mental Health building at the Providence VA Medical Center in Providence, Rhode Island. Work includes general construction, site work, finishes, HVAC, electrical, plumbing, fire protection and alarm, security, and other items defined in the construction documents. Proposals are due based on the solicitation number 36C77623R0039 issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas. The technical specifications provide plumbing details for the project, including general notes, symbols, legends, and plans for gravity and pressure systems at various levels.

View the file

Other files

File Type Posted
36C77623R0039 0002.pdf PDF
Attachment 18 - Addendum 01.pdf PDF
Attachment 23 - MDP Panel Info.pdf PDF
Attachment 20 - Updated Wage Rates.pdf PDF
Attachment 21 - CR211 Panel Info.pdf PDF
Attachment 19 - Technical Questions and Answers.xlsx XLSX spreadsheet
Attachment 22 - Fire Alarm As-Builts.pdf PDF
S02 - Solicitation - 36C77623R0039_R1.pdf PDF
Attachment 17 - Site Visit Sign in Sheet.pdf PDF
36C77623R0039 0001.pdf PDF
Attachment 08 - Fire Protection Drawings.pdf PDF
Attachment 03 - Architectural Drawings - Pt 1.pdf PDF
Attachment 12 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 04 - Architectural Drawings - Pt 2.pdf PDF
Attachment 02 - Specifications - Pt 2.pdf PDF
Attachment 15 - Providence County - Wage Rates.pdf PDF
Attachment 11 - Structural Drawings.pdf PDF
Attachment 14 - VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx DOCX document
Attachment 16 - SOW - Mental Health Phase 2.pdf PDF
Attachment 05 - Civil Drawings.pdf PDF
S02 - Solicitation - 36C77623R0039.pdf PDF
Attachment 01 - Specifications - Pt 1.pdf PDF
Attachment 07 - Electrical Drawings - Pt 2.pdf PDF
Attachment 10 - Plumbing Drawings.pdf PDF
Attachment 13 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 06 - Electrical Drawings - Pt 1.pdf PDF
Attachment 09 - Mechanical Drawings.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH THE RHODE ISLAND PLUMBING CODE

AND VA FACILITY STANDARDS.

2. LOCATE VALVES IN ACCESSIBLE AREAS WHERE NECESSARY. (12"X12" MIN.)

3. COORDINATE ACTUAL LOCATIONS OF MECHANICAL FLOOR DRAINS WITH FINAL EQUIPMENT

LOCATIONS ON SHOP DRAWINGS.

4. VENT PIPING SHOWN IS ONLY FOR DIAGRAMMATIC PURPOSES. COORDINATE FINAL VTR

LOCATIONS AND MAINTAIN A MINIMUM CLEARANCE OF 25'-0" WITH ALL HVAC AIR INTAKES

AND WINDOW OPENINGS. TERMINATE VTR A MINIMUM OF 18" AND A MAXIMUM OF 24" ABOVE

THE ROOF.

5. PROVIDE PIPE MARKER FOR ALL PIPING ABOVE THE CEILING SPACES IN ACCORDANCE WITH

SPECIFICATIONS.

6. PROVIDE AND INSTALL WATER WATER HAMMER ARRESTORS IN ACCORDANCE WITH PDI-

WH201 IN ALL HW AND CW SUPPLY PIPING WITH QUICK CLOSING VALVES AS REQUIRED. AIR

CHAMBERS ARE NOT ACCEPTABLE SUBSTITUTIONS.

7. PROVIDE THERMAL INSULATION FOR HOT WATER AND HOT WATER RETURN PIPING IN

ACCORDANCE WITH THE VA PLUMBING DESIGN MANUAL AND PER SPECIFICATIONS.

8. THE MANUFACTURERS OF EQUIPMENT SHOWN ARE THE BASIS OF DESIGN AND ARE THE

OWNER'S PREFERRED MANUFACTURER OF CHOICE. SEE SPECIFICATION FOR OTHER

ACCEPTABLE MANUFACTURER'S.

9. FIRE CAULK AND SLEEVE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. REFER TO

LIFE SAFETY PLANS FOR RATED ASSEMBLY LOCATIONS. REFER TO ARCHITECTURAL SHEETS

FOR DETAILS AND UL ASSEMBLY NUMBERS.

10. REFER TO ARCHITECTURAL SHEETS FOR FIXTURE MOUNTING.

11. COORDINATE UNDERGROUND PIPING INVERT ELEVATIONS WITH STRUCTURAL FOOTING

ELEVATIONS AND CIVIL INVERT CONNECTIONS PRIOR TO ANY UNDERGROUND PIPING

INSTALLATIONS. IF FOOTINGS ARE IN CONFLICT AND WHERE A PIPING ROLL DOWN IS NOT

POSSIBLE, COORDINATE WITH GENERAL CONTRACTOR FOR DROPS IN FOOTING AS

REQUIRED.

12. COORDINATE CEILING PIPING AND ELEVATIONS IN SHOP DRAWINGS WITH ALL OTHER

TRADES (I.E. HVAC, FIRE PROTECTION, ELECTRICAL, TELECOMM, STRUCTURAL, ETC.) PRIOR

TO ANY INSTALLATION TO ENSURE PROPER CLEARANCES AND PENETRATIONS.

13. SLOPE SANITARY PIPING 2-1/2" OR LESS AT 1/4" PER FOOT. SLOPE SANITARY PIPING 3" AND

LARGER AT 1/8" PER FOOT.

14. VALVES AND FITTINGS SHALL BE THE SAME SIZE AS THE PIPING WHERE THEY ARE LOCATED

UNLESS NOTED OTHERWISE.

15. PROVIDE ALL NECESSARY SUPPORTING DEVICES FOR FIXTURES PER MANUFACTURER

INSTALLATION INSTRUCTIONS.

16. ROUGH-IN WASTE AND WATER SUPPLIES FOR FIXTURES AND PERFORM FINAL

CONNECTIONS PER MANUFACTURER RECOMMENDATIONS.

17. ROUGH IN FLUSH VALVE WATER CLOSETS SO THAT THE FLUSH VALVE HANDLE IS TO THE

WIDE SIDE OF THE ROOM.

18. COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) ACCESSIBILITY GUIDELINES

FOR BUILDINGS AND FACILITIES.

19. ALL AUTOMATIC CONTROL, PROTECTIVE OR SIGNAL DEVICES REQUIRED FOR THE

OPERATION SPECIFIED, SHALL BE PROVIDED WITH ANY CONTROL WIRING AND INSTALLED

PER MANUFACTURERS REQUIREMENTS.

20. THE PRIMARY ROOF DRAIN SYSTEM HAVE BEEN DESIGNED TO HANDLE 3 INCHES OF HEAD

OVER THE PRIMARY ROOF DRAIN. THE ROOF DRAIN BASIS OF DESIGN IS JAY R SMITH,

MODEL NUMBER 1010-C-U-CID.

21. PROVIDE AN AIR GAP, WHEN REQUIRED BY CODE, SERVING INDIVIDUAL FIXTURES, DEVICES, APPLIANCES AND APPARATUS.

22. SHOP DRAWING SUBMITTALS SHALL BE FULLY COORDINATED PRIOR TO SUBMITTAL.

23. USE OF PRESS-CONNECT TYPE FITTINGS IS PROHIBITED.

PLUMBING ABBREVIATIONSPLUMBING SYMBOL LEGEND

SYMBOL DESCRIPTION

NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT

MED AIR PIPINGMA

110° HOT WATER PIPINGHW

HOT WATER RETURN PIPINGHWR

STO STORM OVERFLOW (SECONDARY)

ST STORM (PRIMARY)

SANITARY DRAINAGE PIPING (UNDERGROUND)S U/G

SANITARY DRAINAGE PIPING (ABOVE SLAB)S

V VENT PIPING

GATE VALVE

PRESSURE GAUGE

THERMOMETER

CHECK VALVE

BALL VALVE CIRCULATING PUMP

PIPE END CAP

PIPE TURNING DOWN

PIPE TURNING UP

PIPE TURNING DOWN (TEE)

NATURAL GAS PIPING

CLEANOUTS

CW COLD WATER PIPING

CND CONDENSATE PIPING

CIRCUIT SETTER VALVE

OR

PDI-"A" WATER HAMMER ARRESTER & SIZE

THERMOSTATIC MIXING VALVE

HB-1 OR WHY-1 HOSE BIBB / WALL HYDRANT

FLOW ARROW

P-TRAP

ROLL DOWN

PIPING TEE

ST U/G STORM PIPING (UNDERGROUND)

G

PRESSURE REGULATING VALVE

BUTTERFLY VALVE

SYMBOL DESCRIPTIONSYMBOL DESCRIPTION

AS ABOVE SLAB

ADA AMERICANS WITH DISABILITIES ACT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

AP ACCESS PANEL

ASTM AMERICAN STANDARDS TESTING MATERIALS

AWWA AMERICAN WATER WORKS ASSOCIATION

BFP BACKFLOW PREVENTER

BS BELOW SLAB

BF BELOW FLOOR

BG BELOW GRADE

CA COMPRESSED AIR

CD CONDENSATE

CO CLEANOUT

CONN CONNECTION

CONT CONTINUOUS

CP CONDENSATE PUMP

CW COLD WATER

DF DRINKING FOUNTAIN

DFU DRAINAGE FIXTURE UNITS

DIA DIAMETER

DN DOWN

DWG DRAWING

DW DOMESTIC WATER

E EXISTING

ECO EXTERIOR CLEANOUT

ELEV ELEVATION

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXIST EXISTING

ºF DEGREES FAHRENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FIN FINISH

FL FLOOR

FPS FEET PER SECOND

FT FEET

FU FIXTURE UNITS

G NATURAL GAS

GAL GALLON(S)

GPM GALLONS PER MINUTE

GR GREASE WASTE

HB HOSE BIBB

HP HORSEPOWER

HR HOUR

HWR HOT WATER RETURN

HZ HERTZ

IE INVERT ELEVATION

ID INTERNAL DIAMETER

IN INCHES

IPS INTERNATIONAL PIPE STANDARD

IRR IRRIGATION WATER

KW KILOWATT

LAV LAVATORY

LF LINEAR FEET

MA MED AIR

MAX MAXIMUM

MIN MINIMUM

MNTG MOUNTING

MS MOP SINK

MV MED VACUUM

N NEW

NA NOT APPLICABLE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NSF NATIONAL SANITATION FOUNDATION

NTS NOT TO SCALE

O2 OXYGEN

OD OUTSIDE DIAMETER

ORWL OVERFLOW RAIN WATER LEADER

PDI PLUMBING DRAINAGE INSTITUTE

PH PHASE

PPP PRECISION PLUMBING PRODUCTS

PSI POUNDS PER SQUARE INCH

RP RECIRCULATION PUMP

RPM REVOLUTIONS PER MINUTE

RWL RAIN WATER LEADER

S SANITARY

SAN SANITARY

SH SHOWER

SK SINK

SL SODA LINE

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

ST STORM

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TET THERMAL EXPANSION TANK

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TYP TYPICAL

UL UNDERWRITER'S LABORATORY

U/G UNDERGROUND

UNO UNLESS NOTED OTHERWISE

UR URINAL

V VENT

VTR VENT THROUGH ROOF

VIV VALVE IN VERTICAL

VLV VALVE

VOL VOLUME

W WATTS

W/ WITH

WC WATER CLOSET

WCO WALL CLEANOUT

WHA WATER HAMMER ARRESTOR

WHY WALL HYDRANT

WFU WATER SUPPLY FIXTURE UNITS

A

B

SIM

A

SECTION SYMBOL:

A = IDENTIFYING LETTER

B = SHEET WHERE SECTION IS SHOWN

SIM =

(ONLY NOTED IF IT APPLIES)

PLUMBING RISER DESIGNATION:

A = RISER IDENTIFYING SYSTEM TYPE

1 =

REVISION CLOUD AND

REVISION NUMBER

SHEET NOTE CALLOUT

A

TITLE SYMBOL ON SHEET WHERE SHOWN

A = IDENTIFYING NUMBER/LETTER

POINT OF CONNECTION

RISER IDENTIFYING SYSTEM NUMBER

SIMILAR

XX

ABBR. DESCRIPTION ABBR. DESCRIPTION

PLUMBING GENERAL NOTES

WATER HAMMER ARRESTOR

SYMBOL

1/2"

PIPE SIZE PDI STANDARD FIXTURE UNIT CAP.

3/4"

1"

1-1/4"

A

B

C

D

1 TO 11

12 TO 32

33 TO 60

61 TO 113

MED VACUUM PIPINGMV

OXYGEN PIPINGO2

EXISTING PIPING

NEW PIPING

DEMOLISHED PIPING

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/1

/2

:2

:2

A M

B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

P-001

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING LEGENDS, SYMBOLS, &

GENERAL NOTES

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

PLUMBING DRAWING INDEX

Sheet Number Sheet Name

P-001 PLUMBING LEGENDS, SYMBOLS, & GENERAL NOTES

PS101 PLUMBING GRAVITY - LEVEL B UNDERSLAB PLAN

PS111 PLUMBING GRAVITY - LEVEL B PLAN

PS121 PLUMBING GRAVITY - LEVEL 1 PLAN

PS131 PLUMBING GRAVITY - LEVEL 2 PLAN

PS141 PLUMBING GRAVITY - ROOF PLAN

PP111 PLUMBING PRESSURE - LEVEL B PLAN

PP121 PLUMBING PRESSURE - LEVEL 1 PLAN

PP131 PLUMBING PRESSURE - LEVEL 2 PLAN

PP132 PLUMBING - LEVEL 2 PH1 PLAN

P-401 PLUMBING ENLARGED PLANS

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING ISOMETRICS - PRESSURE

P-602 PLUMBING ISOMETRICS - GRAVITY

P-801 PLUMBING SCHEDULES

Revisions: Revision Description Date:

File details come from the government source that posted it. Updated .