Attachment 16 - SOW - Mental Health Phase 2.pdf
PDF 100 KB Posted
- Attached to
- 36C77623R0039 - Y1DZ - New Mental Health Building Phase 2 Minor Construction - Providence, RI
- Solicitation number
- 36C77623R0039
About this file
This document outlines the scope of work for a construction project at the Providence VA Medical Center in Rhode Island. The Department of Veterans Affairs is soliciting proposals for a firm-fixed-price contract to furnish all labor, materials, tools, equipment, and supervision for the expansion and renovation of space for a new mental health building phase 2 project. The selected contractor will be responsible for general construction, site work, finishes, HVAC, electrical, plumbing, fire alarm and suppression systems, security, and all other work according to the provided drawings and specifications. The project involves the demolition of existing structures and equipment as well as construction activities to complete the new mental health facility. All work must be done in accordance with infection control procedures and with approved interim life safety measures and work permits.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
27 June 2022
CONTRACTOR SCOPE OF WORK SYNOPSIS
VA Medical Center Providence, RI
New Mental Health Building – Phase 2
PROJECT 650-347
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures/equipment, and furnish labor and materials and perform work for the Expansion and Renovation of Space for the New Mental Health Building Phase 2 Construction Project at the
Providence Veterans Affairs Medical Center, Providence, Rhode Island as required by drawings and specifications and per the description herein.
This project shall include, but not be limited to general construction, alterations, civil site work, finishes, HVAC, electrical work, plumbing, fire alarm and suppression, security and other items as contained within the construction documents. Refer to contract documents (drawings and specifications) for complete details of project work.
As VAMC Providence is a 24/7 medical facility the contractor will be required to perform some work outside of VAMC Providence’s normal working hours. VAMC Providence’s normal working hours are 7:00am EST to 5:00pm EST. Refer to Specifications for limitations and requirements on work scheduling and off hours work.
After award, but prior to the start of any field work, the contractor shall contact the VA Project
Manager to review proposed methods and plans for completion of work and to review infection control procedures, interim life safety procedures, above ceiling and wall penetration permits, hot work permits and the contractor’s site-specific safety plan.
This Scope of Work is not considered to be a comprehensive description of work details for this project. All work shall be completed per approved plans and specifications.