Attachment 06 - Electrical Drawings - Pt 1.pdf
PDF 12 MB Posted
- Attached to
- 36C77623R0039 - Y1DZ - New Mental Health Building Phase 2 Minor Construction - Providence, RI
- Solicitation number
- 36C77623R0039
About this file
This solicitation is seeking proposals for a firm-fixed-price construction contract to complete phase two of a new mental health building project at the Providence VA Medical Center in Rhode Island. The Department of Veterans Affairs intends to award a single contract to furnish all labor, materials, equipment and supervision for general construction, site work, alterations, finishes, HVAC, electrical, plumbing, fire alarm and suppression systems, security and other work contained in the construction documents. The contractor will perform all work consistent with the provided drawings and specifications. The solicitation number is 36C77623R0039 and proposals are due by the date specified in the solicitation. The construction project involves completing phase two of a new mental health building to serve veterans at the Providence VA Medical Center.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1PH SINGLE-PHASE
3PH THREE-PHASE
4W FOUR-WIRE
A/E ARCHITECT/ENGINEER
AF AMPERE FRAME OR AMP FUSE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMP AMPERE
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BLDG BUILDING
C CONDUIT
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CKT CIRCUIT
CLG CEILING
COAX COAX CABLE
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUE
COORD COORDINATE
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CU COPPER
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DISC DISCONNECT
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DS DISCONNECT SWITCH
DWG DRAWING
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
ETR EXISTING TO REMAIN
ELECTRICAL ABBREVIATIONS
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FLA FULL LOAD AMPS
FP FIRE PROTECTION
FT FEET OR FOOT
GND GROUND
G or GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HZ HERTZ
IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH AMERICA
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LRA LOCKED ROTOR AMPS
LTG LIGHTING
LV LOW VOLTAGE
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT MICROWAVE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NEUT OR N NEUTRAL
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OL OVERLOAD
P POLE
PA PUBLIC ADDRESS
PCB POLYCHLORINATED BIPHENYL
PH PHASE
PNL PANEL
POD POWER OPERATED DAMPER
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
REQD REQUIRED
SCC SHORT CIRCUIT CAPACITY
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
W WATT
WH WATER HEATER
WP WEATHERPROOF
XFER TRANSFER
XFMR TRANSFORMER
ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION
AWG AMERICAN WIRE GAUGE
KCMIL ONE-THOUSAND CIRCULAR MILS
NA NOT APPLICABLE
HD HEAT DETECTOR
TEE SPLICE
FOUR-WAY SPLICE
NEW (HEAVY, SOLID LINE)
EXISTING TO REMAIN (LIGHT, SOLID LINE)
ABC
PANELBOARD MAIN CIRCUIT BREAKER TYPE, ONE-LINE
### - INDICATES BREAKER RATING
ABC - INDICATES PANEL DESIGNATION
ABC
PANELBOARD MAIN LUG TYPE, ONE-LINE
### - INDICATES BUS RATING
ABC - INDICATES PANEL DESIGNATION
DN
DN
THRU-ROOF CONDUCTOR
DOWN CONDUCTOR
GROUND TERMINAL
AIR TERMINAL; PROVIDE PARAPET TYPE BASE WHERE MOUNTED ON PARAPET;
PROVIDE FLAT BASE FOR MECHANICAL EQUIPMENT OR ROOF PERIMETER WITH NO
PARAPET; PROVIDE BLUNT TIP WHERE MOUNTED ON INTERIOR OF ROOF, UNLESS
OTHERWISE NOTED ON LIGHTNING PROTECTION PLANS
BONDING PLATE
LIGHTNING PROTECTION SYSTEM
DISCONNECT SWITCH, FUSED
DISCONNECT SWITCH, UNFUSED
JUNCTION BOX
EARTH GROUND
RECEPTACLE, DUPLEX
RECEPTACLE, DOUBLE DUPLEX (QUADRAPLEX)
ELECTRICAL SYMBOLS - POWER/LIGHTING PLANS
SWITCH (# SUBSCRIPT AS INDICATED BELOW) - SEE PLANS AND SPECIFICATIONS FOR DETAILS
BLANK = SINGLE POLE 2 = DOUBLE POLE
4 = FOUR-WAY
K = KEY OPERATED
P = WITH PILOT LIGHT
RC= REMOTE CONTROL
WP= WEATHER PROOF
OS= DUAL TECHNOLOGY OCCUPANCY SENSOR
a= SUBSCRIPT DEFINES FIXTURES THAT ARE CONTROLLED BY SWITCH
X= EXPLOSION PROOF
HOA= HAND/OFF/AUTOMATIC
3 = THREE-WAY
D = DIMMER
F = FAN SWITCH
LV= LOW VOLTAGE - SEE BELOW FOR DETAILS
T = TIMER OPERATED
M = MANUAL MOTOR STARTING
MP= MOTOR SNAP WITH PILOT LIGHT
(THERMAL TYPE)
E= SWITCH ON EMERGENCY CIRCUIT
(RED DEVICE)
LIGHTING, EXTERIOR BUILDING
J
SYMBOL DESCRIPTION DESCRIPTION
ALARM, FIRE, PANEL; LETTERS INDICATE AS FOLLOWS:
NAC = BOOSTER PANEL FACP = CONTROL PANEL
FAAP = ANNUNCIATOR PANEL
FACP
DESCRIPTION
SUBSCRIPTS (TYPICAL FOR ALL RECEPTACLES):
G = GFCI TYPE
CH = MOUNTED AT COUNTER HEIGHT WITH BOTTOM OF DEVICE AT 6" ABOVE BACKSPLASH
TV = RECEPTACLE MOUNTED ADJACENT TO TV OUTLET
USB = DUPLEX RECEPTACLE WITH (1) USB TYPE 'A' AND (1) USB TYPE 'C'
WP = DEVICE PROVIDED WITH WEATHERPROOF IN-USE METAL COVER
EWC = DENOTES DEVICE FOR ELECTRIC WATER COOLER - COORDINATE WITH EWC INSTALLER FOR
MOUNTING HEIGHT
E = WIRED TO CRITICAL BRANCH CIRCUIT; PROVIDE RED DEVICE AND COVER PLATE
TRANSFORMER, PLAN
BRANCH CIRCUIT HOMERUN. "ABCD" INDICATES PANEL NAME, "##" INDICATE POLE POSITIONS IN PANEL. ONE
SEPARATE GREEN GROUNDING CONDUCTOR SHALL BE PROVIDED FOR EACH HOMERUN
T
ABCD-## TRANSFORMER, ONE-LINE
FUSIBLE DISCONNECT SWITCH, ONE-LINE
###AF - INDICATES FUSE RATING
###AS - INDICATED SWITCH RATING
###AF
BRANCH CIRCUIT PANELBOARD, OVER 250 VOLTS, SURFACE MOUNTED
BRANCH CIRCUIT PANELBOARD, OVER 250 VOLTS, FLUSH MOUNTED
BRANCH CIRCUIT PANELBOARD, UNDER 250 VOLTS, SURFACE MOUNTED
BRANCH CIRCUIT PANELBOARD, UNDER 250 VOLTS, FLUSH MOUNTED
SWITCHBOARD/ SWITCHGEAR/ DISTRIBUTION PANEL, UNDER 250 VOLTS
SWITCHBOARD/ SWITCHGEAR/ DISTRIBUTION PANEL - OVER 250 VOLTS
LOW VOLTAGE SWITCH - SEE PLANS, SPECIFICATIONS AND WIRING DIAGRAMS FOR DETAILS
LV2Da
S
S
'D' INDICATES 0-10V DIMMING
'2' INDICATES NUMBER OF ZONES CONTROLLED
VFD VARIABLE FREQUENCY DRIVE
A
EXIT LIGHT, LED, WALL MOUNTED
EXIT LIGHT, LED, CEILING OR PENDANT MOUNTED; DIRECTIONAL ARROWS AS INDICATED; SHADED QUADRANT
INDICATES FACE(S) OF LUMINAIRE
LED, RECESSED, PENDANT OR SURFACE CEILING LUMINAIRE
LED, RECESSED, PENDANT OR SURFACE CEILING LIGHTING FIXTURE
SHADING INDICATES FIXTURE CONNECTED TO EMERGENCY CIRCUIT
OR PROVIDED WITH INTEGRAL EMERGENCY BATTERY PACK; "E"
AFTER FIXTURE TYPE TAG INDICATES INTEGRAL BATTERY PACK
UNLESS OTHERWISE NOTED ON LIGHT FIXTURE SCHEDULE
(TYPICAL FOR ALL LIGHT FIXTURE SYMBOLS)
LED FIXTURE, RECESSED, PENDANT OR SURFACE CEILING
LED STRIP LUMINAIRE
FIXTURE TYPE
LOWER CASE LETTER INDICATES CONTROLLING SWITCH
a
CIRCUIT NUMBER
LED, WALL MOUNTED LUMINAIRE
DN
UP
CONDUIT CONTINUED
CONDUIT STUBBED OUT OR UP
CONDUIT TURNING DOWN
CONDUIT TURNING UP
MULTI-SERVICE FLOOR BOX WITH DUPLEX RECEPTACLE, VOICE/DATA/AV DEVICES (REFER TO TECHNOLOGY
DRAWINGS OR OWNER'S VENDOR DRAWINGS FOR LOW VOLTAGE REQUIREMENTS)
CEILING MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSORGROUND BUS BAR, COPPER
SPD SURGE PROTECTIVE DEVICE
SYMBOL SYMBOL
WALL MOUNTED JUNCTION BOXJ
LPP LIGHTING POWER PACK RELAY
LPD LIGHTING POWER PACK RELAY WITH 0-10V DIMMING
###AS
ELECTRICAL ONE-LINE
###A
BRANCH CIRCUIT BREAKER
### - INDICATES BREAKER RATING
OS
a
LOWER CASE LETTER INDICATES FIXTURES CONTROLLED
LOWER CASE LETTER INDICATES FIXTURES / RELAY CONTROLLED
'LV' INDICATES LOW VOLTAGE SWITCH
ELECTRICAL DRAWING INDEX
SHEET DESCRIPTION
E-001 ELECTRICAL LEGENDS
E-002 ELECTRICAL GENERAL NOTES
E-100 ELECTRICAL SITE PLAN
EL201 LEVEL B PLAN - LIGHTING
EL202 LEVEL 1 PLAN - LIGHTING
EL203 LEVEL 2 PLAN - LIGHTING
EP201 LEVEL B PLAN - POWER
EP202 LEVEL 1 PLAN - POWER
EP203 LEVEL 2 PLAN - POWER
EP213 LEVEL 2 PHASE 1 - POWER
EP214 ROOF PLAN - LIGHTNING PROTECTION
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL ONE-LINE DIAGRAM
E-801 ELECTRICAL SCHEDULES
E-802 ELECTRICAL PANEL SCHEDULES
E-803 ELECTRICAL PANEL SCHEDULES
EC101 ELECTRICAL CALCULATIONS - LEVEL B
EC102 ELECTRICAL CALCULATIONS - LEVEL 1
EC103 ELECTRICAL CALCULATIONS - LEVEL 2
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/1
/2
:5
:2
A
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
E-001
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR SDLFEB 04 2022
CONSTRUCTION
DOCUMENTS
ELECTRICAL LEGENDS
FULLY SPRINKLERED
JOHN F. RAINE, P.E.
MD License #41408Revisions: Revision Description Date:
ELECTRICAL GENERAL NOTES ELECTRICAL DEMOLITION NOTES
WHERE THERE IS A DISCREPANCY BETWEEN ABOVE GENERAL NOTES AND SPECIFICATIONS, WHERE APPLICABLE, SPECIFICATIONS SHALL BE FOLLOWED
APPLICABLE CODES
1. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL CODE (NEC), NFPA 70 - 2020
b. NATIONAL FIRE ALARM CODE, NFPA 72 - 2019
c. LIFE SAFETY CODE, NFPA 101 – 2021
d. STANDARD FOR THE INSTALLATION OF LIGHTNING PROTECTION SYSTEMS, NFPA 780
e. HEALTH CARE FACILITIES CODE, NFPA 99 - 2021
2. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL SAFETY CODE, ANSI C2
3. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
4. FEDERAL COMMUNICATION COMMISSION (FCC)
5. NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
6. INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
7. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
8. NATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
9. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
10. ILLUMINATION ENGINEERING SOCIETY (IES)
11. ANTI-FRICTION BEARING MANUFACTURERS ASSOCIATION (AFBMA)
12. BUILDING OFFICIALS AND CODE ADMINISTRATORS INTERNATIONAL, INC. (BOCA)
13. INTERNATIONAL CODE COUNCIL (ICC):
a. INTERNATIONAL BUILDING CODE (IBC)
14. UNIFORM BUILDING CODE (UBC)
15. NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION INSTALLATION STANDARDS (NECA)
16. AMERICANS WITH DISABILITIES ACT (ADA)
17. APPLICABLE STATE AND LOCAL CODES, AMENDMENTS, REGULATIONS, AND PRACTICES.
18. APPLICABLE REGULATORY REQUIREMENTS AND ADVISORY PRACTICES OF APPROPRIATE
a. AUTHORITIES HAVING JURISDICTION (AHJs).
19. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER.
20. VA ELECTRICAL DESIGN MANUAL - 2019
21. VA LIGHTING DESIGN MANUAL - 2015
General:
1. THE DRAWINGS AND APPLICABLE SPECIFICATIONS SHALL BE CONSIDERED SUPPLEMENTARY,
ONE TO THE OTHER AND ARE CONSIDERED THE "CONTRACT DOCUMENTS". ALL WORKMANSHIP,
METHODS AND/OR MATERIALS DESCRIBED OR IMPLIED BY ONE AND NOT DESCRIBED OR
IMPLIED BY THE OTHER SHALL BE PROVIDED, FURNISHED OR PERFORMED AS IF IT HAD
APPEARED IN BOTH SECTIONS. THE TERM "CONTRACT DOCUMENTS" DESCRIBED HEREIN IS
NOT LIMITED SOLELY TO THE ELECTRICAL PORTION OF THE DRAWINGS AND SPECIFICATIONS,
BUT ENCOMPASSES THE DRAWINGS AND SPECIFICATIONS OF ALL DIVISIONS AS A WHOLE.
2. PROVIDE AN OPERATING AND MAINTENANCE MANUAL TO OWNER PRIOR TO THE FINAL
ACCEPTANCE. THE MANUAL SHALL INCLUDE, AS A MINIMUM, (1) SUBMITTAL DATA STATING
EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING
MAINTENANCE. ALSO PROVIDE TWO OPERATIONS AND MAINTENANCE MANUALS FOR EACH
PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS
AND METHOD OF OPERATION FOR EQUIPMENT SHALL BE CLEARLY IDENTIFIED, AND THE NAME,
PHONE NUMBER AND ADDRESS OF AT LEAST ONE QUALIFIED SERVICE AGENCY.
3. INCLUDE ALL COSTS FOR EXCAVATION, SAW CUTTING, DIRECTIONAL BORING, CORE DRILLING, BACKFILLING, SURFACE RESTORATION, REPAIR OF FINISHES, ETC. THAT IS REQUIRED IN ORDER
TO MEET THE PROJECT REQUIREMENTS.
4. INCLUDE IN BID ALL COSTS ASSOCIATED WITH TEMPORARY ELECTRICAL SERVICE AS REQUIRED
FOR USE BY ALL TRADES DURING CONSTRUCTION. REMOVE TEMPORARY POWER AT THE
COMPLETION OF THE PROJECT. OBTAIN AND PAY FOR ALL REQUIRED PERMITS FOR
TEMPORARY POWER. ENGINEER OF RECORD SHALL BE PROVIDED WITH ADDITIONAL
COMPENSATION FROM THE CONTRACTOR WHERE SIGNED & SEALED DRAWINGS ARE
REQUESTED BY THE CONTRACTOR TO THE ENGINEER OF RECORD IF REQUIRED BY THE AHJ
FOR THE TEMPORARY POWER.
5. PROVIDE A COMPLETE UL LISTED LIGHTNING PROTECTION SYSTEM WITH A MASTER LABEL FOR
THE ENTIRE FACILITY PER THE REQUIREMENTS OF NFPA 780, AND THE DIVISION 26
SPECIFICATIONS, UNLESS NOTED OTHERWISE. LIGHTNING PROTECTION SYSTEM SHALL
INCLUDE BURIED COUNTERPOISE, UNLESS NOTED OTHERWISE.
6. INCLUDE IN BID THE TRANSPORT AND DISPOSAL OR RECYLING OF ALL WASTE MATERIALS
GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL RULES,
REGULATIONS AND GUIDELINES APPLICABLE. COMPLY FULLY WITH FLORIDA STATUTES
REGARDING MERCURY-CONTAINING DEVICES, AND WITH ALL DEP AND EPA APPLICABLE
GUIDELINES AT THE TIME OF DISPOSAL. PROVIDE OWNER WITH WRITTEN CERTIFICATION OF
ACCEPTED DISPOSAL.
7. ALL POWER CIRCUITS HAVE BEEN DESIGNED IN COMPLIANCE WITH SECTION C405.7.3 OF THE
ENERGY CONSERVATION CODE, REQUIRING 2% OR LESS VOLTAGE DROP FOR FEEDERS, AND
3% OR LESS VOLTAGE DROP FOR BRANCH CIRCUITS.
ELECTRICAL SYSTEM HAS BEEN DESIGNED IN ACCORDANCE WITH THE 2020 NATIONAL
ELECTRICAL CODE (NFPA 70).
8. ALL BRANCH CIRCUITS SHALL BE FURNISHED WITH A DEDICATED NEUTRAL. SHARED NEUTRALS
ARE NOT ALLOWED UNLESS SPECIFICALLY NOTED ON THE DRAWINGS.
9. VERIFY AND COORDINATE LOCATIONS OF ANY MISCELLANEOUS EQUIPMENT REQUIRING
ELECTRICAL CONNECTIONS (I.E., COPIERS, FAX MACHINES, PRINTERS, KITCHEN APPLIANCES, LAUNDRY APPLIANCES, PROJECTION SCREENS, SHOP TOOLS, MACHINE, ELEVATORS, ETC.)
WITH APPROVED SHOP DRAWINGS, OWNER-PROVIDED CUT SHEETS, MANUFACTURER'S
INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION, PRIOR TO ROUGH IN, AND
PROVIDE ALL NECESSARY ELECTRICAL REQUIRED.
10. VERIFY AND COORDINATE LOCATIONS AND EXACT ELECTRICAL REQUIREMENTS FOR ALL
MECHANICAL, PLUMBING AND FIRE PROTECTION EQUIPMENT PRIOR TO SUBMITTAL OF SHOP
DRAWINGS OF ELECTRICAL EQUIPMENT. PROVIDE ALL NECESSARY RACEWAYS, CONDUCTORS,
BOXES, EQUIPMENT, ACCESSORIES, ASSOCIATED DISCONNECT SWITCHES, CIRCUIT BREAKERS,
CONTROL TRANSFORMERS, FIRE ALARM SHUTDOWN, ETC. REQUIRED FOR A COMPLETE AND
OPERATIONAL SYSTEM. COORDINATE WITH APPROPRIATE TRADE'S APPROVED SHOP
DRAWINGS, MANUFACTURER'S INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION,
PRIOR TO ROUGH IN, AND PROVIDE ALL NECESSARY ELECTRICAL REQUIRED, UNLESS
OTHERWISE NOTED.
11. ALL WORK ON THE ELECTRICAL SYSTEM REQUIRED BY THE CONTRACT DOCUMENTS SHALL BE
COORDINATED WITH THE WORK OF ALL OTHER DIVISIONS/TRADES PRIOR TO COMMENCEMENT
OF WORK. AVOID INTERFERENCES WITH THE PROGRESS OF OTHER DIVISIONS/TRADES.
12. WHERE STRUCTURAL WALLS ARE OF TILT-UP CONSTRUCTION, PROVIDE COORDINATION FOR
EXACT DIMENSIONS AND OPENINGS REQUIRED FOR ALL ELECTRICAL COMPONENTS INSTALLED
WITHIN TILT-UP WALLS DURING THE SHOP DRAWING REVIEW PROCESS OF THE TILT-UP WALLS, PRIOR TO MANUFACTURE OF THE TILT-UP WALLS.
13. LOCATIONS OF VFD'S, DISCONNECTS, MOTOR STARTERS, ETC. FOR HVAC EQUIPMENT ARE
DIAGRAMMATIC ON THE PLAN DRAWINGS. EXACT LOCATIONS ARE TO BE COORDINATED WITH
CONTRACTOR'S COORDINATION DRAWINGS PRIOR TO ROUGHING IN TO ENSURE PROPER NEC
CLEARANCES AND APPROPRIATE MOUNTING SURFACE.
14. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS.
PROVIDE COMPONENTS INDICATED ON RISER DIAGRAMS WHETHER OR NOT INDICATED ON
PLANS AND VICE VERSA.
15. ROUTING OF CONDUIT IS DIAGRAMMATIC AND NOT INTENDED TO SHOW REQUIRED OFFSETS
AND DETAILS. COORDINATE EXACT ROUTING WITH FIELD CONDITIONS AND OTHER TRADES.
16. COORDINATE RECEPTACLE LOCATIONS WITH TECHNOLOGY DRAWINGS OR OWNER'S VENDOR
DRAWINGS SO THAT A 120V 20A 5-20R RECEPTACLE IS LOCATED ADJACENT TO EACH
VOICE/DATA OUTLET AND TV OUTLET INDICATED ON PLANS. RECEPTACLE IS TO BE CONNECTED
TO NEAREST 120V RECEPTACLE CIRCUIT, UNLESS OTHERWISE NOTED ON PLANS.
17. REFER TO ARCHITECTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, CIVIL, LANDSCAPE, INTERIOR DESIGN, TECHNOLOGY, STRUCTURAL, AND KITCHEN EQUIPMENT DRAWINGS FOR
RELATED INFORMATION AND ADDITIONAL INSTALLATION REQUIREMENTS TO BE PERFORMED AS
PART OF THE WORK. REFER TO ARCHITECTURAL ELEVATIONS FOR EXACT MOUNTING HEIGHT
AND LOCATIONS.
18. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR
BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER
IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT REQUIREMENT SHALL
GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR OWNER'S
DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL GOVERN.
19. COORDINATE ALL PROJECT SCHEDULING AND PHASING REQUIREMENTS WITH
ARCHITECT/ENGINEER AND OWNER PRIOR TO SUBMITTING BID PRICE. THIS PROJECT MAY
REQUIRE PHASING SEQUENCES AND POTENTIAL PREMIUM TIME WORK AND ALL COSTS FOR
SUCH SHALL BE INCLUDED IN THE BID PRICE. PROVIDE ADEQUATE WORK FORCE AND
EQUIPMENT, AND INCLUDE PREMIUM TIME AS MAY BE REQUIRED IN ORDER TO ADHERE TO THE
PROJECT SCHEDULE. ADDITIONALLY, ENSURE THAT LONG LEAD ITEMS DO NOT IMPACT THE
PROJECT'S SCHEDULE OR PHASING.
20. ANY TEMPORARY INTERRUPTION ON POWER REQUIRED FOR THE SYSTEM TIE-IN OR
SWITCHOVER FOR ANY PORTION OF THE ELECTRICAL SYSTEM SHALL BE PRE-APPROVED IN
WRITING BY THE OWNER AND SCHEDULED IN ADVANCE.
21. COORDINATE EXACT REQUIREMENTS WITH THE LOCAL UTILITY COMPANIES AND PROVIDERS
(ELECTRIC, TELEPHONE, CABLE TV, ETC.) AND INCLUDE ALL COSTS FOR PROVIDING
TEMPORARY AND PERMANENT SERVICES REQUIRED FOR THIS PROJECT IN THE BID PRICE. BID
PRICE SHALL INCLUDE, BUT NOT BE LIMITED TO, EXCAVATION, RACEWAYS, BACKFILL,
EQUIPMENT, EQUIPMENT PADS, BACKBOARDS, METERS, GROUNDING, UTILITY ENGINEERING
AND IMPACT FEES.
22. CONDUCT WORK OPERATIONS AND DEBRIS REMOVAL IN A MANNER THAT ENSURES MINIMUM
INTERFERENCE WITH NORMAL BUSINESS OPERATIONS, TRAFFIC, PARKING, ETC. ONGOING IN
ADJACENT OCCUPIED SPACES OR FACILITIES. PROVIDE ALL THAT IS REQUIRED TO
EFFECTIVELY PROTECT SURROUNDING OCCUPANTS, EQUIPMENT, FINISHES, FURNITURE, ETC.
FROM DAMAGE OR EXCESSIVE NOISE THROUGHOUT THE DURATION OF THIS PROJECT.
CONTRACTOR IS RESPONSIBLE FOR ANY LOSSES OR DAMAGE. ANY DAMAGE RESULTING FROM
THE FAILURE TO ADHERE TO THIS REQUIREMENT. RESTORE DAMAGED ELEMENTS TO ORIGINAL
CONDITION BY THE CONTRACTOR TO THE SATISFACTION OF THE ARCHITECT/ENGINEER AND
OWNER, AT NO ADDITIONAL COSTS. REPORT OF ANY SUCH OCCURRENCE TO THE
ARCHITECT/ENGINEER AND OWNER IMMEDIATELY AND AWAIT WRITTEN DIRECTION PRIOR TO
PROCEEDING WITH REPAIRS.
23. COORDINATE THE LOCATION OF ALL LIGHT FIXTURES, DEVICES AND BOXES WITH WINDOWS, MIRRORS, MILLWORK, CABINETS, GLASS CURTAIN WALLS, AND GLASS WALLS PRIOR TO
INSTALLATION OF CONDUITS OR BOXES. REVIEW ALL CONTRACT DRAWINGS TO ASCERTAIN
ANY CONFLICTS PRIOR TO BIDDING. OBTAIN CLARIFICATION FROM A/E PRIOR TO BID.
CONTRACTOR SHALL NOT BE ENTITLED TO ADDITIONAL COMPENSATION FOR WORK REQUIRED
TO RELOCATE OUTLET BOXES OR RACEWAYS FOR COORDINATION WITH OTHER TRADE'S
WORK.
24. THE EXCLUSIVELY DEDICATED SPACE EXTENDING FROM FLOOR TO 6' ABOVE EQUIPMENT OR
STRUCTURAL CEILING, WHICHEVER DISTANCE IS LOWER, WITH A WIDTH AND DEPTH OF THE
PANELBOARD OR SWITCHBOARD MUST BE CLEAR OF ALL PIPING, DUCTS, EQUIPMENT FOREIGN
TO THE ELECTRICAL EQUIPMENT OR ARCHITECTURAL APPURTENANCES IN ACCORDANCE WITH
NEC.
25. PROVIDE ALL TEMPORARY NORMAL LIGHTING, EMERGENCY LIGHTING AND EXIT SIGNAGE
REQUIRED DURING THE PROJECT CONSTRUCTION PHASE.
26. THE INFRASTRUCTURE FOR THE ACCESS CONTROL/ CCTV OR SECURITY ELECTRONICS SYSTEM (CONDUITS, ELECTRICAL BOXES) SHALL BE INSTALLED BY DIVISION 26. THE ACCESS CONTROL/
CCTV OR SECURITY ELECTRONICS SYSTEM CONTRACTOR SHALL PROVIDE AND INSTALL THE
WIRE AND CABLE FOR THE SYSTEM AND ALL REQUIRED EQUIPMENT. INSTALLATION OF THE
CONDUITS AND ELECTRICAL BOXES SHALL BE UNDER THE DIRECT SUPERVISION OF THE
ACCESS CONTROL/ CCTV SYSTEM CONTRACTOR. COORDINATE EXACT LOCATIONS OF DEVICES,
RACEWAY LOCATIONS, SIZES AND QUANTITY, CONDUIT STUB-UPS PRIOR TO ROUGH IN.
27. THE INFRASTRUCTURE FOR THE VOICE/DATA TELECOMMUNICATIONS SYSTEM (CONDUITS,
ELECTRICAL BOXES) SHALL BE INSTALLED BY DIVISION 26. THE TELECOMMUNICATIONS
CONTRACTOR SHALL PROVIDE AND INSTALL THE WIRE AND CABLE FOR THE SYSTEM AND ALL
REQUIRED EQUIPMENT AND COMPONENTS. INSTALLATION OF THE CONDUITS AND ELECTRICAL
BOXES SHALL BE UNDER THE DIRECT SUPERVISION OF THE TELECOMMUNICATIONS
CONTRACTOR. COORDINATE EXACT LOCATIONS OF DEVICES, RACEWAY LOCATIONS, SIZES AND
QUANTITY, CONDUIT STUB-UPS PRIOR TO ROUGH IN.
28. PROVIDE 120V 20A 5-20R RECEPTACLE AT ALL FAN COIL UNITS FOR CONDENSATE PUMP POWER
AND HOT WATER RECIRCULATING PUMPS, WHETHER SHOWN ON PLANS OR NOT. RECEPTACLE
IS TO BE CONNECTED TO NEAREST 120V RECEPTACLE CIRCUIT.
29. PROVIDE 120V CONNECTION TO ALL MOTORORIZED DAMPERS INDICATED ON MECHANICAL
PLANS, WHETHER SHOWN ON DIVISION 26 DRAWINGS OR NOT. FIRE/SMOKE DAMPER CIRCUITS
ARE TO BE PROVIDED FROM EMERGENCY BRANCH PANEL (LEGALLY REQUIRED BRANCH IF
AVAILABLE). MOTORIZED DAMPERS WITHIN THE SAME AREA CAN BE CIRCUITED TO THE SAME
CIRCUIT (I.E., DEDICATED CIRCUIT IS NOT REQUIRED).
30. PROVIDE PHONE/DATA OUTLET WITH 1" RACEWAY, AND 120V RECEPTACLE ON DEDICATED
CIRCUIT ADJACENT TO EACH AIR HANDLING UNIT FOR CONTROL POWER.
31. PROVIDE 120V DEDICATED CIRCUIT TO EACH AIR HANDLING UNIT WITH SEPARATE
CONNECTIONS TO UNIT UV LIGHT, UNIT LIGHTS, UNIT RECEPTACLE, AND BI-POLAR IONIZATION
FILTER WHERE PROVIDED. COORDINATE WITH DIVISION 23 SHOP DRAWINGS.
32. UNLESS NOTED AS EXISTING, ALL ELECTRICAL INDICATED ON THE CONTRACT DOCUMENTS
SHALL BE NEW, SHALL BE U.L. LISTED, AND SHALL BEAR A U.L. LABEL. WHERE NO U.L. LABEL OR
LISTING IS AVAILABLE, THE MATERIAL SHALL BE LISTED WITH AN APPROVED, NATIONALLY
RECOGNIZED ELECTRICAL TESTING AGENCY.
33. PROVIDE EXPERIENCED, QUALIFIED AND RESPONSIBLE SUPERVISION FOR ALL WORK
REQUIRED BY THE CONTRACT DOCUMENTS. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED
IN A NEAT AND WORKMANLIKE MANNER, TO THE SATISFACTION OF THE ARCHITECT/ENGINEER
AND OWNER.
34. THE ELECTRICAL PORTION OF THE CONTRACT DOCUMENTS ARE COORDINATED WITH THE
DESIGN BASIS EQUIPMENT SPECIFIED BY DIVISION 26 AND OTHER DIVISIONS. WHERE THE
CONTRACTOR ELECTS TO SUBSTITUTE A PRODUCT IN LIEU OF PROVIDING THE DESIGN BASIS,
AND SAID SUBSTITUTION IS ACCEPTED BY THE A/E AND OWNER, THE CONTRACTOR SHALL MAKE
ALL CORRECTIONS TO THE ELECTRICAL SYSTEM NECESSARY IN ORDER TO ENSURE A
COMPLETE AND OPERATIONAL INSTALLATION OF THE EQUIPMENT AT NO ADDITIONAL COSTS.
WHERE THE CONTRACTOR'S DESIGN SUBSTITUTION RESULTS IN THE NEED FOR THE ENGINEER
TO REVISE THE CONTRACT DOCUMENTS, THE ENGINEER RESERVES THE RIGHT TO REQUEST
COMPENSATION FROM THE CONTRACTOR FOR SAID SERVICES.
35. MAINTAIN A CURRENT AND ACCURATE SET OF PROJECT RECORD DOCUMENTS (AS-BUILTS) AT
THE SITE THROUGHOUT THE DURATION OF THE PROJECT. RECORD DRAWINGS SHALL BE
UPDATED EACH DAY TO REFLECT THE ACTUAL LOCATIONS, SIZES, ROUTING, ETC. OF EACH
PORTION OF THE ELECTRICAL SYSTEM AFFECTED BY THIS WORK. A FINAL SET OF RECORD
DOCUMENTS SHALL BE ISSUED TO THE A/E FOR REVIEW AND THEN SUBMITTED TO THE OWNER
WITHIN 30 DAYS AFTER THE DATE OF FINAL ACCEPTANCE. PROVIDE RECORD DRAWINGS OF
THE ACTUAL INSTALLATION INCLUDING SINGLE LINE DIAGRAM, POWER RISER DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM, SITE PLANS AND ALL ELECTRICAL FLOOR PLANS, DETAILS, PANEL SCHEDULES, ETC.
36. OWNER FURNISHED EQUIPMENT: VERIFY AND COORDINATE ELECTRICAL ROUGH IN
REQUIREMENTS FOR OWNER FURNISHED EQUIPMENT PRIOR TO ROUGH IN.
37. WHERE SUBMITTED EQUIPMENT REQUIRES REVISION TO OVERCURRENT PROTECTION,
CONDUIT OR WIRING, MAKE CHANGES IN ACCORDANCE WITH APPLICABLE CODES.
D1. THE FACILITY WILL REMAIN OCCUPIED DURING RENOVATIONS.
D2. DEVICES, LIGHT FIXTURES AND EQUIPMENT SHOWN IN DASHED LINE TYPE ARE EXISTING TO BE
DEMOLISHED; DEVICES, LIGHT FIXTURES AND EQUIPMENT SHOWN IN LIGHT SOLID LINE TYPE
ARE EXISTING TO REMAIN, UNLESS OTHERWISE NOTED.
D3. EXISTING EQUIPMENT, LIGHT FIXTURES, DEVICES SHOWN ARE BASED ON FIELD SURVEYS AND
RECORD DRAWINGS PROVIDED BY THE OWNER, AND IS NOT NECESSARILY ALL INCLUSIVE IN
EVERY AREA AS FAR AS EXISTING ELECTRICAL EQUIPMENT, LIGHT FIXTURES AND DEVICES.
EXISTING CIRCUITING SHOWN IS BASED ON RECORD DRAWINGS AND THE SURVEYED PANEL
DIRECTORIES, WHERE THEY WERE AVAILABLE. THE ACTUAL CONDITIONS MAY VARY. ALL
EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID. THE CONDITIONS SHOWN ARE
INTENDED TO SHOW THE LOCATIONS OF EXISTING DEVICES, LIGHT FIXTURES AND EQUIPMENT, WHERE SHOWN ON THE PLAN DRAWINGS, AND IN NO WAY RELIEVES THE CONTRACTOR FROM
PROVIDING ANY AND ALL COORDINATION NECESSARY TO COMPLETE THE NEW WORK. FIELD
CONDITIONS SHALL GOVERN.
D4. WHERE EXISTING DEVICES ARE INDICATED TO REMAIN OR RELOCATED, LOCATED WITHIN THE
SCOPE OF THIS PROJECT AND EXISTING CIRCUITING INFORMATION IS UNAVAILABLE,
CONTRACTOR IS TO PROVIDE CIRCUIT TRACING TO IDENTIFY PANEL AND CIRCUIT DEVICES ARE
CONNECTED TO AND PROVIDE THAT INFORMATION TO A/E PRIOR TO ROUTING CONDUITS AND
WIRING FOR NEW DEVICES AND EQUIPMENT WITHIN THE SCOPE OF THIS PROJECT.
D5. PRIOR TO DEMOLITION, FIELD VERIFY CONDUIT AND WIRING WHICH SERVES AREAS OUTSIDE
THE SCOPE OF WORK AND PASSES THROUGH THE AREA OF WORK. MAINTAIN CONTINUITY OF
SYSTEMS.
D6. WHERE EXISTING DEVICES ARE TO REMAIN, CONTRACTOR MUST EXTEND EXISTING CIRCUITING
WHERE NECESSARY TO MAINTAIN CONTINUITY OF CIRCUIT.
D7. COORDINATE WITH THE OWNER FOR DISPOSITION OF ELECTRICAL ITEMS TO BE DEMOLISHED.
OWNER SHALL HAVE THE OPTION TO RETAIN REUSABLE ITEMS SUCH AS COVERPLATES,
RECEPTACLES, LIGHT FIXTURES, PANELBOARDS, TRANSFORMERS, ETC. NOT BEING USED IN
THE FINISHED WORK. COORDINATE WITH THE OWNER PRIOR TO START OF DEMOLITION.
PROPERLY AND LEGALLY DISPOSE OF ALL EQUIPMENT AND MATERIALS BEING REMOVED.
D8. COORDINATE EXACT AREAS, WALLS, CEILINGS, ETC. TO BE DEMOLISHED WITH ARCHITECTURAL, STRUCTURAL, PLUMBING AND MECHANICAL DEMOLITION PLANS.
D9. WHERE EXISTING DEVICES, LIGHT FIXTURES AND EQUIPMENT ARE INDICATED TO BE
DEMOLISHED, REMOVE ASSOCIATED CONDUIT AND WIRING BACK TO SOURCE PANEL OR TO
NEAREST JUNCTION BOX TO MAINTAIN CIRCUIT CONTINUITY OF DEVICES TO REMAIN AND
EQUIPMENT TO REMAIN. WHERE PANELS ARE TO BE REMAIN, TURN BREAKER TO "OFF"
POSITION AND LABEL THE CIRCUIT AS "SPARE" ON THE PANEL DIRECTORY.
D10. ALL AREAS OUTSIDE THE SCOPE OF CONSTRUCTION ARE TO REMAIN ENERGIZED. COORDINATE
PHASING WITH CONSTRUCTION MANAGER AND OWNER PRIOR TO DEMOLITION WHICH MAY
RESULT IN INTERRUPTION OF POWER.
D11. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR EXTENT OF AREA REQUIRING
DEMOLITION AND ADDITIONAL INFORMATION ON ELECTRICAL DEMOLITION WITHIN THAT AREA.
DISCONNECT ELECTRICAL SERVICE TO ALL EQUIPMENT BEING REMOVED. DEMOLITION SHALL
BE PHASED AS REQUIRED BY DIVISION 1, OR DIRECTED BY THE OWNER.
D12. REMOVE ALL CONDUIT LEFT EXPOSED BY REMOVAL OF WALLS AND CEILINGS IN REMODELED
OR RENOVATED AREA. CAP BOTH ENDS OF REMAINING CONDUIT IN WALL OR FLOOR WHERE
CUT. REMOVE ALL ASSOCIATED SUPPORTS. REMOVE WIRING BACK TO SOURCE OF VOLTAGE.
D13. ELECTRICAL DEVICES WITHIN THE AREA OF WORK., AND NOT NOTED ON THE DEMOLITION
DRAWINGS, WHETHER DUE TO CONCEALEMENT BY STORAGE SHELVING, CASEWORK,
FURNITURE OR FOR OTHER REASONS, ARE TO BE REMOVED AS REQUIRED, UNLESS SHOWN AS
EXISTING TO REMAIN.
D14. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING ALL OPENINGS IN EXISTING
CONSTRUCTION AFTER REMOVAL OF EQUIPMENT AND ELECTRICAL DEVICES, UNLESS
OTHERWISE NOTED ON ARCHITECTURAL PLANS. REPAIRS ARE TO BE DONE TO LOGICAL EDGES
OF SURFACES AFFECTED AND SHALL MATCH IMMEDIATE ADJACENT AREAS IN CONSTRUCTION,
MATERIAL, FIRE RATING, FINISH AND COLOR.
D15. PROVIDE BLANK COVERPLATES WHERE DEVICES ARE BEING REMOVED FROM EXISTING WALLS
TO REMAIN. MATCH COLOR OF NEW ADJACENT DEVICE COVERPLATES.
D16. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF
WORK AND OBTAIN CLARIFICATIONS FROM ARCHITECT/ENGINEER IF NECESSARY.
D17. COORDINATE SERVICE INTERRUPTION WITH CONSTRUCTION MANAGER, OWNER, LANDLORD,
AND UTILITY COMPANY, WHERE APPLICABLE, AND DO NOT INTERRUPT POWER WITHOUT
WRITTEN PERMISSION. PROVIDE A MINIMUM OF ONE WEEK'S WRITTEN NOTIFICATION WHEN
POWER IS DESIRED TO BE INTERRUPTED.
D18. EXERCISE EXTREME CAUTION WHEN REMOVING/ RELOCATING WIRING AND EQUIPMENT. IT IS
THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT OTHER WIRING DEVICES, EQUIPMENT
AND LIGHT FIXTURES THAT MAY BE CONNECTED TO THE SAME CIRCUIT REMAIN OPERATIONAL
AND ACTIVE.
D19. INFORMATION INDICATED IN THE DEMOLITION PORTION OF THE CONTRACT DRAWINGS IS
DIAGRAMMATIC IN NATURE. FIELD VERIFY ELECTRICAL CIRCUIT HOMERUNS TO ALL ELECTRICAL
ITEMS SCHEDULED TO BE DEMOLISHED AND PERFORM THE WORK AS INTENDED AND DEPICTED
ON THE DRAWINGS.
D20. UPDATE ALL EXISTING ELECTRICAL EQUIPMENT NAMEPLATES AND DIRECTORIES AS
NECESSARY TO REFLECT FINAL AS-BUILT CONDITIONS AT THE END OF CONSTRUCTION.
D21. STORE ITEMS INDICATED TO BE RETURNED TO THE OWNER IN A DRY, CLEAN AND PROTECTED
AREA. NOTIFY OWNER WHEN ITEMS ARE READY TO BE REMOVED.
D22. COORDINATE ANY ALTERATION AND CHANGES TO THE ELECTRICAL SERVICE WITH THE LOCAL
UTILITY COMPANY AND THE OWNER PRIOR TO COMMENCEMENT OF WORK.
D23. SCHEDULE ALL POWER INTERRUPTION WITH OWNER FOR EXACT DATE, TIME AND DURATION.
PROVIDE A MINIMUM OF 72 HOURS NOTICE PRIOR TO DISCONNECTING ANY POWER TO ANY
PORTION OF THE BUILDING, AND MAKE ARRANGEMENTS TO MAINTAIN POWER TO ALL CRITICAL
EQUIPMENT AS NEEDED AND REQUESTED BY THE OWNER PRIOR TO COMMENCEMENT OF
WORK.
D24. PROVIDE ANY NECESSARY REPROGRAMMING OF EXISTING BUILDING FIRE ALARM SYSTEMS TO
DISABLE FIRE ALARM DEVICES THAT ARE BEING DISCONNECTED AND REMOVED, AND FOR ANY
NEW DEVICES THAT ARE ADDED, AS PART OF BID PRICE.
D25. THE DEMOLITION PLAN IS NOT INCLUSIVE OF ALL ELECTRICAL DEVICES WITHIN THE PROJECT
AREA. IT IS INTENDED TO PROVIDE A GENERAL KNOWLEDGE OF THE EXISTING CONDITIONS
WITHIN THE PROJECT AREA. ANY DISCREPANCIES OR CONDITIONS NOT SHOWN ON THE PLAN
SHALL BE BROUGHT TO THE ATTENTION OF THE A/E. THE CONTRACTOR IS RESPONSIBLE FOR
ALL REQUIRED ELECTRICAL DEMOLITION WHETHER INDICATED ON THE PLANS OR NOT.
D26. ALL CONDUITS SERVING OTHER SPACES THAT RUN THROUGH THE PROJECT AREA SHALL
REMAIN ACTIVE DURING CONSTRUCTION SO AS NOT TO CAUSE DISRUPTION TO THESE OTHER
SPACES. ENSURE THAT ALL CONDUITS, NEW OR EXISTING WITHIN THE PROJECT AREA ARE
PROPERLY SUPPORTED IN ACCORDANCE WITH THE NEC. ANY EXISTING CONDUIT IS INSTALLED
BELOW THE HEIGHT OF THE NEW CEILING SHALL BE RELOCATED TO ABOVE THE NEW CEILING
HEIGHT.
D27. REMOVE ALL ABANDONED WIRING AND CONDUIT THAT IS WITHIN THE PROJECT AREA PRIOR TO
THE END OF CONSTRUCTION.
D28. UPDATE PANELBOARD DIRECTORIES WHICH ARE MODIFIED BY THIS PROJECT.
D29. REPAIR DISTURBED AREAS TO MATCH EXISTING CONDITIONS
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/1
/2
:5
:2
A
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
E-002
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR SDLFEB 04 2022
CONSTRUCTION
DOCUMENTS
ELECTRICAL GENERAL NOTES
FULLY SPRINKLERED
JOHN F. RAINE, P.E.
MD License #41408Revisions: Revision Description Date:
R E
F
REF.
A
A1
A1
B
B
AL AL AL
AL AL AL AL
ALA
A
A A
G-2
G-2G-2
A
A
A
A
AS
A1
A
A1
A
A
G-2
G-3
A
B1
B1
G-1
G-1
R E
F
2-B E.5
2-D
2-2.12-2
CH-39-0-03
TYPICAL
TYPICAL
RM 018A
CR211
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/1
/2
:5
:2
A
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
E-100
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR SDLFEB 04 2022
CONSTRUCTION
DOCUMENTS
ELECTRICAL SITE PLAN
FULLY SPRINKLERED
JOHN F. RAINE, P.E.
MD License #41408
1/8" = 1'-0" F1
ELECTRICAL SITE PLAN
DRAWING NOTES:
1. SEE SHEET E-801 FOR ELECTRICAL EQUIPMENT CONNECTION SCHEDULE.
0 4' 8' 16' 24'
1/8" = 1'-0"
CODED NOTES:
BOND GROUND LOOP TO BUILDING STEEL WITH EXOTHERMIC WELD. REFER TO GROUNDING RISER
DIAGRAM ON SHEET E-501 FOR ADDITIONAL INFORMATION.
10' GROUND ROD WITH TEST WELL.
EXISTING RECEPTACLE LOCATED WITHIN 25' OF NEW CHILLER TO REMAIN. MAINTAIN AND PROTECT
DURING CONSTRUCTION.
CONNECT GROUND LOOP TO EXISTING PHASE 1 GROUND LOOP. COORDINATE EXACT CONNECTION
POINT IN FIELD WITH EXISTING GROUND LOOP CONDUCTOR EXACT ROUTING.
EXISTING MDP LOCATED IN RM 110 IN THIS APPROXIMATE LOCATION ON LEVEL 1. REFER TO
ELECTRICAL ONE-LINE DIAGRAM ON SHEET E-601 FOR ADDITIONAL INFORMATION.
Revisions: Revision Description Date:
F
LV1D
LV1D
LV1D
LV1D
LV1D
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
L V a
O S
OS
OS
LV1b
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
L V b
L V a
OS
OS
OS
OS
OS
OS
OS
OS
2-A
2-C
2-E
2-12-2.12-22-3
2-4
2-5
2-6
2-7
2-8
2-F
A1E
A1
A1
A1E
A1
A1
A1E
A1
A1
A1E
L1
A1
A1 L1
L1
L1E
L1E
L1
L1
L1
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
S1E
S1E
V1
V1
B1
D1
D1
D1
X
X
B1E
LPP
LPP
LPD
LV1D
LV1D
LV1D
LPD
LPD
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
LV2Dab
LV2Dab
LV2Dab
LV2Dab
LV2Dab
LV2Dab
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
b b a a a a a a a a a a a a a a a a a a a a a a a a b b b b b b b b b b b b b b b
LPD
LPD
LPD
LPD
LPD
CR217H-3
CR217H-3
CR217H-1
CR217H-1
NP048H-1
NP048H-1
CR217H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
b
NP048H-1
NP048H-1
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2 NP048H-2
NP048H-2
NP048H-2
NP048H-4
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-3
NP048H-3
NP048H-3 NP048H-3
CR217H-1NP048H-3
NP048H-3
NP048H-3
CR217H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-4
NP048H-4
CR217H-1
NP048H-4
NP048H-4
CR217H-1
NP048H-4
NP048H-4
CR217H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
a a a aa a a a a a b b b b b b b b b b b b b b b b b
NP048H
CONSULT ROOM
PRINTER
034B
STORAGE
CONSULT ROOM
CONSULT ROOM
OFFICE (TRIPLE)
OFFICE (TRIPLE)
042TEAM RM
STAFF TOILET
CORRIDOR
034A
HAC
STAIR 3
CORRIDOR
OFFICE (TRIPLE)
OFFICE (TRIPLE)
ELEC. CL.
OFFICE (DOUBLE)
VETERAN W.S.
OFFICE (DOUBLE)
CONSULT ROOM
OFFICE
OFFICE
CHIEF OFFICE
PUBLIC TOILET
MSA
WAITING AREA
a b
LPP
b
NP048H-4
CR217H-1
LPP
a
NP048H-3
CR217H-1
NP048H-1
NP048H-2
NP048H-4
CR217H-1
NP048H-3
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-1
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
NP048H-2
XC
CR217H-1
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/1
/2
:5
:4
A
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
EL201
650-347PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR SDLFEB 04 2022
CONSTRUCTION
DOCUMENTS
LEVEL B PLAN - LIGHTING
FULLY SPRINKLERED
JOHN F. RAINE, P.E.
MD License #41408
1/4" = 1'-0"F1
LEVEL B PLAN - LIGHTING
0 2' 4' 8' 12'
1/4" = 1'-0"
DRAWING NOTES:
1. LIFE SAFETY LIGHTING SHALL BE ADDRESSED THROUGH INTEGRAL BATTERY BACKUP. ALL LIGHTING
FIXTURES SHALL BE CONTROLLED BY LOCAL LIGHTING CONTROLS.
2. STAIRWELLS SHALL BE CONTROLLED BY INTEGRAL OCCUPANCY SENSING LIGHTING FIXTURES.
3. ALL EMERGENCY LIFE SAFETY LIGHTING FIXTURES AND EXIT SIGNS SHALL BE PROVIDED WITH A
SEPARATE UNSWITCHED PHASE CONDUCTOR FOR POWER OUTAGE SENSING.
P1P2
KEY PLAN
CODED NOTES:
COORDINATE EXACT LOCATION OF DEVICES ON THIS WALL WITH ARCHITECTURAL WALL PANELING
PRIOR TO CONSTRUCTION.
LV1D
LV1D
LV1D
LV1D
OS
LV1
LV1D
LV1D
LV1D
LV1D
O S
OS
LV1Da
LV1Da
L V a
LV1b
L V a
L V b
LV1D
LV1D
LV1D
LV1D
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
2-A
2-C
2-E
2-12-2.1 2-22-3
2-4
2-5
2-6
2-7
2-8
2-F
A1E
A1
A1
A1E
A1
A1
A1E
A1
A1
A1E
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2E
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2E
A2
A2
A2
A2
A2
A2
A2
A2E
A2
A2
A2
A2
A2
A2
A2 A2
A2
A2
A2
A2
A2
A2
A2
L1
L1
L1
L1EL1
L1
L1
L1E
D1
D1
B1
B1
B1
B1E
D1
X
X
X
V1
V1
S1E
S1E
SL1E
SL1
SL1
SL1
SL1
SL1
SL1
SL1
SL1
X
B1E
LPP
LPP
LPD
LPD
LPP
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
CR217H-3
CR217H-3
CR217H-3
NP146H-1
NP146H-1
NP146H-1
NP146H-1
CR217H-5
CR217H-5
CR217H-5
NP146H-2
NP146H-2
NP146H-2
NP146H-2
NP146H-2
CR217H-5
NP146H-2
NP146H-2
NP146H-2
NP146H-2
NP146H-2
NP146H-2
NP146H-4
NP146H-2
NP146H-2
NP146H-2
NP146H-2
NP146H-2
NP146H-2
NP146H-2
NP146H-2
NP146H-2
CR217H-5
NP146H-2
NP146H-2
NP146H-2
NP146H-2
CR217H-5
CR217H-5
NP146H-5
NP146H-5
NP146H-5 NP146H-5
NP146H-5 CR217H-5
CR217H-5
NP146H-5
NP146H-5
CR217H-5
NP146H-1
NP146H-1
NP146H-1
NP146H-4
NP146H-1
NP146H-1
CR217H-5
CR217H-5
NP146H-1
NP146H-1
NP146H-1
NP146H-4
NP146H-4
NP146H-1
NP146H-1
NP146H-1
NP146H-1
CR217H-5
NP146H-4
NP146H-1
NP146H-1
NP146H-1
NP146H-1
NP146H-1
NP146H-1
NP146H-1
NP146H-1
NP146H-4
SL1
NP146H
a a a a a a a a a b b b b b b b b b b b
LPD
NP146H-3
NP146H-3
NP146H-3
NP146H-3
NP146H-3
NP146H-3
NP146H-3
NP146H-3
NP146H-3
NP146H-3
WAITING AREA
MSA
PUBLIC TOILET
CORRIDOR
GROUP THERAPY
GROUP THERAPY
OFFICE
OFFICE
OFFICE
COUPLE'S THERAPY
COUPLE'S THERAPY
OFFICE
OFFICE
PRINTER
131A
TELEDATA
OFFICE
ELEC. CL.
OFFICE
OFFICE
SECTION CHIEF
STAFF TOILET
STAIR 3
LOUNGE, STAFF
COUPLE'S THERAPY
a a a a a a a a a a a a a a b
LPP
b
NP146H-9
CR217H-5
NP146H-4
NP146H-2
CR217H-5
NP146H-5
NP146H-1
LPP
a
NP146H-5
CR217H-5
NP146H-1
CR217H-5
LPD
aNP146H-1
NP146H-7
LPD
CR217H-5
NP146H-7
NP146H-7
NP146H-7
NP146H-7
NP146H-7
NP146H-7
NP146H-7
NP146H-7
NP146H-1
NP146H-1
NP146H-1
NP146H-1
NP146H-1
a a b b b b b
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/3
/2
:4
:0
A M
B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
EL202
650-347PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR SDLFEB 04 2022
CONSTRUCTION
DOCUMENTS
LEVEL 1 PLAN - LIGHTING
FULLY SPRINKLERED
JOHN F. RAINE, P.E.
MD License #41408
1/4" = 1'-0" F1
LEVEL 1 PLAN - LIGHTING
DRAWING NOTES:
1. LIFE SAFETY LIGHTING SHALL BE ADDRESSED THROUGH INTEGRAL BATTERY BACKUP. ALL LIGHTING
FIXTURES SHALL BE CONTROLLED BY LOCAL LIGHTING CONTROLS.
2. STAIRWELLS SHALL BE CONTROLLED BY INTEGRAL OCCUPANCY SENSING LIGHTING FIXTURES.
3. ALL EMERGENCY LIFE SAFETY LIGHTING FIXTURES AND EXIT SIGNS SHALL BE PROVIDED WITH A
SEPARATE UNSWITCHED PHASE CONDUCTOR FOR POWER OUTAGE SENSING.
0 2' 4' 8' 12'
1/4" = 1'-0"
CODED NOTES:
DAYLIGHT RESPONSIVE ZONE PER THE 2015 IECC. LIGHT FIXTURES WITHIN DAYLIGHT-RESPONSIVE
ZONE SHALL BE CONTROLLED BY PHOTO SENSOR(S). DAYLIGHT-RESPONSIVE ZONE LIGHTING
CONTROL SHALL COMPLY WITH SECTION C405.2.3 OF THE 2015 IECC.
PROVIDE DUAL TECHNOLOGY OCCUPANCY SENSOR WITH AUTOMATIC DAYLIGHT / DIMMING CONTROL
OPTION.
EXTERIOR LIGHTING FIXTURES SHALL BE CONTROLLED BY COMBINATION TIME-CLOCK AND
PHOTOCELL. THE TIME-CLOCK SHALL BE AN ASTRONOMICAL TIMECLOCK CAPABLE OF 7-DAY
SCHEDULES AND PRE-SET HOURS. BASIS OF DESIGN IS NSI #DGLC100A-NC.
P1P2
KEY PLAN
LV1D
LV1D
LV1D
O S
OS
LV1D
OS
OS
OS
OS
OS
OS
OS
LV1D
LV1D
LV1D
LV1D
OS
LV1c
LV1b
L V a
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
L V a
L V b
L V c
LV1D
LV1D
2-A
2-C
2-E
2-12-2.12-22-3
2-4
2-5
2-6
2-7
2-8
2-F
A1E
A1
A1
A1E
A1
A1
A1E
L1
A1E
A1
A1
A1
A1E
L1E
L1 L1
L1
L1EL1
L1
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
D1
D1 D1
B1
B1
B1
B1E
B1E
B1
S1E
S1E
B1
V1
V1
X
X
X
X
LPP
LPP
LPP
B1E
B1E
B1
B1
B1E
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
LPD
CR217H-3
CR217H-3
NP146H-8
NP146H-8
NP146H-8
NP146H-8
NP146H-8
NP146H-8
NP146H-8
NP146H-8
NP146H-8
CR217H-7 CR217H-7
NP146H-6
NP146H-6
NP146H-8
CR217H-7
NP146H-10
NP146H-10
NP146H-6
CR217H-7
NP146H-8
NP146H-8
CR217H-7
NP146H-8
NP146H-8
NP146H-8
NP146H-8
NP146H-6
NP146H-8
NP146H-8
NP146H-8
NP146H-8
NP146H-6
CR217H-7
NP146H-10
NP146H-10
NP146H-10
NP146H-10
NP146H-10
NP146H-10
NP146H-10
NP146H-10
NP146H-10
CR217H-7
CR217H-7
NP146H-7
NP146H-7
NP146H-7 NP146H-7
NP146H-7 CR217H-7
CR217H-7
NP146H-7
NP146H-7
NP146H-8
NP146H-8
NP146H-6
NP146H-8
NP146H-8
NP146H-8
NP146H-6
b c c c c c c c b b b b b b b b b b a a a a a a a a aa
WAITING AREA
PUBLIC TOILET
STAFF TOILET
N.P. OFFICE
N.P. OFFICE
N.P. OFFICE
CORRIDOR
CHIEF OFFICE
OFFICE
OFFICE
OFFICE/CONSULT
OFFICE
OFFICE/CONSULT
CORRIDOR
ELEC. RM.
HAC
N.P. OFFICE
N.P. OFFICE
N.P. OFFICE
MECH. RM.
STAIR 3
PRINTER
204A a b c
CR217H
CR217H-7
LPP
aNP146H-7
NP146H-7
CR217H-7
NP146H-6
NP146H-8
LPP
b
NP146H-6
CR217H-7
NP146H-8
NP146H-8
NP146H-8
NP146H-8
NP146H-8
NP146H-8
NP146H-10
NP146H-10
NP146H-10
NP146H-10
NP146H-10
NP146H-10
NP146H-10
NP146H-6
LPP
cCR217H-7
SL1
SL1
SL1
SL1
SL1
SL1
NP146H-3
NP146H-3
NP146H-3
NP146H-3
NP146H-3
NP146H-3
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/3
/2
:4
:1
A M
B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
EL203
650-347PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR SDLFEB 04 2022
CONSTRUCTION
DOCUMENTS
LEVEL 2 PLAN - LIGHTING
FULLY SPRINKLERED
JOHN F. RAINE, P.E.
MD License #41408
1/4" = 1'-0" F1
LEVEL 2 PLAN - LIGHTING
0 2' 4' 8' 12'
1/4" = 1'-0"
DRAWING NOTES:
1. LIFE SAFETY LIGHTING SHALL BE ADDRESSED THROUGH INTEGRAL BATTERY BACKUP. ALL LIGHTING
FIXTURES SHALL BE CONTROLLED BY LOCAL LIGHTING CONTROLS.
2. STAIRWELLS SHALL BE CONTROLLED BY INTEGRAL OCCUPANCY SENSING LIGHTING FIXTURES.
3. ALL EMERGENCY LIFE SAFETY LIGHTING FIXTURES AND EXIT SIGNS SHALL BE PROVIDED WITH A
SEPARATE UNSWITCHED PHASE CONDUCTOR FOR POWER OUTAGE SENSING.
P1P2
KEY PLAN
CODED NOTES:
COORDINATE THE EXACT LOCATION OF LIGHTING FIXTURES IN THIS ARE WITH DUCTWORK.1
F
MP
J
J
J J
J
NP048H
NP048L
TNP048L (SUPSENDED FROM ABOVE)
2-B
E.5
2-D
2-A
2-C
2-E
2-12-2.12-22-3
2-4
2-5
2-6
2-7
2-8
2-F
G,48"
G
G,48"
NP048L-1
NP048L-1
NP048L-1
NP048L-1
NP048L-3
NP048L-3
NP048L-3
NP048L-5
NP048L-5
NP048L-5
NP048L-7
NP048L-7
NP048L-7
NP048L-9
NP048L-9
NP048L-9
NP048L-11
NP048L-11
NP048L-11
NP048L-11
NP048L-11
NP048L-11
NP048L-13
NP048L-13
NP048L-15
NP048L-15
NP048L-15
NP048L-15
NP048L-15
NP048L-15
NP048L-33
NP048L-33
NP048L-17
NP048L-17
NP048L-17
NP048L-17
NP048L-21
NP048L-21
NP048L-21
NP048L-21
NP048L-22
NP048L-22
NP048L-22
NP048L-22
NP048L-19
NP048L-19
NP048L-19
NP048L-19
NP048L-24
NP048L-24
NP048L-24
NP048L-24
NP048L-25
NP048L-23
NP048L-26
NP048L-26
NP048L-26
NP048L-26NP048L-27
NP048L-27
NP048L-27
NP048L-27NP048L-28
NP048L-28
NP048L-28
NP048L-28
NP048L-32
NP048L-32
NP048L-29
NP048L-29
NP048L-29
NP048L-29
NP048L-30
NP048L-31
NP048L-31
NP048L-31
NP048L-31
NP048L-2
NP048L-2
NP048L-2
NP048L-2
NP048L-4
NP048L-6
NP048L-6
NP048L-6
NP048L-2
NP048L-4
AC-39-0-01
EWH-1
UWH-38-0-01
RP-1
UWH-38-0-02
CONSULT ROOM
PRINTER
034B
STORAGE
CONSULT ROOM
CONSULT ROOM
OFFICE (TRIPLE)
OFFICE (TRIPLE)
TEAM RM
STAFF TOILET
CORRIDOR
034A
HAC
STAIR 3
CORRIDOR
OFFICE (TRIPLE)
OFFICE (TRIPLE)
ELEC. CL.
OFFICE (DOUBLE)
VETERAN W.S.
OFFICE (DOUBLE)
CONSULT ROOM
OFFICE
OFFICE
CHIEF OFFICE
PUBLIC TOILET
MSA
036 WAITING AREA
DS-EWH-1
DS-CP-01
DS-AC-39-0-01
NP048L-34
+78"
CR217L-20
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/8
/2
:4
:2
P M
B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
EP201
650-347PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR SDLFEB 04 2022
CONSTRUCTION
DOCUMENTS
LEVEL B PLAN - POWER
FULLY SPRINKLERED
JOHN F. RAINE, P.E.
MD License #41408
1/4" = 1'-0" F1
LEVEL B PLAN - POWER
0 2' 4' 8' 12'
1/4" = 1'-0"
DRAWING NOTES:
1. ALL RECEPTACLES IN PUBLIC AREAS AND CONSULT ROOMS SHALL BE TAMPER RESISTANT.
2. REFER TO ELECTRICAL EQUIPMENT CONNECTION SCHEDULE AND DISCONNECT SCHEDULE ON SHEET
E-801 FOR ADDITIONAL CONNECTION AND SIZING INFORMATION.
CODED NOTES:
FUSIBLE DISCONNECT DS-TNP048L. SEE ONE-LINE DIAGRAM FOR FURTHER DETAILS.
PROVIDE 120V JUNCTION BOX ABOVE ACCESSIBLE CEILING ON SECURE SIDE OF DOOR FOR ACCESS
CONTROL HARDWARE. PROVIDE LABEL STATING "ACCESS CONTROL 120V" AND CONNECT TO
BRANCH CIRCUIT BREAKER INDICATED WITH LOCK-ON ACCESSORY.
COORDINATE ELECTRICAL CONNECTION WITH BDA EQUIPMENT. REFER TO TELECOM DRAWING T-601
FOR ADDITIONAL INFORMATION.
COORDINATE EXACT TV RECEPTACLE LOCATION WITH TV DATA OUTLET AND TV WALL MOUNTING
BRACKET PRIOR TO ROUGH-IN.
COORDINATE EXACT LOCATION OF DEVICES ON THIS WALL WITH ARCHITECTURAL WALL PANELING
PRIOR TO CONSTRUCTION.
PROVIDE 120V JUNCTION BOX FOR WINDOW FIRE CURTAIN. COORDINATE EXACT LOCATION AND
REQUIREMENTS WITH FIRE CURTAIN VENDOR PRIOR TO ROUGH-IN.
EXISTING PHASE 1. NO WORK IN THIS AREA, UNLESS OTHERWISE NOTED.
P1P2
KEY PLAN
Revisions: Revision Description Date:
1 FIRE CURTAINS TBD
G-2A1 G-3
J
J
J
J
J
J
J J
J
J
J
NP146H
NP146L
TNP146L(SUSPENDED FROM ABOVE)
2-B
E.5
2-D
2-A
2-C
2-E
2-12-2.12-22-3
2-4
2-5
2-6
2-7
2-8
2-F
+60"
+66" G,48"
G,48"
EP202
C7
G
G
NP146L-1
NP146L-1
NP146L-1
NP146L-3
NP146L-3
NP146L-3
NP146L-5
NP146L-5
NP146L-5
NP146L-7
NP146L-7
NP146L-7
NP146L-9
NP146L-9
NP146L-9
NP146L-11
NP146L-11
NP146L-11
NP146L-13
NP146L-13
NP146L-13
NP146L-15
NP146L-15
NP146L-15
NP146L-17
NP146L-17
NP146L-17
CH
CH
NP146L-21
NP146L-21
NP146L-50
NP146L-21
NP146L-23
NP146L-23
NP146L-23
NP146L-25
NP146L-25
NP146L-25
NP146L-27
NP146L-27
NP146L-27
NP146L-29
NP146L-29
NP146L-29
NP146L-31
NP146L-31
NP146L-31
NP146L-31
NP146L-31
NP146L-37
NP146L-35
NP146L-35
NP146L-35
NP146L-37
NP146L-35
NP146L-35 NP146L-33
NP146L-37
NP146L-35
NP146L-39
NP146L-4
NP146L-2
NP146L-41
NP146L-39
NP146L-39
NP146L-39
NP146L-39
NP146L-39
NP146L-41
NP146L-41
NP146L-4
NP146L-4
NP146L-41
NP146L-41
NP146L-17
NP146L-31
NP146L-15
NP146L-13
NP146L-11
NP146L-9
NP146L-6NP146L-7NP146L-5
NP146L-3
NP146L-1
NP146L-19
NP146L-21 NP146L-23
NP146L-25
NP146L-27
NP146L-29
NP146L-8
NP146L-8
NP146L-10
NP146L-10
NP146L-10
AC-39-1-03
UWH-39-1-02 AC-39-1-04
AC-39-1-05
UWH-39-1-01
WAITING AREA
MSA
PUBLIC TOILET
CORRIDOR
GROUP THERAPY
GROUP THERAPY
OFFICE
OFFICE
OFFICE
COUPLE'S THERAPY
COUPLE'S THERAPY
OFFICE
OFFICE
PRINTER
131A
TELEDATA
OFFICE
ELEC. CL.
OFFICE
OFFICE
SECTION CHIEF
STAFF TOILET
STAIR 3
LOUNGE, STAFF
COUPLE'S THERAPY
DS-AC-39-1-03
DS-AC-39-1-04
DS-AC-39-1-05
G
G
CH
NP146L-50
NP146L-33
NP146L-2
NP146L-52
+78"
CH
+60"
NP146L-54
NP146L-53
G
CR217L-20
2-A
2-C
2-6
5 (TYPICAL)
4 (TYPICAL)
DS-UPS-3
DS-UPS-1
DS-UPS-2
DS-UPS-4
(TYPICAL) 6
SEE ENLARGED TELEDATA ROOM 138 PLAN ON
SHEET T-401 AND COORDINATION NOTES ON T-001
FOR BUSBAR AND GROUNDING REQUIREMENTS
NP146L-12,14,16
NP146L-18,20,22
NP146L-24,26,28
NP146L-30,32,34
NP146L-40
CR217L-9
NP146L-40
CR217L-9
NP146L-40
CR217L-10
NP146L-38
CR217L-10
NP146L-38 CR217L-10
NP146L-38
CR217L-11
NP146L-36
CR217L-11
NP146L-36
CR217L-11
NP146L-36
CR217L-9
CR217L-18
E
E
E
E
E
E
E
E
E
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/8
/2
:4
:2
P M
B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
EP202
650-347PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR SDLFEB 04 2022
CONSTRUCTION
DOCUMENTS
LEVEL 1 PLAN - POWER
FULLY SPRINKLERED
JOHN F. RAINE, P.E.
MD License #41408
1/4" = 1'-0" F1
LEVEL 1 PLAN - POWER
0 2' 4' 8' 12'
1/4" = 1'-0"
DRAWING NOTES:
1. ALL RECEPTACLES IN PUBLIC AREAS AND CONSULT ROOMS SHALL BE TAMPER RESISTANT.
2. REFER TO ELECTRICAL EQUIPMENT CONNECTION SCHEDULE AND DISCONNECT SCHEDULE ON SHEET
E-801 FOR ADDITIONAL CONNECTION AND SIZING INFORMATION.
CODED NOTES:
FUSIBLE DISCONNECT DS-TNP146L. SEE ONE-LINE DIAGRAM ON SHEET E-601 FOR DETAILS.
6" POKE THROUGH FLOOR BOX FOR IN FLOOR POWER/DATA OUTLETS. COORDINATE INSTALLATION WITH TELELCOM AND ARCHITECTURAL DRAWINGS PRIOR TO INSTALLATION. BASIS OF DESIGN IS LEGRAND 6" FLUSH MOUNTED POKE THROUGH EVOLUTION SERIES. FINISH TO BE AS DIRECTED BY ARCHITECT. PROVIDE ALL PARTS, ACCESSORIES, PLATES AND COVERS FOR A COMPLETE SYSTEM.
COORDINATE EXACT TV RECEPTACLE LOCATION WITH TV DATA OUTLET AND TV WALL MOUNTING
BRACKET PRIOR TO ROUGH-IN.
NORMAL POWER RECEPTACLE (L21-20) FOR DATA RACK NORMAL SIDE POWER DISTRIBUTION UNIT.
MOUNT RECEPTACLE TO BOTTOM OF CABLE TRAY IN THIS ROOM. COORDINATE EXACT LOCATION
WITH TELECOM DRAWINGS PRIOR TO CONSTRUCTION.
POWER CONNECTION FOR DATA RACK MOUNTED UPS. MOUNT JUNCTION BOX TO BOTTOM OF CABLE
TRAY IN THIS ROOM. COORDINATE EXACT LOCATION WITH TELECOM DRAWINGS PRIOR TO
CONSTRUCTION. JUNCTION BOX CONNECTED TO ASSOCIATED DISCONNECT.
RACK MOUNTED UPS LOCAL DISCONNECT. (2) DISCONNECTS STACKED VERTICALLY. CONNECT
DISCONNECT LOAD SIDE TO JUNCTION BOX ABOVE ASSOCIATED RACK. REFER TO SCHEDULES ON
SHEET E-801 FOR ADDITIONAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .