Attachment 08 - Fire Protection Drawings.pdf
PDF 7 MB Posted
- Attached to
- 36C77623R0039 - Y1DZ - New Mental Health Building Phase 2 Minor Construction - Providence, RI
- Solicitation number
- 36C77623R0039
About this file
This is a solicitation for a firm-fixed-price construction contract to design and build a new mental health building phase 2 project at the Providence VA Medical Center in Providence, Rhode Island. The selected contractor will furnish all labor, materials, equipment, tools and supervision to complete general construction, alterations, civil site work, finishes, HVAC, electrical, plumbing, fire alarm and suppression, security and other work contained in the construction documents. The scope of work includes a 3-floor expansion adjacent to an existing mental health facility building. The Department of Veterans Affairs intends to award a single contract through its Veterans Health Administration Program Contracting Activity Central office.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION LEGEND
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
FIRE SPRINKLER BRANCH PIPING
SYMBOL DESCRIPTION
FIRE PROTECTION COMPLIANCE NOTES
FIRE PROTECTION ABBREVIATIONS
AHJ AUTHORITY HAVING JURISDICTION
(E) EXISTING
DN DOWN
DWG DRAWING
ºF DEGREES FAHRENHEIT
FDC FIRE DEPARTMENT CONNECTION
FDV FIRE DEPARTMENT VALVE
FHC FIRE HOSE CABINET
FM FACTORY MUTUAL
FP FIRE PROTECTION
FT FEET
GPM GALLONS PER MINUTE
MAX MAXIMUM
MIN MINIMUM
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
PSI POUNDS PER SQUARE INCH
RCP REFLECTED CEILING PLAN
SF SQUARE FEET
TEMP TEMPERATURE
UL UNDERWRITER'S LABORATORY
VAMC VETERANS AFFAIRS MEDICAL CENTER
FIRE PROTECTION GENERAL NOTES
BUILDING DESIGN:
THE PROVIDENCE VAMC MENTAL HEALTH PHASE 2 PROJECT IS A 3 FLOOR EXPANSION
ADJACENT TO AND CONNECTING TO THE EXISTING PROVIDENCE VAMC MENTAL
HEALTH FACILITY. THE OCCUPANCY TYPE IS CLASSIFIED AS "NEW BUSINESS".
SCOPE OF WORK:
PROVIDE A FULLY AUTOMATIC WET SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA
13 2019 EDITION. THE FIRE PROTECTION SYSTEM SHALL BE AN EXTENSION OF THE
EXISTING PHASE 1 SYSTEM. THE CURRENT SYSTEM IS CAPPED IN THE HALLWAY
OUTSIDE OF THE NEW EXPANSION ON EACH OF THE 3 FLOORS IN PREPARATION FOR
THIS PROJECT. THE CAP SHALL BE DEMOLISHED, AND A NEW CONNECTION SHALL BE
MADE TO EXTEND THE EXISTING SYSTEM TO THE NEW PHASE 2 EXPANSION. ALL
SPRINKLER HEADS SHALL BE QUICK RESPONSIVE TYPE AND INSTALLED IN CENTER OF
CEILING TILES. SPRINKLER CONTRACTOR SHALL USE EXTRAPOLATED FLOW DATA
WHEN PERFORMING HYDRAULIC CALCULATIONS.
FIRE PROTECTION SPRINKLER CONTRACTOR SHALL COORDINATE THE DESIGN AND
INSTALLATION OF THE FIRE PROTECTION SPRINKLER SYSTEM AND DELIVER A
COMPLETE, FULLY FUNCTIONAL, AND TESTED FIRE PROTECTION SYSTEM THAT
MEETS THE REQUIREMENTS OF THE FIRE PROTECTION DRAWINGS, FIRE PROTECTION
SPECIFICATIONS, LISTED CODES AND STANDARDS, AND THE REQUIREMENTS OF THE
AHJ. THE FIRE PROTECTION SPRINKLER CONTRACTOR SHALL PROVIDE AND INSTALL
NEW MATERIALS THAT ARE UL LISTED AND\OR FM APPROVED AS REQUIRED BY THE
FIRE PROTECTION DRAWINGS AND THE FIRE PROTECTION SPECIFICATIONS. THE FIRE
PROTECTION SPRINKLER CONTRACTOR SHALL INTEGRATE THE NEW FIRE SPRINKLER
SYSTEM WITH THE EXISTING PHASE 1 FIRE ALARM SYSTEM.
CHARACTERISTICS OF THE WATER SUPPLY TO BE USED:
EACH FLOOR WILL CONNECT TO THE EXISTING FIRE SPRINKLER MAIN LOCATED IN THE
EXISTING BUILDING. A CURRENT HYDRANT FLOW TEST SHALL BE PERFORMED AND
VERIFIED PRIOR TO PRODUCTION OF LAYOUT DOCUMENTS. THE CONTRACTOR SHALL
OBTAIN THE LATEST FLOW TEST DATA. FLOW TEST SHALL BE WITH THE LAST 12
MONTHS.
FLOW TEST DATA:
FLOW TEST INFORMATION UTILIZED FOR PHASE 1: 70 PSI STATIC; 66 PSI RESIDUAL;
2122 GPM FLOWING; FLOW TEST RESULTS WAS PERFORM ON FIRE HYDRANT P0135
AT VALLEY STREET AND WOLCOTT STREET ON 10/23/2018.
FLOW TEST DATA SHALL BE RE-TESTED WITHIN 12 MONTHS OF SUBMITTED WORKING
DOCUMENTS AND PROVIDED TO FIRE PROTECTION SPRINKLER CONTRACTOR FOR
USE IN HYDRAULIC CALCULATIONS FOR THE PHASE 2 EXPANSION.
QUALITY AND PERFORMANCE SPECIFICATIONS OF ALL INTERIOR FIRE PROTECTION
COMPONENTS:
ALL NEW INTERIOR FIRE PROTECTION EQUIPMENT EQUIPMENT SHALL BE UL LISTED
AND/OR FM APPROVED.
ACCEPTANCE TEST CRITERIA:
FIRE SPRINKLER SYSTEM SHALL BE DESIGNED PER NFPA 13, 2019 EDITION AND SHALL
COMPLY WITH THE AHJ. THE ACCEPTANCE TESTING OF
THE FIRE SPRINKLER SYSTEM AND IT'S COMPONENTS SHALL CONSIST OF ALL
APPLICABLE ITEMS SHOWN IN THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATE
FOR ABOVE GROUND PIPING FORMS, NFPA 13, 2019 EDITION, CHAPTER 28 (FIG. 28.1).
SEE NFPA 13, 2019 EDITION CHAPTER 28 FOR SYSTEM ACCEPTANCE AND NFPA 25,
2020 INSPECTION TESTING AND MAINTENANCE.
A. CHAPTER 28, SYSTEM ACCEPTANCE
B. 28.1 APPROVAL OF SPRINKLER SYSTEM
C. 28.2 ACCEPTANCE REQUIREMENTS
D. 28.3 AUTOMATED INSPECTION AND TESTING DEVICES AND EQUIPMENT
E. 28.4 INSTRUCTION
F. 28.5 HYDRAULIC DESIGN INFORMATION SIGNS
APPLICABLE NFPA STANDARDS TO BE APPLIED:
A. U.S. DEPARTMENT OF VETERAN AFFAIRS FIRE PROTECTION DESIGN MANUAL -
EIGHTH EDITION
B. INTERNATIONAL BUILDING CODE 2021 EDITION
C. NFPA 13, 2019 EDITION, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
D. NFPA 24, 2019 EDITION, STANDARD FOR THE INSTALLATION OF FIRE SERVICE MAINS
E. NFPA 25, 2020 EDITION, INSPECTION, TESTING AND MAINTENANCE OF WATER BASED
FIRE PROTECTION SYSTEM.
F. NFPA 101, 2021 EDITION, LIFE SAFETY CODE
CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR AREA:
LIGHT HAZARD:
SPACES WITH LOW QUANTITY AND COMBUSTIBILITY OF CONTENTS
I.E. OFFICES, EXAM ROOMS, CORRIDORS, MEETING ROOMS, BREAK ROOMS,
AND RESTROOMS.
ORDINARY HAZARD GROUP 1:
SPACES WITH MODERATE QUANTITY AND LOW COMBUSTIBILITY OF CONTENTS
I.E. MECHANICAL ROOMS, ELECTRICAL ROOMS, AND JANITOR CLOSETS.
DESIGN APPROACH:
SPRINKLER SYSTEM TO EXTEND INTO ALL AREAS IN ACCORDANCE WITH NFPA 13
LIGHT HAZARD OR AS NOTED. LISTED AND APPROVED SIDEWALL (5.60 K-FACTOR)
AND PENDENT (5.60 K-FACTOR) SPRINKLER HEADS TO BE PROVIDED. UPRIGHT (5.60
K-FACTOR) HEADS TO BE PROVIDED WHERE NOTED ON DRAWINGS.
LIGHT HAZARD:
SYSTEM TYPE: WET PIPE AUTOMATIC SPRINKLER SYSTEM, USING STEEL SUPPLY
PIPING TO NEW QUICK RESPONSE, PENDENT OR UPRIGHT HEADS.
K-FACTOR: 5.6 (EXTENDED COVERAGE SPRINKLER HEADS ARE ACCEPTABLE).
DENSITY: 0.10 GPM/SQ.FT.
AREA OF OPERATION: 900 SQ FT MIN AND 1500 SQ FT MAX (DESIGN AREA
REDUCTION MAY ONLY BE USED IF CEILING HEIGHT AND AREA CLASSIFICATION
PERMITS PER NFPA 13 2019 EDITION.
HEAD TEMPERATURE RATING: 155 DEGREES F.
SPACING: 225 SQ. FT. MAX. PER SPRINKLER HEAD OR BY MANUFACTURER
LITERATURE.
HOSE ALLOWANCE: 100 GPM
ORDINARY HAZARD GROUP 1:
SYSTEM TYPE: WET PIPE AUTOMATIC SPRINKLER SYSTEM, USING STEEL SUPPLY
PIPING TO NEW QUICK RESPONSE, PENDENT OR UPRIGHT HEADS.
K-FACTOR: 5.6, 8.0, 11.2, OR 14.0 (EXTENDED COVERAGE SPRINKLER HEADS ARE
ACCEPTABLE).
DENSITY: 0.15 GPM/SQ.FT.
AREA OF OPERATION: 900 SQ FT MIN AND 1500 SQ FT MAX (DESIGN AREA
REDUCTION MAY ONLY BE USED IF CEILING HEIGHT AND AREA CLASSIFICATION
PERMITS PER NFPA 13 2019 EDITION.
HEAD TEMPERATURE RATING: 155 DEGREES F.
SPACING: 130 SQ. FT. MAX. PER SPRINKLER HEAD OR BY MANUFACTURER
LITERATURE.
HOSE ALLOWANCE: 250 GPM
1. FIRE PROTECTION SYSTEM SHALL COMPLY WITH NFPA 13 (2019 EDITION) FOR
INSTALLATION OF SPRINKLER SYSTEMS. INSPECTION, TESTING, AND MAINTENANCE SHALL
COMPLY TO NFPA 25 (2020 EDITION). IN ADDITION, INSTALLATION AND INSPECTION,
TESTING, AND MAINTENANCE SHALL COMPLY WITH THE PROJECT SPECIFICATIONS AND
AHJ REQUIREMENTS.
2. FINAL INSPECTION AND APPROVAL BY AHJ.
3. SPRINKLER SHOP DRAWINGS AND MATERIAL SUBMITTALS SHALL BE SUBMITTED TO THE
ARCHITECT/ENGINEER AND AHJ AND SHALL BE APPROVED PRIOR TO ANY INSTALLATION.
THE ENGINEER OF RECORD SHALL HAVE THE RIGHT TO REJECT ANY SUBMITTALS.
4. CUTTING OF STRUCTURAL AND/OR ARCHITECTURAL MEMBERS TO BE DONE ONLY WITH
THE WRITTEN APPROVAL OF THE ARCHITECT AND STRUCTURAL ENGINEER.
5. FITTINGS REQUIRED FOR PROPER INSTALLATION, COORDINATION WITH OTHER EXISTING
TRADES, AND/OR TO MAINTAIN PROPER CLEARANCES SHALL BE PROVIDED. VERIFY
STRUCTURAL, MECHANICAL, ELECTRICAL INSTALLATIONS AND AVOID AN/ALL
OBSTRUCTIONS OR INTERFERENCES WITH FIRE PROTECTION PIPE ROUTING.
6. FIRE STOP ALL PENETRATIONS OF SMOKE/FIRE WALLS, CEILINGS, FLOORS, ROOFS, ETC., FLASH AND COUNTERFLASH ROOF PENETRATIONS.
7. PROVIDE ACCESS PANELS TO ALL VALVES ABOVE NON-ACCESSIBLE CEILINGS AND
CHASES.
8. SPRINKLER HEADS ARE TO BE COORDINATED WITH ALL LOCATIONS OF DIFFUSERS,
SPEAKERS, LIGHTING FIXTURES, CEILING SYSTEMS AND STRUCTURAL SYSTEM.
9. INDICATE CENTER TO CENTER DIMENSIONS AND/OR PIPE CUT LENGTHS AND NOMINAL
PIPE DIAMETERS ON ALL PIPING. INDICATE PIPE TYPE, SCHEDULE OF WALL THICKNESS
AND METHOD OF JOINING ON SHOP DRAWING.
10. PROVIDE STOCK OF EXTRA SPRINKLERS IN ACCORDANCE WITH NFPA 13.
11. PROVIDE DETAIL AND INDICATE TYPE OF HANGERS TO BE INSTALLED FOR SPRINKLER
PIPING. METHODS OF HANGING PIPES, HEADERS AND BRANCHES SHALL BE IN
ACCORDANCE WITH NFPA 13. ALL HANGERS ON 4" PIPE AND LARGER SHALL BE CLEVIS-
TYPE HANGERS. HANGERS SHALL NOT INTERFERE WITH ANY OTHER TRADE. POWDER
DRIVEN STUDS SHALL NOT BE USED.
12. ALL GROOVED & SCREWED FITTINGS SHALL BE UL/FM APPROVED AND SUBMITTED TO THE
ENGINEER OF RECORD FOR APPROVAL PRIOR TO ANY INSTALLATION. THE ENGINEER OF
RECORD RESERVES THE RIGHT TO DISAPPROVE ANY FITTING.
13. WELD-O-LETS SHALL BE TWO SIZES SMALLER THAN CROSS MAIN, NO LENGTH OF CROSS
MAIN SHALL BE GREATER THAN 10'-0". ALL SPRINKLER PIPING & FITTINGS SHALL BE
INSTALLED ABSOLUTELY RUST-FREE.
14. SPRINKLERS SHALL BE FM APPROVED.
15. AUTOMATIC SPRINKLER TEMPERATURE RATINGS OF FUSIBLE ELEMENTS TO BE IN
ACCORDANCE WITH NFPA 13.
16. ALL VALVES FOR FIRE SERVICE SHALL BE LISTED BY THE UNDERWRITER'S LABORATORIES, INC. AND THE FACTORY MUTUAL LABORATORIES. VALVES SHALL BE FACTORY MARKED
"UL" OR "FM", AND RATED FOR 175 WORKING PRESSURE.
17. ELECTRICALLY SUPERVISED VALVES SHALL BE PROVIDED WHERE REQUIRED IN NFPA 13.
TYPE AND EXACT LOCATION AND PURCHASE/INSTALLATION OF FLOW AND SUPERVISORY
SWITCHES SHALL BE BY THE SPRINKLER CONTRACTOR. ELECTRICAL CONTRACTOR TO
PROVIDE ADDITIONAL CIRCUITS, WIRING, SWITCHES, CONDUIT OR JUNCTION BOXES
REQUIRED.
18. SPRINKLER COVERAGE SHALL COMPLY WITH NFPA 13. SPRINKLER LOCATIONS WITH
RESPECT TO OBSTRUCTIONS SHALL COMPLY WITH NFPA 13-2019, CHAPTER 10, OR THE
APPROPRIATE CHAPTER BASED ON SPRINKLER TYPE.
19. IMMEDIATELY NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES FOUND
BETWEEN THESE PLANS, OTHER ENGINEERING PLANS, THE ARCHITECTURAL PLANS
AND/OR FIELD CONDITIONS PRIOR TO FINAL BID PRICE OR FINAL PERMITTING.
20. IN CASE OF DISPUTE OR DOUBT AS TO INTENT OF DRAWINGS OR SPECIFICATIONS, OBTAIN
ARCHITECT/ENGINEER'S WRITTEN DECISION BEFORE PROCEEDING WITH BID OR WORK
INVOLVED.
21. BEFORE SUBMITTING PROPOSAL OR BID, EXAMINE ALL DRAWINGS AND SPECIFICATIONS
RELATING TO THIS PROJECT, THE AMOUNT OF SPACE AVAILABLE FOR PIPING, EQUIPMENT
AND CONNECTING SERVICES, THE SCOPE OF SITE OF THE WORK, THE REQUIREMENTS TO
CORRELATE THE FIRE PROTECTION WORK WITH THAT OF OTHER TRADES AND THE TIME
SCHEDULE NECESSARY TO PERFORM THAT WORK.
22. PIPE SHALL BE REAMED AND CLEANED BEFORE ASSEMBLY, AND AFTER ASSEMBLY
THE ENTIRE PIPING SYSTEM SHALL BE FLUSHED CLEAN.
23. PROVIDE SPRINKLERS ABOVE AND BELOW EXPOSED DUCTWORK 4 FEET OR WIDER.
24. PROVIDE HAZARD COVERAGE FOR THE FUNCTIONS FOR EACH AREA.
25. INDICATE THE LOCATION AND SIZE OF BLIND SPACES AND CLOSETS.
26. INDICATE THE TOTAL SQUARE FOOT AREA PROTECTED BY SYSTEM(S).
27. INDICATE THE NUMBER OF SPRINKLERS ON EACH RISER.
28. ALL PENDENT SPRINKLERS SHALL BE CENTER OF TILE, UNLESS MAXIMUM
DISTANCES FROM WALLS OR BETWEEN HEADS IS EXCEEDED OR UNLESS SHOWN
DIFFERENTLY ON DRAWINGS. IF NOT POSSIBLE ALL SPRINKLER HEADS MOUNTED IN
CEILING SHALL BE LOCATED A MINIMUM OF 4" AWAY FROM ANY WALLS, CEILING
GRID MEMBERS, CEILING HEIGHT CHANGES OR ANY OTHER VERTICAL
INTERSECTING STRUCTURAL SURFACE.
29. FIRE PROTECTION CONTRACTOR SHALL ASSIST IN PREPARATION OF COORDINATION
DRAWINGS FOR ALL LEVELS WHICH INDICATE ALL THE ENGINEERING DISCIPLINES &
FIRE PROTECTION PIPING. THESE DRAWINGS SHALL BE PREPARED & APPROVED BY
THE ENGINEER OF RECORD PRIOR TO ANY INSTALLATION.
30. FIRE SPRINKLER PIPING SHALL NOT TRAVEL OVER THE TOPS OF ELECTRICAL
PANELBOARDS, IT EQUIPMENT, OR ANY ELECTRICAL EQUIPMENT.
31. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING HEIGHTS IN EACH AREA.
32. ALL PIPING SHALL BE SHALL BE PAINTED PER SPECIFICATION 21 13 13.
33. ALL MATERIALS, WHERE APPLICABLE, SHALL BE U.L. LISTED OR FACTORY MUTUAL
APPROVED FOR USE IN AUTOMATIC SPRINKLER SYSTEMS. ALL NEW PIPING SHALL
BE HYDROSTATICALLY TESTED FOR TWO HOURS IN ACCORDANCE WITH NFPA 13.
MINIMUM HYDROSTATIC TEST PRESSURE SHALL BE 200 PSI.
34. FLEXIBLE SPRINKLER CONNECTIONS SHALL ONLY BE PERMITTED UPON VA
APPROVAL. IF FLEXIBLE SPRINKLER CONNECTIONS ARE PERMITTED AND USED,
HYDRAULIC CALCULATIONS MUST BE PERFORMED AND SUBMITTED TO THE
ENGINEER OF RECORD.
35. THE SMALL ROOM RULE SHALL BE ACCEPTABLE FOR PLACEMENT OF SPRINKLERS
PER NFPA 13-2019, 10.2.5.2.1.
36. UPON SPRINKLER SYSTEM IMPAIRMENT, NFPA 25-2020, 15.5.2 SHALL BE FOLLOWED
DURING SPRINKLER SYSTEM DOWNTIME. APPROVED PERSONNEL SHALL
COORDINATE REQUIREMENTS PER NFPA 25, SUCH AS AN APPROVED FIRE WATCH IF
REQUIRED. IMPAIRMENT PROCEDURES REQUIRED TO BE TAKEN SHALL BE
INCLUDED IN CONTRACTOR'S BUDGET.
FB
-CONNECT TO EXISTING
-DEMOLISH TO POINT INDICATED
VIEW NUMBER
DRAWING NUMBER WHERE SHOWN
SECTIONLETTER
FP4
FP7
A
SHEET NUMBER
REVISION REFERENCEXX
SHEET NOTE CALLOUTXX
DRAWING SYMBOLS
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/2
/2
:3
:3
A
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
FP001
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
ADL AJZFEB 04 2022
CONSTRUCTION
DOCUMENTS
FIRE PROTECTION LEGENDS,
SYMBOLS, & NOTES
FULLY SPRINKLERED
Allen D. Lantz, P.E.
MD License #41513
FIRE PROTECTION DRAWING INDEX
Sheet Number Sheet Name
FP001 FIRE PROTECTION LEGENDS, SYMBOLS, & NOTES
FP100 FIRE PROTECTION AREAS OF WORK
FP111 LEVEL B PLAN - FIRE PROTECTION
FP121 LEVEL 1 PLAN - FIRE PROTECTION
FP131 LEVEL 2 PLAN - FIRE PROTECTION
FP501 FIRE PROTECTION DETAILS
Revisions: Revision Description Date:
2-A
2-C
2-F
2-8 2-7
2-6
2-5
2-4 2-3 2-2.12-22-1
2-B
2-D
2-E
E.5
E.9
AREA OF WORK
2-A
2-C
2-F
2-8 2-7
2-6
2-5
2-4 2-3 2-2.12-22-1
2-B
2-D
2-E
E.5
E.9
AREA OF WORK
2-A
2-C
2-F
2-8 2-7
2-6
2-5
2-4 2-3 2-2.1
2-22-1
2-B
2-D
2-E
E.5
E.9
AREA OF WORK
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/2
/2
:3
:3
A
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
FP100
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
ADL AJZFEB 04 2022
CONSTRUCTION
DOCUMENTS
FIRE PROTECTION AREAS OF
WORK
FULLY SPRINKLERED
Allen D. Lantz, P.E.
MD License #41513
1/16" = 1'-0"C3
LEVEL B AREA OF WORK - FIRE PROTECTION
1/16" = 1'-0"F1
LEVEL 1 AREA OF WORK - FIRE PROTECTION
1/16" = 1'-0"F5
LEVEL 2 AREA OF WORK - FIRE PROTECTION
CODED NOTES:
EXISTING FIRE RISER LOCATED IN ROOM 020 IN PHASE 1.
REFER TO SHEET FP111 FOR LEVEL B FIRE PROTECTION.
REFER TO SHEET FP121 FOR LEVEL 1 FIRE PROTECTION.
REFER TO SHEET FP131 FOR LEVEL 2 FIRE PROTECTION.
2-A
2-C
2-F
2-8
2-7
2-6
2-5
2-4
2-3 2-2.1 2-2 2-1
2-B
2-D
2-E
E.5
E.9
3" FB
CONTINUED TO (E)FLOOR
CONTROL VALVE LOCATED IN
PHASE 1 FIRE ENTRANCE
ROOM
STAIR 1
STAFF TOILET
TEAM RM
OFFICE (TRIPLE)
OFFICE (TRIPLE)
CONSULT ROOM
CONSULT ROOM
STORAGE
CONSULT ROOM
PUBLIC TOILET
MSA
WAITING AREA
CORRIDOR
CHIEF OFFICE
OFFICE
OFFICE
CONSULT ROOM
OFFICE (DOUBLE)
OFFICE (DOUBLE)
OFFICE (TRIPLE)
OFFICE (TRIPLE)
ELEC. CL.
STAIR 3
HAC
VETERAN W.S.
CORRIDOR
034A
PRINTER
034B
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/2
/2
:3
:3
A
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
FP111
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
ADL AJZFEB 04 2022
CONSTRUCTION
DOCUMENTS
LEVEL B PLAN - FIRE PROTECTION
FULLY SPRINKLERED
Allen D. Lantz, P.E.
MD License #41513
0 4' 8' 16' 24'
1/8" = 1'-0"
1/4" = 1'-0" F1
LEVEL B PLAN - FIRE PROTECTION
0 4' 8' 16' 24'
1/8" = 1'-0"
CODED NOTES:
PROVIDE A HYDRAULICALLY CALCULATED AUTOMATIC SPRINKLER SYSTEM FOR A LIGHT HAZARD
OCCUPANCY WITH A MINIMUM DENSITY/AREA OF 0.10 GPM/SF OVER 1500 SF PER NFPA 13.
LEGEND:
PROVIDE A HYDRAULICALLY CALCULATED AUTOMATIC SPRINKLER SYSTEM FOR A ORDINARY HAZARD GROUP 1 OCCUPANCY WITH A MINIMUM DENSITY/AREA OF 0.15 GPM/SF OVER 1500 SF PER NFPA 13.
LEGEND:
REMOVE AND DISPOSE OF (E)CAP. EXTEND 3" FIRE PROTECTION MAIN FROM PHASE 1 BUILDING.
PROVIDE FLEXIBLE COUPLING AT STRUCTURAL EXPANSION JOINT PER 2019 NFPA 13-18.2.3.1(4).
DRAWING NOTES:
1. COORDINATE SPRINKLER HEIGHT WITH ARCHITECTURAL RCP. REFER TO ARCHITECTURAL PLANS.
2. REFER TO FIRE PROTECTION GENERAL NOTE #36 / FP001 FOR SPRINKLER SYSTEM IMPAIRMENT
REQUIREMENTS.
P1P2
KEY PLAN
2-A
2-C
2-F
2-8
2-7
2-6
2-5
2-4
2-3 2-2.1 2-2 2-1
2-B
2-D
2-E
E.5
E.9
3" FB
CONTINUED TO (E)FLOOR
CONTROL VALVE LOCATED IN
PHASE 1 COMMUNICATION
CENTER 103
STAIR 1
STAIR 3
LOUNGE, STAFF
STAFF TOILET
OFFICE
139 TELEDATA
138 COUPLE'S
THERAPY
137 COUPLE'S
THERAPY
COUPLE'S
THERAPY
GROUP THERAPY
134 PUBLIC TOILET
MSA
WAITING AREA
GROUP THERAPY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ELEC. CL.
SECTION CHIEF
143 CORRIDOR
PRINTER
131A
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/2
/2
:3
:3
A
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
FP121
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
ADL AJZFEB 04 2022
CONSTRUCTION
DOCUMENTS
LEVEL 1 PLAN - FIRE PROTECTION
FULLY SPRINKLERED
Allen D. Lantz, P.E.
MD License #41513
1/4" = 1'-0" F1
LEVEL 1 PLAN - FIRE PROTECTION
0 4' 8' 16' 24'
1/8" = 1'-0"
0 4' 8' 16' 24'
1/8" = 1'-0"
CODED NOTES:
PROVIDE A HYDRAULICALLY CALCULATED AUTOMATIC SPRINKLER SYSTEM FOR A LIGHT HAZARD
OCCUPANCY WITH A MINIMUM DENSITY/AREA OF 0.10 GPM/SF OVER 1500 SF PER NFPA 13.
LEGEND:
PROVIDE A HYDRAULICALLY CALCULATED AUTOMATIC SPRINKLER SYSTEM FOR A ORDINARY HAZARD GROUP 1 OCCUPANCY WITH A MINIMUM DENSITY/AREA OF 0.15 GPM/SF OVER 1500 SF PER NFPA 13.
LEGEND:
REMOVE AND DISPOSE OF (E)CAP. EXTEND 3" FIRE PROTECTION MAIN FROM PHASE 1 BUILDING.
PROVIDE FLEXIBLE COUPLING AT STRUCTURAL EXPANSION JOINT PER 2019 NFPA 13-18.2.3.1(4).
DRAWING NOTES:
1. COORDINATE SPRINKLER HEIGHT WITH ARCHITECTURAL RCP. REFER TO ARCHITECTURAL PLANS.
2. REFER TO FIRE PROTECTION GENERAL NOTE #36 / FP001 FOR SPRINKLER SYSTEM IMPAIRMENT
REQUIREMENTS.
P1P2
2-A
2-C
2-F
2-8
2-7
2-6
2-5
2-4
2-3 2-2.1 2-2 2-1
2-B
2-D
2-E
E.5
E.9
CONTINUED TO (E)FLOOR
CONTROL VALVE LOCATED IN
PHASE 1 MECHANICAL ROOM
STAIR 1
STAIR 3
PUBLIC TOILET
STAFF TOILET
N.P. OFFICE
N.P. OFFICE
N.P. OFFICE
N.P. OFFICE
N.P. OFFICE
N.P. OFFICE
MECH. RM.
ELEC. RM.
CORRIDOR
OFFICE/CONSULT
OFFICE
OFFICE/CONSULT
OFFICE
OFFICE
CHIEF OFFICE
CORRIDOR
HAC
216 PRINTER
204A
WAITING AREA
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/2
/2
:3
:4
A
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
FP131
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
ADL AJZFEB 04 2022
CONSTRUCTION
DOCUMENTS
LEVEL 2 PLAN - FIRE PROTECTION
FULLY SPRINKLERED
Allen D. Lantz, P.E.
MD License #41513
0 4' 8' 16' 24'
1/8" = 1'-0"
1/4" = 1'-0" F1
LEVEL 2 PLAN - FIRE PROTECTION
CODED NOTES:
PROVIDE A HYDRAULICALLY CALCULATED AUTOMATIC SPRINKLER SYSTEM FOR A LIGHT HAZARD
OCCUPANCY WITH A MINIMUM DENSITY/AREA OF 0.10 GPM/SF OVER 1500 SF PER NFPA 13.
LEGEND:
PROVIDE A HYDRAULICALLY CALCULATED AUTOMATIC SPRINKLER SYSTEM FOR A ORDINARY HAZARD GROUP 1 OCCUPANCY WITH A MINIMUM DENSITY/AREA OF 0.15 GPM/SF OVER 1500 SF PER NFPA 13.
LEGEND:
REMOVE AND DISPOSE OF (E)CAP. EXTEND 3" FIRE PROTECTION MAIN FROM PHASE 1 BUILDING.
PROVIDE FLEXIBLE COUPLING AT STRUCTURAL EXPANSION JOINT PER 2019 NFPA 13-18.2.3.1(4).
DRAWING NOTES:
1. COORDINATE SPRINKLER HEIGHT WITH ARCHITECTURAL RCP. REFER TO ARCHITECTURAL PLANS.
2. REFER TO FIRE PROTECTION GENERAL NOTE #36 / FP001 FOR SPRINKLER SYSTEM IMPAIRMENT
REQUIREMENTS.
0 4' 8' 16' 24'
1/8" = 1'-0"
P1P2
CONCRETE FASTENER (U.L. LISTED
OR F.M. APPROVED)
PIPE HANGER RING (U.L. LISTED
OR F.M. APPROVED)
ALL THREAD ROD
CEILING
ESCUTCHEON
FINISH
CEILING
1" SUPPLY LINE
1"x1/2" REDUCING
COUPLING
PENDANT TYPE SPRINKLER
HEAD
CEILING
1/2"REDUCER
BRANCH LINE
1" 90° ELL1" 90° ELL
1" DROP
1. WALL ASSEMBLY--THE 1, 2, 3 OR 4 HR FIRE-RATED GYPSUM
WALLBOARD/STUD WALL ASSEMBLY SHALL BE CONSTRUCTED OF THE
MATERIALS AND IN THE MANNER DESCRIBED IN THE INDIVIDUAL U300 OR
U400 SERIES WALL OR PARTITION DESIGNS IN THE UL FIRE RESISTANCE
DIRECTORY AND SHALL INCLUDE THE FOLLOWING CONSTRUCTION
FEATURES:
A. STUDS--WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS
(MAX 2 H FIRE RATED ASSEMBLIES OR STEEL CHANNEL STUDS.
WOOD STUDS TO CONSIST OF NOM 2 BY 4 IN. LUMBER SPACED 16
IN. OC WITH NOM 2 BY 4 IN. LUMBER END PLATES AND CROSS
BRACES. STEEL STUDS TO BE MIN 3-5/8 IN. WIDE BY 1-3/8 IN. DEEP
CHANNELS SPACED MAX 24 IN. OC.
B. WALLBOARD, GYPSUM *--NOM 1/2 OR 5/8 IN. THICK, 4 FT. WIDE WITH
SQUARE OR TAPERED EDGES. THE GYPSUM WALLBOARD TYPE,
THICKNESS, NUMBER OF LAYERS, FASTENER TYPE AND SHEET
ORIENTATION SHALL BE AS SPECIFIED IN THE INDIVIDUAL U300 OR
U400 SERIES DESIGN IN THE UL FIRE RESISTANCE DIRECTORY. MAX
DIAM OF OPENING IS 13-1/2 IN.
2. PIPE OR CONDUIT--NOM 12 IN. DIAM (OR SMALLER) SCHEDULE 10 (OR
HEAVIER) STEEL PIPE, NOM 12 IN. DIAM (OR SMALLER) SERVICE WEIGHT (OR
HEAVIER) CAST IRON SOIL PIPE, NOM 12 IN. DIAM (OR SMALLER) CLASS 50
(OR HEAVIER) DUCTILE IRON PRESSURE PIPE, NOM 6 IN. DIAM (OR SMALLER)
STEEL CONDUIT, NOM 4 IN. DIAM (OR SMALLER) STEEL ELECTRICAL
METALLIC TUBING, NOM 6 IN. DIAM (OR SMALLER) TYPE L OR (OR
HEAVIER) COPPER TUBING OR NOM 1 IN. DIAM (OR SMALLER) FLEXIBLE
STEEL CONDUIT. WHEN COPPER PIPE IS USED, MAX F RATING OF FIRESTOP
SYSTEM (ITEM 3) IS 2 H. STEEL PIPES OR CONDUITS LARGER THAN NOM 4 IN.
DIAM MAY ONLY BE USED IN WALLS CONSTRUCTED USING STEEL CHANNEL
STUDS. A MAX OF ONE PIPE OR CONDUIT IS PERMITTED IN THE FIRESTOP
SYSTEM. PIPE OR CONDUIT TO BE INSTALLED NEAR CENTER OF STUD
CAVITY WIDTH AND TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL
ASSEMBLY.
3. FILL, VOID OR CAVITY MATERIAL*--CAULK--CAULK FILL MATERIAL INSTALLED
TO COMPLETELY FILL ANNULAR SPACE BETWEEN PIPE OR CONDUIT AND
GYPSUM WALLBOARD AND WITH A MIN 1/4 IN. DIAM BEAD OF CAULK APPLIED
TO PERIMETER OF PIPE OR CONDUIT AT ITS EGRESS FROM THE WALL.
CAULK INSTALLED SYMMETRICALLY ON BOTH SIDES OF WALL ASSEMBLY.
THE HOURLY F RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON
THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS
INSTALLED, AS SHOWN IN THE FOLLOWING TABLE. THE HOURLY T RATING
OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE TYPE OR SIZE OF THE
PIPE OR CONDUIT AND THE HOURLY FIRE RATING OF THE WALL ASSEMBLY
IN WHICH IT IS INSTALLED, AS TABULATED BELOW:
Max pipe or Conduit Diam
In.
+When copper is used, T Rating is 0h.
SECTION A-A
12 3/16 to 3/8
1/4 to 1/2
0 to 1-1/2
1/4 to 1/2
3 to 3/16
3 or 4
1 or 2
1 or 2
3 or 4
1 or 2 0
0+, 1 or 2
3 or 4
Minnesota Mining & Mfg. Co .--Types FB-2000, FB-2000+.
*Bearing the UL Classification Marking
System No. W-L-1001
(Formerly System No. 147)
F Rating--1, 2, 3 and 4 Hr (See Items 2 and 3)
T Ratings--0, 1, 2, 3, and 4 Hr (See Items 2 and 3)
L Rating at Ambient--less than 1 CFM/sq ft
L Rating At 400 F--less than 1 CFM/sq ft
Annular Space In. F Rating Hr. T Rating Hr.
A
A
1B
1A
1. FLOOR OR WALL ASSEMBLY - LIGHTWEIGHT OR NORMAL WEIGHT (100-150PCF)
CONCRETE. EXCEPT AS NOTED IN TABLE UNDER ITEM 4, MIN THICKNESS OF SOLID
CONCRETE FLOOR OR WALL ASSEMBLY IS 4-1/2". FLOOR MAY ALSO BE CONSTRUCTED
OF A MIN. 6" THICK. UL CLASSIFIED HOLLOW CORE PRECAST CONCRETE UNITS*. WHEN
FLOOR IS CONSTRUCTED OF HOLLOW CORE PRECAST CONCRETE UNITS, PACKING
MATERIAL (ITEM 3) AND CAULK FILL MATERIAL (ITEM 4) TO BE INSTALLED
SYMMETRICALLY ON BOTH SIDES OF FLOOR, FLUSH WITH FLOOR SURFACE. WALL
ASSEMBLY MAY ALSO BE CONSTRUCTED OF ANY UL CLASSIFIED CONCRETE BLOCKS*.
MAX. DIA. OF OPENING IS IN SOLID LIGHTWEIGHT OR NORMAL WEIGHT CONCRETE.
FLOOR IS 32" MAX. DIA. OF OPENING IN FLOOR CONSTRUCTED OF HOLLOW-CORE
PRECAST CONCRETE UNITS IS 7".
SEE CONCRETE BLOCKS (CAZT) AND PRECAST CONCRETE UNITS (CFTV)
CATEGORIES IN THE FIRE RESISTANCE DIRECTORY FOR NAMES OF MANUFACTURERS.
1A. STEEL SLEEVE - (OPTIONAL, NOT SHOWN) - MAX. 15" ID (OR SMALLER) SCHEDULE 10
(OR HEAVIER) STEEL SLEEVE CAST OR GROUTED INTO FLOOR OR WALL ASSEMBLY.
SLEEVE MAY EXTEND A MAX. OF 2" ABOVE TOP OF FLOOR OR BEYOND EITHER
SURFACE OF WALL. MAX. 16" ID (OR SMALLER) MIN. 0.028 WALL THICKNESS (OR
HEAVIER) GALVANIZED STEEL SLEEVE CAST OR GROUTED INTO FLOOR OR WALL
ASSEMBLY. SLEEVE MAY EXTEND A MAX. OF 1/2" BEYOND EITHER SURFACE OF FLOOR
OR WALL.
2. THROUGH PENETRANT'S - ONE METALLIC PIPE, CONDUIT OR TUBING TO BE INSTALLED
EITHER CONCENTRIC ALLY OR ECCENTRIC ALLY WITHIN THE FIRESTOP SYSTEM. MAX.
ANNULAR SPACE BETWEEN PIPE, CONDUIT OR TUBING AND EDGE OF THROUGH
OPENING OR SLEEVE IS DEPENDENT ON THE PARAMETERS SHOWN IN ITEM 4. MIN.
ANNULAR SPACE BETWEEN PIPE OR CONDUIT AND EDGE OF THROUGH OPENING IS 0".
(POINT CONTACT). PIPE CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH
SIDES OF FLOOR OR WALL ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF
METALLIC PIPES, CONDUITS OR TUBING MAY BE USED
A. STEEL PIPE - NOM. 30" DIA. (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE
B. IRON PIPE - NOM. 30" DIA. (OR SMALLER) CAST OR DUCTILE IRON PIPE
C. CONDUIT - NOM. 6" DIA. (OR SMALLER) RIGID STEEL CONDUIT
D. CONDUIT - NOM. 4" DIA. (OR SMALLER) STEEL ELECTRICAL METALLIC TUBING
E. COPPER TUBING - NOM. 8" DIA. (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBE
F. COPPER PIPE - NOM. 6" DIA. (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE
3. PACKING MATERIAL - POLYETHYLENE BACKER ROD OR NOM. 1" THICKNESS OF
TIGHTLY PACKED MINERAL WOOL BATT OR GLASS FIBER INSULATION FIRMLY PACKED
INTO OPENING AS A PERMANENT FORM. PACKING MATERIAL TO BE RECESSED FROM
TOP SURFACE OF FLOOR OR FROM BOTH SURFACES OF WALL AS REQUIRED TO
ACCOMMODATE THE REQUIRED THICKNESS OF CAULK FILL MATERIAL (ITEM 4).
4. FILL, VOID OR CAVITY MATERIAL* - CAULK - APPLIED TO FILL THE ANNULAR SPACE
FLUSH WITH TOP SURFACE OF FLOOR. IN WALL ASSEMBLIES, REQUIRED CAULK
THICKNESS TO BE INSTALLED SYMMETRICALLY ON BOTH SIDES OF WALL, FLUSH WITH
WALL SURFACE, AT POINT CONTACT LOCATION BETWEEN PENETRANT AND SLEEVE
OR BETWEEN PENETRANT AND CONCRETE, A MIN. 1/4" DIA. BEAD OF CAULK SHALL BE
APPLIED AT TOP SURFACE PIPE CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON
BOTH SIDES OF FLOOR OR WALL OF FLOOR AND AT BOTH SURFACES OF WALL.
THE HOURLY F RATINGS AND THE MIN. REQUIRED CAULK THICKNESS' ARE
DEPENDENT UPON A NUMBER OF PARAMETERS, AS SHOWN IN THE FOLLOWING
TABLE:
min. floor or wall nom. pipe tube or conduit thickness, in. dia.., in.
max. annular space, in. thickness, in.
min. caulk f rating, hr.
21/21-3/81/2-122-1/2
22-1/2 1/2-12 3-1/4 1
24-1/2 1/2-6 1-3/8 1/4 (A)
34-1/2 1/2-12 1-1/4 1/2
4-1/2 1/2-20 2 1 3
4-1/2
1/2-6
2 1
34-1/2 1/2-12 3-1/4 1
44-1/2
1/2-20
1-3/8 1 (B)
(A) min. 2" thickness of mineral wool batt insulation required in annular space.
(B) min. 1" thickness of mineral wool batt insulation required in annular space. on both sides of floor or wall assembly. min 1" thickness of caulk to be installed flush with each surface of floor or wall assembly.
minnesota mining and manufacturing co. - cp 25wb+.
*bearing the ul classification marking
SECTION A-A
System No. C-AJ-1044
(formerly system no. 319)
F Rating - 2, 3 and 4 Hr (see items 2A and 4)
T Rating - 0 Hr
L Rating At Ambient - 2 CFM/sq ft
L Rating At 400 F - less than 1 CFM/sq ft
A
4A
4 1
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/2
/2
:3
:4
A
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
FP501
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
ADL AJZFEB 04 2022
CONSTRUCTION
DOCUMENTS
FIRE PROTECTION DETAILS
FULLY SPRINKLERED
Allen D. Lantz, P.E.
MD License #41513
N.T.S.
CONCRETE HANGER DETAIL
B8
N.T.S.
PENDENT SPRINKLER HEAD DETAIL
D8
N.T.S.
RETURN BEND DETAIL
F8
N.T.S.
WALL - DRYWALL - PIPE - 1/2/3/4 HR
D6N.T.S.
WALL/FLR - CONC - PIPE - 2/3/4 HR
D3
FIRE ALARM SYMBOLS
SYMBOL DESCRIPTION
ALARM, FIRE, PANEL; LETTERS INDICATE AS FOLLOWS:
FACC = CENTRAL CONSOLE FACP = CONTROL PANEL
MFACP= MASTER CONTROL PANEL FAAP = ANNUNCIATOR PANEL
ALARM, SPEAKER/LIGHT, ONE ASSEMBLY. ADJUSTABLE
15CD, 30CD, 75CD UNLESS OTHERWISE NOTED
ALARM, SPEAKER/LIGHT, ONE ASSEMBLY WITH CHIME.
ADJUSTABLE 15CD, 30CD, 75CD UNLESS OTHERWISE NOTED
ALARM, SPEAKER/LIGHT, SEPARATE ASSEMBLY. ADJUSTABLE
15CD, 30CD, 75CD UNLESS OTHERWISE NOTED
ALARM, LAMP LIGHT, SIGNAL LIGHT, STROBE. ADJUSTABLE
15CD, 30CD, 75CD UNLESS OTHERWISE NOTED
DETECTOR, HEAT
DETECTOR, SMOKE, FOR DUCT
FIRE ALARM TERMINAL CABINET.
FIRE ALARM STATION, MANUAL PULL
FACP
C
FATC
HD
FIRE ALARM ABBREVIATIONS
1PH SINGLE-PHASE
1P SINGLE POLE
2/C TWO-CONDUCTOR
3/C THREE-CONDUCTOR
3PH THREE-PHASE
4/C FOUR-CONDUCTOR
4W FOUR-WIRE
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
ADO AUTOMATIC DOOR OPENER
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
AMB OR A AMBIENT
ARCH ARCHITECT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BAT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISH FLOOR
BLDG BUILDING
BPIP BOILER PLANT INSTRUMENTATION PANEL
BYP BY PASS
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
COMPT COMPARTMENT
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
CUR CURRENT
OC ON CENTER
OD OUTSIDE DIAMETER
P POLE
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
RGS RIGID GALVANIZED STEEL
RM ROOM
REQD REQUIRED
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SURF SURFACE
SW SWITCH
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
WP WEATHERPROOF
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISTR DISTRIBUTION
DN DOWN
DRSW DOOR SWITCH
DWG DRAWING
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EXIST EXISTING
FLEX FLEXIBLE METALLIC CONDUIT
FOUTT TELEPHONE FLOOR OUTLET
FP FIRE PROTECTION
FT FEET OR FOOT
FU SW FUSED SWITCH
G OR GND GROUND OR GENERATOR
GEN GENERATOR
GTB GROUND TERMINAL BOX
HOA HAND-OFF-AUTOMATIC
HT HEIGHT
HZ HERTZ
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
J-BOX JUNCTION BOX
LF LINEAR FEET (FOOT)
LTNG LIGHTING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MT MOUNT
MTD MOUNTED
MTG MOUNTING
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEUT OR N NEUTRAL
NIC NOT IN CONTRACT
NS NO SCALE
NTS NOT TO SCALE
CEILING ALARM, SPEAKER/LIGHT, ONE ASSEMBLY.
ADJUSTABLE 15CD, 30CD, 75CD UNLESS OTHERWISE NOTED
ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION
FA1. ALL FIRE ALARM EQUIPMENT IS TO BE NEW, UL LISTED FOR FIRE SERVICE,
AND SHALL BE COMPATIBLE WITH THE SYSTEM BEING USED. THE EXISTING
FIRE ALARM SYSTEM IS NOTIFIER NSF2-640 SYSTEM.
FA2. ALL WIRING AND CONDUIT IS TO CONFORM TO NEC ARTICLE 760. WIRING
SHALL BE UL LISTED, MINIMUM 300V TYPE FPLP PLENUM RATED SOLID
COPPER OR STANDARD COPPER WITH MAXIMUM 19 STRANDS.
FA3. LOW VOLTAGE CONDUCTORS: PROVIDE CONDUCTORS IN ACCORDANCE WITH
NFPA 70 AND NFPA 72, AND AS RECOMMENDED BY THE FIRE ALARM SYSTEM
MANUFACTURER. CONDUCTORS SHALL BE COPPER, MINIMUM NO. 14 AWG,
TWISTED SHIELDED PAIR.
FA4. SURVIVABILITY: PER AUTHORITY HAVING JURISDICTION, WIRING INSTALLED IN
METAL RACEWAY WITHIN BUILDINGS THAT ARE PROTECTED THROUGHOUT BY
SPRINKLERS SHALL BE CONSIDERED TO MEET THE REQUIREMENTS FOR
PATHWAY SURVIVABILITY LEVEL 2 IN ACCORDANCE WITH NFPA 72 (2020) AS A
2-HOUR PERFORMANCE ALTERNATIVE.
FA5. ALL FIRE ALARM POWER CIRCUITS SHALL HAVE A DEDICATED 120V 20A
BREAKER THAT SHALL BE RED IN COLOR AND MECHANICALLY PROTECTED
(LOCKABLE IN THE "ON" POSITION), MARKED AS "FIRE ALARM CIRCUIT".
FA6. MINIMUM CANDELA RATING OF STROBES IS 15; "##" ADJACENT TO DEVICE
INDICATES THE CANDELA RATING. PROVIDE SYNCHRONIZATION OF STROBES
IN ALL ADJACENT AREAS WHERE STROBES ARE VISIBLE TO EACH OTHER.
FA7. FIRE ALARM DESIGN IS IN ACCORDANCE WITH THE NATIONAL FIRE
PROTECTION ASSOCIATION (NFPA 72 - 2019) AND NATIONAL FIRE CODES (NFC).
WHERE A FIRE ALARM RISER IS INDICATED, IT IS DIAGRAMMATIC IN NATURE
AND NOT INTENDED TO REPRESENT A COMPLETE WIRING AND DEVICE
DISPLAY. ALL WIRING AND DEVICES SHALL BE IN ACCORDANCE WITH
SELECTED VENDOR'S POINT-BY-POINT WIRING DIAGRAM. REFER TO FLOOR
PLAN FOR DESIGN INTENT AND PROPOSED QUANTITY OF FIRE ALARM SYSTEM
COMPONENTS.
FA8. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO
SHOW ALL POSSIBLE CONDITIONS. IT IS INTENDED THAT A COMPLETE FIRE
ALARM SYSTEM BE PROVIDED WITH ALL THE NECESSARY EQUIPMENT,
WIRING, CONDUIT, AND CONTROLS, COMPLETELY COORDINATED WITH ALL
DISCIPLINES. THE MINIMUM FIRE ALARM DESIGN CRITERIA IN THESE
DOCUMENTS SHALL BE STRICTLY CONFORMED TO IN ACCORDANCE WITH
61G15-30.008. ANY ITEMS AND LABOR REQUIRED FOR A COMPLETE FIRE
ALARM SYSTEM, IN ACCORDANCE WITH ALL APPLICABLE CODES, STANDARDS,
LOCAL AUTHORITIES AND THESE CONTRACT DOCUMENTS SHALL BE
FURNISHED AT NO ADDITIONAL COST TO THE OWNER. THE FIRE ALARM
CONTRACTOR SHALL CAREFULLY REVIEW ALL CONTRACT DOCUMENTS AND
THE DESIGN OF OTHER TRADES BEFORE PREPARING SHOP DRAWINGS.
FA9. FIRE ALARM CONTRACTOR SHALL BE AWARE OF THE TYPE OF FINISHES,
DECOR AND OCCUPANCY. COORDINATION WITH THE STAKEHOLDERS(S)
SHALL BE PERFORMED BY THE FIRE ALARM CONTRACTOR FOR PLACEMENT
OF FIRE ALARM DEVICES.
FA10. FIRE ALARM SYSTEM SHALL COMPLY WITH NFPA 70 AND 72 FOR PROPER
INSTALLATION PRACTICES.
FA11. FIRE ALARM PATHWAYS IN ALL AREAS SHALL BE IN 3/4" EMT, AND SHALL BE
PAINTED RED. ALL FIRE ALARM WIRING SHALL BE ROUTED THROUGH CONDUIT
THAT IS STRICTLY DEDICATED FOR FIRE ALARM. NO OTHER SYSTEMS MAY
UTILIZE FIRE ALARM WIRING CONDUIT OR EMT.
FA12. ALL FIRE ALARM JUNCTION BOX AND PULL BOX COVERS SHALL BE PAINTED
RED.
FA13. PERFORM RE-ACCEPTANCE TESTING IN ACCORDANCE WITH NFPA 72.
FA14. FIRE ALARM CIRCUITS SHALL NOT HAVE SPLICES. CIRCUITS SHALL BE
EXTENDED FROM DEVICE AND APPLIANCE SCREW TERMINALS.
FIRE ALARM SYSTEM NOTES
P
ALL FIRE ALARM NOTIFICATION AND INITIATION DEVICES WILL BE CONNECTED TO THE
EXISTING NOTIFIER NSF2-640 FIRE ALARM SYSTEM THAT IS BEING INSTALLED UNDER A
SEPARATE PROJECT THROUGH A NEW BOOSTER PANEL (NAC).
FIRE ALARM SYSTEM OVERVIEW
S
SPEAKER, CEILING MOUNTED FIRE ALARM VOICE
EVACUATION .
DETECTOR, SMOKESD
FIRE ALARM RELAY MODULER
NAC= NOTIFICATION APPLIANCE CIRCUIT PANEL
FIRE ALARM DRAWING INDEX
SHEET DESCRIPTION
FA001 FIRE ALARM LEGEND
FA101 LEVEL B PLAN - FIRE ALARM PLAN
FA102 LEVEL 1 PLAN - FIRE ALARM PLAN
FA103 LEVEL 2 PLAN - FIRE ALARM PLAN
FA501 FIRE ALARM DETAILS
FA601 FIRE ALARM DIAGRAM
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/3
/2
:2
:1
P
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
FA001
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR CVMFEB 04 2022
CONSTRUCTION
DOCUMENTS
FIRE ALARM LEGEND
FULLY SPRINKLERED
JOHN F. RAINE, P.E.
MD License #41408Revisions: Revision Description Date:
G-2A1 G-3
R E
F
P
S
S
S
S
S
S
S
S
S
SD
R
2-B
E.5
2-D
2-A
2-C
2-E
2-12-2.12-22-3
2-4
2-5
2-6
2-7
2-8
2-F
CONSULT ROOM
PRINTER
034B
STORAGE
CONSULT ROOM
CONSULT ROOM
OFFICE (TRIPLE)
OFFICE (TRIPLE)
TEAM RM
STAFF TOILET
CORRIDOR
034A
HAC
STAIR 3
CORRIDOR
OFFICE (TRIPLE)
OFFICE (TRIPLE)
ELEC. CL.
OFFICE (DOUBLE)
VETERAN W.S.
OFFICE (DOUBLE)
CONSULT ROOM
OFFICE
OFFICE
CHIEF OFFICE
PUBLIC TOILET
MSA
WAITING AREA
45CD
15CD
15CD
15CD
75CD
30CD
15CD
N A
C
DRAWING NOTES:
1. COORDINATE EXACT LOCATION OF CEILING AND WALL MOUNTED FIRE ALARM DEVICES WITH ALL
OTHER UTILITIES AND ARCHITECTURAL PLANS PRIOR TO CONTRUCTION.
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/8
/2
:4
:3
P M
B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
FA101
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR CVMFEB 04 2022
CONSTRUCTION
DOCUMENTS
LEVEL B PLAN - FIRE ALARM PLAN
FULLY SPRINKLERED
JOHN F. RAINE, P.E.
MD License #41408
1/4" = 1'-0" F1
LEVEL B PLAN - FIRE ALARM
0 2' 4' 8' 12'
1/4" = 1'-0"
Revisions: Revision Description Date:
1 FIRE CURTAINS TBD
PROVIDE FIRE ALARM CONTROL RELAY MODULE FOR WINDOW FIRE CURTAIN. COORDINATE EXACT
LOCATION AND REQUIREMENTS WITH FIRE CURTAIN VENDOR PRIOR TO ROUGH-IN.
EXISTING PHASE 1. NO WORK IN THIS AREA, UNLESS OTHERWISE NOTED.
CODED NOTES:
P
S
S
S
S
S
S
S
S
SD
R
2-B
E.5
2-D
2-A
2-C
2-E
2-12-2.12-22-3
2-4
2-5
2-6
2-7
2-8
2-F
WAITING AREA
MSA
PUBLIC TOILET
CORRIDOR
GROUP THERAPY
GROUP THERAPY
OFFICE
OFFICE
OFFICE
COUPLE'S THERAPY
COUPLE'S THERAPY
OFFICE
OFFICE
PRINTER
131A
TELEDATA
OFFICE
ELEC. CL.
OFFICE
OFFICE
SECTION CHIEF
STAFF TOILET
STAIR 3
LOUNGE, STAFF
COUPLE'S THERAPY
30CD
15CD
75CD
45CD
30CD
15CD
75CD
45CD
N A
C
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/8
/2
:4
:3
P M
B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
FA102
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR CVMFEB 04 2022
CONSTRUCTION
DOCUMENTS
LEVEL 1 PLAN - FIRE ALARM PLAN
FULLY SPRINKLERED
JOHN F. RAINE, P.E.
MD License #41408
1/4" = 1'-0" F1
LEVEL 1 PLAN - FIRE ALARM
0 2' 4' 8' 12'
1/4" = 1'-0"
DRAWING NOTES:
1. COORDINATE EXACT LOCATION OF CEILING AND WALL MOUNTED FIRE ALARM DEVICES WITH ALL
OTHER UTILITIES AND ARCHITECTURAL PLANS PRIOR TO CONTRUCTION.
Revisions: Revision Description Date:
1 FIRE CURTAINS TBD
PROVIDE FIRE ALARM CONTROL RELAY MODULE FOR WINDOW FIRE CURTAIN. COORDINATE EXACT
LOCATION AND REQUIREMENTS WITH FIRE CURTAIN VENDOR PRIOR TO ROUGH-IN.
EXISTING PHASE 1. NO WORK IN THIS AREA, UNLESS OTHERWISE NOTED.
CODED NOTES:
P
S
S
S
S
S
S
S
S
S
S
SD
S
R
2-B
E.5
2-D
2-A
2-C
2-E
2-12-2.12-22-3
2-4
2-5
2-6
2-7
2-8
2-F
FIRE ALARM
NAC
WAITING AREA
PUBLIC TOILET
STAFF TOILET
N.P. OFFICE
N.P. OFFICE
N.P. OFFICE
CORRIDOR
CHIEF OFFICE
OFFICE
OFFICE
OFFICE/CONSULT
OFFICE
OFFICE/CONSULT
CORRIDOR
ELEC. RM.
HAC
N.P. OFFICE
N.P. OFFICE
N.P. OFFICE
MECH. RM.
STAIR 3
PRINTER
204A
AHU-39-2-02
45CD
45CD
45CD
45CD
45CD
45CD
15CD
45CD
15CD
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/8
/2
:4
:3
P M
B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
FA103
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR CVMFEB 04 2022
CONSTRUCTION
DOCUMENTS
LEVEL 2 PLAN - FIRE ALARM PLAN
FULLY SPRINKLERED
JOHN F. RAINE, P.E.
MD License #41408
1/4" = 1'-0"F1
LEVEL 2 PLAN - FIRE ALARM
0 2' 4' 8' 12'
1/4" = 1'-0"
DRAWING NOTES:
1. COORDINATE EXACT LOCATION OF CEILING AND WALL MOUNTED FIRE ALARM DEVICES WITH ALL
OTHER UTILITIES AND ARCHITECTURAL PLANS PRIOR TO CONTRUCTION.
DUCT SMOKE DETECTOR FURNISHED AND CONNECTED BY ELECTRICAL CONTRACTOR, MOUNTED IN
DUCTWORK BY MECHANICAL CONTRACTOR.
PROVIDE FIRE ALARM CONTROL RELAY MODULE FOR WINDOW FIRE CURTAIN. COORDINATE EXACT
LOCATION AND REQUIREMENTS WITH FIRE CURTAIN VENDOR PRIOR TO ROUGH-IN.
EXISTING PHASE 1. NO WORK IN THIS AREA, UNLESS OTHERWISE NOTED.
CODED NOTES:
Revisions: Revision Description Date:
1 FIRE CURTAINS TBD
1'-0" MAX.
5'-0" MIN. TO
6'-6" MAX.
FINISHED
FLOOR
SPEAKER
DEVICE
7'-6" TO TOP
OF DEVICE,
OR
0'-6" BELOW
FINISHED CEILING,
WHICHEVER IS
LOWER
6'-8" MIN. TO 8'-0" MAX.
FROM STROB LENS TO
FLOOR, OR
WITHIN 0'-6" OF
FINISHED CEILING,
WHICHEVER IS
LOWER
STROBE
DEVICE
SPEAKER/STROBE
COMBINATION
DEVICE
FIRE ALARM CONTROL
PANEL OR EMERGENCY
VOICE PANEL
ANNUCIATOR
PANEL OR
TERMINAL
CABINET
MANUAL PULL
STATION
5'-6"
3'-10" FROM
OPERATING
HANDLE
TO FLOOR
5'-0" MAX.
FROM EXIT OPENING
0'-4" MIN. 3'-0" MIN.
SMOKE/HEAT
DETECTOR
MOUNT DETECTOR
ON APPROVED BOX 6'-0" MAX. LENGTH FLEXIBLE RACEWAY TO DEVICE MOUNTED
ON SUSPENDED CEILING
AIR SUPPLY DIFFUSER OR
RETURN AIR OPENING
JUNCTION BOX
CONDUIT
INSTALL PER NATIONAL
ELECTRIC CODE
FLOOR-CEILING
ASSEMBLY
SUSPENDED
CEILING
SMOKE
DETECTOR
1'-0" MAX.
FINISHED
FLOOR
SUSPENDED
CEILING
HEAT
DETECTOR
0'-4" MIN.
0'-4" MIN
HEAT
DETECTOR
DO NOT LOCATE
DETECTOR WITHIN
THIS AREA
HEAT DETECTOR MOUNTING
PLACEMENT REQUIREMENTSNOTES:
1. MOUNT FIRE ALARM DEVICES ON APPROVED BOXES.
N.T.S.
FIRE ALARM DEVICE MOUNTING DETAIL
E5
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/3
/2
:2
:1
P
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
FA501
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR CVMFEB 04 2022
CONSTRUCTION
DOCUMENTS
FIRE ALARM DETAILS
FULLY SPRINKLERED
NEW
FIRE ALARM
BOOSTER PANEL
"NAC"
LEVEL 2
R R
P
TYPICAL CONTROL RELAYS
INDICATING DEVICES
TYPICAL INITIATION DEVICES
ROOF
SDHD
CODED NOTE:
NEW FIRE ALARM BOOSTER PANEL TO INTERFACE WITH
EXISTING FIRE ALARM SYSTEM IN BUILDING 38.
EXISTING BUILDING #38 PH-1
FIRE ALARM NETWORK
(NOTIFIER NFS2-640)
CLASS B WIRING TYPICAL,
UNLESS OTHERWISE NOTED.
CLASS X WIRING. GENERAL NOTE: EXISTING FIRE ALARM SYSTEM RESPONSE
WILL NOT BE ALTERED BY THIS PROJECT. MAINTAIN
EXISTING FIRE ALARM SYSTEM RESPONSE.
LEVEL 1
P
INDICATING DEVICES
TYPICAL INITIATION DEVICESSDHD
LEVEL B
P
INDICATING DEVICES
TYPICAL INITIATION DEVICESSDHD
S
S
S
LEVEL 1 FIRE ALARM
NAC PANEL.
LEVEL B FIRE ALARM
NAC PANEL.
N.T.S.
FIRE ALARM RISER DIAGRAM2
F7
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
ENGINEER ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
/3
/2
:2
:1
P
M B
IM
/0
V A
P ro v id e n c e M e n ta l H e a lt h
B u ild in g
P H
/0
V A
P ro v id e n c e
M H
C P
H
R
D iv
.r v t
FA601
650-347
PROVIDENCE VAMC MENTAL
HEALTH PHASE 2
PROVIDENCE, RI
JFR CVMFEB 04 2022
CONSTRUCTION
DOCUMENTS
FIRE ALARM DIAGRAM
FULLY SPRINKLERED
File details come from the government source that posted it. Updated .