This solicitation is seeking proposals for a firm-fixed-price construction contract to complete the Mental Health Phase 2 project at the Providence VA Medical Center in Providence, Rhode Island. The selected contractor will furnish all labor, materials, equipment, tools and supervision necessary for general construction, alterations, civil site work, finishes, HVAC, electrical, plumbing, fire alarm and suppression, security and other work defined in the construction documents. The project scope includes new construction as well as work in existing buildings. Interested offerors should review the provided drawings and specifications for additional requirement details. Proposals are due based on the solicitation response date specified in the document. The Department of Veterans Affairs intends to award a single contract for completion of this project.

View the file

Other files

File Type Posted
36C77623R0039 0002.pdf PDF
Attachment 18 - Addendum 01.pdf PDF
Attachment 24 - Sheet P-001.pdf PDF
Attachment 23 - MDP Panel Info.pdf PDF
Attachment 20 - Updated Wage Rates.pdf PDF
Attachment 21 - CR211 Panel Info.pdf PDF
Attachment 19 - Technical Questions and Answers.xlsx XLSX spreadsheet
Attachment 22 - Fire Alarm As-Builts.pdf PDF
S02 - Solicitation - 36C77623R0039_R1.pdf PDF
Attachment 17 - Site Visit Sign in Sheet.pdf PDF
36C77623R0039 0001.pdf PDF
Attachment 08 - Fire Protection Drawings.pdf PDF
Attachment 03 - Architectural Drawings - Pt 1.pdf PDF
Attachment 12 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 04 - Architectural Drawings - Pt 2.pdf PDF
Attachment 02 - Specifications - Pt 2.pdf PDF
Attachment 15 - Providence County - Wage Rates.pdf PDF
Attachment 11 - Structural Drawings.pdf PDF
Attachment 14 - VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx DOCX document
Attachment 16 - SOW - Mental Health Phase 2.pdf PDF
Attachment 05 - Civil Drawings.pdf PDF
S02 - Solicitation - 36C77623R0039.pdf PDF
Attachment 01 - Specifications - Pt 1.pdf PDF
Attachment 07 - Electrical Drawings - Pt 2.pdf PDF
Attachment 13 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 06 - Electrical Drawings - Pt 1.pdf PDF
Attachment 09 - Mechanical Drawings.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2-A

2-C

2-F

2-8

2-7

2-6

2-5

2-4

2-3 2-2.1 2-2 2-1

2-B

2-D

2-E

E.5

E.9

2" V UP

4" SAN UP

4" S

4" S

4" S

4" S

2" S

4" S

4" S

4" S

3" S

2" S

4" S

3" P-TRAP UP

TO MOP SINK

REFER TO CIVIL DRAWINGS

FOR CONTINUATION.

COORDINATE, INVERT, AND

OFFSET PIPE AS NEEDED.

4" S

STAFF TOILET

TEAM RM

OFFICE (TRIPLE)

OFFICE (TRIPLE)

CONSULT ROOM

CONSULT ROOM

STORAGE

CONSULT ROOM

PUBLIC TOILET

MSA

WAITING AREA

CORRIDOR

CHIEF OFFICE

OFFICE

OFFICE

CONSULT ROOM

OFFICE (DOUBLE)

OFFICE (DOUBLE)

OFFICE (TRIPLE)

OFFICE (TRIPLE)

ELEC. CL.

STAIR 3

HAC

VETERAN W.S.

CORRIDOR

034A

PRINTER

034B

4" FCO

4" FCO

4" FCO

4" SAN UP

2" SAN UP

4" SAN UP

4" SAN UP

2" SAN UP

4" 2-WAY ECO

3" S

3" SAN UP

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:0

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

PS101

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING GRAVITY - LEVEL B

UNDERSLAB PLAN

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

1/4" = 1'-0" F1

PLUMBING UNDERSLAB GRAVITY PLAN - LEVEL B

0 4' 8' 16' 24'

1/8" = 1'-0"

P1P2

KEY PLAN

Revisions: Revision Description Date:

P-103

P-420

P-103

P-420

4"SAN UP

2" V UP

4" SAN DN

2-A

2-C

2-F

2-8

2-7

2-6

2-5

2-4

2-3 2-2.1 2-2 2-1

2-B

2-D

2-E

E.5

E.9

4"S UP

2" S

1 1/2" V

2" V

2" S 4" S

2" V

4" S

WCO

WCO

2" SAN UP

4" FCO

4" FCO

P-502

1 1/2" V UP

2" S DN

ST OUT ABOVE BASEMENT CEILING

REFER TO CIVIL DRAWINGS FOR

CONTINUATION. COORDINATE,

INVERT, AND OFFSET PIPE AFTER

BACKWATER VALVE AS NEEDED.

CO

8" ST

S T

8" S

T

4" FCO

AC-39-0-01

STAFF TOILET

TEAM RM

OFFICE (TRIPLE)

OFFICE (TRIPLE)

CONSULT ROOM

CONSULT ROOM

STORAGE

CONSULT ROOM

PUBLIC TOILET

MSA

WAITING AREA

CORRIDOR

CHIEF OFFICE

OFFICE

OFFICE

CONSULT ROOM

OFFICE (DOUBLE)

OFFICE (DOUBLE)

OFFICE (TRIPLE)

OFFICE (TRIPLE)

ELEC. CL.

STAIR 3

HAC

VETERAN W.S.

CORRIDOR

034A

PRINTER

034B

3/4" CND

3/4" CND UP

BACKWATER

VALVE

CO

2" CND2" CND UP TO

WALL BOX

2"SAN UP

2" V DN

8" ST UP

2" V

2"V UP

8"ST UP

4" SAN DN

2" V UP

4" TWO-WAY ECO

4" SAN DN

1 1/2" V UP

2" S DN

4" SAN DN

2" V UP

2" SAN UP

2" V

OFFSET SANITARY LINE WITHIN

WALL TO AVOID FOOTING BELOW.

3" SAN UP

3" SAN DN

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:0

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

PS111

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING GRAVITY - LEVEL B

PLAN

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

1/4" = 1'-0"F1

PLUMBING GRAVITY PLAN - LEVEL B

0 4' 8' 16' 24'

1/8" = 1'-0"

P1P2

P-103

P-420

P-528

4"S DN

4"S UP

4"S DN

2"V UP

2-A

2-C

2-F

2-8

2-7

2-6

2-5

2-4

2-3 2-2.1 2-2 2-1

2-B

2-D

2-E

E.5

E.9

2" V

2" V UP

2"S DN

1 1/2"V UP

2"V UP/DN

2"S UP/DN

2"ST UP

2"ST UP

8" S

T O

8" ST

2" ST

AC-39-1-03

AC-39-1-04

1" CND

3/4" CND3/4" CND

AC-39-1-05

CO

CO

BACKWATER

VALVE

STAIR 3

LOUNGE, STAFF

STAFF TOILET

OFFICE

TELEDATA

COUPLE'S

THERAPY

137 COUPLE'S

THERAPY

COUPLE'S

THERAPY

GROUP THERAPY

PUBLIC TOILET

MSA

WAITING AREA

GROUP THERAPY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ELEC. CL.

SECTION CHIEF

143 CORRIDOR

PRINTER

131A

3/4" CND

4" S

4" S

3/4" CND UP

1" CND DN TO WALL

BOX. REFER TO DETAIL.

8"ST UP/DN

2"V DN

4"S UP

4"S UP

8"ST UP

8"ST DN

8"STO UP

2"V UP

2"S DN

1 1/2"V UP

2"S UP

2"ST UP

CO

2" ST

3" SAN DN2" V UP

3" SAN UP

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:0

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

PS121

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING GRAVITY - LEVEL 1

PLAN

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

1/4" = 1'-0" F1

PLUMBING GRAVITY PLAN - LEVEL 1

CODED NOTES:

8" STO DN TO DOWNSPOUT. REFER TO DETAIL 9/P-501.

ROUTE 2" STORM PIPING BETWEEN STRUCTURAL BEAMS AS NECESSARY. OFFSET PIPING AS

NECESSARY.

0 4' 8' 16' 24'

1/8" = 1'-0"

P1P2

P-103 P-420

2" FD-M

2" FD-M

4"S DN

2" V UP

2-A

2-C

2-F

2-8

2-7

2-6

2-5

2-4

2-3 2-2.1 2-2 2-1

2-B

2-D

2-E

E.5

E.9

CO

6" ST

6" STO

6" ST

6" ST UP

6" STO UP

8" ST DN

3" V

2" V

1 1/2" V

H-39-2-02

P-502

2"S DN

1 1/2"V UP

CO

CO

CO

CO

CO

CO

CO

CO

6" ST

6" STO

8" ST

8" ST

8" STO 6" ST

6" STO

6" STO 6" STO

6" ST

8" ST

6" ST

STAIR 3

PUBLIC TOILET

STAFF TOILET

N.P. OFFICE

N.P. OFFICE

N.P. OFFICE

N.P. OFFICE

N.P. OFFICE

N.P. OFFICE

MECH. RM.

ELEC. RM.

CORRIDOR

OFFICE/CONSULT

OFFICE

219 OFFICE/CONSULT

OFFICE

OFFICE

CHIEF OFFICE

CORRIDOR

HAC

PRINTER

204A

WAITING AREA

AC-39-2-01

P-604

CO

4" FD-C

4" FD-C

3/4" CND DN

6" ST UP

6" ST UP

6" STO UP

6" ST UP

6" STO UP

6" ST UP

CO

6" ST DN

6" STO DN

2" V DN

2" V

2"S DN

1 1/2"V UP

2" FD-M

3" V

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:0

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

PS131

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING GRAVITY - LEVEL 2

PLAN

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

1/4" = 1'-0" F1

PLUMBING GRAVITY PLAN - LEVEL 2

CODED NOTES:

3" VENT PIPING UP TO ROOF. REFER TO SHEET PS141 FOR CONTINUATION.

CONDENSATE PIPING DISCHARGING TO FLOOR DRAIN.

0 4' 8' 16' 24'

1/8" = 1'-0"

P1P2

2-F

2-8

2-7

2-6

2-5

2-4

2-3 2-2.1 2-2 2-1

2-B

2-D

2-E

E.5

E.9

6" RD-A

6" RD-A

6" RD-A

6" RD-B

6" RD-B

3" VTR

3" VTR

3" VTR

3" VTR

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:1

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

PS141

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING GRAVITY - ROOF PLAN

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

1/4" = 1'-0"F1

GRAVITY PLAN - ROOF

0 4' 8' 16' 24'

1/8" = 1'-0"

P1P2

KEY PLAN

P1P2

2-F

2-8

2-7

2-6

2-5

2-4

2-3 2-2.1 2-2 2-1

2-B

2-D

2-E

E.5

E.9

P-401

D1

3/4" HW UP

P-401

F1

STAFF TOILET

TEAM RM

OFFICE (TRIPLE)

OFFICE (TRIPLE)

CONSULT ROOM

CONSULT ROOM

039 STORAGE

CONSULT ROOM

PUBLIC TOILET

MSA

WAITING AREA

CORRIDOR

CHIEF OFFICE

OFFICE

OFFICE

CONSULT ROOM

OFFICE (DOUBLE)

OFFICE (DOUBLE)

OFFICE (TRIPLE)

OFFICE (TRIPLE)

ELEC. CL.

STAIR 3

HAC

VETERAN W.S.

CORRIDOR

034A

PRINTER

034B

3/4" HW

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:5

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

PP111

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING PRESSURE - LEVEL B

PLAN

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

1/4" = 1'-0" F1

PLUMBING PRESSURE PLAN - LEVEL B

DRAWING NOTES:

0 4' 8' 16' 24'

1/8" = 1'-0"

1. ALL VALVE ACCESS PANELS TO BE LOCATED OUTSIDE OF RESTROOMS.

P1P2

2-F

2-8

2-7

2-6

2-5

2-4

2-3 2-2.1 2-2 2-1

2-B

2-D

2-E

E.5

E.9

(E)1 1/4" G

(E)2 1/2" CW

(E)2 1/2" CW AND (E)1 1/4" G

CONTINUED TO (E) BUILDING.

SHUTOFF VALVES LOCATED

OUTSIDE TOILET 104.

1 1/2" CW UP

P-401

D4

P-401

F4

1 1/2" CW

2" CW

1 1/2" CW

2" CW

2 1/2" CW

1 1/2" CW

SET BALANCING

VALVE TO 1.0 GPM

3/4" HW

3/4" HW UP

NC VALVE

3/4" HWR

3/4" HWR

STAIR 1

WAITING

STAIR 3

LOUNGE, STAFF

STAFF TOILET

OFFICE

TELEDATA

COUPLE'S

THERAPY

137 COUPLE'S

THERAPY

COUPLE'S

THERAPY

GROUP THERAPY

PUBLIC TOILET

MSA

WAITING AREA

GROUP THERAPY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ELEC. CL.

SECTION CHIEF

CORRIDOR

PRINTER

131A

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:0

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

PP121

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING PRESSURE - LEVEL 1

PLAN

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

1/4" = 1'-0"F1

PLUMBING PRESSURE PLAN - LEVEL 1

DRAWING NOTES:

0 4' 8' 16' 24'

1/8" = 1'-0"

1. ALL VALVE ACCESS PANELS TO BE LOCATED OUTSIDE OF RESTROOMS.

P1P2

2-F

2-8

2-7

2-6

2-5

2-4

2-3 2-2.1 2-2 2-1

2-B

2-D

2-E

E.5

E.9

REFER TO PP132

FOR CONTINUATION

TP-1

1 1/4" CW DN

P-401

F7

3/4" HW DN

H-39-2-02

P-502

1 1/4" CW

N.P. OFFICE

STAIR 3

PUBLIC TOILET

STAFF TOILET

N.P. OFFICE

N.P. OFFICE

N.P. OFFICE

N.P. OFFICE

N.P. OFFICE

MECH. RM.

ELEC. RM.

CORRIDOR

OFFICE/CONSULT

OFFICE

OFFICE/CONSULT

OFFICE

OFFICE

CHIEF OFFICE

CORRIDOR

HAC

PRINTER

204A

WAITING AREA

3/4" HW

3/4" HWR

3/4" CW

P-804

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:4

:5

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

PP131

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING PRESSURE - LEVEL 2

PLAN

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

1/4" = 1'-0"F1

PLUMBING PRESSURE PLAN - LEVEL 2

CODED NOTES:

3/4" CW ROUTED DOWN TO SERVICE HUMIDIFIER. PROVIDE BACKFLOW PREVENTER BEFORE

CONNECTION TO HUMIDIFIER. BACKFLOW DESIGN BASIS ZURN 700XL.

3/4" CW ROUTED DOWN TO SERVICE TRAP PRIMER.

1/2" CW FROM TRAP PIMER TO FD

DRAWING NOTES:

0 4' 8' 16' 24'

1/8" = 1'-0"

1. ALL VALVE ACCESS PANELS TO BE LOCATED OUTSIDE OF RESTROOMS.

P1P2

KEY PLAN

2-B

2-D

E.5

E.9

CONTINUED TO

PHASE 1 AREAS

CONTINUED TO

PHASE 1 AREAS

3/4" HWR

3/4" HW

(E)3/4" HWR

(E)1 1/2" HW

(E)1 1/2" CW

(E)3" G

REFER TO PP131

FOR CONTINUATION

STAIR 1

ELEV 1

ELEV 2

CIRCULATION

MECHANICAL

ROOM

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:0

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

PP132

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING - LEVEL 2 PH1 PLAN

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

CODED NOTES:

CONNECT HW AND HWR TO (E)MAINS. CONNECT HWR BEFORE (E)RECIRC PUMP.1

1/4" = 1'-0" F1

PLUMBING PRESSURE PLAN - PHASE 1 - LEVEL 2

0 4' 8' 16' 24'

1/8" = 1'-0"

P1P2

2-8

EWH-1

RP-1

ET-1

1 1/4" CW

1 1/2" CW

1/2" CW

3/4" HW

3/4" HW

3/4" HW

3/4" HWR

3/4" HW

P-103

P-420

TMV-1

3/4" CW3/4" HW

3/4" CW3/4" CW

3/4" HWR

3/4" CW

STAFF TOILET

CORRIDOR

STAIR 3

HAC

CORRIDOR

034A

REFER TO PP111

FOR CONTINUTATION

3/4" HWR UP

1 1/2" CW UP

P-502

TMV-2

NC

REFER TO B8/P-501 FOR

SUSPENDED WATER

HEATER DETAIL

2-A

2-2.1 2-2

E.9

1/2" HWR

1/2" HW

P-103

1/2" HW UP

1/2" HWR UP

1 1/4" CW UP

P-420

1 1/4" CW

PUBLIC TOILET

MSA

1/2" CW

1 1/4" CW

TMV-2

SET BALANCING

VALVE TO 0.75 GPM

2-A

2-C

2-8 2-7

P-103

P-420

P-528

3/4" HWR DN

1 1/2" CW DN

1 1/2" CW

3/4" HW

1 1/2" CW

1 1/4" CW1/2" CW

3/4" HW

3/4" HW

1 1/4" CW

3/4" HW

LOUNGE, STAFF

STAFF TOILET

REFER TO PP121

FOR CONTINUTATION

REFER TO PP121

FOR CONTINUTATION

TMV-2

TMV-2

NC

REFER TO PP121

FOR CONTINUTATION

2-A

2-2.1 2-2

E.9

P-103

P-420

1 1/2" CW UP

1 1/4" CW DN

SET BALANCING

VALVE TO 0.75 GPM

1 1/4" CW1 1/4" CW

1/2" CW

1/2" HW

3/4" HW UP

3/4" HW DN

3/4" HW UP

3/4" HW DN

PUBLIC TOILET

MSA

REFER TO PP121

FOR CONTINUTATION

1/2" HW1/2" HWR

TMV-2

REFER TO PP121

FOR CONTINUTATION

2-A

2-C

2-2.1 2-2

E.9

P-103

P-420

P-103

P-420

1 1/2" CW DN SET BALANCING .

VALVE TO 0.75 GPM

3/4" HWR

1/2" CW

1 1/2" CW

3/4" HW

3/4" HWR

3/4" HW

3/4" HWR DN

3/4" HW DN

PUBLIC TOILET

STAFF TOILET

WAITING AREA

REFER TO PP131

FOR CONTINUTATION

3/4" HW

3/4" HWR

P-604

TMV-2

TMV-2

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:4

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

P-401

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING ENLARGED PLANS

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

1/2" = 1'-0" D1

LEVEL B ENLARGED STAFF TOILET 044 & HAC 045 PLAN

DRAWING NOTES:

1. ALL VALVE ACCESS PANELS TO BE LOCATED OUTSIDE OF RESTROOMS.

2. PROVIDE THERMOSTATIC MIXING VALVE AT ALL LAVATORIES.

1/2" = 1'-0" F1

LEVEL B ENLARGED PUBLIC TOILET 035

1/2" = 1'-0" D4

LEVEL 1 ENLARGED STAFF TOILET 141 & STAFF LOUNGE

1/2" = 1'-0" F4

LEVEL 1 ENLARGED PUBLIC TOILET 132

1/2" = 1'-0"

F7

LEVEL 2 ENLARGED PUBLIC TOILET 207 & STAFF TOILET 208

0 1' 2' 4' 6'

1/2" = 1'-0"

(3) 2 x 4 STUDS AT EACH

LEG LOCATION (TYP)

(4) 5/16" x 3 LAG SCREWS (TYP.)

NOTE:

1. INSULATE ALL RELIEF DRAINS

2. PROVIDE 2 LAYERS OF "ARMAFLEX" 3/4" INSULATION ON

ALL ANGLE IRON SUPPORTS.

4"X4"X1/4" PLATE ANCHOR TO

WALL, 4 PLACES EA. PLATE

1 1/4" L IRON FRAME ALL

WELDED

6'-6" MIN.

TO FLOOR

DRAIN VALVE

ELECTRIC

WATER

HEATER

VACUUM RELIEF

VALVE

CHECK VALVE (TYP)

EXPANSION TANK

THERMOMETER (TYP)

T & P RELIEF VALVE

FULL SIZE OF RELIEF VALVE

TO NEAREST DRAIN

RECIRCULATION

PUMP

DRAIN PAN WITH MINIMUM 2" HIGH SIDES

CW FROM MAIN

THERMOSTATIC

MIXING VALVE

HWR FROM FIXTURES

120ºF HW TO FIXTURES

FULL SIZE BYPASS

THERMOMETER/AQUASTAT

HEAT TRAP

DRAIN VALVE

DRAIN PAN OVERFLOW PIPE, FULL SIZE,

TO MOP SINK IN HAC CLOSET 045.

LIQUID SENSOR TO ALARM BAS

UPON DETECTION OF WATER

OR CATCH BASIN

TO STORM DRAIN

CAST IRON BACKWATER VALVE

W/PVC FLAPPER AND O-RING

SEAL EQUAL TO ZURN-Z-1090

GRADE

10" DIAMETER CAST IRON COVER

MARKED 'BACKWATER VALVE',

EQUAL TO BROOKS 3-RT SERIES

PRECAST CONCRETE BODY

PROVIDE EXTENSIONS AS

REQUIRED

UNDERGROUND CONDESATE DRAIN

PIPING, SEE PLAN FOR SIZE

SLOPE

INSULATE UNDERSIDE ROOF

SUMP & HORIZONTAL RAIN

LEADERS

INSULATION

PIPE SUPPORT (TYP)

ROOF DRAIN

ROOF DECK

CO

TILE FLOOR

NOTE:

1. SLOPE MEMBRANE LINER 2% TO DRAIN.

2. PROVIDE FLASHING MEMBRANE WHEN DRAIN IS INSTALLED IN A NON MEMBRANE FLOOR

CONCRETE FLOOR

CEMENT BED

LOOSE GRAVEL

AT WEEP HOLES

3mm TO 6mm SIZE

NICKLE BRONZE

ADJUSTABLE STRAINER

(FLUSH WITH FINISHED

FLOOR)

CLAMP WATERPROOF

MEMBRANE INSIDE OF

DRAIN BODY TO DRAIN

TO WEEP HOLES

WATERPROOF MEMBRANE

FLASHING

CLAMP WITH

WEEP HOLES

STRUCTURAL SLAB

THREADED, CAULKED OR

NO-HUB CONNECTION

PROVIDE A METAL SUPPORT PLATE

WHEN DRAIN IS INSTALLED IN AN

EXISTING FLOOR - CAULK AROUND

DRAIN PRIOR TO RE-GROUTING

2"

4"

[1 m m

[5 0m m

EXTERIOR SIDE OF CONCRETE WALL

1/4" [6mm] STEEL PLATE WATER

STOP & ANCHOR COLLAR

STAINLESS STEEL BOLTS,

NUTS, & WASHERS

FLEXIBLE EXPANSION JOINT MIN.

DEFLECTION 15" [375mm] MIN.

EXPANSION 4" [100mm]

PIPE CENTERED

IN SLEEVE

RESILIENT

WATERPROOF

CAULKING

WELD

5/8" [16mm] ROD

INTERIOR SIDE

OF WALL

1/4" X 1/4" [6x6mm]

IRON PIPE STRAP

STANDARD WEIGHT GAL.

STEEL PIPE SLEEVE

1/4" X 1/4" [6x6mm]

IRON PIPE CLAMP

MODULAR TYPE WALL

PENETRATION SEAL

FLANGED CONNECTION

HANGER ROD

NOTE:

PIPE SUPPORT BELOW SLAB REQUIRED FOR ALL GRAVITY PIPING

BELOW SLAB. HANGER IS SPACING IS TO BE PER PLUMBING CODE.

SLEEVE AND SEAL

PIPING THRU SLAB

HEAVY DUTY TYPE 304

STAINLESS STEEL NO-HUB

CAST IRON PIPE CLAMP HANGER REQUIRED AT ALL

FITTINGS AND COUPLINGS

GRADE BEAM

SLOPE: MIN. w" PER FOOT

EQUAL TO ELCEN NO.12 (TYP.)

HEAVY DUTY CLEVIS HANGER

SLEEVE PIPING THRU GRADE

BEAM WHERE REQUIRED

FIRST FLOOR SLABSPOT TYPE CONCRETE

INSERT EQUAL TO ELCEN

NO.61 (TYP.)

POLISHED BRONCE TOP

CONCRETE SLAB

PROVIDE ADJUSTABLE FLOOR CLEANOUT,

CAST IRON BODY WITH GAS & WATER

TIGHT ABS TAPERED THREAD PLUG &

ROUND SECURED TOP FOR ADJUSTMENT

SLIP JOINT

SAME SIZE AS SEWER

SHORT SWEEP

ELBOW

NOTE: SECURE CLEANOUT COVER WITH SCREWS

DETAIL NOTES:

DOMESTIC COLD WATER

FLOW DIRECTION LABEL. PROVIDE 360

DEGREE WRAP OVERLAPPING BOTH ENDS OF

THE PIPE FUNCTION LABEL AND MATCHING

THE FLOW DIRECTION OF THE PIPE

CONTENTS.

PIPE FUNCTION LABEL

A.

B.

C.

D.

E.

F.

PROVIDE A PIPE LABEL FOR EACH PIPE FUNCTION.

PROVIDE AT LEAST ONE LABEL ON EACH PIPE FOR EVERY ROOM THE

PIPE PASSES THROUGH.

PROVIDE LABELS IN LARGE SPACES ON MAXIMUM 20' CENTERS FOR

EVERY PIPE UNLESS OTHERWISE NOTED IN THE SPECIFICATIONS.

LABELS TO BE LOCATED IN AN EASILY VISIBLE LOCATION AS THEY

WOULD NORMALLY BE SEEN. IE. ON THE BOTTOM HALF OF PIPES

IN THE AIR AND ON THE TOP HALF OR SIDES OF PIPES MOUNTED LOW.

LABELS SHALL BE, COLOR CODED, PRE-PRINTED, SELF ADHESIVE VINYL.

SEE SPECIFICATION FOR OTHER REQUIREMENTS AND LIST OF PIPE FUNCTIONS.

STAINLESS STEEL DOWNSPOUT WITH COVER

EQUAL TO ZURN #Z-199-DC WITH HINGED

COVER FLAT WITH WALL FOR OVERFLOW.

COVER SHALL NOT BE SECURED CLOSED.

SECONDARY STORM DRAIN PIPING, SEE FLOOR

PLANS FOR SIZE AND LOCATIONS

WALL

FLOOR

18"-24"MAX

SPLASH BLOCK

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:5

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

P-501

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING DETAILS

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

N.T.S.

ELECTRIC WATER HEATER (SUSPENDED) DETAIL

B8

N.T.S.

BACKWATER VALVE

D8

N.T.S.

ROOF DRAIN - INSULATED

F8

N.T.S.

TYPE "C" FLOOR DRAIN DETAIL

B4

N.T.S.

PIPE PENETRATION THROUGH WALLS BELOW GRADE

D4

N.T.S.

UNDERGROUND PIPE SUPPORT

F4

N.T.S.

FLOOR CLEANOUT (FCO) DETAIL

B1

N.T.S.

PIPING IDENTIFICATION LABEL DETAIL

D1

N.T.S.

OVERFLOW NOZZLE DETAIL

F1

4' -0

FLOOR DRAIN

P-TRAP

4 TO 30

FLOOR DRAINS

BALL VALVE

3/4" COLD WATER

FINISH FLOOR

1/2" TYPE "K" SOFT SEAMLESS COPPER

WITH NO JOINTS BELOW FLOOR SLAB.

SLOPE AT 1/8" PER FOOT MINIMUM TO

FLOOR DRAIN CONNECTION.

120/1/60 ELECTRICAL

CONNECTION

ELECTRONIC TRAP PRIMING MANIFOLD SUITABLE FOR 4 TO 30

FLOOR DRAINS. COMPLETE WITH CIRCUIT BREAKER, TIMER,

BALL VALVE, SOLENOID VALVE & VACUUM BREAKER

COMPLETLY MOUNTED IN STEEL CABINET ENCLOSURE.

(PRECISION PLUMBING PRODUCTS PT-4 THRU PT-30)

SOLENOID VALVE

24-HOUR TIME CLOCK

WITH TEST AND

OVERRIDE BUTTONS.

VACUUM BREAKER

GALVANIZED STEEL

CABINET

2"VP

CONDENSATE PIPING TO HVAC UNIT BY

MECHANICAL TRADES

2"WASTE

FINISHED

WALL

CENTER KNOCKOUT FOR

CONDENSATE DRAIN

KNOCK-OUT

CONDENSATE PIPE

CONDENSATE BOX:

OATEY MODEL "THE ELIMINATOR"

OUTLET BOX. PROVIDE WITH ALL

MOUNTING HARDWARE, AND FACEPLATE.

PROVIDE AIR GAP.

FACE PLATE

2"SAN

FINISH FLOOR

SLEEVE AS REQUIRED

1" MIN. AIR GAP

2" MINIMUM AIR

GAP (SEE NOTE)

CAST IRON

FLOOR DRAIN

DRAIN LINE

TO "P" TRAP

FINISHED FLOOR

REMOVABLE GRATE

SUPPORT PIPING

EVERY 4'-0"

INDIRECT WASTE

LINE

NOTE:

THE AIR GAP BETWEEN THE INDIRECT WASTE PIPEAND THE FLOOD LEVEL RIM OF THE WASTE RECEPTOR SHALL BE A

MINIMUM OF TWICE THE EFFECTIVEOPENING OF THE INDIRECT WASTE PIPE.

THERMOSTATIC VALVE. REFER

TO FLOOR PLAN AND SCHEDULE

H W C W

HW

CW

H W

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:5

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

P-502

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL WRHFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING DETAILS

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

N.T.S.

ELECTRONIC TRAP PRIMER

B8

N.T.S.

CONDENSATE WALL BOX DETAIL

D8

N.T.S.

TYP "M" FLOOR DRAIN DETAIL

F8

N.T.S.

LAVATORY PIPING DETAIL

B5

TP-1

H-39-2-02

P-502

CONTINUES TO SOUTH RISER

E6/P-601

P-420

P-103

P-502

P-103P-420

P-528

RP-1

EWH-1

ET-1

TMV-1

3/4" HW

3/4" HW

3/4" HW 1/2" CW

3/4" HW

2" CW

3/4" CW

3/4" HW

3/4" HWR

3/4" HW

3/4" CW

3/4" CW

1 1/4" CW

1 1/4" CW

1/2" CW

3/4" HW

3/4" HW

3/4" HW

1 1/2" CW

3/4" HWR

3/4" HW

3/4" HWR

1 1/4" CW

3/4" CW

3/4" HW

3/4" HW

3/4" HW

3/4" CW

3/4" HWR

3/4" HW

1 1/2" CW

P-804

3/4" CW

1 1/4" CW

REFER TO PP132

FOR CONTINUATION

CONTINUES TO (E)2 1/2" CW TO

(E) BUILDING. SHUTOFF VALVES

LOCATED OUTSIDE TOILET 104

P-420

P-103

P-103

P-420

P-604

P-420 P-103

P-103

P-420

CONTINUES TO NORTH RISER

E3/P-601

2" CW

2" CW

1 1/2" CW

1 1/2" CW

1 1/2" CW

1 1/2" CW

1 1/4" CW

1 1/4" CW

2 1/2" CW

1 1/4" CW

1/2" CW

1/2" HW

1/2" HW

1/2" HWR

1/2" HW

1 1/4" CW

1 1/4" CW

1/2" CW

1/2" HW

1/2" HW

1/2" HWR

1 1/4" CW

3/4" HW

3/4" HWR

1/2" CW

3/4" CW

1/2" CW

1/2" CW

3/4" BALANCING VALVE

1/2" BALANCING VALVE

1/2" BALANCING VALVE

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:5

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

P-601

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING ISOMETRICS -

PRESSURE

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

N.T.S.

PLUMBING PRESSURE ISOMETRIC - NORTH

E2 N.T.S.

PLUMBING PRESSURE ISOMETRIC - SOUTH

E6

AC-039-0-01

AC-039-1-03

AC-039-1-04

AC-039-1-05

AC-039-2-01

DISPERSION TUBE

AHU-039-2-02

12" BACKWATER VALVE

8" ST

8" ST

6" ST

6" ST

12" ST

8" ST

8" ST

8" STO

6" STO

6" ST

6" STO

6" STO

6" ST

6" ST

8" ST

8" ST

1 1/4" CND

3/4" CND

3/4" CND

3/4" CND

3/4" CND

1/2" CND

2" BACKWATER VALVE

FD-M

FD-M

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO CO

6" RD-A

CO

6" RD-A

6" RD-A

6" RD-B

6" RD-B

CO

REFER TO CIVIL DRAWINGS FOR

CONTINUATION. COORDINATE,

INVERT, AND OFFSET PIPE AFTER

BACKWATER VALVE AS NEEDED.

8" STO DN TO DOWNSPOUT

3/4" CND

3/4" CND

3/4" CND

3/4" CND

CO

2" BACKWATER VALVE

FD-M

FCO

FCO

4" S

4" S

4" S

4" S

4" S

4" S

2" S

4" S

1 1/2" V 2" V

4" S

2" S

2" V

2" V

2" V 1 1/2" V

2" V

3" V

3" VTR

CONTINUES TO NORTH RISER

D3/P-602

CO

P-103

P-103

P-420

P-420

P-604

P-103 P-420

P-103 P-420

REFER TO CIVIL DRAWINGS

FOR CONTINUATION. FCO

P-502

P-420 P-103

CO

P-103

P-420

P-538

4" S

4" S

3" S

4" S

4" S 2" S

4" S4" S

2" S

2" S

4" S

2" V

2" V

1 1/2" V

1 1/2" V 2" V

2" V

1 1/2" V

2" V

2" V

3" VTR

CONTINUES TO SOUTH RISER

D6/P-602

3" VTR

2" V

FD-C

FD-C

4" S

4" S4" S

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:5

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

P-602

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL WRHFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING ISOMETRICS - GRAVITY

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

N.T.S.

PLUMBING GRAVITY ISOMETRIC - STORM

F2

N.T.S.

PLUMBING GRAVITY ISOMETRIC - SANITARY - SOUTH

D6N.T.S.

PLUMBING GRAVITY ISOMETRIC - SANITARY - NORTH

D2

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

ENGINEER ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn www.abovegroupinc.com

COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/3

/2

:3

:5

P

M B

IM

/0

V A

P ro v id e n c e M e n ta l H e a lt h

B u ild in g

P H

/0

V A

P ro v id e n c e

M H

C P

H

R

D iv

.r v t

P-801

650-347

PROVIDENCE VAMC MENTAL

HEALTH PHASE 2

PROVIDENCE, RI

ADL AJZFEB 04 2022

CONSTRUCTION

DOCUMENTS

PLUMBING SCHEDULES

FULLY SPRINKLERED

Allen D. Lantz, P.E.

MD License #41513

PLUMBING FIXTURE SCHEDULE

MARK FIXTURE MATERIAL WASTE VENT CW HW

WRIST BLADE

HANDLE

HARD WIRED

SENSOR BATTERY SENSOR

P-103 WATER CLOSET (ADA ACCESSIBLE) VITREOUS CHINA 4" 2" 1-1/2" - - - YES

P-420 LAVATORY (ADA ACCESSIBLE) VITREOUS CHINA 2" 1-1/2" 1/2" 1/2" - - YES

P-502 MOP SINK TERRAZZO 3" 1-1/2" 3/4" 3/4" - - -

P-528 SINK (SINGLE COMPARTMENT) STAINLESS STEEL 2" 1-1/2" 1/2" 1/2" YES - -

P-604 ELECTRIC WATER COOLER CRS 1-1/2" 1-1/2" 1/2" - - - -

P-804 HOSE BIBB CAST IRON - - 3/4" - - - -

FD-C FLOOR DRAIN STAINLESS STEEL REFER TO FLOOR PLAN - - - - - -

FD-M FLOOR DRAIN STAINLESS STEEL REFER TO FLOOR PLAN - - - - - -

RD-A COMBINATION PRIMARY AND OVERFLOW ROOF DRAIN CAST IRON REFER TO FLOOR PLAN - - - - - -

RD-B PRIMARY ROOF DRAIN CAST IRON REFER TO FLOOR PLAN - - - - - -

NOTES:

1. REFER TO SPECS FOR MORE INFORMATION.

ELECTRIC WATER HEATER SCHEDULE

MARK MANUFACTURER MODEL NO. KW

NO. OF

ELEMENTS

KW PER

ELEMENT

RECOVERY

(GPH) @ 100º STORAGE (GAL.) SIZE (D"xH")

VOLTS/PHASE/H

ERTZ

OPERATING

WEIGHT (LBS)

EWH-1 AO SMITH DEL-20 3 1 3 12 20 21-3/4" x 22-1/4 208/3/60 240

HOT WATER RECIRC. PUMP SCHEDULE

MARK MANUFACTURER MODEL NO. TYPE CAPACITY (GPM) HEAD (FEET) MOTOR (HP) MOTOR (VOLTS/PHASE/HERTZ)

RP-1 TACO 008-SF6 INLINE 0.81 14.7 1/25 115/1/60

EXPANSION TANK SCHEDULE

MARK

BASIS OF DESIGN

MANUFACTURER

BASIS OF DESIGN

MODEL NUMBER

TANK VOLUME

(GAL)

ACCEPTANCE

VOLUME (GAL) SIZE (D" x H") CONNECTION SIZE WEIGHT (LBS)

ET-1 TACO PAX10-150 2.6 1.7 12" x 12" 3/4" 40

TRAP PRIMER SCHEDULE

MARK BASIS OF DESIGN MANUFACTURER

BASIS OF DESIGN

MODEL NUMBER CW INLET CW OUTLET SIZE

MAX NUMBER OF

DRAINS SERVED DIMENSIONS (L" x W" x H")

ELECTRICAL

(V/P/HZ)

TP-1 PRECISION PLUMBING PRODUCTS PT-8 3/4" 1/2" 8 16" x 14" x 3-3/8" 120/1/60

THERMOSTATIC MIXING VALVE SCHEDULE

MARK MANUFACTURER MODEL NO. OUTLET/TEMPERATURE INLET/OUTLET SIZE MIN. FLOW RATE

TMV-1 BRADLEY S59-3045 120°F 3/4" / 1" 1.5

TMV-2 BRADLEY S59-4007 105°F 1/2" / 1/2" 0.2

NOTES:

1. WATER HEATER AND ALL ASSOCIATED COMPONENTS SHALL BE PIPED PER MANUFACTURER RECOMMENDATIONS.

2. ROUTE T&P VALVE AND INDIRECT DISCHARGE TO FLOOR DRAIN.

3. OUTLET TEMPERATURE SHALL BE SET TO 140°F ON WATER HEATER.

4. WATER HEATER SHALL BE PLACED ON A RAISED PLATFORM. REFER TO DETAIL FOR MORE INFORMATION.

NOTES:

1. PROVIDE WITH INTEGRAL DISCONNECT.

NOTES:

1. EXPANSION TANK SHALL BE PIPED PER MANUFACTURER RECOMMENDATIONS.

NOTES:

1. THERMOSTATIC MIXING VALVE SHALL BE PIPED PER MANUFACTURER RECOMMENDATIONS.

2. PROVIDE WITH INLET AND OUTLET SHUT-OFF VALVES.

NOTES:

1. RECIRC PUMP SHALL BE PIPED PER MANUFACTURER RECOMMENDATIONS

2. BALANCING VALVES SHALL BE PROVIDED FOR ALL CIRCULATING SYSTEMS, VALVES SHALL BE SET TO FLOW RATES SHOWN UNLESS NOTED OTHERWISE.

3. PROVIDE AUTOMATIC TIMER KIT TC-1 AND AQUASTAT AQS-1/2 FOR EACH PUMP LOCATION.