S02_RFP Attachment_SPEC 28 08 00_Commissioning of Electronic Safety and Security Systems.docx

DOCX document 22 KB Posted

Attached to
6350--FY23: STATION (PROJ: 673-22-107) D/B: Renovate Fire Alarm System
Solicitation number
36C24823R0036
Issued by

About this file

This document contains a specification section for commissioning electronic safety and security systems for a federal construction project. The specification outlines requirements for commissioning the fire alarm system renovation project at the James A. Haley Veterans Medical Center in Tampa, Florida, solicited by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. Key requirements include contractor completion of pre-functional checklists and participation in systems functional performance testing managed by the commissioning agent to verify proper installation and operation of the renovated fire alarm system prior to training of VA facility personnel. The specification also defines commissioning team roles and responsibilities in accordance with other related sections.

View the file

Other files

File Type Posted
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Fire Alarm System_Final.docx DOCX document
S05_RFI Tracking Log_Phase Two_673_22_107 DB Renovate Fire Alarm System_Final.docx DOCX document
S04_Phase Two Site Visit Sign In_Fire Alarm_23Mar2023.pdf PDF
36C24823R0036 0006.docx DOCX document
S02_RFP Attachment_AHERA Survey.pdf PDF
36C24823R0036 0005.docx DOCX document
P03_JA_OVER_SAT_Fire Alarm System_Signed_HCA_Redacted.pdf PDF
36C24823R0036 0004.docx DOCX document
S05_RFI Tracking Log PN 673_22_107 DB Renovate Fire Alarm System System_8Feb2023.docx DOCX document
36C24823R0036 0003.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Fire Alarm System_Updated.docx DOCX document
S02_RFP Attachment_Bldg 55 Elec_FA.pdf PDF
S02_RFP Attachment_38 4th floor.pdf PDF
36C24823R0036 0002.docx DOCX document
S02_RFP Attachment_38 Insterstitial.pdf PDF
S05_RFI Tracking Log 673_22_107 DB Renovate Fire Alarm System_Final.docx DOCX document
S02_RFP Attachment_SPEC 00 11 21_RFP 673_22_107 Renovate Fire Alarm System_Updated.docx DOCX document
S02_RFP Attachment_Bldg 38 _ 3rd Floor FA and Nurse call.pdf PDF
S02_RFP Attachment_Bldg 38 _ 2nd floor Polytrauma Fire Alarm and Nurse Call.pdf PDF
36C24823R0036 0001.docx DOCX document
Experience Information Sheet.docx DOCX document
S02_RFP Attachment_SPEC 01 00 00_General Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 28 05 00_Common Work Results for Electronic Safety and Security.docx DOCX document
S02_RFP Attachment_SPEC 01 32 16 16_Network Analysis Schedule_Design-Build Only.docx DOCX document
S02_RFP Attachment_DB Wage Rate FL20220208 dtd 09.09.22.txt TXT text file
S02_RFP Attachment_SPEC 21 13 13_Wet-Pipe Sprinkler Systems.docx DOCX document
S02_RFP Attachment_SPEC 01 35 26_Safety Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 28 05 26_Grounding and Bonding for Electronic Safety and Security.docx DOCX document
S02_RFP Attachment_Past Performance Questionnaire.pdf PDF
S02_RFP 36C24823R0036_Final.docx DOCX document
S02_RFP Attachment_SPEC 08 71 00_Door Hardware.docx DOCX document
S02_RFP Attachment_VA HALEY FA ASBUILT.pdf PDF
S02_RFP Attachment_Tampa site map.pdf PDF
S02_RFP Attachment_SPEC 28 13 00_Physical Access Control System.docx DOCX document
S02_RFP Attachment_Contractor Trade Memo 673-22-107 Renovate Fire Alarm System.docx DOCX document
36C24823R0036_1.docx DOCX document
S02_RFP Attachment_EMR.pdf PDF
S02_RFP Attachment_SPEC 01 33 23_Shop Drawings 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 28 31 00_Fire Detection and Alarm_Combined Job Specific 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 00 11 21_RFP 673-22-107 Renovate Fire Alarm System.docx DOCX document
S02_RFP Attachment_SPEC 28 05 13_ Conductors and Cables for Electronic Safety and Security.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Fire Alarm System.docx DOCX document
S02_RFP Attachment_Price Matrix.xlsx XLSX spreadsheet
S02_RFP Attachment_SPEC 28 05 28.33_Conduits and Backboxes for Electronic Safety and Security Systems.docx DOCX document
S02_RFP Attachment_SPEC 01 42 19_Reference Standards 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 07 84 00_Firestopping.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11-1-16

SECTION 28 08 00

COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS

SPEC WRITER NOTES:

Delete between // --- // if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs.

The spec writer shall review the Physical Security Design Manual for VA Facilities to determine and include in this section any Mission Critical or Life Safety requirements called out.

PART 1 - GENERAL

1.1 DESCRIPTION

A.The requirements of this Section apply to all sections of Division 28.
B.This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A Commissioning Agent (CxA) appointed by the VA will manage the commissioning process.

1.2 RELATED WORK

A. Section 01 00 00 GENERAL REQUIREMENTS.

B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.

C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

1.3 SUMMARY

A.This Section includes requirements for commissioning the Facility electronic safety and security systems, related subsystems and related equipment. This Section supplements the general requirements specified in Section 01 91 00 General Commissioning Requirements.
B.Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members.

1.4 DEFINITIONS

A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions.

1.5 COMMISSIONED SYSTEMS

A.Commissioning of a system or systems specified in Division 28 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and Maintenance personnel in accordance with the requirements of Section 01 91 00 and of Division 28, is required in cooperation with the VA and the Commissioning Agent.
B.The Facility exterior closure systems commissioning will include the systems listed in Section 01 91 00 General Commissioning Requirements:

1.6 SUBMITTALS

A.The commissioning process requires review of selected Submittals that pertain to the systems to be commissioned. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.
B.The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 Construction Inspections

A. Commissioning of Electronic Safety and Security systems will require inspection of individual elements of the electronic safety and security systems throughout the construction period. The Contractor shall coordinate with the Commissioning Agent in accordance with Section 01 91 00 and the Commissioning plan to schedule electronic safety and security systems inspections as required to support the Commissioning Process.

3.2 PRE-FUNCTIONAL CHECKLISTS

A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The Commissioning Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of completed checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning Agent will select a broader sample of checklists for review. If the Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the Contractor for correction and resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents.

3.3 CONTRACTORS TESTS

A. Contractor tests as required by other sections of Division 28 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days’ notice of testing. The Commissioning Agent will witness selected Contractor tests at the sole discretion of the Commissioning Agent. Contractor tests shall be completed prior to scheduling Systems Functional Performance Testing.

3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING

A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the Resident Engineer. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing. The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS, for additional details.

3.5 TRAINING OF VA PERSONNEL

A. Training of the VA operation and maintenance personnel is required in cooperation with the Resident Engineer and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 91 00. The instruction shall be scheduled in coordination with the VA Resident Engineer after submission and approval of formal training plans. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS and Division 28 Sections for additional Contractor training requirements.

----- END -----

28 08 00 - 1