This Request for Proposal document outlines requirements for a design-build project to renovate the fire alarm system at the James A. Haley Veterans Medical Center campus in Tampa, Florida. The project involves replacing fire alarm panels, nodes, computers, and upgrading the campus communication loop and addressable notification systems across 18 buildings. The anticipated cost range is $2-5 million and work must be completed within 360 days of notice to proceed.

Offerors should submit separate cost and technical proposals by the deadline. The technical proposal must demonstrate experience with similar healthcare design-build projects and provide a schedule, staffing plan, and construction documents for the work. The selected contractor will be responsible for designing the system upgrades in coordination with the VA's project team, obtaining necessary approvals, and performing the installation work per approved plans and specifications.

View the file

Other files

File Type Posted
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Fire Alarm System_Final.docx DOCX document
S05_RFI Tracking Log_Phase Two_673_22_107 DB Renovate Fire Alarm System_Final.docx DOCX document
S04_Phase Two Site Visit Sign In_Fire Alarm_23Mar2023.pdf PDF
36C24823R0036 0006.docx DOCX document
S02_RFP Attachment_AHERA Survey.pdf PDF
36C24823R0036 0005.docx DOCX document
P03_JA_OVER_SAT_Fire Alarm System_Signed_HCA_Redacted.pdf PDF
36C24823R0036 0004.docx DOCX document
S05_RFI Tracking Log PN 673_22_107 DB Renovate Fire Alarm System System_8Feb2023.docx DOCX document
36C24823R0036 0003.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Fire Alarm System_Updated.docx DOCX document
S02_RFP Attachment_Bldg 55 Elec_FA.pdf PDF
S02_RFP Attachment_38 4th floor.pdf PDF
36C24823R0036 0002.docx DOCX document
S02_RFP Attachment_38 Insterstitial.pdf PDF
S05_RFI Tracking Log 673_22_107 DB Renovate Fire Alarm System_Final.docx DOCX document
S02_RFP Attachment_Bldg 38 _ 3rd Floor FA and Nurse call.pdf PDF
S02_RFP Attachment_Bldg 38 _ 2nd floor Polytrauma Fire Alarm and Nurse Call.pdf PDF
36C24823R0036 0001.docx DOCX document
Experience Information Sheet.docx DOCX document
S02_RFP Attachment_SPEC 01 00 00_General Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 28 05 00_Common Work Results for Electronic Safety and Security.docx DOCX document
S02_RFP Attachment_SPEC 01 32 16 16_Network Analysis Schedule_Design-Build Only.docx DOCX document
S02_RFP Attachment_DB Wage Rate FL20220208 dtd 09.09.22.txt TXT text file
S02_RFP Attachment_SPEC 21 13 13_Wet-Pipe Sprinkler Systems.docx DOCX document
S02_RFP Attachment_SPEC 01 35 26_Safety Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 28 05 26_Grounding and Bonding for Electronic Safety and Security.docx DOCX document
S02_RFP Attachment_Past Performance Questionnaire.pdf PDF
S02_RFP 36C24823R0036_Final.docx DOCX document
S02_RFP Attachment_SPEC 08 71 00_Door Hardware.docx DOCX document
S02_RFP Attachment_VA HALEY FA ASBUILT.pdf PDF
S02_RFP Attachment_Tampa site map.pdf PDF
S02_RFP Attachment_SPEC 28 13 00_Physical Access Control System.docx DOCX document
S02_RFP Attachment_Contractor Trade Memo 673-22-107 Renovate Fire Alarm System.docx DOCX document
36C24823R0036_1.docx DOCX document
S02_RFP Attachment_EMR.pdf PDF
S02_RFP Attachment_SPEC 01 33 23_Shop Drawings 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 28 31 00_Fire Detection and Alarm_Combined Job Specific 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 00 11 21_RFP 673-22-107 Renovate Fire Alarm System.docx DOCX document
S02_RFP Attachment_SPEC 28 05 13_ Conductors and Cables for Electronic Safety and Security.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Fire Alarm System.docx DOCX document
S02_RFP Attachment_SPEC 28 08 00_Commissioning of Electronic Safety and Security Systems.docx DOCX document
S02_RFP Attachment_Price Matrix.xlsx XLSX spreadsheet
S02_RFP Attachment_SPEC 28 05 28.33_Conduits and Backboxes for Electronic Safety and Security Systems.docx DOCX document
S02_RFP Attachment_SPEC 01 42 19_Reference Standards 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 07 84 00_Firestopping.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

673-22-107 Renovate Fire Alarm System

REQUEST FOR PROPOSAL TO DESIGN-BUILD

RENOVATE FIRE ALARM SYSTEM

673-22-107

A.PROJECT OBJECTIVES
A1.Definition

Design-Build (DB) as defined by the Department of Veterans Affairs (VA) is the procurement by the Government, under one contract, with one firm (which may be a joint venture) for both design and construction services for a specific project.

A2. Scope of Work Provide all labor, materials, tools and equipment, and Design-Build services necessary for 673-22-107 Renovate Fire Alarm System. The project encompasses upgrades to the current VAMC James A. Haley campus-wide Simplex fire alarm system located at 13000 Bruce B. Downs Boulevard, Tampa, Florida, 33612. The project includes replacing all the existing 4100u fire alarm panels, 4009 fire alarm panels, 4010 fire alarm panels, and the TSWs (computers) on campus. The Campus Main Network Communication Loop will receive upgrades replacing any building inter-connections that are not fiberoptic as well as various additional upgrades described in the SOW. The work includes, but is not limited to site investigation, design and preparation of drawings, phase planning, specifications, construction and installation of the Fire Alarm System as designed in the hospital areas identified in the project description of the SOW and this RFP.

A3. Cost Range The anticipated cost range for this project is between $2,000,000 and $5,000,000.

A4. Schedule Objectives The anticipated completion of this project is 360 days after “notice to proceed”.

B. SELECTION PROCEDURE

The Government expects its selection of the Design-Build Contractor will encompass several steps. However, the Government may initiate action to award a contract at any point after review of the offers. Therefore, each offer should reflect the Offeror’s best terms, both from a cost and technical standpoint. See FAR 52. 215-1, Instructions to Offerors - Competitive Acquisition (OCT 1997).

B1.Role for VA’s consultant A/E Team
A.The Government has determined that the Department of Veterans Affairs team of architect and engineering (A/E) consultant firms who developed this project to date (and produced these RFP documents) are not available to be named as members of the Offerer’s design team. The VA will retain their team for the remainder of the project’s development for review and monitoring purposes; and
B.For clarity the A/E team who produced these RFP documents are listed below:

JAHVA FMS Project Engineering Section

C. OFFER REQUIREMENTS

C1. Proposal Sections Cost and Technical sections of the Offerors proposals will be evaluated independently. Offeror shall separately bind each section. Each section must therefore be labeled with the Offeror’s organization, business address, and VA Project Number 673-22-10.

C2.Cost Proposal Requirements
A.Carefully follow “Instructions, Conditions, and Notices to Offerors.” Standard Form 1442 (Solicitation, Offer, and Award) shall be used for submitting offers. Offerors shall affix their names and return addresses in the lower left corner of the Offeror’s envelope. Envelopes containing offers must be sealed. Submit four copies of Standard Form 1442 with an offer guarantee as stipulated in the Section “Instructions, Conditions, and Notices to Offerors”;
B.Offerors shall submit separate prices for architect-engineer services, construction work and other activities (and the equipment). Under Section 304(b) of the Federal Property and Administrative Services Act, VA is not authorized to obligate funds or pay for architect-engineer services that exceed 6 percent of the estimated project cost, exclusive of fees; and
C.Offeror shall include all required Representations and Certifications.
C3.Technical Proposal Requirements
A.The proposal shall meet the following requirements and evaluation will be based upon the criteria mentioned in article A2.5, Technical Evaluation;
B.The Offeror shall provide a narrative description of the proposed building system or technology; and
C.Past (Corporate) Experience: The Offeror shall demonstrate prior corporate experience in the last five years with Design-Build. In describing project design and construction experience, provide the following information:
1.Project location;
2.Project owner;
3.Name and telephone number of Owner’s contact person;
4.Design Architect and Engineers;
5.Completion Date;
6.Construction Cost;
7.Names of Major Subcontractors;
8.Square Footage;
9.Foundation Type;
10.Number of Levels;
11.Length of Design Effort;
12.Length of Construction; and
13.A list of all consultants and all proposed major subcontractors.

Also include experience in meeting the completion schedule, awards, and major equipment suppliers and their qualifications for similar Design-Build projects.

D.Detailed Schedule and Narrative: The Offeror shall provide a detailed schedule and narrative, indicating specific dates for each step of the process:
1.Contract progress schedule: The progress schedule will be in a time scaled bar graph format. The horizontal axis will be scaled for time beginning with the Notice to Proceed and concluding with contract completion. The vertical axis will show the milestones and major portions of the contract work. All schedule items will show a start date and a completion date;
2.The Offeror shall describe in a written narrative its plans for phasing the work so that the Medical Center remains operational while utilities and access roadways are realigned. The narrative will also detail how the contractor intends to prepare the site, disassemble, relocate, reassemble, and reactivate utility services to the Medical Center within the specified time limits;
3.The Offeror shall clarify its intended uses of portions of the site for materials staging, temporary trailer offices, employee parking, and other activities;
4.The Offeror shall specify how much allowance has been made for bad weather in the schedule;
5.The Offeror shall specify the days of the week and the hours of construction operations during each phase of the work; and
6.The Offeror shall specify the percentage of contract completion that will be achieved at the completion of design and thereafter at each month of construction.
E.CADD Drawings: The Offeror shall submit all drawings in both hard copy and electronic form in AutoCAD.
D.GENERAL CONTRACT REQUIREMENTS

A. Project Description: Provide design build services to accommodate the replacement of the devices and cabling infrastructure of the current Fire Alarm System (Simplex) within the JAHVA Campus as identified in this SOW. The project will bring the systems up to date with the most current product, infrastructure, hardware, and software available.

The following fire alarm system areas have been identified as in need of the upgrade. The DB Team shall review all the existing field conditions and perform a survey of these affected areas (to verify the existing conditions):

· Upgrade the following 18 Nodes from 4100U CPU/Display to latest version of 4100ES CPU/Display

NODE
BUILDING
LOCATION
EQUIPMENT ID
2
CEP NDU
CEP
3
CEP NVCC
CEP
4
BLD 39 CEP
CEP
38099
5
BLD 38 SCIU/BLD 40
A224-38
84122
6
BLD 32 RTU/BLD 63/T98
127-32
83137
7
BLD 1 MRI/BLD 56
C052-01
83133
9
BLD 1/BLD 19/T33 PULLS
GA-023
83134
10
BLD 2
1FL ELEC CLOSET
25073
11
BLD 36
113-36
100559
12
BLD 41
135-41
63692
13
BLD 68/T62/T80/T81/T82/T83
119-68
80844
14
BLD 53 FH1
117-53
80843
15
BLD 1 ER EXPANSION
GE005-01
72619
16
BLD 1 A WING/T33 SMKS
GA-016C
83135
17
BLD 30/BLD 64/T77/T78
171-30
80869
19
BLD 1 OR EXPANSION
BD-11
74194
20
BLD 1 D WING
D131B-01
83136
21
BLD 42/T73/T74/T75/T76
228-42
80406

· Update existing 4100ES software to the latest revision in the following nodes:

NODE
BUILDING
LOCATION
EQUIPMENT ID
8
BLD 1 C WING
C101C-01
84121
24
BLD 52 FH2
KITCHEN
139813

· Replace the following 4010 fire alarm panels to the latest version of 4100ES:

NODE
BUILDING
LOCATION
EQUIPMENT ID
22
BLD 54 MAINT
004-54
114698
23
BLD 55 GARAGE
104-55
100483

· Replace the following TSW Computers and upgrade graphics to reflect the current floor plans:

NODE
BUILDING
LOCATION
EQUIPMENT ID
1
CEP TSW
CEP
18
ELECTRONICS SHOP
GD-023

· Determine which 4009 NAC Extender panels will remain and ones that do remain will be updated with new chips/firmware. The quantity of 4009’s will be affected by the addressable notification portion of the project.

· The Campus Main Network Communication Loop will receive upgrades replacing any building inter-connections that are not fiberoptic. It will replace the two copper networks for the fire alarm system. One is the node-to-node connection for comms, the other is the connection for the audio riser. According to the product specifications, both networks can utilize a common fiber route as described as follows:

NODE
FROM BUILDING
NODE
TO BUILDING
1
CEP TSW
2
CEP NDU
2
CEP NDU
3
CEP NVCC
3
CEP NVCC
4
BLD 39 CEP
4
BLD 39 CEP
5
BLD 38 SCIU/BLD 40
5
BLD 38 SCIU/BLD 40
6
BLD 32 RTU/BLD 63/T98
6
BLD 32 RTU/BLD 63/T98
7
BLD 1 MRI/BLD 56
7
BLD 1 MRI/BLD 56
8
BLD 1 C WING
8
BLD 1 C WING
9
BLD 1/BLD 19/T33 PULLS
9
BLD 1/BLD 19/T33 PULLS
10
BLD 2
10
BLD 2
11
BLD 36
11
BLD 36
12
BLD 41
12
BLD 41
24
BLD 52 FH2
24
BLD 52 FH2
13
BLD 68/T62/T80/T81/T82/T83
13
BLD 53 FH1
22
BLD 54 MAINT
22
BLD 54 MAINT
23
BLD 55 GARAGE
23
BLD 55 GARAGE
14
BLD 53 FH1
14
FH1
15
BLD 1 ER EXPANSION
15
BLD 1 ER EXPANSION
16
BLD 1 A WING/T33 SMKS
16
BLD 1 A WING/T33 SMKS
17
BLD 30/BLD 64/T77/T78
17
BLD 30/BLD 64/T77/T78
18
ELECTRONICS SHOP
18
ELECTRONICS SHOP
19
BLD 1 OR EXPANSION
19
BLD 1 OR EXPANSION
20
BLD 1 D WING
20
BLD 1 D WING
21
BLD 42/T73/T74/T75/T76
21
BLD 42/T73/T74/T75/T76
1
CEP TSW

· Addressable notification alterations:

1. For the entire facility the existing speakers, speaker/strobes and strobes will be replaced with addressable devices.

2. The following areas will be replaced with addressable horn strobes only: Fisher house 1 (Bldg 53), Maintenance Bldg (Bldg 54), and the Parking Garage (Bldg 55).

· Provide and install a new smoke detector, along with any conduit/wiring needed for the following locations and devices:

1. 7 locations: Bldg 38 Third FL

2. 6 locations: Bldg 38 Second Fl

3. 4 locations: Bldg 38 Ground Fl

4. 5 locations: Bldg 1 Second Fl

5. 4 locations: Bldg 1 Fifth floor

6. 1 location : Bldg 1 Seventh Fl

· Incidentals:

1. Any troubles, grounds, opens or shorts found during the installation shall be recorded in detail and documentation submitted to the COR. This will be addressed as a possible change order or separate project depending on the magnitude of the findings.

D1. Design-Build (DB) Team’s Responsibilities Intent: The DB contractor shall construct the project in accordance with the VA RFP documents and approved construction documents prepared by the DB A/E within the required time period (contract length).

.D2.Construction Documents
A.General:
1.The RFP documents are intended to define the room layout, the basic materials, and systems to be installed in the project. It is the DB team’s responsibility to complete the documents and construction in a manner consistent with the intent of the solicitation documents;
2.The Design-Build Team A/E (DB A/E) shall prepare and submit complete construction documents for review and approval by the VA in accordance with standard professional practice, the Department of Veterans Affairs Request for Proposal (VA RFP), and prevailing codes. The DB A/E shall submit the construction documents for review at (65%) and (95%) completion stage;
3.The DB team shall allow a minimum of (15) working day for each review cycle. A cycle commences with the VA’s receipt of the review documents and concludes with the DB team’s receipt of comments, either electronically by fax, or by hard copy delivery. The DB Team shall allow for (1) full day meetings with the staff of VA Medical Center James A Haley to review each submission and resolve design issues;
4.Each submission shall include 10 hard copy sets and 3 sets on computer floppy disks;
5.Each submittal shall be made to the VA Project Manager for coordination with the VA Medical Center, VA Resident Engineer;
6.Mandatory schedules and details may be indicated either on the drawings or in the specifications, at the option of the DB team;
7.The drawings included in the VA RFP will be available to the DB team in electronic format in AutoCAD Version for use in preparing the construction drawings. Since data stored on electronic media can deteriorate undetected or be modified without the RFP Architect/Engineer’s knowledge, the CADD drawing files are provided without warranty or obligation on the part of the RFP Architect/Engineer as to accuracy or information contained in the files. All information in the files shall be independently verified by the user. Any user shall agree to indemnify and hold the RFP Architect Engineer harmless from any and all claims, damages, losses, and expenses including, but not limited to, attorney’s fee arising out of the use of the CADD drawing files;
8.The specifications included in the VA RFP shall be available to the DB team in electronic format in (Word 6.0) for use in preparing the construction specifications. Since data stored on electronic media can deteriorate undetected or be modified without the RFP Architect/Engineer’s knowledge, the CADD drawing files are provided without warranty or obligation on the part of the RFP Architect/Engineer as to accuracy or information contained in the files. All information in the files shall be independently verified by the user. Any user shall agree to indemnify and hold the RFP Architect Engineer harmless from any and all claims, damages, losses, and expenses including, but not limited to, attorney’s fee arising out of the use of the electronic files;
9.The DB A/E who prepares the construction documents shall be professional architect/engineers licensed in the state in which the design work is completed. The professional seal indicating such license by the state shall appear on the documents. The architect whose seal is shown will be known as the architect of record. The DB A/E shall certify compliance with the VA RFP; and
10.The construction drawings shall comply with the VA RFP and be prepared to include such details that the project can be constructed. The construction record drawings shall be completed in AutoCAD. Construction shop drawings are not required to be completed in AutoCAD. Drawings shall be plotted at scales no smaller than those used for equivalent information in the RFP (solicitation)documents.
B.Construction Drawings: The construction drawings shall include a coordinated set of:
1.Civil engineering drawings including grading and drainage plans, paving plans, utility plans, schedules, and details;
2.Landscape drawings including landscape plans, plant schedule and list, special landscape elements, proposed materials to be used for each special landscape element, and details;
3.Structural drawings including foundation plans, roof framing plans, schedules, and details, including general notes and all calculations;
4.Architectural drawings including floor plans, building elevations, building sections, wall sections, reflected ceiling plans, stair details, toilet and bath details, cabinetry elevations, door schedules and details, window schedules and details, room finish schedules, loading dock details, auto transport and pneumatic tube details, and other details;
5.Fire protection drawings including floor and roof plans, riser diagrams, equipment schedules, plumbing fixture schedules, and details, including general notes and all related calculations;
6.Food service Equipment drawings including floor plans, elevators, equipment schedules, and details;
7.Plumbing drawings including floor and roof plans, riser diagrams, equipment schedules, plumbing fixture schedules, and details, including general notes and all related calculations;
8.HVAC drawings including floor and roof plans, one-line flow diagrams, equipment schedules, and details, including general notes and all related calculations. Also provide sections for mechanical equipment rooms and sequence of operation for all HVAC equipment;
9.Outside Steam Distribution drawings including system plans and profiles, manhole piping plans and sections, equipment schedules, and details; and
10.Electrical drawings including floor and roof plans (power, lighting, and other systems), one-line diagrams, panel schedules, equipment schedules, light fixture schedules and details.
C.Construction Specifications: Project Specifications shall include specifications for all products, materials, equipment, methods, and systems shown on the construction drawings and to be incorporated in the project:
1.The DB Team shall prepare and submit 100 per cent complete construction specifications in accordance with standard professional practice and the VA RFP;
2.The construction specifications shall be at a comparable level of detail and demonstrate compliance with the VA RFP. The specification submitted for review shall be a “redline and strikeout” version of the VA RFP Specifications that clearly indicate the locations of deletions, revisions, and additions to the VA RFP Specifications; and
3.The construction specifications shall include the name of the manufacturer, the product name, model number, or other identification as appropriate to clearly identify the product that will be used in the construction of the project.
D3.Construction Period Submittals
A.The DB Contractor shall prepare and submit shop drawings, product data, and samples during construction as required by the VA RFP documents. The shop drawings, product data, and samples shall bear the stamp of the licensed architect or engineer of record certifying compliance with the RFP (See B.1.1.A);
B.Other Submittals: The DB team shall submit test results, certificates, manufacturer’s instructions, manufacturers field reports, etc. as required by the VA RFP specifications; and
C.Project Record Drawings: The DB team will maintain a set of construction documents (field as-built drawings) to record actual construction changes during the construction process as required by the RFP specifications. The project record drawings will be available for review by the VA Resident Engineer at all times.
D4.Project Close-out

The DB team shall comply with the requirements in the “General Conditions”, 01001, and “General Requirements”, 01010, for submission of final RFP as-built drawings, shop drawings, manuals, and other documents as noted.

- - - END - - -