S05_RFI Tracking Log 673_22_107 DB Renovate Fire Alarm System_Final.docx

DOCX document 37 KB Posted

Attached to
6350--FY23: STATION (PROJ: 673-22-107) D/B: Renovate Fire Alarm System
Solicitation number
36C24823R0036
Issued by

About this file

This document contains a request for information tracking log for a federal contract solicitation to renovate the fire alarm system at the James A. Haley Veterans Medical Center in Tampa, Florida. The solicitation number is 36C24823R0036 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The tracking log includes 28 questions submitted by various contractors and the agency's responses. Key areas of clarification sought include the correct NAICS code, scope of design phases, technical evaluation criteria, and requests for additional details on locations and quantities of specific alarm nodes, transponders, detectors, and other equipment to be upgraded or replaced as part of the project.

View the file

Other files

File Type Posted
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Fire Alarm System_Final.docx DOCX document
S05_RFI Tracking Log_Phase Two_673_22_107 DB Renovate Fire Alarm System_Final.docx DOCX document
S04_Phase Two Site Visit Sign In_Fire Alarm_23Mar2023.pdf PDF
36C24823R0036 0006.docx DOCX document
S02_RFP Attachment_AHERA Survey.pdf PDF
36C24823R0036 0005.docx DOCX document
P03_JA_OVER_SAT_Fire Alarm System_Signed_HCA_Redacted.pdf PDF
36C24823R0036 0004.docx DOCX document
S05_RFI Tracking Log PN 673_22_107 DB Renovate Fire Alarm System System_8Feb2023.docx DOCX document
36C24823R0036 0003.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Fire Alarm System_Updated.docx DOCX document
S02_RFP Attachment_Bldg 55 Elec_FA.pdf PDF
S02_RFP Attachment_38 4th floor.pdf PDF
36C24823R0036 0002.docx DOCX document
S02_RFP Attachment_38 Insterstitial.pdf PDF
S02_RFP Attachment_SPEC 00 11 21_RFP 673_22_107 Renovate Fire Alarm System_Updated.docx DOCX document
S02_RFP Attachment_Bldg 38 _ 3rd Floor FA and Nurse call.pdf PDF
S02_RFP Attachment_Bldg 38 _ 2nd floor Polytrauma Fire Alarm and Nurse Call.pdf PDF
36C24823R0036 0001.docx DOCX document
Experience Information Sheet.docx DOCX document
S02_RFP Attachment_SPEC 01 00 00_General Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 28 05 00_Common Work Results for Electronic Safety and Security.docx DOCX document
S02_RFP Attachment_SPEC 01 32 16 16_Network Analysis Schedule_Design-Build Only.docx DOCX document
S02_RFP Attachment_DB Wage Rate FL20220208 dtd 09.09.22.txt TXT text file
S02_RFP Attachment_SPEC 21 13 13_Wet-Pipe Sprinkler Systems.docx DOCX document
S02_RFP Attachment_SPEC 01 35 26_Safety Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 28 05 26_Grounding and Bonding for Electronic Safety and Security.docx DOCX document
S02_RFP Attachment_Past Performance Questionnaire.pdf PDF
S02_RFP 36C24823R0036_Final.docx DOCX document
S02_RFP Attachment_SPEC 08 71 00_Door Hardware.docx DOCX document
S02_RFP Attachment_VA HALEY FA ASBUILT.pdf PDF
S02_RFP Attachment_Tampa site map.pdf PDF
S02_RFP Attachment_SPEC 28 13 00_Physical Access Control System.docx DOCX document
S02_RFP Attachment_Contractor Trade Memo 673-22-107 Renovate Fire Alarm System.docx DOCX document
36C24823R0036_1.docx DOCX document
S02_RFP Attachment_EMR.pdf PDF
S02_RFP Attachment_SPEC 01 33 23_Shop Drawings 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 28 31 00_Fire Detection and Alarm_Combined Job Specific 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 00 11 21_RFP 673-22-107 Renovate Fire Alarm System.docx DOCX document
S02_RFP Attachment_SPEC 28 05 13_ Conductors and Cables for Electronic Safety and Security.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Fire Alarm System.docx DOCX document
S02_RFP Attachment_SPEC 28 08 00_Commissioning of Electronic Safety and Security Systems.docx DOCX document
S02_RFP Attachment_Price Matrix.xlsx XLSX spreadsheet
S02_RFP Attachment_SPEC 28 05 28.33_Conduits and Backboxes for Electronic Safety and Security Systems.docx DOCX document
S02_RFP Attachment_SPEC 01 42 19_Reference Standards 673-22-107.docx DOCX document
S02_RFP Attachment_SPEC 07 84 00_Firestopping.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFI)

D/B Renovate Fire Alarm System Project 673-22-107

RFI NBR
Question/

Response

Company Submitted By
Dated Received
1.
The SF1442, Block 10 states the NAICS code for project is 236220. The Contractor Trade Memo attachment document issued with the other solicitation documents shows the NAICS code as 238210. Please clarify which NAICS code applies, as this will make a difference as to whether we can submit or not.
Jarrett Construction
5Dec22

VA Response: 236220 is the correct NAICS

2.
Reference the Statement of Work, Part I Scope of Work, second paragraph of sub-part A where it states that “The design phases will include 65%, 95% and review stages.”. It appears that something is missing in this sentence. Should 100% be added to this statement?
Jarrett Construction
5Dec22

VA Response: It should read “will include 65% and 95% review stages”. The comments and direction from the 95% will be incorporated into the 100%. Corrections can be redlined as needed. The 100% does not need a formal review stage but will be reviewed.

3.
Reference RFP Attachment Instructions to Offerors and Evaluation Information, Part III Evaluation Factors for Award, Phase One – Factor 2 Technical Qualifications, subpart 1 under Definitions. Under “Size” it refers to the installation of large high-tech medical equipment and under “Scope” it refers to repair or replace parking garage facilities. These don’t seem to fit the scope of this project. Please clarify these items.
Jarrett Construction
5Dec22

VA Response: Updated Instructions are attached.

4.
Reference RFP Attachment Instructions to Offerors and Evaluation Information and Spec 00 11 21. Spec 00 11 21 also contains Technical information under parts B5 and C3 that appears that is being requested to be submitted as part of the proposal. Are we to comply with and follow the requirements of the RFP Attachment Instructions to Offerors and Evaluation Information, or the requirements of Spec 00 11 21?
Jarrett Construction
5Dec22

VA Response: Updated SPEC 00 11 21 and Instructions attached.

5
Our company ATEAM is currently using a more high‐tech system. Is there any intent to switch to another system?
JetCo
13Dec22

VA Response: No

6
Please provide attachment #3 Specialized Experience Form.
MULE
19Dec22

VA Response: May be found at SAM.gov

7
Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO?
Blue Cord
19Dec22

VA Response: It will be acceptable for portions of this project to operate in this manner. Depending on the size, scope of the area and work plan.

8
If no to the question above, will the SSHO need to be full-time for this project?
Blue Cord
19Dec22

VA Response: The SSHO must be identified and assigned to this project. The SSHO must be readily available while the project is manned and working.

9
Will it be acceptable to propose to replace the existing system in its entirety with a system that is nonproprietary?
Blue Cord
19Dec22

VA Response: No

10
Please provide the as-builts for Building 38 Interstitial, 2nd, 3rd and 4th Floors along with Building 55 as they were not included in the issued drawings.
Blue Cord
19Dec22

VA Response: Provided separately

11
Please confirm that NESHAP Survey requested is only related to Building 1 and is only required for areas where contractor will be working and not the entire building.
Blue Cord
19Dec22

VA Response: A NESHAP will be limited to the areas that the contractor is working. This requirement applies to all buildings on campus.

12
Please provide the latest as-builts for Building 2, as the solicited as-builts are of the old floor plan.
Blue Cord
19Dec22

VA Response: There are no current plans available for Building 2. The changes for construction of this building have not been determined yet and design is not complete.

13
Per the first bullet point of the SOW, it states to “Upgrade the following 18 Nodes from 4100U CPU/Display to latest version of 4100ES CPU/Display. It appears based on the list and drawings provided that there may be additional nodes. Please confirm that only these 18 nodes get upgraded. Or does the VA intend on having all nodes/transponder panels upgraded, if so please provide a list of all nodes/panels to be upgraded.
Blue Cord
19Dec22

VA Response: The list was developed by the VA owner of the system. It is the intent of the VA to have all nodes/transponders upgraded. Some of the information acquired to date shows the project should include (all bullet points) 21 Node control panels and 6 remote Transponders associated with the system that will be scheduled for upgrade replacements to 4100ES panels, also 6 NAC Signal expanders. The specific detailed locations are not recorded on VA records and the current system service by JCI has been notified to provide this information.

14
Per the fourth bullet point of the SOW the contractor is to “Replace the following TSW Computers and upgrade graphics to reflect the current floor plans: CEP and Electronics Shop”. It is the contractor’s understanding that this is being taken care of under another contract. Please confirm if this is the case and this scope can be removed.
Blue Cord
19Dec22

VA Response: This part will remain in the scope to ensure that the latest version of the graphics and floor plans will be available by the end of the project.

15
Please confirm if there are any other existing 4100ES nodes that will need to be upgraded besides the 2 issued in the SOW.
Blue Cord
19Dec22

VA Response: The VA currently has reported only 2

16
Please provide a list of all existing 4009 NAC Extender Panels and their current software/firmware.
Blue Cord
19Dec22

VA Response: The specific detailed locations are not recorded on VA records and the current system service by JCI has been notified to provide this information.

17
Please provide exact locations of all new smoke detectors scheduled to be installed as part of this project (total 27 per the SOW).
Blue Cord
19Dec22
VA Response: The exact locations are not recorded outside of the locations below:
1.7 locations: Bldg 38 Third FL
2.6 locations: Bldg 38 Second Fl
3.4 locations: Bldg 38 Ground Fl
4.5 locations: Bldg 1 Second Fl
5.4 locations: Bldg 1 Fifth floor
6.1 location : Bldg 1 Seventh Fl
18
Please confirm if any duct detectors will need to be added/replaced as part of this project. if so, please provide their locations.
Blue Cord
19Dec22

VA Response: There are some duct detectors that will be needed to be replaced with updated devices. The specific detailed locations are not recorded on VA records and the current system service by JCI has been notified to provide this information.

19
In addition to acknowledging amendments on the SF1442, where should offerors include copies of any signed amendments that are issued in their proposal package?
Jarrett Construction
20Dec22

VA Response: Attach to proposal package

20
EVALUATION CRITERIA FACTOR 3 – PAST PERFORMANCE: states a window of (7) years for recent, relevant experience to be evaluated. Factor 2 – Technical Qualifications provides a (5) year window for evaluation. What is the correct window of time for an offeror's past examples used in Factors 2 & 3 to be considered relevant and acceptable?
Jarrett Construction
20Dec22

VA Response: 5 years

21
PHASE ONE ‐ FACTOR 2: TECHNICAL QUALIFICATIONS references using a "Specialized Experience Form" for offerors to submit their past performance projects. This form was not provided in the solicitation package. Please provide the required form or clarify its location within the solicitation package.
Jarrett Construction
20Dec22

VA Response: May be found at SAM.gov

22
PHASE ONE ‐ FACTOR 3: PAST PERFORMANCE (1) states "If available, copies of a completed Contractor Performance Assessment Reporting System (CPARS) for projects performed for the U.S. Government shall be provided." Part (4) references submitting a PPQ. Please confirm that a PPQ is only required to be submitted if a valid CPAR is NOT available for an offeror's past performance examples.
Jarrett Construction
20Dec22

VA Response: Correct. Provide PPQ if no valid CPAR is available.

VA Response:

VA Response:

VA Response:

VA Response:

VA Response:

VA Response:

Attachment 2 RFI Tracking Log