S05_RFI Tracking Log 673_22_107 DB Renovate Fire Alarm System_Final.docx
DOCX document 37 KB Posted
- Solicitation number
- 36C24823R0036
About this file
This document contains a request for information tracking log for a federal contract solicitation to renovate the fire alarm system at the James A. Haley Veterans Medical Center in Tampa, Florida. The solicitation number is 36C24823R0036 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The tracking log includes 28 questions submitted by various contractors and the agency's responses. Key areas of clarification sought include the correct NAICS code, scope of design phases, technical evaluation criteria, and requests for additional details on locations and quantities of specific alarm nodes, transponders, detectors, and other equipment to be upgraded or replaced as part of the project.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI)
D/B Renovate Fire Alarm System Project 673-22-107
| RFI NBR |
| Question/ |
Response
| Company Submitted By |
| Dated Received |
| 1. |
| The SF1442, Block 10 states the NAICS code for project is 236220. The Contractor Trade Memo attachment document issued with the other solicitation documents shows the NAICS code as 238210. Please clarify which NAICS code applies, as this will make a difference as to whether we can submit or not. |
| Jarrett Construction |
| 5Dec22 |
VA Response: 236220 is the correct NAICS
| 2. |
| Reference the Statement of Work, Part I Scope of Work, second paragraph of sub-part A where it states that “The design phases will include 65%, 95% and review stages.”. It appears that something is missing in this sentence. Should 100% be added to this statement? |
| Jarrett Construction |
| 5Dec22 |
VA Response: It should read “will include 65% and 95% review stages”. The comments and direction from the 95% will be incorporated into the 100%. Corrections can be redlined as needed. The 100% does not need a formal review stage but will be reviewed.
| 3. |
| Reference RFP Attachment Instructions to Offerors and Evaluation Information, Part III Evaluation Factors for Award, Phase One – Factor 2 Technical Qualifications, subpart 1 under Definitions. Under “Size” it refers to the installation of large high-tech medical equipment and under “Scope” it refers to repair or replace parking garage facilities. These don’t seem to fit the scope of this project. Please clarify these items. |
| Jarrett Construction |
| 5Dec22 |
VA Response: Updated Instructions are attached.
| 4. |
| Reference RFP Attachment Instructions to Offerors and Evaluation Information and Spec 00 11 21. Spec 00 11 21 also contains Technical information under parts B5 and C3 that appears that is being requested to be submitted as part of the proposal. Are we to comply with and follow the requirements of the RFP Attachment Instructions to Offerors and Evaluation Information, or the requirements of Spec 00 11 21? |
| Jarrett Construction |
| 5Dec22 |
VA Response: Updated SPEC 00 11 21 and Instructions attached.
| 5 |
| Our company ATEAM is currently using a more high‐tech system. Is there any intent to switch to another system? |
| JetCo |
| 13Dec22 |
VA Response: No
| 6 |
| Please provide attachment #3 Specialized Experience Form. |
| MULE |
| 19Dec22 |
VA Response: May be found at SAM.gov
| 7 |
| Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? |
| Blue Cord |
| 19Dec22 |
VA Response: It will be acceptable for portions of this project to operate in this manner. Depending on the size, scope of the area and work plan.
| 8 |
| If no to the question above, will the SSHO need to be full-time for this project? |
| Blue Cord |
| 19Dec22 |
VA Response: The SSHO must be identified and assigned to this project. The SSHO must be readily available while the project is manned and working.
| 9 |
| Will it be acceptable to propose to replace the existing system in its entirety with a system that is nonproprietary? |
| Blue Cord |
| 19Dec22 |
VA Response: No
| 10 |
| Please provide the as-builts for Building 38 Interstitial, 2nd, 3rd and 4th Floors along with Building 55 as they were not included in the issued drawings. |
| Blue Cord |
| 19Dec22 |
VA Response: Provided separately
| 11 |
| Please confirm that NESHAP Survey requested is only related to Building 1 and is only required for areas where contractor will be working and not the entire building. |
| Blue Cord |
| 19Dec22 |
VA Response: A NESHAP will be limited to the areas that the contractor is working. This requirement applies to all buildings on campus.
| 12 |
| Please provide the latest as-builts for Building 2, as the solicited as-builts are of the old floor plan. |
| Blue Cord |
| 19Dec22 |
VA Response: There are no current plans available for Building 2. The changes for construction of this building have not been determined yet and design is not complete.
| 13 |
| Per the first bullet point of the SOW, it states to “Upgrade the following 18 Nodes from 4100U CPU/Display to latest version of 4100ES CPU/Display. It appears based on the list and drawings provided that there may be additional nodes. Please confirm that only these 18 nodes get upgraded. Or does the VA intend on having all nodes/transponder panels upgraded, if so please provide a list of all nodes/panels to be upgraded. |
| Blue Cord |
| 19Dec22 |
VA Response: The list was developed by the VA owner of the system. It is the intent of the VA to have all nodes/transponders upgraded. Some of the information acquired to date shows the project should include (all bullet points) 21 Node control panels and 6 remote Transponders associated with the system that will be scheduled for upgrade replacements to 4100ES panels, also 6 NAC Signal expanders. The specific detailed locations are not recorded on VA records and the current system service by JCI has been notified to provide this information.
| 14 |
| Per the fourth bullet point of the SOW the contractor is to “Replace the following TSW Computers and upgrade graphics to reflect the current floor plans: CEP and Electronics Shop”. It is the contractor’s understanding that this is being taken care of under another contract. Please confirm if this is the case and this scope can be removed. |
| Blue Cord |
| 19Dec22 |
VA Response: This part will remain in the scope to ensure that the latest version of the graphics and floor plans will be available by the end of the project.
| 15 |
| Please confirm if there are any other existing 4100ES nodes that will need to be upgraded besides the 2 issued in the SOW. |
| Blue Cord |
| 19Dec22 |
VA Response: The VA currently has reported only 2
| 16 |
| Please provide a list of all existing 4009 NAC Extender Panels and their current software/firmware. |
| Blue Cord |
| 19Dec22 |
VA Response: The specific detailed locations are not recorded on VA records and the current system service by JCI has been notified to provide this information.
| 17 |
| Please provide exact locations of all new smoke detectors scheduled to be installed as part of this project (total 27 per the SOW). |
| Blue Cord |
| 19Dec22 |
| VA Response: The exact locations are not recorded outside of the locations below: | |
| 1. | 7 locations: Bldg 38 Third FL |
| 2. | 6 locations: Bldg 38 Second Fl |
| 3. | 4 locations: Bldg 38 Ground Fl |
| 4. | 5 locations: Bldg 1 Second Fl |
| 5. | 4 locations: Bldg 1 Fifth floor |
| 6. | 1 location : Bldg 1 Seventh Fl |
| 18 |
| Please confirm if any duct detectors will need to be added/replaced as part of this project. if so, please provide their locations. |
| Blue Cord |
| 19Dec22 |
VA Response: There are some duct detectors that will be needed to be replaced with updated devices. The specific detailed locations are not recorded on VA records and the current system service by JCI has been notified to provide this information.
| 19 |
| In addition to acknowledging amendments on the SF1442, where should offerors include copies of any signed amendments that are issued in their proposal package? |
| Jarrett Construction |
| 20Dec22 |
VA Response: Attach to proposal package
| 20 |
| EVALUATION CRITERIA FACTOR 3 – PAST PERFORMANCE: states a window of (7) years for recent, relevant experience to be evaluated. Factor 2 – Technical Qualifications provides a (5) year window for evaluation. What is the correct window of time for an offeror's past examples used in Factors 2 & 3 to be considered relevant and acceptable? |
| Jarrett Construction |
| 20Dec22 |
VA Response: 5 years
| 21 |
| PHASE ONE ‐ FACTOR 2: TECHNICAL QUALIFICATIONS references using a "Specialized Experience Form" for offerors to submit their past performance projects. This form was not provided in the solicitation package. Please provide the required form or clarify its location within the solicitation package. |
| Jarrett Construction |
| 20Dec22 |
VA Response: May be found at SAM.gov
| 22 |
| PHASE ONE ‐ FACTOR 3: PAST PERFORMANCE (1) states "If available, copies of a completed Contractor Performance Assessment Reporting System (CPARS) for projects performed for the U.S. Government shall be provided." Part (4) references submitting a PPQ. Please confirm that a PPQ is only required to be submitted if a valid CPAR is NOT available for an offeror's past performance examples. |
| Jarrett Construction |
| 20Dec22 |
VA Response: Correct. Provide PPQ if no valid CPAR is available.
VA Response:
VA Response:
VA Response:
VA Response: