This document is a Cost Estimate Worksheet for the Fort Logan National Cemetery Phase 1B project (Solicitation Number 36C10F25B0001) issued by the Department of Veterans Affairs Office of Construction and Facilities Management. The worksheet provides a comprehensive division-based breakdown for construction cost estimation, covering 20 different construction divisions including General Requirements, Concrete, Masonry, Metals, Electrical, Plumbing, HVAC, and Exterior Improvements, among others.

The solicitation is for a construction project involving Phase 1B Expansion at Fort Logan National Cemetery, specifically focusing on dam spillway work. The cost estimate template requires contractors to provide lump sum amounts for each applicable division, with instructions to mark divisions not being utilized as "N/A". The worksheet includes spaces for calculating bonds, overhead, and profit, with a current grand total placeholder of $0, indicating that actual cost calculations are to be completed by the bidding contractor.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Estimate - Fort Logan 1B

This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp)
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

Fort Logan Natl Cem | IFB No: 36C10F25B0001

DIVISIONBASETOTAL
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastic, and Composites
Division 07
Thermal and Moisture Protection
Division 08
Openings (Doors, Windows, etc...)
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Fire Suppression
Division 22
Plumbing
Division 23
Heat, Ventilating, and Air Conditioning
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Division 35
Waterways and Marine Construction
Bonds

Overhead

Profit

GRAND TOTALS $ - 0