S02 - WD - Heavy - Denver County CO20250002 12-05-2025.pdf

PDF 2 MB Posted

Attached to
Y1KA--Fort Logan National Cemetery Phase 1B Dam Spillway
Solicitation number
36C10F25B0001
Issued by

About this file

This document is a General Decision wage determination for heavy construction projects in Colorado, issued by the U.S. Department of Labor. It covers counties including Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo, and Weld, and specifies prevailing wage rates for various construction trades effective in 2024 and 2025. The document details hourly rates and fringe benefits for workers in multiple classifications such as asbestos workers, bricklayers, electricians, plumbers, pipefitters, ironworkers, power equipment operators, and laborers, with rates ranging from $8.91 to $61.46 per hour depending on the specific job role and location.

The wage determination provides important compliance information for federal contractors, noting that contracts subject to the Davis-Bacon Act must pay workers at least the applicable minimum wage rates. It includes specific provisions under Executive Orders 14026 and 13658, which mandate minimum wage requirements for contracts entered into on or after January 30, 2022. The document also outlines an appeals process for wage determinations and provides contact information for the Wage and Hour Division of the U.S. Department of Labor for further inquiries or disputes. Contractors must adhere to these wage rates for all hours worked on covered contracts in 2024 and 2025.

View the file

Other files

File Type Posted
S02 - WD-Bldg-Denver County-CO20260020-01-02-2026.pdf PDF
S02 - WD-Heavy-Denver County-CO20260002-01-02-2026.pdf PDF
S02 - WD-Highway-Denver County-CO20260009-01-02-2026.pdf PDF
36C10F25B0001 0005.docx DOCX document
S06 - PPI Responses - Fort Logan.pdf PDF
36C10F25B0001 0004.docx DOCX document
36C10F25B0001 0003.docx DOCX document
36C10F25B0001 0002.docx DOCX document
S02 - WD - Heavy - Denver County CO20250002 09-12-2025.pdf PDF
S06 - 9-16-25 Fort Logan National Cemetery Walkthrough Agenda.pdf PDF
S06 - Pre-Bid Walk Through Sign In Sheet.pdf PDF
S06 - Pre-Proposal Conference slides FOLO Phase 1B.pdf PDF
36C10F25B0001 0001.docx DOCX document
S06 - FOLO NCA Phase 1B Pre-Bid Meeting Agenda - Calibre.pdf PDF
S02 - 2025.03.12_FOLO NC Phase 1B_Drawings.pdf PDF
S02 - 2025.03.26_FOLO NC Phase 1B - Specifications.pdf PDF
S02 - IFB- Cost Estimate Worksheet - Fort Logan - 36C10F25B0001.xlsx XLSX spreadsheet
S02 - WD- Highway - Denver County CO20250009 01-03-2025.pdf PDF
S02 - WD-Heavy-Denver County CO20250002 08-15-2025.pdf PDF
36C10F25B0001_2.docx DOCX document
S02 Pre-Proposal Inquiry Form 36C10F25B0001.docx DOCX document
S02 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE .pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .