This document is a pre-proposal conference presentation for a Department of Veterans Affairs (VA) solicitation for the Fort Logan National Cemetery Phase 1B Dams/Spillways project in Lakewood, Colorado. The solicitation (36C10F25B0001) is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a project cost range between $10-20 million and a firm fixed-price contract type.

The project scope involves comprehensive infrastructure improvements at Fort Logan National Cemetery, including drainage improvements, dam modifications for three specific areas (NE Channel, Veterans Dam, and Memorial Dam), and related construction activities. Key project elements include channel improvements, utility relocations, spillway installations, dam crest raising, pedestrian infrastructure, and various demolition and repair work. Critical dates include a bid due date of October 15, 2025, a tentative contract award date of November 15, 2025, and a 730-calendar-day performance period. Bidders must be registered in SAM and VetCert, submit detailed documentation including representations and certifications, and comply with specific submission instructions for an electronic, sealed bid process.

View the file

Other files

File Type Posted
36C10F25B0001 0005.docx DOCX document
S02 - WD-Highway-Denver County-CO20260009-01-02-2026.pdf PDF
S02 - WD-Heavy-Denver County-CO20260002-01-02-2026.pdf PDF
S02 - WD-Bldg-Denver County-CO20260020-01-02-2026.pdf PDF
36C10F25B0001 0004.docx DOCX document
S02 - WD - Heavy - Denver County CO20250002 12-05-2025.pdf PDF
S06 - PPI Responses - Fort Logan.pdf PDF
36C10F25B0001 0003.docx DOCX document
S02 - WD - Heavy - Denver County CO20250002 09-12-2025.pdf PDF
36C10F25B0001 0002.docx DOCX document
S06 - 9-16-25 Fort Logan National Cemetery Walkthrough Agenda.pdf PDF
S06 - FOLO NCA Phase 1B Pre-Bid Meeting Agenda - Calibre.pdf PDF
36C10F25B0001 0001.docx DOCX document
S06 - Pre-Bid Walk Through Sign In Sheet.pdf PDF
S02 - 2025.03.26_FOLO NC Phase 1B - Specifications.pdf PDF
S02 - 2025.03.12_FOLO NC Phase 1B_Drawings.pdf PDF
S02 - WD-Heavy-Denver County CO20250002 08-15-2025.pdf PDF
S02 - WD- Highway - Denver County CO20250009 01-03-2025.pdf PDF
S02 Pre-Proposal Inquiry Form 36C10F25B0001.docx DOCX document
S02 - IFB- Cost Estimate Worksheet - Fort Logan - 36C10F25B0001.xlsx XLSX spreadsheet
S02 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE .pdf PDF
36C10F25B0001_2.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IAS

FORT LOGAN

NATIONAL CEMETERY

PHASE 1B DAMS/SPILLWAYS

LAKEWOOD, COLORADO

SOLICITATION 36C10F25B0001

PROJECT # 888-043B

PRE-PROPOSAL CONFERENCE

SEPTEMBER 16, 2025

1 Office of Construction and Facilities Management

Agenda

Opening Remarks NCA Mission Solicitation Summary Milestones Project Scope and Overview Site walkthrough

2 Office of Construction and Facilities Management

Opening Remarks

Introductions VA Representatives

VA CFM: Rachel Beason, Contracting Officer VA CFM: Bill Marks, Project Manager VA CFM: Xoel Castillo Rivera, Senior Resident Engineer FLNC: Roderick (Tony) Thomas, Director

3 Office of Construction and Facilities Management

NCA Mission The National Cemetery Administration honors Veterans and their families with final resting places in national shrines and lasting tributes that commemorate their service and sacrifice to our Nation.

In 1865, during his second inaugural address, President Abraham

Lincoln pledged: “To care for him who shall have borne the battle and for his widow and his orphan.”

In 2023, the VA upholds this pledge through the mission:

“To fulfill President Lincoln’s promise to care for those who have served in our nation’s military and for their families, caregivers, and survivors.”

4 Office of Construction and Facilities Management

Solicitation Overview

Solicitation is set aside for Service-Disabled Veteran Owned Small Business (SDVOSB) in accordance with 38 U.S.C. 8127(d).

SDVOSB Offerors must be registered in SAM and registered & verified in VetCert prior to submission Annual Representation and Certification https://www.sam.gov/SAM/ Small Business Administration Veteran Certification

(VetCert) https://veterans.certify.sba.gov/ https://veterans.certify.sba.gov/ https://veterans.certify.sba.gov/

5 Office of Construction and Facilities Management

Service-Disabled

Veteran-Owned Small Business VA Office of Small and Disadvantaged

Business Utilization (OSDBU) Washington, D.C.

http://www4.va.gov/osdbu/

Contact OSDBU for information on Joint Ventures Teaming Agreement Mentor Protégée (See VAAR 819-71) SBA Veteran Certification (VetCert) http://www4.va.gov/osdbu/ http://www4.va.gov/osdbu/

6 Office of Construction and Facilities Management

Project Cost Range Between $10,000,000 - $20,000,000

Contract Type: Firm Fixed Price Evaluation Method: PRICE ONLY – SEALED BID

Federal , State, and Local Tax (FAR Clause 52.229-3) Is the Responsibility of the Contractor, include it in your proposal price Construction Wage Rate Requirements (Davis

Bacon Act) Applies Buy American Act Applies

7 Office of Construction and Facilities Management

Contract Line Item Numbers (CLINs 001)

CLIN 001: Base Bid - All work necessary to construct the base project

Period of Performance 730 calendar days after the Notice to Proceed for base bid

8 Office of Construction and Facilities Management

Bid Bond/Bid Guarantee (SF 24)

Bond amount 20% of the offer price but shall not exceed $3,000,000 Your emailed bid package must contain a legible, scanned copy of your Executed Bid Guarantee (SF-24). Please shade any raised seals with pencil lead to make them legible before you scan the bond.

An original, hard copy, executed Bid Guarantee (on form SF-24) must also be mailed to the address listed in the solicitation by the bid due date/time. See page Solicitation pg. 9, para (d.)

Make sure your bond is compliant with Far Part 28

Performance & Payment Bonds (SF 25) Required Penal sum = 100% of award amount Required of awardee within 10 calendar days of award.

9 Office of Construction and Facilities Management

Insurance Certificate of Insurance required prior to commencing work

Worker’s compensation and employers' liability General Liability Automobile Liability

10 Office of Construction and Facilities Management

Pre-Proposal Inquiries (PPI)/Requests for Information (RFI’S) Use Solicitation PPI Form (Attachment ) Questions Due: September 25, 2025 at 4:00PM (EDT) Email to:

Rachel.Beason@va.gov

The subject line to read “Ft. Logan Phase 1B | 36C10F25B0001”

Answers posted on or about: October 3, 2025 mailto:Rachel.Beason@va.gov mailto:Rachel.Beason@va.gov

11 Office of Construction and Facilities Management

Submission Instructions

Electronic Submission

(a) BIDS ARE DUE ON OCTOBER 15, 2025, BY 2:00 PM EDT. Bidders must submit their bids via email to: Rachel.Beason@va.gov. Bidders shall include the following in the subject line: “SEALED BID DOCUMENTS – 36C10F25B0001 – COMPANY NAME”

(b) Only emailed bids will be accepted. Bids submitted by any method other than email are not allowed and will be deemed non-responsive and therefore ineligible for award. The bid submission emails will be kept in an electronic folder unread until 2:15 PM EDT when they will be opened and read to the public. **NOTE: PLEASE ALLOW AT LEAST 30 MINUTES

FOR BIDS TO ARRIVE IN EMAIL.**

(c) The bid opening will be conducted via teleconference. An in person bid opening will not be facilitated. (See section C.(a) below for bid submission due date information.)

(d) Failure to provide electronic bids and the electronic copy of the bid bond on the date and time set for bid opening, will deem the bid non-responsive.

13 Office of Construction and Facilities Management

Submission Instructions

BID PACKAGE CONTENTS:

Standard Form (SF) 1442 Solicitation, Offer and Award: Bidders must complete

& sign the “OFFER” section of the SF 1442. Please include your company’s Unique Entity Identifier number associated with SAM.gov in Block 14. Electronic submissions may be electronic signature or signed and scanned “wet signature”.

Acknowledgement of All Amendments: Bidders must acknowledge all amendments by either 1.) Completing block 19 of the SF 1442, or 2.) Returning the signed amendment form(s) with the submission.

Price Schedule: (1) Bidders must include the total price in Block 17 on the SF 1442. The Bidder must submit separate pricing for all items listed. (2) Completed Contractor Cost Estimate Worksheet (attached)

Bid Guarantee: See previous slide Safety: The Bidder shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture and for the entity itself. EMR shall not be submitted for subcontractors.) See solicitation for additional information

14 Office of Construction and Facilities Management

Submission Instructions

BID PACKAGE CONTENTS:

Representations & Certifications: The offeror must provide their Representations and

Certifications or their response to FAR 52.204-8 (2) (i) or (ii) Annual Representations and Certifications.

Information Regarding Responsibility Matters: Offeror must provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.

Violation of Arms Controls Treaties or Agreements: Offeror must provide their response to FAR 52.209-13 (b) (1) or (2) Violation of Arms Controls Treaties or Agreements.

Tax on Certain Foreign Procurements: Offeror must provide their response to FAR 52.229-11 (d)

Post Award Small Business Program Representations: Offeror must provide their response to FAR 52.219-28 (h), if applicable.

Limitations on Subcontracting: In accordance with VAAR 852.219-75, the offeror must complete VA Notice of Limitations on Subcontracting-Certificate of Compliance for Construction (attached) and return with their bid submission..

(l) Notice to SDVOSB Joint Venture/Mentor Protegee (if applicable): See solicitation for information.

15 Office of Construction and Facilities Management

Submission Instructions

VIRTUAL PUBLIC BID OPENING:

Bids will be publicly read aloud on the due date of October 15, 2025 at

2:15 PM (EDT). A conference line will be announced via an amendment to the solicitation approximately five (5) calendar days prior to the receipt date for bids. Entry to the conference line will begin at 2:00

PM (EDT).

Bids will be recorded on a Bid Abstract (SF 1409) and made available upon request.

In the event there are concerns with the bids, in accordance with FAR 14.402-1 (c), Microsoft Teams will be used to assist in the examination of the bid(s).

16 Office of Construction and Facilities Management

Milestones 1 Solicitation Issued August 27, 2025

2 BID Due Date October 15, 2025, 2:00PM EDT

3 Contract Award (TENTATIVE) November 15, 2025

4 Notice To Proceed (TENTATIVE) TBD

17 Office of Construction and Facilities Management

Project Scope/Overview

VA Office of Construction & Facilities Management

Xoel Castillo Rivera, SRE Bill Marks, PM

18 Office of Construction and Facilities Management18

Project Overview Overview:

• Location

• Fort Logan National Cemetery, Denver, CO

• Scope

• Dam spillway modifications, alterations, roads, walks, grading, drainage, utility systems, water storage facilities, necessary removal of existing structures

19 Office of Construction and Facilities Management19

Scope Details – Drainage ImprovementsScope Details – Drainage

Improvements:

• NE Channel Improvements

• Clearing/Grubbing

• Excavation

• Install riprap channel, Retaining Wall

• Denver Drive

• Install Box Culvert, Wingwalls

• Remove/Replace -

Curb/Gutter

• Remove/Replace Asphalt

Paving

20 Office of Construction and Facilities Management20

Scope Details – Drainage ImprovementsScope Details – Drainage Improvements (cont.):

• Omaha Drive

• Remove/Replace - Curb/Gutter

• Remove/Replace Asphalt Paving

• Install Box Culvert, Wingwalls

• Install Energy Dissipator Chute

• Misc. Flatwork Repair

• Misc. Rock wall Repair

• Landscape Repair

21 Office of Construction and Facilities Management21

Scope Details – Veterans Dam Scope Details – Veterans Dam:

• Veterans Dam

• Tree Removal

• Utility Relocation

• Clearing/Grubbing

• Demolish Existing Outlet and Spillway

• Install Spillway

• Raise Dam Crest

• Install Sidewalk

• Install Pedestrian Bridge

• Pump House Repairs

22 Office of Construction and Facilities Management22

Scope Details – Memorial Dam Scope Details – Memorial Dam:

• Memorial Dam

• Replace Outlet Gate

• Install Stem Wall and Vent

• Demolish Existing Spillway

• Install Spillway

• Downstream Slope Improvements

• Upstream Slope Repairs

• Crest Fill/Surfacing

23 Office of Construction and Facilities Management

QUESTIONS???

No technical questions will be answered today or during the pre-proposal site visit.

Submit all technical Requests for Information in writing per the solicitation.

Questions

Slide Number 1
Agenda
Opening Remarks
NCA Mission
Solicitation Overview
Solicitation Overview�Service-Disabled�Veteran-Owned Small Business
Solicitation Overview
Solicitation Overview
Solicitation Overview
Solicitation Overview
Solicitation Overview
Solicitation Overview�Submission Instructions
Solicitation Overview�Submission Instructions
Solicitation Overview�Submission Instructions
Solicitation Overview�Submission Instructions
Milestones
Project Scope/Overview
Project Overview
Scope Details – Drainage Improvements
Scope Details – Drainage Improvements
Scope Details – Veterans Dam
Scope Details – Memorial Dam
Questions???��No technical questions will be answered today or during the pre-proposal site visit. ���Submit all technical Requests for Information in writing per the solicitation.

File details come from the government source that posted it. Updated .