S02 - WD - Heavy - Denver County CO20250002 09-12-2025.pdf

PDF 2 MB Posted

Attached to
Y1KA--Fort Logan National Cemetery Phase 1B Dam Spillway
Solicitation number
36C10F25B0001
Issued by

About this file

This is a Davis-Bacon General Decision wage determination document for heavy construction projects in multiple Colorado counties (Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo, and Weld). The document specifies prevailing wage rates for various construction trades and classifications, with hourly rates and fringe benefits for roles such as Asbestos Workers/Insulators, Bricklayers, Electricians, Plumbers, Pipefitters, Ironworkers, Line Construction workers, Sheet Metal Workers, Truck Drivers, and Power Equipment Operators.

Key wage rate details include variations by county and specific job classification, with rates ranging from $11.22 to $58.53 per hour. The document covers wage requirements under Executive Orders 14026 and 13658, which mandate minimum wage rates for federal contracts. Notably, if the contract is entered into on or after January 30, 2022, contractors must pay covered workers at least $17.75 per hour, with rates adjusted annually. The document also provides guidance on wage determination appeals process and includes details on how wage rates are identified and updated, referencing union rates, survey rates, and state-adopted rates.

View the file

Other files

File Type Posted
S02 - WD-Bldg-Denver County-CO20260020-01-02-2026.pdf PDF
S02 - WD-Heavy-Denver County-CO20260002-01-02-2026.pdf PDF
S02 - WD-Highway-Denver County-CO20260009-01-02-2026.pdf PDF
36C10F25B0001 0005.docx DOCX document
S06 - PPI Responses - Fort Logan.pdf PDF
S02 - WD - Heavy - Denver County CO20250002 12-05-2025.pdf PDF
36C10F25B0001 0004.docx DOCX document
36C10F25B0001 0003.docx DOCX document
36C10F25B0001 0002.docx DOCX document
S06 - 9-16-25 Fort Logan National Cemetery Walkthrough Agenda.pdf PDF
S06 - Pre-Bid Walk Through Sign In Sheet.pdf PDF
S06 - Pre-Proposal Conference slides FOLO Phase 1B.pdf PDF
36C10F25B0001 0001.docx DOCX document
S06 - FOLO NCA Phase 1B Pre-Bid Meeting Agenda - Calibre.pdf PDF
S02 - 2025.03.12_FOLO NC Phase 1B_Drawings.pdf PDF
S02 - 2025.03.26_FOLO NC Phase 1B - Specifications.pdf PDF
S02 - IFB- Cost Estimate Worksheet - Fort Logan - 36C10F25B0001.xlsx XLSX spreadsheet
S02 - WD- Highway - Denver County CO20250009 01-03-2025.pdf PDF
S02 - WD-Heavy-Denver County CO20250002 08-15-2025.pdf PDF
36C10F25B0001_2.docx DOCX document
S02 Pre-Proposal Inquiry Form 36C10F25B0001.docx DOCX document
S02 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE .pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .