S02 - WD-Heavy-Denver County-CO20260002-01-02-2026.pdf

PDF 2 MB Posted

Attached to
Y1KA--Fort Logan National Cemetery Phase 1B Dam Spillway
Solicitation number
36C10F25B0001
Issued by

About this file

This document is a Davis-Bacon General Decision wage determination for heavy construction projects in multiple Colorado counties (Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo, and Weld) effective 01/02/2026. The document provides detailed hourly wage rates and fringe benefits for various construction trade classifications, including:

Key wage rates include Asbestos Workers at $36.98 with 16.82 fringe benefits, Bricklayers ranging from $32.93 to $42.37 with corresponding fringes, Electricians between $31.75 and $46.80 with varying fringe rates, Plumbers at $41.32 to $50.68, and Ironworkers at $39.21. The document also includes two important Executive Order notes: EO 13706 on paid sick leave for federal contractors (up to 56 hours annually) and EO 13658 regarding minimum wage requirements. The document provides detailed instructions for wage determination appeals and clarifies how union, survey, and state-adopted rate identifiers are used in classifying and calculating prevailing wages.

View the file

Other files

File Type Posted
S02 - WD-Bldg-Denver County-CO20260020-01-02-2026.pdf PDF
S02 - WD-Highway-Denver County-CO20260009-01-02-2026.pdf PDF
36C10F25B0001 0005.docx DOCX document
S06 - PPI Responses - Fort Logan.pdf PDF
S02 - WD - Heavy - Denver County CO20250002 12-05-2025.pdf PDF
36C10F25B0001 0004.docx DOCX document
36C10F25B0001 0003.docx DOCX document
36C10F25B0001 0002.docx DOCX document
S02 - WD - Heavy - Denver County CO20250002 09-12-2025.pdf PDF
S06 - 9-16-25 Fort Logan National Cemetery Walkthrough Agenda.pdf PDF
S06 - Pre-Bid Walk Through Sign In Sheet.pdf PDF
S06 - Pre-Proposal Conference slides FOLO Phase 1B.pdf PDF
36C10F25B0001 0001.docx DOCX document
S06 - FOLO NCA Phase 1B Pre-Bid Meeting Agenda - Calibre.pdf PDF
S02 - 2025.03.12_FOLO NC Phase 1B_Drawings.pdf PDF
S02 - 2025.03.26_FOLO NC Phase 1B - Specifications.pdf PDF
S02 - IFB- Cost Estimate Worksheet - Fort Logan - 36C10F25B0001.xlsx XLSX spreadsheet
S02 - WD- Highway - Denver County CO20250009 01-03-2025.pdf PDF
S02 - WD-Heavy-Denver County CO20250002 08-15-2025.pdf PDF
36C10F25B0001_2.docx DOCX document
S02 Pre-Proposal Inquiry Form 36C10F25B0001.docx DOCX document
S02 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE .pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .