S06 - 9-16-25 Fort Logan National Cemetery Walkthrough Agenda.pdf

PDF 120 KB Posted

Attached to
Y1KA--Fort Logan National Cemetery Phase 1B Dam Spillway
Solicitation number
36C10F25B0001
Issued by

About this file

This document is a Pre-Proposal Site Visit agenda for the Fort Logan National Cemetery, Phase 1B Dams/Spillways project. The solicitation is set aside exclusively for Service-Disabled Veteran Owned Small Businesses (SDVOSB) and is associated with VA contract number 36C10F25B0001. Key dates include RFIs due September 25, 2025 at 4:00 PM EDT, to be submitted via email to Rachel.Beason@va.gov, with VA responses to be posted on SAM.gov around October 3. Bids are due October 15, 2025 by 2:00 PM EDT and will be opened virtually at 2:15 PM EDT.

The site visit involves key personnel including the Contracting Officer (Rachel Beason), Senior Resident Engineer (Xoel Castillo Rivera), Project Manager (Bill Marks), and Fort Logan National Cemetery Director (Roderick Thomas). Attendees are required to sign a sign-in sheet, and no technical questions will be answered during the site visit. Participants are instructed to submit all questions in writing using the Pre-Proposal Inquiry (PPI) form provided in the solicitation, with a specific email subject line requirement of "Ft. Logan Phase 1B | 36C10F25B0001".

View the file

Other files

File Type Posted
S02 - WD-Bldg-Denver County-CO20260020-01-02-2026.pdf PDF
S02 - WD-Heavy-Denver County-CO20260002-01-02-2026.pdf PDF
S02 - WD-Highway-Denver County-CO20260009-01-02-2026.pdf PDF
36C10F25B0001 0005.docx DOCX document
S06 - PPI Responses - Fort Logan.pdf PDF
S02 - WD - Heavy - Denver County CO20250002 12-05-2025.pdf PDF
36C10F25B0001 0004.docx DOCX document
36C10F25B0001 0003.docx DOCX document
36C10F25B0001 0002.docx DOCX document
S02 - WD - Heavy - Denver County CO20250002 09-12-2025.pdf PDF
S06 - Pre-Bid Walk Through Sign In Sheet.pdf PDF
S06 - Pre-Proposal Conference slides FOLO Phase 1B.pdf PDF
36C10F25B0001 0001.docx DOCX document
S06 - FOLO NCA Phase 1B Pre-Bid Meeting Agenda - Calibre.pdf PDF
S02 - 2025.03.12_FOLO NC Phase 1B_Drawings.pdf PDF
S02 - 2025.03.26_FOLO NC Phase 1B - Specifications.pdf PDF
S02 - IFB- Cost Estimate Worksheet - Fort Logan - 36C10F25B0001.xlsx XLSX spreadsheet
S02 - WD- Highway - Denver County CO20250009 01-03-2025.pdf PDF
S02 - WD-Heavy-Denver County CO20250002 08-15-2025.pdf PDF
36C10F25B0001_2.docx DOCX document
S02 Pre-Proposal Inquiry Form 36C10F25B0001.docx DOCX document
S02 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE .pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Logan National Cemetery, Phase 1B, Dams/Spillways

Pre-Proposal Site Visit

Tuesday, September 16, 2025 Fort Logan National Cemetery

10:00 am – 12:00 pm MDT

1. Introductions and Comments

a. Contracting Officer – Rachel Beason

b. Senior Resident Engineer – Xoel Castillo Rivera

c. Project Manager – Bill Marks

d. Fort Logan National Cemetery Director – Roderick (Tony) Thomas

e. Other Introductions

f. All attendees, please sign the sign-in sheet.

g. Solicitation is set aside for Service-Disabled Veteran Owned Small

Businesses (SDVOSB)

2. RFI Process & Key Dates

a. NO technical questions will be answered today, please submit all questions in writing

b. Use Pre-Proposal Inquiry (PPI) form provided in solicitation

c. RFI’s Due September 25, 2025 at NLT 4:00 PM EDT

d. Submit RFI’s via email to: Rachel.Beason@va.gov

e. Email subject line shall include “Ft. Logan Phase 1B | 36C10F25B0001

f. VA responses to RFI’s received by the 9/25 deadline will be posted to

SAM.gov on approximately 10/3.

g. BIDS are due Friday 10/15/20253 by 2:00 PM EDT to the email address provided in the solicitation.

h. BIDS will be opened VIRTUALLY at 2:15 PM EDT. An amendment with meeting link will be published approximately 5 to 7 days prior to the bidding deadline.

3. Project Scope & Overview

4. Site Walkthrough mailto:Rachel.Beason@va.gov

4. Site Walkthrough

File details come from the government source that posted it. Updated .