S02 Exhibit N_Tenant Improvements Cost Summary TICS_Table.Jul.2022.pdf
PDF 33 KB Posted
- Attached to
- X1AA--Raleigh VA Dental Clinic RLP
- Solicitation number
- 36C24625R0058
About this file
This document is a template for a Tenant Improvement Cost (TICS) table used in federal lease agreements. The form is designed to capture key financial details for a specific lease, including lease number, agency, location, and various cost components. It provides fields for calculating costs such as Tenant Improvement General Contractor Fee, Shell General Contractor Fee, Architect/Engineering (A/E) Fees for both Tenant Improvements and Shell, Lessor's Project Management Fee, and other lessor costs. The template includes instructions for entering percentage values as decimals and converting per-square-foot rates to lump sum amounts, allowing flexibility in cost calculation and documentation.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEASE GS-XXP-LXXXXXXX or Project
Agency
Location: City, State
ABOA SF =
TENANT IMPROVEMENT ALLOWANCE PER ABOA SF =
RSF=
DATE:
Basis Amount
Tenant Improvement General Contractor Fee
Shell General Contractor Fee
Tenant Improvement A/E Fees (per Lease)
Shell A/E Fees
Lessor's TI Project Management Fee (per Lease)
TI Shell
Other Lessor Costs Established Under the Lease
INFORMATION NEEDED TO COMPLETE TICS TABLE
For A/E fees established as a cost per ABOA sf, convert rate to lump sum.
General contractor fee, A/E Fee and Lessor's
Project Management Fee fields are structured to allow you to choose percentage or a lump sum.
Enter percent values as decimals. Ex: Enter
0.06 for 6.00%.
File details come from the government source that posted it. Updated .