S02 Exhibit N_Tenant Improvements Cost Summary TICS_Table.Jul.2022_1.pdf
PDF 33 KB Posted
- Attached to
- X1AA--Raleigh VA Dental Clinic RLP
- Solicitation number
- 36C24625R0058
About this file
This is a Tenant Improvement Costs (TICS) template used for federal lease documentation. The form captures financial details related to tenant improvement and shell work associated with a specific GSA lease, identified by lease number, agency, and location (City, State). The template requires entry of the Assignable Building Area (ABOA) in square feet, the tenant improvement allowance per ABOA square foot, and the rentable square feet (RSF), along with a date field.
The template documents costs in a structured table format with separate columns for "Basis" and "Amount." Key cost categories include: Tenant Improvement General Contractor Fee, Shell General Contractor Fee, Tenant Improvement A/E (Architect/Engineer) Fees, Shell A/E Fees, and Lessor's TI Project Management Fee, with the last category requiring separate entries for TI and Shell components. An additional row captures Other Lessor Costs Established Under the Lease. The instructions specify that General Contractor fees, A/E fees, and Lessor's Project Management fees can be entered as either percentages (expressed as decimals, e.g., 0.06 for 6.00%) or lump sum amounts. A/E fees initially established as a cost per ABOA square foot must be converted to a lump sum for entry into this table. This is a template document with no specific lease information, costs, or financial data populated.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEASE GS-XXP-LXXXXXXX or Project
Agency
Location: City, State
ABOA SF =
TENANT IMPROVEMENT ALLOWANCE PER ABOA SF =
RSF=
DATE:
Basis Amount
Tenant Improvement General Contractor Fee
Shell General Contractor Fee
Tenant Improvement A/E Fees (per Lease)
Shell A/E Fees
Lessor's TI Project Management Fee (per Lease)
TI Shell
Other Lessor Costs Established Under the Lease
INFORMATION NEEDED TO COMPLETE TICS TABLE
For A/E fees established as a cost per ABOA sf, convert rate to lump sum.
General contractor fee, A/E Fee and Lessor's
Project Management Fee fields are structured to allow you to choose percentage or a lump sum.
Enter percent values as decimals. Ex: Enter
0.06 for 6.00%.
File details come from the government source that posted it. Updated .