S02 EXHIBIT B Subcontractor Information and Consent Form.pdf

PDF 172 KB Posted

Attached to
Y1NB--650-19-100 Replace Boilers in Bldg 10 Federal contract opportunity
Solicitation number
36C24122R0084
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document contains a subcontractor consent form template and information on a federal contract opportunity to replace boilers in a Department of Veterans Affairs building. The consent form is to be completed by major subcontractors identified in proposals and allows the prime contractor to discuss past performance with the government. It requests company information, signature, and three references with contact details.

The related federal contract opportunity is solicitation number 36C24122R0084 to replace boilers in Building 10 of the VA Medical Center in Providence, Rhode Island. Proposals are due in response to the attached request for proposal. The work will be awarded by the VA's Veterans Health Administration VISN 1 office.

View the file

Other files for this federal contract opportunity

Other files attached to Y1NB--650-19-100 Replace Boilers in Bldg 10, newest first.
File Type Posted
36C24122R0084 0007.docx DOCX document
S06 AMENDED Drawing P-502.pdf PDF
S06 AMENDED Spec Section 33 16 15 07202022.pdf PDF
S06 RFI Responses 07202022.pdf PDF
S06 EXHIBIT C Past Performance Questionnaire Revised.pdf PDF
S06 IMG_3850.pdf PDF
36C24122R0084 0005.docx DOCX document
S06 AMENDED Spec Section 33 16 15.pdf PDF
S06 IMG_4037.pdf PDF
S06 GE- Roofs.pdf PDF
S06 ARCHITECTURAL DRAWINGS BULLETIN 2.pdf PDF
S06 IMG_4010.pdf PDF
S06 IMG_0098.pdf PDF
S06 IMG_0094.pdf PDF
S06 RFI Responses 07142022.pdf PDF
S06 Bldg 10 Boiler Plant REGULATED BLDG MATERIALS SURVEY REPORT.pdf PDF
S06 STRUCTURAL DRAWINGS BULLETIN 1.pdf PDF
S06 ELECTRICAL DRAWINGS BULLETIN 1.pdf PDF
S06 MECHANICAL DRAWINGS BULLETIN 1.pdf PDF
S06 EXHIBIT D Calculation of Self Performed Work Amended.pdf PDF
S06 JA CCTV System Boilers 650-19-100.pdf PDF
36C24122R0084 0003.docx DOCX document
S06 EXHIBIT A Project Information Sheet for Contractors Amended.pdf PDF
S06 EXHIBIT C Past Performance Questionnaire.pdf PDF
36C24122R0084 0002.docx DOCX document
36C24122R0084 0001.docx DOCX document
S02 BD03252022 Drawings - 0_General.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol I.pdf PDF
S02 BD03252022 Drawings - 1_Hazardous Materials.pdf PDF
S02 BD03252022 Drawings - 2b_Civil - Part 2.pdf PDF
S02 BD03252022 Drawings - 3_Structural.pdf PDF
S02 BD03252022 Drawings - 4_Architecture.pdf PDF
S02 BD03252022 Drawings - 8b_Electrical - Part 2.pdf PDF
S02 BD03252022 Drawings - 9_Security Electronics.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol II.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol III.pdf PDF
S02 BD03252022 Drawings - 2a_Civil - Part 1.pdf PDF
S02 BD03252022 Drawings - 5_Fire Protection.pdf PDF
S02 BD03252022 Drawings - 6_Plumbing.pdf PDF
S02 BD03252022 Drawings - 7a_Mechanical - Part 1.pdf PDF
S02 BD03252022 - Hazardous Materials Report Bldgs 9_10_.pdf PDF
S02 BD03252022 - Soil Erosion and Sediment Control Plan.pdf PDF
S02 JA DDC Security Systems Boilers 650-19-100.pdf PDF
S02 JA Utility Plant Boilers 650-19-100.pdf PDF
S02 RI20220001 Wage Determinations.pdf PDF
S02 36C24122R0084 Solicitation.pdf PDF
S02 JA Fire Alarm System Boilers 650-19-100.pdf PDF
S02 EXHIBIT D Calculation of Self Performed Work.pdf PDF
S02 EXHIBIT C Past Performance Questionnaire.pdf PDF
S02 EXHIBIT A Project Information Sheet for Contractors.pdf PDF
Show all 50

Y1NB--650-19-100 Replace Boilers in Bldg 10 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT B – SUBCONTRACTOR INFORMATION AND CONSENT FORM

Each major subcontractor and/or Teaming Partner identified in your technical proposal must complete an Exhibit B, “Subcontractor Information and Consent Form” to be considered. Written references for subcontractors may be included and are encouraged; however, subcontractors do not need to send out past performance questionnaires. Multiple Subcontractors may be named for the same discipline, but you are limited to a maximum of three (3) subcontractors per discipline.

Subcontractor and/or Teaming Partner Consent for the Release of Past Performance Information to the Prime Contractor and Reference Information:

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor’s or teaming partner’s consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government in assessing your past performance relevancy we request that the following consent form be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent forms shall be submitted to the offering contractor for submission with the technical proposal.

(Name of Firm) is currently planning on participating as a (subcontractor and or a teaming partner) with (prime contractor or name of entity providing proposal) in responding to the Request for Proposal Number 36C24122R0084 – 650-19-100 Replace Boilers in Building 10 issued by the Department of Veterans Affairs- Providence VA Medical Center, 830 Chalkstone Ave., Providence

RI 02908.

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process, we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process.

(Signature) (Title of Individual with authority to sign for and legally bind the company

Address:

City/State/Zip Code: Date:

Reference List (required):

1. Contract No. And Title

Describe your role (Prime/Sub) and work Performed

Reference POC Name Phone Fax

Email address:

2. Contract No. And Title

Reference POC Name Phone Fax

3. Contract No. And Title

Reference POC Name_ Phone Fax

File details come from the government source that posted it. Updated .