S02 BD03252022 Drawings - 7a_Mechanical - Part 1.pdf
PDF 18 MB Posted
- Attached to
- Y1NB--650-19-100 Replace Boilers in Bldg 10 Federal contract opportunity
- Solicitation number
- 36C24122R0084
About this file
This document provides details on a federal contract opportunity to replace boilers in Building 10. The solicitation number is 36C24122R0084 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The opportunity type is a solicitation to replace boilers, as outlined in the attached request for proposal. Interested parties should review the attached RFP for additional requirements and specifications related to replacing the boilers. The agency and location make it clear this opportunity relates to improving boiler infrastructure at a Veterans Affairs facility.
View the file
Other files for this federal contract opportunity
Show all 50
Y1NB--650-19-100 Replace Boilers in Bldg 10 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
01-07-2022
MECHANICAL ABBREVIATIONS
& SYMBOLS
M-001
JJPAP
2 3
'- 0
'-9
/2
'- 0
43'-1"
FUEL OIL TANK
4,000 GAL
FUEL OIL
TANK
30,000 GAL
FUEL OIL
TANK
30,000 GAL
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
01-07-2022
MECHANICAL
PHASING AND TEMPORARY WORK
SITE PLAN
MC101
GDSAP
PLAN
NORTH
ACTUAL
NORTH
4321 5
A
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
MP304
(E)2"MPR
(E)2 1/2"MPS
(E)1"MPR
(E)2"MPR
(T)8"HPS
FROM NEW
STEAM HEADER
(T)4"HPS FROM
NEW STEAM
HEADER. REFER
TO DRAWING
MP101.
(E)8"HPS
(E)4"HPS
(E)
BLOWDOWN
TANK
OFFICE
E
(E) CONDENSATE
PUMP BELOW
(E) FEEDWATER
PUMPS
(E)CONDENSATE
STORAGE TANK
RESTROOM
E LOCKERS
E
MAINTENANCE
E
ANNEX
E
EXISTING
BOILER
NO. 3
EXISTING
BOILER
NO. 2
EXISTING
BOILER
NO. 1
(E)CHEMICAL
EQUIPMENT
(E)CHEMICAL
EQUIPMENT
SHOWER
F
(E)AIR
COMPRESSOR 2
(E)AIR
COMPRESSOR 1
(E)AIR
COMPRESSOR 3
(E)AC-UNIT-2
(E)AC-UNIT-1
(E)FUEL OIL PIPING
FROM (E)UNDERGROUND
STORAGE TANK
(E)FUEL OIL
PUMPS
(T)8"HPS FROM
TEMP. BOILERS
(T)4"HPS FROM
TEMP. BOILERS
(E)2-1/2"MPS UP
(E)8"HPS
(E)4"SPARE
UP FROM MAIN
STEAM HEADER
(E)6"HPS TO
SILENCER
(E)6"HPS
UP FROM MAIN
STEAM HEADER (E)4"HPS TO
IN-HOUSE
SUB HEADER
(T)1 1/2"HPS
MP304
(E)2 1/2"
(E)2"
(T)2 1/2"MPS
(T)2-1/2"
MPS UP
(T)4"PC
FROM ABOVE
(N)4"PC
(TYP.)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t
PLAN
NORTH ACTUAL
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/1
/2
:5
:4
A
M
MJ101
MECHANICAL
TEMPORARY PIPING PLAN
MAIN LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP MK0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
TEMPORARY PIPING PLAN - MAIN LEVEL
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 EXISTING PIPING & EQUIPMENT TO REMAIN AS IS. REFER TO DRAWINGS MJ601, MJ602, MJ603
& MJ604 FOR PHASING.
2 NEW TEMPORARY PIPING.
3 PROVIDE TEMPORARY PIPE SUPPORTS FOR THE EXISTING PIPING, AS REQUIRED TO FACILITATE
THE NEW CONSTRUCTION. COORDINATE WITH ALL TRADES. REFER TO STRUCTURAL DRAWINGS
FOR ADDITIONAL DETAILS.
4 CONNECT TEMPORARY 4" PC INTO DISCHARGE FROM EXISTING CONDENSATE PUMP. REFER TO
DRAWING MJ604 FOR ADDITIONAL DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702 AND M-703 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
TRADES.
Revisions: Date:
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
MP304
(T)PRV-1
EXISTING
BOILER
NO. 3
EXISTING
BOILER
NO. 2
EXISTING
BOILER
NO. 1
(T)2-1/2"
HPS UP
(E)8"HPS
DOWN
MAINTENANCE
E
ANNEX
E
(E)8"HPS
(E)8"HPS UP
FROM MAIN
STEAM HEADER
(E)4"HPS UP
FROM MAIN
STEAM HEADER
(E)4"HPS
(TYP.)
(E)1"FOS
(E)2-1/2"NG
(E)2"FWPS
(E)2"FWPD
(E)2"FWPD
(E)1"V
(E)1-1/2"V
(E)2"FOS
(E)1-1/2"FOR
(E)2"FWPD
UP FROM MAIN
STEAM HEADER
(T)2-1/2"
MPR UP
(E)2-1/2"
MPS FROM
EXIST. STEAM
HEADER
(E)1"HPC
(E)2-1/2"MPS
(E)6"HPS TO
SILENCER
(E)8" BLIND
FLANGE
MP304
(E)6"HPS
FROM EXIST. BOILERS
(T)1 1/2"HPS
(T)4"PC
UP
(T)1-1/2"
MPS DN
(E)4"HPS
(TYP.)
(E)UNIT
HEATER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/1
/2
:5
:4
A
M
MJ102
MECHANICAL
TEMPORARY PIPING PLAN
BOILER LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP MK0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
TEMPORARY PIPING PLAN - BOILER LEVEL
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 EXISTING PIPING & EQUIPMENT TO REMAIN AS IS. REFER TO DRAWINGS MJ601, MJ602, MJ603
& MJ604 FOR PHASING.
2 NEW LINE SIZE 300# TRIPLE OFFSET BUTTERFLY VALVES WITH WARM-UP BYPASS.
3 PROVIDE TEMPORARY PIPE SUPPORTS FOR THE EXISTING PIPING, AS REQUIRED TO FACILITATE
THE NEW CONSTRUCTION. COORDINATE WITH ALL TRADES. REFER TO STRUCTURAL DRAWINGS
FOR ADDITIONAL DETAILS.
4 TEMPORARY PRESSURE REDUCING STATION (T)-PRV-1 - SHALL MATCH EXISTING PRV SERVING
THE MPS FOR THE CLINIC (BDLG 7) AND WAREHOUSE (BDLG 8). LOCATE PRV IN ACCESSIBLE
LOCATION.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
MP304
(T)8"HPS
FROM TEMP.
BOILERS
(E)HPS UP
FROM EXIST.
STEAM HEADER
(E)6"HPS UP FROM
EXIST. BOILER (TYP.)
(E)BOILER
FLUE STACK
(TYP.)
(E)DEAERATOR
CATWALK LEVEL
ANNEX
(E)16" STEAM SILENCER
UP THRU ROOF
MP304
(T)8"HPS DN
(T)1-1/2"HPS
DN TO (T)PRV-1
(T)2-1/2"MPS DN
(T)4"PC FROM EXIST.
CONDENSATE PUMP
TO TEMP. BOILERS
TRAILERS
(T)4"PC DN
(T)2-1/2"MPR FROM
TEMP. BOILERS
(TYP.)
LOW ROOF
EXISTING CATWALK
EXISTING CATWALK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/1
/2
:5
:4
A
M
MJ103
MECHANICAL
TEMPORARY PIPING PLAN
CATWALK LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP MK0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
TEMPORARY PIPING PLAN - CATWALK LEVEL
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 REFER TO DRAWING MC101 FOR CONTINUATION.
2 PROVIDE TEMPORARY PIPE SUPPORTS FOR THE EXISTING PIPING, AS REQUIRED TO FACILITATE
THE NEW CONSTRUCTION. COORDINATE WITH ALL TRADES. REFER TO STRUCTURAL DRAWINGS
FOR ADDITIONAL DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
MECHANICAL STEAM GENERATION
TEMPORARY STEAM BOILER SYSTEM
PHASING (RENTAL & TEMPORARY )
MJ601
GDS/AHTMAP
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
01-07-2022
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
01-07-2022
MECHANICAL
TEMPORARY AND FINAL HPS PIPING
INSTALLATION SEQUENCE
MJ602
GDS/MKAP
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
01-07-2022
MECHANICAL
TEMPORARY AND FINAL HPS PIPING
INSTALLATION SEQUENCE
MJ603
GDS/RHDAP
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
MR PROJECT NO: 0506-0011
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
100% CORRECTED
CONSTRUCTION DOCUMENTS
01-07-2022
MECHANICAL
TEMPORARY AND FINAL CONDENSATE
PIPING INSTALLATION SEQUENCE
MJ604
GDSAP
UP
A
D
6.7
8 9 10B
C
B.3
CC
BB
DD
(E)4"HPS
(E)2 1/2"MPR
(E)1 1/2"MPR
(E)2"MPR
(E)2"MPR
(D)2"
(D)1 1/2"
(D)1"
(D)1"
(D)2"FW
(D)1 1/2"
(D)1"
(D)2"NG
(D)10"HPS
(D)1"HPR
(D)1"HPR
(D)2"MPR(D)10"HPS
(D)1 1/2"HPR
(D)2"FW
(D)1 1/2"
(D)2"FWPD (D)2"FW
(D)2"FW
(D)2 1/2"
(D)1"FOR (D)2 1/2"
(D)1 1/2"FOS
(D)2 1/2"
(D)1"
(D)2"
32Ø
(D)1"
(D)1"
(D)2 1/2"
(D)1"FOR(D)1"FOR
(D)2 1/2"
(D)1 1/2"FOS
(D)2 1/2"
(D)2 1/2"
(D)2"
(D)2"FW
(D)2"FW
(D)2"FWPD
32Ø
32Ø
(D)1 1/2"FOS
(D)2 1/2"
(D)2"
(D)2"FWPS
(D)2"FWPD
(D)Water
(D)AIR
COMPRESSOR
(D)AIR
COMPRESSOR
(D)1 1/2"BO
(D)2"BO
(D)1 1/2"BO
(D)2"BO
(D)2"BD
(D)1 1/2"BO
(D)2"FOR
(D)2"FOS
(D)2"FOR
(D)2"FOS
(E)1"MPR
(E)2 1/2"MPS
(E)2"MPR
LOCKERS
RESTROOM
MAINTENANCE
(E)8"HPS
ANNEX
(D)SURGE TANK
(D)CHEMICAL
EQUIPMENT
(D)CHEMICAL
EQUIPMENT
ACB-10-002
(E)AIR
COMPRESSOR
(D)AC-UNIT-1
(D)AC-UNIT-2
(D)AC
UNITS
(D)AC
UNITS
BREAK ROOM
SHOWER
(D) FEEDWATER
PUMPS
(D) FUEL OIL
PUMPS
(D) BLOWDOWN TANK
(D)8"HPS
(D)4"SPARE
(D)6"HPS
12 4
(E)NATURAL GAS
GAS TRAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/1
/2
:5
:1
A
M
MD101
MECHANICAL
DEMOLITION PLAN
MAIN LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP AHTM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 DEMOLITION PLAN - LOWER LEVEL
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 REFER TO ARCHITECTURAL & STRUCTURAL DRAWINGS FOR CATWALK DEMOLITION SCOPE.
2 ONCE NEW CONDENSATE SYSTEM IS OPERATIONAL - DISCONNECT AND REMOVE THE EXISTING
CONDENSATE RECEIVER, PUMPS AND CONTROL PANEL. REFER TO DRAWING MP101 FOR
ADDITIONAL DETAILS.
3 ONCE TEMPORARY BOILERS ARE OPERATIONAL, DISCONNECT AND REMOVE THE EXISTING FUEL
OIL PUMPS, PIPING AND EXISTING UNDERGROUND TANKS. COORDINATE WORK WILL ALL TRADES.
REFER TO ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL PHASING INFORMATION.
4 ONCE TEMPORARY BOILERS ARE OPERATIONAL, ISOLATE AND PURGE EXISTING NATURAL GAS
PIPING WITHIN THE BOILER PLANT FROM PIPING DOWNSTREAM OF THE EXISTING SHUT-OFF
VALVE AT THE GAS TRAIN. PIPING DOWNSTREAM TO BE DISCONNECTED AND REMOVED.
5 TEMPORARY PIPING TO REMAIN AS IS DURING DEMOLITION. PROVIDE TEMPORARY PIPE
SUPPORTS AS REQUIRED TO FACILITATE DEMOLITION.
6 ONCE TEMPORARY BOILERS ARE OPERATIONAL, DISCONNECT & REMOVE EXISTING FEEDWATER
PUMPS & ALL ASSOCIATED PIPING, POWER, ETC.
7 ONCE TEMPORARY BOILERS ARE OPERATIONAL - DISCONNECT & REMOVE EXISTING CONDENSATE
STORAGE TANK AND CONDENSATE TRANSFER PUMPS & ALL ASSOCIATED PIPING, POWER, ETC.
8 DISCONNECT & REMOVE EXISTING RADIANT CEILING PANELS IN ITS ENTIRETY.
9 DISCONNECT & REMOVE EXISTING BASEBOARD HEATER AND SPLIT SYSTEM IN ITS ENTIRETY.
10 DISCONNECT & REMOVE EXISTING BASEBOARD HEATER IN ITS ENTIRETY.
11 DISCONNECT & REMOVE ALL EXISTING UNIT HEATERS AND ASSOCIATED PIPING, CONTROLS, POWER, SUPPORTS, ETC.
12 DISCONNECT & REMOVE EXISTING CHEMICAL TANK AND ALL ASSOCIATED PIPING, POWER, ETC.
13 DISCONNECT AND REMOVE EXISTING GAS SERVICE FROM EXISTING GAS TRAIN UNDERGROUND
TO UNIT HEATER IN EXISTING WATER TANK (BUILDING 11). CAP EXISTING PIPE.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
(E)4"HPS
(D)1"HPR
(E)4"HPS
(D)2-1/2"MPS
(D)1"HPR
(D)1"HPR
(D)2"HPR
(D)1"BO(D)1"BO(D)1"BO
(D)2"FW
(D)2"FWPD
(D)2"FWPS
(D)2 1/2"NG
(D)1 1/2"V
(D)2"FWPD
(D)2"FWPD
(D)2"FWPS
(D)2 1/2"NG
(D)1"V
(D)1 1/2"V
(D)2"FW
32Ø 32Ø32Ø
(D)1"HPC
(D)2"FWPS
(D)4"HPS
(D)2"FWPD
(D)2"FWPD
(D)2"NPW
(D)1 1/2"CW
(D)2"FWPS
(D)2"FWPD
(D)1 1/2"FOR
(D)2"FOS
(D)2"FWPD
(D)2"FWPD
(D)2"FWPD
(D)1 1/2"FOR
(D)2"FOS
(D)1 1/2"V
(D)1"V
(D)2"FW (D)2"FW (D)1 1/2"FOR
(D)2"FOS
(D)1"V
(D)1"FOS
(D)1"HPR
(D)4"HPS
(D)1"HPR
(D)1"HPC
(D)1"HPC
(D)BOILER (D)BOILER (D)BOILER
(D)2"HPR
(D)2-1/2"MPS
(D)16"HPS
(D)2 1/2"NG
(T)PRV-1
(D)2"NPW
(D)2"FWPD
(D)8"HPS (D)6"HPS
(TYP.)
(TYP.)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/1
/2
:5
:2
A
M
MD102
MECHANICAL
DEMOLITION PLAN
BOILER LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP AHTM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
DEMOLITION PLAN - BOILER LEVEL
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 REFER TO ARCHITECTURAL & STRUCTURAL DRAWINGS FOR CATWALK DEMOLITION SCOPE.
2 TEMPORARY PIPING TO REMAIN AS IS DURING DEMOLITION. PROVIDE TEMPORARY PIPE
SUPPORTS AS REQUIRED TO FACILITATE DEMOLITION.
3 ONCE TEMPORARY BOILERS ARE OPERATIONAL, DISCONNECT AND REMOVE THE EXISTING FUEL
OIL PUMPS, PIPING AND EXISTING UNDERGROUND TANKS. COORDINATE WORK WILL ALL TRADES.
REFER TO ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL PHASING INFORMATION.
4 ONCE TEMPORARY BOILERS ARE OPERATIONAL, ISOLATE AND PURGE EXISTING NATURAL GAS
PIPING WITHIN THE BOILER PLANT FROM PIPING DOWNSTREAM OF THE EXISTING SHUT-OFF
VALVE AT THE GAS TRAIN. PIPING DOWNSTREAM TO BE DISCONNECTED AND REMOVED.
5 DISCONNECT & REMOVE EXISTING BOILER STACKS. FILL OPENING & PATCH ROOF. REFER TO
ARCHITECTURAL & STRUCTURAL DRAWINGS FOR ADDITIONAL DETAILS.
6 ONCE TEMPORARY BOILERS ARE OPERATIONAL, DISCONNECT & REMOVE EXISTING FEEDWATER
PUMPS & ALL ASSOCIATED PIPING, POWER, ETC.
7 DISCONNECT & REMOVE EXISTING GENERATOR, DAY TANK, CONCRETE DIKE, ASSOCIATED PIPING, POWER, ETC. REFER TO ARCHITECTURAL DRAWING AD102 AND ELECTRICAL DRAWING ED102
FOR ADDITIONAL DETAILS.
8 ONCE TEMPORARY BOILERS ARE OPERATIONAL - DISCONNECT & REMOVE EXISTING CONDENSATE
STORAGE TANK AND CONDENSATE TRANSFER PUMPS & ALL ASSOCIATED PIPING, POWER, ETC.
9 DISCONNECT & REMOVE ALL EXISTING UNIT HEATERS AND ASSOCIATED PIPING, CONTROLS,
POWER, SUPPORTS, ETC.
10 DISCONNECT & REMOVE WALL MOUNTED EXHAUST FAN AND ASSOCIATED DUCTWORK, POWER,
ETC.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
(D)6"HPS
(D)8"HPS
(D)10"HPS
(D)10"HPS
(D)8"HPS
(D)10"HPS
(D)10"HPS
(D)10"HPS
(D)2"FOR
(D)2"FOS
(D)1"HPR
(D)1"HPS(D)1"HPS
(D)3"NG
(D)1"HPR
(D)1"HPS
(D)2"FWPD
(D)3"NG
(D)1"HPR
(D)2"FOR
(D)2"FWPD
(D)1"HPR
(D)6"SV
(D)2"FOR
(D)2"FOS
(D)2"FOR
(D)3"HPS
(D)2"FOR
(D)2"FOS
(D)AHU
(D)NG (D)2 1/2"NG (D)2 1/2"NG
32Ø32Ø
CATWALK LEVEL
ANNEX
(T)8"
(E)HPS UP FROM
MAIN STEAM
HEADER
1 1 1
2 2
TEMPORARY
PIPING FROM
TEMPORARY
BOILERS
(TYP)
LOW ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/1
/2
:5
:2
A
M
MD103
MECHANICAL
DEMOLITION PLAN
CATWALK LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP AHTM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
DEMOLITION PLAN - CATWALK LEVEL
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 DISCONNECT & REMOVE HPS PIPING FROM EXISTING BOILERS TO EXISTING VALVE AT HEADER.
2 DISCONNECT & REMOVE EXISTING BOILER STACKS.
3 DISCONNECT & REMOVE EXISTING DEAERATOR & ALL ASSOCIATED PIPING, CONTROLS, POWER, ETC.
4 DISCONNECT & REMOVE EXISTING AIR HANDLER AND ASSOCIATED DUCTWORK, CONTROLS,
POWER, ETC.
5 TEMPORARY PIPING TO REMAIN AS IS DURING DEMOLITION. PROVIDE TEMPORARY PIPE
SUPPORTS AS REQUIRED TO FACILITATE DEMOLITION.
6 DISCONNECT & REMOVE ALL EXISTING UNIT HEATERS AND ASSOCIATED PIPING, CONTROLS,
POWER, SUPPORTS, ETC.
7 DISCONNECT & REMOVE EXISTING INTAKE LOUVER AND INTAKE DUCT TRANSITION, PREPARE
OPENING FOR NEW BLAST RATED LOUVER.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
(D)RD
(D)3"RD
(E)4"V
(D)2"
(D)2"
(E)4"
(D)2"
(D)2"
(D)2"
32"Ø
(D)16"
(D)2"
(D)2"
(D)3"RD
32"Ø
(D)RD
1 1
(TYP)
LOW ROOF
HIGH ROOF
6 6
32Ø
EXISTING ROOF
ACCESS HATCH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/1
/2
:5
:2
A
M
MD104
MECHANICAL
DEMOLITION PLAN
ROOF LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP AHTM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
DEMOLITION PLAN - ROOF LEVEL
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 DISCONNECT & REMOVE EXISTING BOILER STACKS. FILL OPENING & PATCH ROOF. REFER TO
ARCHITECTURAL & STRUCTURAL DRAWINGS FOR ADDITIONAL DETAILS.
2 REFER TO PLUMBING DRAWINGS FOR PLUMBING SCOPE.
3 DISCONNECT & REMOVE EXISTING EXHAUST FAN, EXISTING ROOF CURB TO REMAIN AS IS.
PREP CURB FOR INSTALLATION OF NEW EXHAUST FAN.
4 DISCONNECT & REMOVE EXISTING STEAM SILENCER AND DISCHARGE PIPE UP THROUGH THE
ROOF. PATCH ROOF OPENING. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR
ADDITIONAL DETAILS.
5 DISCONNECT & REMOVE THE EXISTING ROOF MOUNTED EXHAUST FAN AND CURB. PATCH ROOF.
REFER TO ARCHITECTURAL AND STRUCUTRAL DRAWINGS FOR ADDITIONAL DETAILS.
6 DISCONNECT & REMOVE THE EXISTING ROOF MOUNTED HOODS AND CURB. PATCH ROOF. REFER
TO ARCHITECTURAL AND STRUCUTRAL DRAWINGS FOR ADDITIONAL DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
E
MP303
CONDENSATE
RECEIVER
BDS-10-01-001
CRU-10-01-001
BLOW
DOWN
SEPERATOR
CS-10-01-001
CONDENSATE
STORAGE
TANK
ACHP-10-001
ACHP-10-01-01A
FOM-10-01-001FOP-10-01-001
FWP-10-01-003
FWP-10-01-002
FWP-10-01-001
FEEDWATER
PUMPS
FUEL
PUMP
SKID
FUEL
OIL
FILTERATION
MAINTENANCE
MAINTENANCE -
ADDITION
LOCKERS
RESTROOM
OFFICE
BREAK ROOM
ANNEX
GENERATOR
FUEL
PUMP
SKID
FOP-10-01-002
AIR
COMPRESSOR
(E)AIR
COMPRESSOR
FLASH
TANK
SHOWER
FT-10-01-001
UH-10-01-001
CTP-10-01-001
CTP-10-01-002
UH-10-01-003
ACHP-10-01-03A
ACHP-10-01-02A
(N)CORROSIVE
COMPOUNT
TANK
(N)CORROSIVE
COMPOUNT
TANK
(N)CORROSIVE
COMPOUNT
TANK
TRANSFORMER
CONDENSATE
RECEIVER
CRU-10-01-002
UH-10-01-002
FOM-10-01-002
FUEL
OIL
FILTERATION
WATER TREATMENT
SKID
MP302
MP303
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/1
/2
:0
:2
A
M
MQ101
MECHANICAL
EQUIPMENT ARRANGEMENT PLAN
MAIN LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP AHTM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
EQUIPMENT ARRANGEMENT PLAN - MAIN LEVEL
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
E
BOILER CONTROL
PANEL CLEARANCE
(R E F
TU
B E
P U
LL
(R E F
TU
B E
P U
LL
(R E F
TU
B E
P U
LL
C L
C L
C L
BOILER CONTROL
PANEL
CLERANCE
BOILER CONTROL
PANEL
CLERANCE
D/A-10-03-001
MP303
MP303
BOILER REAR
DOOR CLERANCE
BOILER REAR
DOOR CLERANCE
BOILER REAR
DOOR CLERANCE
B-10-02-001 B-10-02-002 B-10-01-003
DEAREATOR
(N)BOILER
(N)BOILER
(N)BOILER
ECONOMIZER
ECONOMIZER
ECONOMIZER
FHX-10-02-001
FHX-10-02-002 FHX-10-02-003
ACHP-10-02-04A
MP302
GENERATOR
ROOM
BOILER LEVEL
CONTROL ROOM
ERV-10-02-001
UH-10-03-004
UH-10-03-005
UH-10-03-006
UH-10-02-003
UH-10-03-001 UH-10-03-002
UH-10-03-003
DT-10-02-001
TRANSFORMER
UH-10-02-004
ACHP-10-02-05A
ACHP-10-02-06A
ACHP-10-02-07A
BOILER FRONT
DOOR SWING
(TYP.)
UH-10-02-007
UH-10-02-001
DWH-10-03-001
UH-10-02-002
ACHP-10-02-06B
ACHP-10-02-07B
MP302
EXHAUST MUFFLER
REFER TO MH102
FOR DETAILS3
MP303
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/1
/2
:0
:2
A
M
MQ102
MECHANICAL
EQUIPMENT ARRANGEMENT PLAN
BOILER LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP AHTM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
EQUIPMENT ARRANGEMENT PLAN - BOILER LEVEL
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
D
6.7 8 9 10
B
C
B.3
CC
BB
DD
E
(E)4"HPS
(E)2 1/2"MPR
(E)1 1/2"MPR
(E)2"MPR
(N)8" HPS DROP
MP301
MP302
MP303
MP303
(N)3/4" HPS
UP TO AMINE-
CHEMICAL FEED
(N)6" HPS
SPARE (N)4" HPS TO
BUILDING 9
(N)8" HPS TO
BUILDING 9
(N)8" HPS TO
BUILDING 1
(N)6" HPS RISE
TO BOILER 1
(N)6" HPS RISE
TO BOILER 2
(N)6" HPS
RISE TO
BOILER 3
(N)8" HPS UP
TO STEAM TEST
SILENCER
(N)4" HPS UP
TO DEAREATOR
BDS-10-01-001
BLOW
DOWN
SEPERATOR
CONDENSATE
RECEIVER
CONDENSATE
STORAGE
TANK
CS-10-01-001
(N)3"PC
(N)4"HPS
(N)2"BD
(N)2"FWPS
(E)2"MPR
(N)8"HPS
(N)3"NG
ACHP-10-001
2"FWPS UP
REFER TO DRAWING
MP102 FOR CONTINUATION
(N)2 1/2"FWPD
(N)2 1/2"FWPD
FUEL
PUMP
SKID
(N)8"HPS
(E)2 1/2"MPS
(E)1"MPR
(E)2"MPR
RUN FUEL OIL
PIPING IN NEW
TRENCH.
(N)1"BO
(E)8"HPS
(N)4"HPS
(N)2"BD UP
(N)2"BD UP
(N)2"BD UP
(N)2"BD UP
(N)2"FWPD UP
(N)1"BD UP
(N)1"BO UP
(N)2"FWPD UP
(N)1"BD UP
(N)1"BO UP
(N)2"BD UP
(N)2"FWPD UP
(N)1"BD UP
(N)1"BO UP
(N)2"BD UP
(N)2"FWPD UP
(N)STEAM TRAP
(N)1 1/2"HPR
UP
(N )1
M P R
FEEDWATER
PUMPS
FWP-10-01-003
FWP-10-01-002
FWP-10-01-001
(E)8" HPS TO
BUILDING 1
(N)2"FOR
(N)2"FOS
(N)2"FOS
(N)2"FOR
(N)2"FOS AND (N)2" FOR DN IN
TRENCH PIT. REFER TO DRAWING
MC101 FOR CONTIINUATION.
(TYP. OF 4)
(N)1"FOS &
(N)1"FOR UP
TO BOILER 3.
(N)1"FOS &
(N)1"FOR UP
TO BOILER 2.
FUEL
OIL
FILTERATION
GENERATOR
FUEL
PUMP
SKID
FLASH
TANK
FT-10-01-001
ACHP-10-01-01A
(N)1"FOS &
(N)1"FOR UP
TO BOILER 1.
(N)5"HPR
(N )4 H P S
(N)4"PC(N)4"PC
(N )2
S C W
TYPICAL
INSULATION
ON PIPING
1' - 1 1/2"
(N)4"HPS
FOP-10-01-002
FOM-10-01-001
FOP-10-01-001
(N)6"SV
(N)1"MPR
(N)1"MPR
(N)2"MPR
(N)1 1/2"MPR
(N)3"HPS
(N)4"SV
(N)3"HPS
(N)10"HPS
10-PRV-01-001
10-01-PRV-002
(N)4" HPS TO
PRV FOR UNIT
HEATERS
(N)2-1/2"MPS
DROP
(N)1/2"CF
(N )1 C F
(N)1/2"CF
(N)2"FOR
RUN 2"FOR AND
2"FOS IN TRENCH.
(N)2"BD
(N)4"SV UP
(N)2"MPR
(N)2"MPR
(N)1 1/4"HPR
(N)1"MPR
(N)4"PC
DROP
(N)1" HPS UP TO
MASTER STEAM
PRESSURE
TRANSMITTER
(N)6" SV UP
RE:DRAWING MP102
(N)2"FWPD UP
TO BOILER #1
(N)2"FWPD UP
TO BOILER #2
(N)2"FWPD UP
TO BOILER #3
(N)2"FWPD(N)2"FWPD
(N)2"FWPD
(N)2"FWPD
(N)2"FWPD
UH-10-01-001
UH-10-01-002
(N)2 1/2"FWPD
(N)2 1/2"FWPD
(N)3"NG UP
RE: DRAWING MP102
OFFICE
(N)4"MPS UP
SEE DWG
MP103 FOR
CONT.
(N)2"MPR
(N)4"OFL
(N)2"FWPD
(N)2"FOS
(N)2"FOR
(N)2"FWPD
(N)3/4"MPS
1-1/4"MPC
DOWN FROM
ABOVE
(N)2"FOS
(N)2 1/2"MPS
(N)3/4"MPR UP
(N)4"SV UP
THRU ROOF
(N)3/4"MPR
CTP-10-01-001
CTP-10-01-002
UH-10-01-003
(N)2"D
(N)4"FWPS
FUEL OIL
PIPING DROP
(N)CORROSIVE
COMPOUNT
TANK
(N)CORROSIVE
COMPOUNT
TANK
CHEMICAL
INJECTION
PUMPS
(N)CORROSIVE
COMPOUNT
TANK
(N)1"FOS
(N)1"FOR
(N)1"FOS
(N)1"FOR
ANNEX
(N)4"PC
(N)3/4"MPS(N)3/4"MPS
(N)3/4"MPR
TRANSFORMER
BREAK ROOM
ACHP-10-01-03A
ACHP-10-01-02A
(N)4"MPS
(N)RS
& RL
(TYP.)
(N)3/4"PC
RS, RL, AND PC
PIPING UP IN
PLUMBING CHASE
(TYP.)
CO
CO
T
T
T
CO
(N)3/4"MPS
(N)1-1/2"MPR
UP
LOUVER
L-10-01-001
EXISTING
GAS TRAIN
TO REMAIN AS IS
(N)3/4"RS & RL
UP
(N)3/4"MPS &
MPR UP
3' - 4"
1' - 2"
1' - 4"
1' - 6"
(N)1 1/4"MPR
(N)1 1/2"HPR9
(N)1"FOS
(N)1"FOR
(N)3/4"MPS
(N)8"HPS
(N)1 1/2"MPR
(N)1 1/4"MPR
(N)2"MPR
UP
(N)3"PC
(N)8"HPS
CRU-10-01-002
(E)8"HPS
(E)10"HPS
(N)6"MPR
(N)3"HPR
(N)3"CTPD (N)3"CTPD
(N)5"HPR
(E)4"HPS
(N)3"HPS RISE
TO DOMESTIC
WATER
HEATER
(N)6"SV
MP101
FOM-10-01-002
WATER TREATMENT
SKID
(N)1"FOR
(N)1"FOS
MP302
(N)2"FOS
(N)2"FOR
(N)1 1/4"MPR 12
(N)PIPE HANGER TYP
(N)PIPE HANGER TYP
(N)PIPE HANGER
TYP
(N)PIPE HANGER
TYP
(N)PIPE HANGER
TYP
(N)4"PC
MP303
(N)2 1/2"MPS
(N)2 1/2"MPS
E
MP302
MP302
MAIN
STEAM HEADER
(N)2"FOS
(N)2"FOR
(N)2"FOR
(N)2"FOS
(N)1 1/4"MPR
(N)3"HPS
(N)8"HPS(N)2"MPR
(N)2"FWPS
PIPE
HANGER (TYP.)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/1
/2
:5
:5
A
M
MP101
MECHANICAL
PIPING PLAN
MAIN LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP AHTM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
NEW WORK PLAN - MAIN LEVEL
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 FEEDWATER ISOLATION VALVES FOR EACH BOILER SHALL BE LOCATED IN AN ACCESSIBLE
LOCATION.
2 RUN NEW FUEL OIL PIPING IN NEW TRENCH IN THE EXISTING LOWER LEVEL SLAB. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS.
3 1"FOS & 1"FOR UP TO GENERATOR ON BOILER LEVEL.
4 ALL FUEL PIPING MUST BE DOUBLE CONTAINMENT PIPE. BASIS OF DESIGN FOR DOUBLE
CONTAINMENT PIPE WITHIN THE BUILDING - TRICON DOUBLE-CON.
5 3/4" PUMPED CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM
1/8 INCH PER FOOT. TERMINATE TO FUNNEL DRAIN IN WALL.
6 REFER TO DRAWING MH601 FOR REFRIGERANT PIPING DIAGRAM.
7 NEW TRENCH FOR FUEL OIL PIPING. REFER TO DETAIL 6 ON DRAWING MP501 AND
STRUCTURAL DRAWINGS FOR DETAILS.
8 3/4" PUMPED CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM
1/8 INCH PER FOOT. ROUTE TO NEAREST FLOOR DRAIN.
9 PROVIDE SCH 40 STEEL PIPE SLEEVE IN EXTERIOR/FOUNDATION WALL. PROVIDE LINK-SEAL IN
ANNUL SPACE BETWEEN PIPE AND SLEEVE. REFER TO DETAIL 5 ON DRAWING MP502.
10 INSTALL NEW NATURAL GAS PIPING DOWNSTREAM OF THE EXISTING SHUT-OFF VALVE AT THE
GAS TRAIN. REFER TO DRAWING MP604 FOR ADDITIONAL DETAILS.
11 COORDINATE ROUTING OF NEW PIPING IN AREA OF NEW STAIRS. DO NOT LOCATE ANY
EQUIPMENT REQUIRING MAINTENEANCE ACCESS UNDER THE STAIRS. REFER TO STRUCTURAL
DRAWINGS FOR ADDITIONAL DETAILS.
12 SAFETY RELIEF VALVE - REFER TO SCHEDULES AND DETAIL 8 ON DRAWING MP503 FOR
ADDITIONAL DETAILS.
13 ALL PIPING IN THE BOILER PLANT MUST BE FORGED STEEL.
14 ALL BLOWDOWN VALVES MUST BE ACCESSIBLE.
15 ALL MAIN STEAM VALVES SHALL HAVE A FACTORY INSTALLED 1" BYPASS LINE WITH GLOBE
VALVE FOR WARM-UP. NOT SHOWN FOR CLARITY.
16 4" CTPD UP TO DA FROM CONDENSATE TRANSFER PUMP DISCHARGE HEADER. REFER TO
DRAWINGS MP601, MP602 AND MP603 FOR ADDITIONAL DETAILS. REFER TO DRAWING MP102
FOR CONTINUATION.
17 NEW 1" FOS AND 1" FOR FROM NEW 4,000 UNDERGROUND TANK. REFER TO DRAWING MC101
AND CIVIL DRAWINGS FOR ADDITIONAL DETAILS. COORDINATE ROUTING OF PIPES WITH ALL
TRADES.
18 BOILER WATER TREATMENT SYSTEM TO BE PROVIDED UNDER A SEPARATE CONTRACT.
CONTRACTOR SHALL COORDINATE SPACE REQUIREMENTS WITH WATER TREATMENT VENDOR AND
ALL TRADES. WATER TREATMENT SKID BASIS OF DESIGN BARCLAY WATER MANAGEMENT INC.
CONTACT: ERIC NADEAU 774-400-4259 OR ALEX JARVIS 617-945-3046.
19 PROVIDE 8" HPS WITH BLIND FLANGE FOR FUTURE RENTAL BOILER. REFER TO DRAWING MP601
FOR ADDITIONAL INFORMATION.
20 1" LPG PIPE TO LPG CYLINDERS - REFER TO DRAWING MC101 FOR CONTINUATION. REFER TO
DETAIL 2 ON DRAWING M-506 AND ARCHITECTURAL, CIVIL AND STRUCUTRAL DRAWINGS.
21 PROVIDE 4" PC WITH BLIND FLANGE FOR FUTURE RENTAL BOILER. REFER TO DRAWING MP603
FOR ADDITIONAL INFORMATION.
22 1" HPS UP TO WATER FILL CONNECTION (HYDRO STATIC TESTING). REFER TO DRAWING MP602
FOR ADDITIONAL DETAILS.
23 4"PC FROM CONDENSATE RETURN UNITS (CRU-10-01-001/002) UP TO TOP INLET ON
CONDENSATE STORAGE TANK. COORDINATE ROUTING WITH ALL TRADES.
24 COORDINATE LOCATIONS OF NEW FUEL OIL EQUIPMENT WITH ALL TRADES.
25 NEW MAXON AUTOMATIC GAS SHUTOFF VALVE. REFER TO DRAWING MP604 FOR ADDITIONAL
DETAILS. LOCATE VALVE IN ACCESSIBLE LOCATION, COORDINATE LOCATION WITH ALL TRADES.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL
TRADES.
SCALE: 1/2" = 1'-0"2
PART PLAN - PIPE PENETRATIONS
D
6.7 8 9
B
C
B.3
CC
BB
DD
E
D/A-10-03-001
MP301
MP302
MP303
DEAREATOR
B-10-02-001 B-10-02-002 B-10-01-003
(N)BOILER
(N)BOILER
(N)BOILER
(N)6"SV
(N)2"FWPS
(N)4"OFL
(N)2"FWPD
(N)2"BD
(N)1"BD
(N)2"BD
(N)1"BD
(N)2"BD
(N)2"BD
(N)2"BD
(N)3"NG
(N)3"NG
(N)3"NG
(N)1"CF
(N)1"CF
(N)1"CF
(N)1/2"FWS
(N)1"CF
(N)3"NG
ACHP-10-02-04A
(N)3"NG
(N)6" HPS
RISE TO
BOILER 1
(N)6" HPS RISE
TO BOILER 2
(N)6" HPS
RISE TO
BOILER 3
(N)8" HPS UP
TO STEAM TEST
SILENCER
(N)3" HPS UP
TO DEAREATOR
ERV-10-02-001
UP FROM BELOW
RE:DRAWING MP101
UP THRU ROOF
(N)3"NG 1
(N)3"NG(N)3"NG
BOILER TUBE PULL
(TYPICAL)
(N)2"FWPD
GENERATOR
ROOM
ANNEX
CONTROL ROOM
BOILER LEVEL
(N)2"BD
DOWN
(N)2"BD
DOWN
(N)2"BD
DOWN
(N)1"FOS
(N)1"FOR
(UP FROM LOWER LEVEL
RE: DRAWING MP101)
(N)4"SV UP UH-10-02-003
2"FWPD UP
FROM LOWER LEVEL
UP FROM LOWER LEVEL
2"FWPD UP
FROM LOWER LEVEL
DT-10-02-001
(N)2-1/2"MPS UP
(N)3/4"MPR DN
(N)3/4"MPS
(N)3/4"MPR
(N)4"CTPD
DN. TO SURGE
TANK BELOW
(N)4"FWPS
UH-10-02-004
(N)3/4"MPS
(N)3/4"MPR
ACHP-10-02-06A
ACHP-10-02-07A
ACHP-10-02-05A
(N)4"SV FROM
BELOW UP
THRU ROOF
(N)3/4"MPS & MPR DN
(N)RS & RL (N)3/4"PC
RS, RL, AND PC
PIPING DN 3
(N)RS & RL
(N)RS & RL
(TYP.)
SECURITY
IT
(N)3/4"RS & RL
(N)3/4"RS & RLTYP.
(N)3/4"RS & RL
L-10-02-003
(UP TO
CATWALK LEVEL)
RE: DRAWING
MP103
LOUVER
L-10-02-004
(ABOVE DOOR)
TRANSFORMER
6"SV UP
1-1/4"LPR
1-1/2"MPR UP
4"FWPS DN TO
FEEDWATER PUMPS
FROM DA
RE:DWG MP101
3"NG UP
(N)3"NG UP
RE: DRAWING MP102
3"NG
DOWN FROM ABOVE
RE:DRAWING MP103
(N)1 1/4"LPR
UP TO 10-PRV-1
STATION 6
(N)3/4"MPR
FROM UNIT
HEATERS
(T)4"PC
(T)2 1/2"
(TYP.)
MAINTENACE
ADDITION
UH-10-02-002
(N)2" HPS
UP/DN
UH-10-02-001
(N)6"SV
EXHAUST MUFFLER
REFER TO MH102
FOR DETAILS
(N)1"LPG
(N)1"LPG
(N)3/4"LPG
(N)3/4"LPG (N)3/4"LPG
(TYP.)
(N)1"LPG
ACHP-10-02-06B
ACHP-10-02-07B
4"PC
UP FROM BELOW
RE: DWG MP101
MP303
L-10-02-005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
NORTH
KEYPLAN
HAZARDOUS MATERIALS
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, STONEHAM, MA 02180
PHONE: (781)275-6050
CIVIL / STRUCTURAL
LABELLA
303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614
PHONE: (585)454-6110
ARCHITECTURAL
OCULUS INC.
1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102
PHONE: (314)367-6100
ELECTRONIC SECURITY
GRW
801 CORPORATE DRIVE, LEXINGTON, KY 40503
PHONE: (859)223-3999
FIRE SUPPRESSION
KOFFEL ASSOCIATES
8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045
PHONE: (410)750-2246
PHYSICAL SECURITY
FORCE PROTECT SECURITY CONSULTANTS
10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407
PHONE: (502)836-4232
/1
/2
:0
:0
A
M
MP102
MECHANICAL
PIPING PLAN
BOILER LEVEL
REPLACE BOILERS IN BUILDING 10
830 CHALKSTONE AVENUE
PROVIDENCE, RI 02908
650-19-100
01-07-2022 AP AHTM0506-0011
100% CORRECTED
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"1
NEW WORK PLAN - BOILER LEVEL
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1 NATURAL GAS PIPING IS LOCATED IN CEILING SPACE OF ANNEX.
2 ALL FUEL PIPING MUST BE DOUBLE CONTAINMENT PIPE. BASIS OF DESIGN FOR DOUBLE
CONTAINMENT PIPE WITHIN THE BUILDING - TRICON DOUBLE-CON.
3 PROVIDE INSULATED METAL WALL ENCLOSURE FOR PIPING DOWN THRU FLOOR. FINISH TO
MATCH ADJACENT SURFACES.
4 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE
BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS
AS REQUIRED.
5 3/4" PUMPED CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM
1/8 INCH PER FOOT.
6 FUEL OIL PIPING UP FROM BELOW.
7 REFER TO THE MJ SERIES DRAWINGS FOR PHASING (TEMPORARY) PIPING.
8 BLOWDOWN PIPING BELOW BOILERS.
9 GAS TRAIN VENTS UP THROUGH ROOF. SIZE VENTS PER DETAIL #2 ON DRAWING MP506.
10 ALL BLOWDOWN VALVES MUST BE ACCESSIBLE.
11 1" LPG PIPE TO LPG CYLINDERS - REFER TO DRAWING MC101 FOR CONTINUATION. REFER TO
DETAIL 2 ON DRAWING M-506 AND ARCHITECTURAL, CIVIL AND STRUCUTRAL DRAWINGS.
12 3/4" LPG TO BOILER BURNER/IGNITER - REFER TO DETAIL 2 ON DRAWING MP506.
13 BOILER SAFETY RELIEF VALVE. CONTRACTOR SHALL VERIFY CONNECTION SIZES WITH APPROVED
EQUIPMENT SHOP DRAWINGS. REFER TO SCHEDULES AND DETAIL 8 ON DRAWING MP503 FOR
ADDITIONAL DETAILS.
14 REFER TO DRAWING MP604 FOR ADDITIONAL LPG PIPING DETAILS.
15 4" CTPD DA TANK BYPASS. REFER TO DRAWING MP603 FOR ADDITIONAL DETAILS.
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.
4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.
5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A
MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM
OR STEAM CONDENSATE SYSTEM.
6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE.