S02 BD03252022 Drawings - 7a_Mechanical - Part 1.pdf

PDF 18 MB Posted

Attached to
Y1NB--650-19-100 Replace Boilers in Bldg 10 Federal contract opportunity
Solicitation number
36C24122R0084
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document provides details on a federal contract opportunity to replace boilers in Building 10. The solicitation number is 36C24122R0084 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The opportunity type is a solicitation to replace boilers, as outlined in the attached request for proposal. Interested parties should review the attached RFP for additional requirements and specifications related to replacing the boilers. The agency and location make it clear this opportunity relates to improving boiler infrastructure at a Veterans Affairs facility.

View the file

Other files for this federal contract opportunity

Other files attached to Y1NB--650-19-100 Replace Boilers in Bldg 10, newest first.
File Type Posted
36C24122R0084 0007.docx DOCX document
S06 AMENDED Drawing P-601.pdf PDF
36C24122R0084 0006.docx DOCX document
S06 AMENDED Spec Section 33 16 15 07202022.pdf PDF
S06 RFI Responses 07202022.pdf PDF
S06 AMENDED Drawing P-502.pdf PDF
S06 RFI Responses 07192022.pdf PDF
S06 IMG_3850.pdf PDF
36C24122R0084 0005.docx DOCX document
S06 IMG_4044.pdf PDF
36C24122R0084 0004.docx DOCX document
S06 AMENDED Spec Section 03 52 00.pdf PDF
S06 ARCHITECTURAL DRAWINGS BULLETIN 2.pdf PDF
S06 IMG_4010.pdf PDF
S06 IMG_0098.pdf PDF
S06 IMG_4037.pdf PDF
S06 GE- Roofs.pdf PDF
S06 RFI Responses.pdf PDF
S06 STRUCTURAL DRAWINGS BULLETIN 1.pdf PDF
S06 ELECTRICAL DRAWINGS BULLETIN 1.pdf PDF
S06 MECHANICAL DRAWINGS BULLETIN 1.pdf PDF
S06 EXHIBIT D Calculation of Self Performed Work Amended.pdf PDF
S06 JA CCTV System Boilers 650-19-100.pdf PDF
36C24122R0084 0003.docx DOCX document
S06 Bldg 10 Boiler Plant REGULATED BLDG MATERIALS SURVEY REPORT.pdf PDF
S06 EXHIBIT C Past Performance Questionnaire.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
36C24122R0084 0001.docx DOCX document
S02 BD03252022 Drawings - 7b_Mechanical - Part 2.pdf PDF
S02 BD03252022 Drawings - 8a_Electrical - Part 1.pdf PDF
S02 BD03252022 - 100pc Const Docs - Specs Vol I.pdf PDF
S02 BD03252022 Drawings - 1_Hazardous Materials.pdf PDF
S02 BD03252022 Drawings - 2b_Civil - Part 2.pdf PDF
S02 BD03252022 Drawings - 3_Structural.pdf PDF
S02 BD03252022 Drawings - 4_Architecture.pdf PDF
S02 BD03252022 Drawings - 8b_Electrical - Part 2.pdf PDF
S02 BD03252022 Drawings - 9_Security Electronics.pdf PDF
S02 BD03252022 Drawings - 0_General.pdf PDF
S02 BD03252022 -Slope Stability Report.pdf PDF
S02 BD03252022 - Hazardous Materials Report Bldgs 9_10_.pdf PDF
S02 JA Lockset Boilers 650-19-100.pdf PDF
S02 JA Utility Plant Boilers 650-19-100.pdf PDF
S02 RI20220001 Wage Determinations.pdf PDF
S02 JA DDC Security Systems Boilers 650-19-100.pdf PDF
S02 VHA Supplemental Contract Requirements for Combatting COVID-19.pdf PDF
S02 EXHIBIT E VAAR Clause 852.219-77 Certificate of Compliance.pdf PDF
S02 EXHIBIT B Subcontractor Information and Consent Form.pdf PDF
S02 EXHIBIT D Calculation of Self Performed Work.pdf PDF
S02 EXHIBIT C Past Performance Questionnaire.pdf PDF
S02 EXHIBIT A Project Information Sheet for Contractors.pdf PDF
Show all 50

Y1NB--650-19-100 Replace Boilers in Bldg 10 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

01-07-2022

MECHANICAL ABBREVIATIONS

& SYMBOLS

M-001

JJPAP

2 3

'- 0

'-9

/2

'- 0

43'-1"

FUEL OIL TANK

4,000 GAL

FUEL OIL

TANK

30,000 GAL

FUEL OIL

TANK

30,000 GAL

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

01-07-2022

MECHANICAL

PHASING AND TEMPORARY WORK

SITE PLAN

MC101

GDSAP

PLAN

NORTH

ACTUAL

NORTH

4321 5

A

D

6.7 8 9 10

B

C

B.3

CC

BB

DD

MP304

(E)2"MPR

(E)2 1/2"MPS

(E)1"MPR

(E)2"MPR

(T)8"HPS

FROM NEW

STEAM HEADER

(T)4"HPS FROM

NEW STEAM

HEADER. REFER

TO DRAWING

MP101.

(E)8"HPS

(E)4"HPS

(E)

BLOWDOWN

TANK

OFFICE

E

(E) CONDENSATE

PUMP BELOW

(E) FEEDWATER

PUMPS

(E)CONDENSATE

STORAGE TANK

RESTROOM

E LOCKERS

E

MAINTENANCE

E

ANNEX

E

EXISTING

BOILER

NO. 3

EXISTING

BOILER

NO. 2

EXISTING

BOILER

NO. 1

(E)CHEMICAL

EQUIPMENT

(E)CHEMICAL

EQUIPMENT

SHOWER

F

(E)AIR

COMPRESSOR 2

(E)AIR

COMPRESSOR 1

(E)AIR

COMPRESSOR 3

(E)AC-UNIT-2

(E)AC-UNIT-1

(E)FUEL OIL PIPING

FROM (E)UNDERGROUND

STORAGE TANK

(E)FUEL OIL

PUMPS

(T)8"HPS FROM

TEMP. BOILERS

(T)4"HPS FROM

TEMP. BOILERS

(E)2-1/2"MPS UP

(E)8"HPS

(E)4"SPARE

UP FROM MAIN

STEAM HEADER

(E)6"HPS TO

SILENCER

(E)6"HPS

UP FROM MAIN

STEAM HEADER (E)4"HPS TO

IN-HOUSE

SUB HEADER

(T)1 1/2"HPS

MP304

(E)2 1/2"

(E)2"

(T)2 1/2"MPS

(T)2-1/2"

MPS UP

(T)4"PC

FROM ABOVE

(N)4"PC

(TYP.)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

PLAN

NORTH ACTUAL

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/1

/2

:5

:4

A

M

MJ101

MECHANICAL

TEMPORARY PIPING PLAN

MAIN LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP MK0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

TEMPORARY PIPING PLAN - MAIN LEVEL

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 EXISTING PIPING & EQUIPMENT TO REMAIN AS IS. REFER TO DRAWINGS MJ601, MJ602, MJ603

& MJ604 FOR PHASING.

2 NEW TEMPORARY PIPING.

3 PROVIDE TEMPORARY PIPE SUPPORTS FOR THE EXISTING PIPING, AS REQUIRED TO FACILITATE

THE NEW CONSTRUCTION. COORDINATE WITH ALL TRADES. REFER TO STRUCTURAL DRAWINGS

FOR ADDITIONAL DETAILS.

4 CONNECT TEMPORARY 4" PC INTO DISCHARGE FROM EXISTING CONDENSATE PUMP. REFER TO

DRAWING MJ604 FOR ADDITIONAL DETAILS.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702 AND M-703 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

TRADES.

Revisions: Date:

D

6.7 8 9 10

B

C

B.3

CC

BB

DD

MP304

(T)PRV-1

EXISTING

BOILER

NO. 3

EXISTING

BOILER

NO. 2

EXISTING

BOILER

NO. 1

(T)2-1/2"

HPS UP

(E)8"HPS

DOWN

MAINTENANCE

E

ANNEX

E

(E)8"HPS

(E)8"HPS UP

FROM MAIN

STEAM HEADER

(E)4"HPS UP

FROM MAIN

STEAM HEADER

(E)4"HPS

(TYP.)

(E)1"FOS

(E)2-1/2"NG

(E)2"FWPS

(E)2"FWPD

(E)2"FWPD

(E)1"V

(E)1-1/2"V

(E)2"FOS

(E)1-1/2"FOR

(E)2"FWPD

UP FROM MAIN

STEAM HEADER

(T)2-1/2"

MPR UP

(E)2-1/2"

MPS FROM

EXIST. STEAM

HEADER

(E)1"HPC

(E)2-1/2"MPS

(E)6"HPS TO

SILENCER

(E)8" BLIND

FLANGE

MP304

(E)6"HPS

FROM EXIST. BOILERS

(T)1 1/2"HPS

(T)4"PC

UP

(T)1-1/2"

MPS DN

(E)4"HPS

(TYP.)

(E)UNIT

HEATER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/1

/2

:5

:4

A

M

MJ102

MECHANICAL

TEMPORARY PIPING PLAN

BOILER LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP MK0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

TEMPORARY PIPING PLAN - BOILER LEVEL

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 EXISTING PIPING & EQUIPMENT TO REMAIN AS IS. REFER TO DRAWINGS MJ601, MJ602, MJ603

& MJ604 FOR PHASING.

2 NEW LINE SIZE 300# TRIPLE OFFSET BUTTERFLY VALVES WITH WARM-UP BYPASS.

3 PROVIDE TEMPORARY PIPE SUPPORTS FOR THE EXISTING PIPING, AS REQUIRED TO FACILITATE

THE NEW CONSTRUCTION. COORDINATE WITH ALL TRADES. REFER TO STRUCTURAL DRAWINGS

FOR ADDITIONAL DETAILS.

4 TEMPORARY PRESSURE REDUCING STATION (T)-PRV-1 - SHALL MATCH EXISTING PRV SERVING

THE MPS FOR THE CLINIC (BDLG 7) AND WAREHOUSE (BDLG 8). LOCATE PRV IN ACCESSIBLE

LOCATION.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

D

6.7 8 9 10

B

C

B.3

CC

BB

DD

MP304

(T)8"HPS

FROM TEMP.

BOILERS

(E)HPS UP

FROM EXIST.

STEAM HEADER

(E)6"HPS UP FROM

EXIST. BOILER (TYP.)

(E)BOILER

FLUE STACK

(TYP.)

(E)DEAERATOR

CATWALK LEVEL

ANNEX

(E)16" STEAM SILENCER

UP THRU ROOF

MP304

(T)8"HPS DN

(T)1-1/2"HPS

DN TO (T)PRV-1

(T)2-1/2"MPS DN

(T)4"PC FROM EXIST.

CONDENSATE PUMP

TO TEMP. BOILERS

TRAILERS

(T)4"PC DN

(T)2-1/2"MPR FROM

TEMP. BOILERS

(TYP.)

LOW ROOF

EXISTING CATWALK

EXISTING CATWALK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/1

/2

:5

:4

A

M

MJ103

MECHANICAL

TEMPORARY PIPING PLAN

CATWALK LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP MK0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

TEMPORARY PIPING PLAN - CATWALK LEVEL

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 REFER TO DRAWING MC101 FOR CONTINUATION.

2 PROVIDE TEMPORARY PIPE SUPPORTS FOR THE EXISTING PIPING, AS REQUIRED TO FACILITATE

THE NEW CONSTRUCTION. COORDINATE WITH ALL TRADES. REFER TO STRUCTURAL DRAWINGS

FOR ADDITIONAL DETAILS.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

MECHANICAL STEAM GENERATION

TEMPORARY STEAM BOILER SYSTEM

PHASING (RENTAL & TEMPORARY )

MJ601

GDS/AHTMAP

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

01-07-2022

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

01-07-2022

MECHANICAL

TEMPORARY AND FINAL HPS PIPING

INSTALLATION SEQUENCE

MJ602

GDS/MKAP

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

01-07-2022

MECHANICAL

TEMPORARY AND FINAL HPS PIPING

INSTALLATION SEQUENCE

MJ603

GDS/RHDAP

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

MR PROJECT NO: 0506-0011

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

100% CORRECTED

CONSTRUCTION DOCUMENTS

01-07-2022

MECHANICAL

TEMPORARY AND FINAL CONDENSATE

PIPING INSTALLATION SEQUENCE

MJ604

GDSAP

UP

A

D

6.7

8 9 10B

C

B.3

CC

BB

DD

(E)4"HPS

(E)2 1/2"MPR

(E)1 1/2"MPR

(E)2"MPR

(E)2"MPR

(D)2"

(D)1 1/2"

(D)1"

(D)1"

(D)2"FW

(D)1 1/2"

(D)1"

(D)2"NG

(D)10"HPS

(D)1"HPR

(D)1"HPR

(D)2"MPR(D)10"HPS

(D)1 1/2"HPR

(D)2"FW

(D)1 1/2"

(D)2"FWPD (D)2"FW

(D)2"FW

(D)2 1/2"

(D)1"FOR (D)2 1/2"

(D)1 1/2"FOS

(D)2 1/2"

(D)1"

(D)2"

32Ø

(D)1"

(D)1"

(D)2 1/2"

(D)1"FOR(D)1"FOR

(D)2 1/2"

(D)1 1/2"FOS

(D)2 1/2"

(D)2 1/2"

(D)2"

(D)2"FW

(D)2"FW

(D)2"FWPD

32Ø

32Ø

(D)1 1/2"FOS

(D)2 1/2"

(D)2"

(D)2"FWPS

(D)2"FWPD

(D)Water

(D)AIR

COMPRESSOR

(D)AIR

COMPRESSOR

(D)1 1/2"BO

(D)2"BO

(D)1 1/2"BO

(D)2"BO

(D)2"BD

(D)1 1/2"BO

(D)2"FOR

(D)2"FOS

(D)2"FOR

(D)2"FOS

(E)1"MPR

(E)2 1/2"MPS

(E)2"MPR

LOCKERS

RESTROOM

MAINTENANCE

(E)8"HPS

ANNEX

(D)SURGE TANK

(D)CHEMICAL

EQUIPMENT

(D)CHEMICAL

EQUIPMENT

ACB-10-002

(E)AIR

COMPRESSOR

(D)AC-UNIT-1

(D)AC-UNIT-2

(D)AC

UNITS

(D)AC

UNITS

BREAK ROOM

SHOWER

(D) FEEDWATER

PUMPS

(D) FUEL OIL

PUMPS

(D) BLOWDOWN TANK

(D)8"HPS

(D)4"SPARE

(D)6"HPS

12 4

(E)NATURAL GAS

GAS TRAIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/1

/2

:5

:1

A

M

MD101

MECHANICAL

DEMOLITION PLAN

MAIN LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP AHTM0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 DEMOLITION PLAN - LOWER LEVEL

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 REFER TO ARCHITECTURAL & STRUCTURAL DRAWINGS FOR CATWALK DEMOLITION SCOPE.

2 ONCE NEW CONDENSATE SYSTEM IS OPERATIONAL - DISCONNECT AND REMOVE THE EXISTING

CONDENSATE RECEIVER, PUMPS AND CONTROL PANEL. REFER TO DRAWING MP101 FOR

ADDITIONAL DETAILS.

3 ONCE TEMPORARY BOILERS ARE OPERATIONAL, DISCONNECT AND REMOVE THE EXISTING FUEL

OIL PUMPS, PIPING AND EXISTING UNDERGROUND TANKS. COORDINATE WORK WILL ALL TRADES.

REFER TO ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL PHASING INFORMATION.

4 ONCE TEMPORARY BOILERS ARE OPERATIONAL, ISOLATE AND PURGE EXISTING NATURAL GAS

PIPING WITHIN THE BOILER PLANT FROM PIPING DOWNSTREAM OF THE EXISTING SHUT-OFF

VALVE AT THE GAS TRAIN. PIPING DOWNSTREAM TO BE DISCONNECTED AND REMOVED.

5 TEMPORARY PIPING TO REMAIN AS IS DURING DEMOLITION. PROVIDE TEMPORARY PIPE

SUPPORTS AS REQUIRED TO FACILITATE DEMOLITION.

6 ONCE TEMPORARY BOILERS ARE OPERATIONAL, DISCONNECT & REMOVE EXISTING FEEDWATER

PUMPS & ALL ASSOCIATED PIPING, POWER, ETC.

7 ONCE TEMPORARY BOILERS ARE OPERATIONAL - DISCONNECT & REMOVE EXISTING CONDENSATE

STORAGE TANK AND CONDENSATE TRANSFER PUMPS & ALL ASSOCIATED PIPING, POWER, ETC.

8 DISCONNECT & REMOVE EXISTING RADIANT CEILING PANELS IN ITS ENTIRETY.

9 DISCONNECT & REMOVE EXISTING BASEBOARD HEATER AND SPLIT SYSTEM IN ITS ENTIRETY.

10 DISCONNECT & REMOVE EXISTING BASEBOARD HEATER IN ITS ENTIRETY.

11 DISCONNECT & REMOVE ALL EXISTING UNIT HEATERS AND ASSOCIATED PIPING, CONTROLS, POWER, SUPPORTS, ETC.

12 DISCONNECT & REMOVE EXISTING CHEMICAL TANK AND ALL ASSOCIATED PIPING, POWER, ETC.

13 DISCONNECT AND REMOVE EXISTING GAS SERVICE FROM EXISTING GAS TRAIN UNDERGROUND

TO UNIT HEATER IN EXISTING WATER TANK (BUILDING 11). CAP EXISTING PIPE.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

D

6.7 8 9 10

B

C

B.3

CC

BB

DD

(E)4"HPS

(D)1"HPR

(E)4"HPS

(D)2-1/2"MPS

(D)1"HPR

(D)1"HPR

(D)2"HPR

(D)1"BO(D)1"BO(D)1"BO

(D)2"FW

(D)2"FWPD

(D)2"FWPS

(D)2 1/2"NG

(D)1 1/2"V

(D)2"FWPD

(D)2"FWPD

(D)2"FWPS

(D)2 1/2"NG

(D)1"V

(D)1 1/2"V

(D)2"FW

32Ø 32Ø32Ø

(D)1"HPC

(D)2"FWPS

(D)4"HPS

(D)2"FWPD

(D)2"FWPD

(D)2"NPW

(D)1 1/2"CW

(D)2"FWPS

(D)2"FWPD

(D)1 1/2"FOR

(D)2"FOS

(D)2"FWPD

(D)2"FWPD

(D)2"FWPD

(D)1 1/2"FOR

(D)2"FOS

(D)1 1/2"V

(D)1"V

(D)2"FW (D)2"FW (D)1 1/2"FOR

(D)2"FOS

(D)1"V

(D)1"FOS

(D)1"HPR

(D)4"HPS

(D)1"HPR

(D)1"HPC

(D)1"HPC

(D)BOILER (D)BOILER (D)BOILER

(D)2"HPR

(D)2-1/2"MPS

(D)16"HPS

(D)2 1/2"NG

(T)PRV-1

(D)2"NPW

(D)2"FWPD

(D)8"HPS (D)6"HPS

(TYP.)

(TYP.)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/1

/2

:5

:2

A

M

MD102

MECHANICAL

DEMOLITION PLAN

BOILER LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP AHTM0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

DEMOLITION PLAN - BOILER LEVEL

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 REFER TO ARCHITECTURAL & STRUCTURAL DRAWINGS FOR CATWALK DEMOLITION SCOPE.

2 TEMPORARY PIPING TO REMAIN AS IS DURING DEMOLITION. PROVIDE TEMPORARY PIPE

SUPPORTS AS REQUIRED TO FACILITATE DEMOLITION.

3 ONCE TEMPORARY BOILERS ARE OPERATIONAL, DISCONNECT AND REMOVE THE EXISTING FUEL

OIL PUMPS, PIPING AND EXISTING UNDERGROUND TANKS. COORDINATE WORK WILL ALL TRADES.

REFER TO ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL PHASING INFORMATION.

4 ONCE TEMPORARY BOILERS ARE OPERATIONAL, ISOLATE AND PURGE EXISTING NATURAL GAS

PIPING WITHIN THE BOILER PLANT FROM PIPING DOWNSTREAM OF THE EXISTING SHUT-OFF

VALVE AT THE GAS TRAIN. PIPING DOWNSTREAM TO BE DISCONNECTED AND REMOVED.

5 DISCONNECT & REMOVE EXISTING BOILER STACKS. FILL OPENING & PATCH ROOF. REFER TO

ARCHITECTURAL & STRUCTURAL DRAWINGS FOR ADDITIONAL DETAILS.

6 ONCE TEMPORARY BOILERS ARE OPERATIONAL, DISCONNECT & REMOVE EXISTING FEEDWATER

PUMPS & ALL ASSOCIATED PIPING, POWER, ETC.

7 DISCONNECT & REMOVE EXISTING GENERATOR, DAY TANK, CONCRETE DIKE, ASSOCIATED PIPING, POWER, ETC. REFER TO ARCHITECTURAL DRAWING AD102 AND ELECTRICAL DRAWING ED102

FOR ADDITIONAL DETAILS.

8 ONCE TEMPORARY BOILERS ARE OPERATIONAL - DISCONNECT & REMOVE EXISTING CONDENSATE

STORAGE TANK AND CONDENSATE TRANSFER PUMPS & ALL ASSOCIATED PIPING, POWER, ETC.

9 DISCONNECT & REMOVE ALL EXISTING UNIT HEATERS AND ASSOCIATED PIPING, CONTROLS,

POWER, SUPPORTS, ETC.

10 DISCONNECT & REMOVE WALL MOUNTED EXHAUST FAN AND ASSOCIATED DUCTWORK, POWER,

ETC.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

D

6.7 8 9 10

B

C

B.3

CC

BB

DD

(D)6"HPS

(D)8"HPS

(D)10"HPS

(D)10"HPS

(D)8"HPS

(D)10"HPS

(D)10"HPS

(D)10"HPS

(D)2"FOR

(D)2"FOS

(D)1"HPR

(D)1"HPS(D)1"HPS

(D)3"NG

(D)1"HPR

(D)1"HPS

(D)2"FWPD

(D)3"NG

(D)1"HPR

(D)2"FOR

(D)2"FWPD

(D)1"HPR

(D)6"SV

(D)2"FOR

(D)2"FOS

(D)2"FOR

(D)3"HPS

(D)2"FOR

(D)2"FOS

(D)AHU

(D)NG (D)2 1/2"NG (D)2 1/2"NG

32Ø32Ø

CATWALK LEVEL

ANNEX

(T)8"

(E)HPS UP FROM

MAIN STEAM

HEADER

1 1 1

2 2

TEMPORARY

PIPING FROM

TEMPORARY

BOILERS

(TYP)

LOW ROOF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/1

/2

:5

:2

A

M

MD103

MECHANICAL

DEMOLITION PLAN

CATWALK LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP AHTM0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

DEMOLITION PLAN - CATWALK LEVEL

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 DISCONNECT & REMOVE HPS PIPING FROM EXISTING BOILERS TO EXISTING VALVE AT HEADER.

2 DISCONNECT & REMOVE EXISTING BOILER STACKS.

3 DISCONNECT & REMOVE EXISTING DEAERATOR & ALL ASSOCIATED PIPING, CONTROLS, POWER, ETC.

4 DISCONNECT & REMOVE EXISTING AIR HANDLER AND ASSOCIATED DUCTWORK, CONTROLS,

POWER, ETC.

5 TEMPORARY PIPING TO REMAIN AS IS DURING DEMOLITION. PROVIDE TEMPORARY PIPE

SUPPORTS AS REQUIRED TO FACILITATE DEMOLITION.

6 DISCONNECT & REMOVE ALL EXISTING UNIT HEATERS AND ASSOCIATED PIPING, CONTROLS,

POWER, SUPPORTS, ETC.

7 DISCONNECT & REMOVE EXISTING INTAKE LOUVER AND INTAKE DUCT TRANSITION, PREPARE

OPENING FOR NEW BLAST RATED LOUVER.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

D

6.7 8 9 10

B

C

B.3

CC

BB

DD

(D)RD

(D)3"RD

(E)4"V

(D)2"

(D)2"

(E)4"

(D)2"

(D)2"

(D)2"

32"Ø

(D)16"

(D)2"

(D)2"

(D)3"RD

32"Ø

(D)RD

1 1

(TYP)

LOW ROOF

HIGH ROOF

6 6

32Ø

EXISTING ROOF

ACCESS HATCH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/1

/2

:5

:2

A

M

MD104

MECHANICAL

DEMOLITION PLAN

ROOF LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP AHTM0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

DEMOLITION PLAN - ROOF LEVEL

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 DISCONNECT & REMOVE EXISTING BOILER STACKS. FILL OPENING & PATCH ROOF. REFER TO

ARCHITECTURAL & STRUCTURAL DRAWINGS FOR ADDITIONAL DETAILS.

2 REFER TO PLUMBING DRAWINGS FOR PLUMBING SCOPE.

3 DISCONNECT & REMOVE EXISTING EXHAUST FAN, EXISTING ROOF CURB TO REMAIN AS IS.

PREP CURB FOR INSTALLATION OF NEW EXHAUST FAN.

4 DISCONNECT & REMOVE EXISTING STEAM SILENCER AND DISCHARGE PIPE UP THROUGH THE

ROOF. PATCH ROOF OPENING. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR

ADDITIONAL DETAILS.

5 DISCONNECT & REMOVE THE EXISTING ROOF MOUNTED EXHAUST FAN AND CURB. PATCH ROOF.

REFER TO ARCHITECTURAL AND STRUCUTRAL DRAWINGS FOR ADDITIONAL DETAILS.

6 DISCONNECT & REMOVE THE EXISTING ROOF MOUNTED HOODS AND CURB. PATCH ROOF. REFER

TO ARCHITECTURAL AND STRUCUTRAL DRAWINGS FOR ADDITIONAL DETAILS.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

D

6.7 8 9 10

B

C

B.3

CC

BB

DD

E

MP303

CONDENSATE

RECEIVER

BDS-10-01-001

CRU-10-01-001

BLOW

DOWN

SEPERATOR

CS-10-01-001

CONDENSATE

STORAGE

TANK

ACHP-10-001

ACHP-10-01-01A

FOM-10-01-001FOP-10-01-001

FWP-10-01-003

FWP-10-01-002

FWP-10-01-001

FEEDWATER

PUMPS

FUEL

PUMP

SKID

FUEL

OIL

FILTERATION

MAINTENANCE

MAINTENANCE -

ADDITION

LOCKERS

RESTROOM

OFFICE

BREAK ROOM

ANNEX

GENERATOR

FUEL

PUMP

SKID

FOP-10-01-002

AIR

COMPRESSOR

(E)AIR

COMPRESSOR

FLASH

TANK

SHOWER

FT-10-01-001

UH-10-01-001

CTP-10-01-001

CTP-10-01-002

UH-10-01-003

ACHP-10-01-03A

ACHP-10-01-02A

(N)CORROSIVE

COMPOUNT

TANK

(N)CORROSIVE

COMPOUNT

TANK

(N)CORROSIVE

COMPOUNT

TANK

TRANSFORMER

CONDENSATE

RECEIVER

CRU-10-01-002

UH-10-01-002

FOM-10-01-002

FUEL

OIL

FILTERATION

WATER TREATMENT

SKID

MP302

MP303

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/1

/2

:0

:2

A

M

MQ101

MECHANICAL

EQUIPMENT ARRANGEMENT PLAN

MAIN LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP AHTM0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

EQUIPMENT ARRANGEMENT PLAN - MAIN LEVEL

GENERAL SHEET NOTES:

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

D

6.7 8 9 10

B

C

B.3

CC

BB

DD

E

BOILER CONTROL

PANEL CLEARANCE

(R E F

TU

B E

P U

LL

(R E F

TU

B E

P U

LL

(R E F

TU

B E

P U

LL

C L

C L

C L

BOILER CONTROL

PANEL

CLERANCE

BOILER CONTROL

PANEL

CLERANCE

D/A-10-03-001

MP303

MP303

BOILER REAR

DOOR CLERANCE

BOILER REAR

DOOR CLERANCE

BOILER REAR

DOOR CLERANCE

B-10-02-001 B-10-02-002 B-10-01-003

DEAREATOR

(N)BOILER

(N)BOILER

(N)BOILER

ECONOMIZER

ECONOMIZER

ECONOMIZER

FHX-10-02-001

FHX-10-02-002 FHX-10-02-003

ACHP-10-02-04A

MP302

GENERATOR

ROOM

BOILER LEVEL

CONTROL ROOM

ERV-10-02-001

UH-10-03-004

UH-10-03-005

UH-10-03-006

UH-10-02-003

UH-10-03-001 UH-10-03-002

UH-10-03-003

DT-10-02-001

TRANSFORMER

UH-10-02-004

ACHP-10-02-05A

ACHP-10-02-06A

ACHP-10-02-07A

BOILER FRONT

DOOR SWING

(TYP.)

UH-10-02-007

UH-10-02-001

DWH-10-03-001

UH-10-02-002

ACHP-10-02-06B

ACHP-10-02-07B

MP302

EXHAUST MUFFLER

REFER TO MH102

FOR DETAILS3

MP303

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/1

/2

:0

:2

A

M

MQ102

MECHANICAL

EQUIPMENT ARRANGEMENT PLAN

BOILER LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP AHTM0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

EQUIPMENT ARRANGEMENT PLAN - BOILER LEVEL

GENERAL SHEET NOTES:

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

D

6.7 8 9 10

B

C

B.3

CC

BB

DD

E

(E)4"HPS

(E)2 1/2"MPR

(E)1 1/2"MPR

(E)2"MPR

(N)8" HPS DROP

MP301

MP302

MP303

MP303

(N)3/4" HPS

UP TO AMINE-

CHEMICAL FEED

(N)6" HPS

SPARE (N)4" HPS TO

BUILDING 9

(N)8" HPS TO

BUILDING 9

(N)8" HPS TO

BUILDING 1

(N)6" HPS RISE

TO BOILER 1

(N)6" HPS RISE

TO BOILER 2

(N)6" HPS

RISE TO

BOILER 3

(N)8" HPS UP

TO STEAM TEST

SILENCER

(N)4" HPS UP

TO DEAREATOR

BDS-10-01-001

BLOW

DOWN

SEPERATOR

CONDENSATE

RECEIVER

CONDENSATE

STORAGE

TANK

CS-10-01-001

(N)3"PC

(N)4"HPS

(N)2"BD

(N)2"FWPS

(E)2"MPR

(N)8"HPS

(N)3"NG

ACHP-10-001

2"FWPS UP

REFER TO DRAWING

MP102 FOR CONTINUATION

(N)2 1/2"FWPD

(N)2 1/2"FWPD

FUEL

PUMP

SKID

(N)8"HPS

(E)2 1/2"MPS

(E)1"MPR

(E)2"MPR

RUN FUEL OIL

PIPING IN NEW

TRENCH.

(N)1"BO

(E)8"HPS

(N)4"HPS

(N)2"BD UP

(N)2"BD UP

(N)2"BD UP

(N)2"BD UP

(N)2"FWPD UP

(N)1"BD UP

(N)1"BO UP

(N)2"FWPD UP

(N)1"BD UP

(N)1"BO UP

(N)2"BD UP

(N)2"FWPD UP

(N)1"BD UP

(N)1"BO UP

(N)2"BD UP

(N)2"FWPD UP

(N)STEAM TRAP

(N)1 1/2"HPR

UP

(N )1

M P R

FEEDWATER

PUMPS

FWP-10-01-003

FWP-10-01-002

FWP-10-01-001

(E)8" HPS TO

BUILDING 1

(N)2"FOR

(N)2"FOS

(N)2"FOS

(N)2"FOR

(N)2"FOS AND (N)2" FOR DN IN

TRENCH PIT. REFER TO DRAWING

MC101 FOR CONTIINUATION.

(TYP. OF 4)

(N)1"FOS &

(N)1"FOR UP

TO BOILER 3.

(N)1"FOS &

(N)1"FOR UP

TO BOILER 2.

FUEL

OIL

FILTERATION

GENERATOR

FUEL

PUMP

SKID

FLASH

TANK

FT-10-01-001

ACHP-10-01-01A

(N)1"FOS &

(N)1"FOR UP

TO BOILER 1.

(N)5"HPR

(N )4 H P S

(N)4"PC(N)4"PC

(N )2

S C W

TYPICAL

INSULATION

ON PIPING

1' - 1 1/2"

(N)4"HPS

FOP-10-01-002

FOM-10-01-001

FOP-10-01-001

(N)6"SV

(N)1"MPR

(N)1"MPR

(N)2"MPR

(N)1 1/2"MPR

(N)3"HPS

(N)4"SV

(N)3"HPS

(N)10"HPS

10-PRV-01-001

10-01-PRV-002

(N)4" HPS TO

PRV FOR UNIT

HEATERS

(N)2-1/2"MPS

DROP

(N)1/2"CF

(N )1 C F

(N)1/2"CF

(N)2"FOR

RUN 2"FOR AND

2"FOS IN TRENCH.

(N)2"BD

(N)4"SV UP

(N)2"MPR

(N)2"MPR

(N)1 1/4"HPR

(N)1"MPR

(N)4"PC

DROP

(N)1" HPS UP TO

MASTER STEAM

PRESSURE

TRANSMITTER

(N)6" SV UP

RE:DRAWING MP102

(N)2"FWPD UP

TO BOILER #1

(N)2"FWPD UP

TO BOILER #2

(N)2"FWPD UP

TO BOILER #3

(N)2"FWPD(N)2"FWPD

(N)2"FWPD

(N)2"FWPD

(N)2"FWPD

UH-10-01-001

UH-10-01-002

(N)2 1/2"FWPD

(N)2 1/2"FWPD

(N)3"NG UP

RE: DRAWING MP102

OFFICE

(N)4"MPS UP

SEE DWG

MP103 FOR

CONT.

(N)2"MPR

(N)4"OFL

(N)2"FWPD

(N)2"FOS

(N)2"FOR

(N)2"FWPD

(N)3/4"MPS

1-1/4"MPC

DOWN FROM

ABOVE

(N)2"FOS

(N)2 1/2"MPS

(N)3/4"MPR UP

(N)4"SV UP

THRU ROOF

(N)3/4"MPR

CTP-10-01-001

CTP-10-01-002

UH-10-01-003

(N)2"D

(N)4"FWPS

FUEL OIL

PIPING DROP

(N)CORROSIVE

COMPOUNT

TANK

(N)CORROSIVE

COMPOUNT

TANK

CHEMICAL

INJECTION

PUMPS

(N)CORROSIVE

COMPOUNT

TANK

(N)1"FOS

(N)1"FOR

(N)1"FOS

(N)1"FOR

ANNEX

(N)4"PC

(N)3/4"MPS(N)3/4"MPS

(N)3/4"MPR

TRANSFORMER

BREAK ROOM

ACHP-10-01-03A

ACHP-10-01-02A

(N)4"MPS

(N)RS

& RL

(TYP.)

(N)3/4"PC

RS, RL, AND PC

PIPING UP IN

PLUMBING CHASE

(TYP.)

CO

CO

T

T

T

CO

(N)3/4"MPS

(N)1-1/2"MPR

UP

LOUVER

L-10-01-001

EXISTING

GAS TRAIN

TO REMAIN AS IS

(N)3/4"RS & RL

UP

(N)3/4"MPS &

MPR UP

3' - 4"

1' - 2"

1' - 4"

1' - 6"

(N)1 1/4"MPR

(N)1 1/2"HPR9

(N)1"FOS

(N)1"FOR

(N)3/4"MPS

(N)8"HPS

(N)1 1/2"MPR

(N)1 1/4"MPR

(N)2"MPR

UP

(N)3"PC

(N)8"HPS

CRU-10-01-002

(E)8"HPS

(E)10"HPS

(N)6"MPR

(N)3"HPR

(N)3"CTPD (N)3"CTPD

(N)5"HPR

(E)4"HPS

(N)3"HPS RISE

TO DOMESTIC

WATER

HEATER

(N)6"SV

MP101

FOM-10-01-002

WATER TREATMENT

SKID

(N)1"FOR

(N)1"FOS

MP302

(N)2"FOS

(N)2"FOR

(N)1 1/4"MPR 12

(N)PIPE HANGER TYP

(N)PIPE HANGER TYP

(N)PIPE HANGER

TYP

(N)PIPE HANGER

TYP

(N)PIPE HANGER

TYP

(N)4"PC

MP303

(N)2 1/2"MPS

(N)2 1/2"MPS

E

MP302

MP302

MAIN

STEAM HEADER

(N)2"FOS

(N)2"FOR

(N)2"FOR

(N)2"FOS

(N)1 1/4"MPR

(N)3"HPS

(N)8"HPS(N)2"MPR

(N)2"FWPS

PIPE

HANGER (TYP.)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/1

/2

:5

:5

A

M

MP101

MECHANICAL

PIPING PLAN

MAIN LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP AHTM0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

NEW WORK PLAN - MAIN LEVEL

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 FEEDWATER ISOLATION VALVES FOR EACH BOILER SHALL BE LOCATED IN AN ACCESSIBLE

LOCATION.

2 RUN NEW FUEL OIL PIPING IN NEW TRENCH IN THE EXISTING LOWER LEVEL SLAB. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS.

3 1"FOS & 1"FOR UP TO GENERATOR ON BOILER LEVEL.

4 ALL FUEL PIPING MUST BE DOUBLE CONTAINMENT PIPE. BASIS OF DESIGN FOR DOUBLE

CONTAINMENT PIPE WITHIN THE BUILDING - TRICON DOUBLE-CON.

5 3/4" PUMPED CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM

1/8 INCH PER FOOT. TERMINATE TO FUNNEL DRAIN IN WALL.

6 REFER TO DRAWING MH601 FOR REFRIGERANT PIPING DIAGRAM.

7 NEW TRENCH FOR FUEL OIL PIPING. REFER TO DETAIL 6 ON DRAWING MP501 AND

STRUCTURAL DRAWINGS FOR DETAILS.

8 3/4" PUMPED CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM

1/8 INCH PER FOOT. ROUTE TO NEAREST FLOOR DRAIN.

9 PROVIDE SCH 40 STEEL PIPE SLEEVE IN EXTERIOR/FOUNDATION WALL. PROVIDE LINK-SEAL IN

ANNUL SPACE BETWEEN PIPE AND SLEEVE. REFER TO DETAIL 5 ON DRAWING MP502.

10 INSTALL NEW NATURAL GAS PIPING DOWNSTREAM OF THE EXISTING SHUT-OFF VALVE AT THE

GAS TRAIN. REFER TO DRAWING MP604 FOR ADDITIONAL DETAILS.

11 COORDINATE ROUTING OF NEW PIPING IN AREA OF NEW STAIRS. DO NOT LOCATE ANY

EQUIPMENT REQUIRING MAINTENEANCE ACCESS UNDER THE STAIRS. REFER TO STRUCTURAL

DRAWINGS FOR ADDITIONAL DETAILS.

12 SAFETY RELIEF VALVE - REFER TO SCHEDULES AND DETAIL 8 ON DRAWING MP503 FOR

ADDITIONAL DETAILS.

13 ALL PIPING IN THE BOILER PLANT MUST BE FORGED STEEL.

14 ALL BLOWDOWN VALVES MUST BE ACCESSIBLE.

15 ALL MAIN STEAM VALVES SHALL HAVE A FACTORY INSTALLED 1" BYPASS LINE WITH GLOBE

VALVE FOR WARM-UP. NOT SHOWN FOR CLARITY.

16 4" CTPD UP TO DA FROM CONDENSATE TRANSFER PUMP DISCHARGE HEADER. REFER TO

DRAWINGS MP601, MP602 AND MP603 FOR ADDITIONAL DETAILS. REFER TO DRAWING MP102

FOR CONTINUATION.

17 NEW 1" FOS AND 1" FOR FROM NEW 4,000 UNDERGROUND TANK. REFER TO DRAWING MC101

AND CIVIL DRAWINGS FOR ADDITIONAL DETAILS. COORDINATE ROUTING OF PIPES WITH ALL

TRADES.

18 BOILER WATER TREATMENT SYSTEM TO BE PROVIDED UNDER A SEPARATE CONTRACT.

CONTRACTOR SHALL COORDINATE SPACE REQUIREMENTS WITH WATER TREATMENT VENDOR AND

ALL TRADES. WATER TREATMENT SKID BASIS OF DESIGN BARCLAY WATER MANAGEMENT INC.

CONTACT: ERIC NADEAU 774-400-4259 OR ALEX JARVIS 617-945-3046.

19 PROVIDE 8" HPS WITH BLIND FLANGE FOR FUTURE RENTAL BOILER. REFER TO DRAWING MP601

FOR ADDITIONAL INFORMATION.

20 1" LPG PIPE TO LPG CYLINDERS - REFER TO DRAWING MC101 FOR CONTINUATION. REFER TO

DETAIL 2 ON DRAWING M-506 AND ARCHITECTURAL, CIVIL AND STRUCUTRAL DRAWINGS.

21 PROVIDE 4" PC WITH BLIND FLANGE FOR FUTURE RENTAL BOILER. REFER TO DRAWING MP603

FOR ADDITIONAL INFORMATION.

22 1" HPS UP TO WATER FILL CONNECTION (HYDRO STATIC TESTING). REFER TO DRAWING MP602

FOR ADDITIONAL DETAILS.

23 4"PC FROM CONDENSATE RETURN UNITS (CRU-10-01-001/002) UP TO TOP INLET ON

CONDENSATE STORAGE TANK. COORDINATE ROUTING WITH ALL TRADES.

24 COORDINATE LOCATIONS OF NEW FUEL OIL EQUIPMENT WITH ALL TRADES.

25 NEW MAXON AUTOMATIC GAS SHUTOFF VALVE. REFER TO DRAWING MP604 FOR ADDITIONAL

DETAILS. LOCATE VALVE IN ACCESSIBLE LOCATION, COORDINATE LOCATION WITH ALL TRADES.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE. COORDINATE WITH ALL

TRADES.

SCALE: 1/2" = 1'-0"2

PART PLAN - PIPE PENETRATIONS

D

6.7 8 9

B

C

B.3

CC

BB

DD

E

D/A-10-03-001

MP301

MP302

MP303

DEAREATOR

B-10-02-001 B-10-02-002 B-10-01-003

(N)BOILER

(N)BOILER

(N)BOILER

(N)6"SV

(N)2"FWPS

(N)4"OFL

(N)2"FWPD

(N)2"BD

(N)1"BD

(N)2"BD

(N)1"BD

(N)2"BD

(N)2"BD

(N)2"BD

(N)3"NG

(N)3"NG

(N)3"NG

(N)1"CF

(N)1"CF

(N)1"CF

(N)1/2"FWS

(N)1"CF

(N)3"NG

ACHP-10-02-04A

(N)3"NG

(N)6" HPS

RISE TO

BOILER 1

(N)6" HPS RISE

TO BOILER 2

(N)6" HPS

RISE TO

BOILER 3

(N)8" HPS UP

TO STEAM TEST

SILENCER

(N)3" HPS UP

TO DEAREATOR

ERV-10-02-001

UP FROM BELOW

RE:DRAWING MP101

UP THRU ROOF

(N)3"NG 1

(N)3"NG(N)3"NG

BOILER TUBE PULL

(TYPICAL)

(N)2"FWPD

GENERATOR

ROOM

ANNEX

CONTROL ROOM

BOILER LEVEL

(N)2"BD

DOWN

(N)2"BD

DOWN

(N)2"BD

DOWN

(N)1"FOS

(N)1"FOR

(UP FROM LOWER LEVEL

RE: DRAWING MP101)

(N)4"SV UP UH-10-02-003

2"FWPD UP

FROM LOWER LEVEL

UP FROM LOWER LEVEL

2"FWPD UP

FROM LOWER LEVEL

DT-10-02-001

(N)2-1/2"MPS UP

(N)3/4"MPR DN

(N)3/4"MPS

(N)3/4"MPR

(N)4"CTPD

DN. TO SURGE

TANK BELOW

(N)4"FWPS

UH-10-02-004

(N)3/4"MPS

(N)3/4"MPR

ACHP-10-02-06A

ACHP-10-02-07A

ACHP-10-02-05A

(N)4"SV FROM

BELOW UP

THRU ROOF

(N)3/4"MPS & MPR DN

(N)RS & RL (N)3/4"PC

RS, RL, AND PC

PIPING DN 3

(N)RS & RL

(N)RS & RL

(TYP.)

SECURITY

IT

(N)3/4"RS & RL

(N)3/4"RS & RLTYP.

(N)3/4"RS & RL

L-10-02-003

(UP TO

CATWALK LEVEL)

RE: DRAWING

MP103

LOUVER

L-10-02-004

(ABOVE DOOR)

TRANSFORMER

6"SV UP

1-1/4"LPR

1-1/2"MPR UP

4"FWPS DN TO

FEEDWATER PUMPS

FROM DA

RE:DWG MP101

3"NG UP

(N)3"NG UP

RE: DRAWING MP102

3"NG

DOWN FROM ABOVE

RE:DRAWING MP103

(N)1 1/4"LPR

UP TO 10-PRV-1

STATION 6

(N)3/4"MPR

FROM UNIT

HEATERS

(T)4"PC

(T)2 1/2"

(TYP.)

MAINTENACE

ADDITION

UH-10-02-002

(N)2" HPS

UP/DN

UH-10-02-001

(N)6"SV

EXHAUST MUFFLER

REFER TO MH102

FOR DETAILS

(N)1"LPG

(N)1"LPG

(N)3/4"LPG

(N)3/4"LPG (N)3/4"LPG

(TYP.)

(N)1"LPG

ACHP-10-02-06B

ACHP-10-02-07B

4"PC

UP FROM BELOW

RE: DWG MP101

MP303

L-10-02-005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NORTH

KEYPLAN

HAZARDOUS MATERIALS

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, STONEHAM, MA 02180

PHONE: (781)275-6050

CIVIL / STRUCTURAL

LABELLA

303 SOUTH STREET, SUITE 201, ROCHESTER, NY 14614

PHONE: (585)454-6110

ARCHITECTURAL

OCULUS INC.

1 SOUTH MEMORIAL DRIVE, SUITE 1500, SAINT LOUIS, MO 63102

PHONE: (314)367-6100

ELECTRONIC SECURITY

GRW

801 CORPORATE DRIVE, LEXINGTON, KY 40503

PHONE: (859)223-3999

FIRE SUPPRESSION

KOFFEL ASSOCIATES

8815 CENTRE PARK DRIVE, SUITE 200, COLUMBIA, MD 21045

PHONE: (410)750-2246

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415, PANAMA CITY BEACH, FL 32407

PHONE: (502)836-4232

/1

/2

:0

:0

A

M

MP102

MECHANICAL

PIPING PLAN

BOILER LEVEL

REPLACE BOILERS IN BUILDING 10

830 CHALKSTONE AVENUE

PROVIDENCE, RI 02908

650-19-100

01-07-2022 AP AHTM0506-0011

100% CORRECTED

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

NEW WORK PLAN - BOILER LEVEL

GENERAL SHEET NOTES:

SHEET KEYNOTES:

1 NATURAL GAS PIPING IS LOCATED IN CEILING SPACE OF ANNEX.

2 ALL FUEL PIPING MUST BE DOUBLE CONTAINMENT PIPE. BASIS OF DESIGN FOR DOUBLE

CONTAINMENT PIPE WITHIN THE BUILDING - TRICON DOUBLE-CON.

3 PROVIDE INSULATED METAL WALL ENCLOSURE FOR PIPING DOWN THRU FLOOR. FINISH TO

MATCH ADJACENT SURFACES.

4 REFRIGERANT PIPING (SUCTION & LIQUID) UP THRU ROOF PIPE PORTAL. PROVIDE SEPARATE

BOOT FOR EACH PIPE. ROUTE PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE SUPPORTS

AS REQUIRED.

5 3/4" PUMPED CONDENSATE DRAIN PIPING. PITCH DOWNWARD IN DIRECTION OF FLOW MINIMUM

1/8 INCH PER FOOT.

6 FUEL OIL PIPING UP FROM BELOW.

7 REFER TO THE MJ SERIES DRAWINGS FOR PHASING (TEMPORARY) PIPING.

8 BLOWDOWN PIPING BELOW BOILERS.

9 GAS TRAIN VENTS UP THROUGH ROOF. SIZE VENTS PER DETAIL #2 ON DRAWING MP506.

10 ALL BLOWDOWN VALVES MUST BE ACCESSIBLE.

11 1" LPG PIPE TO LPG CYLINDERS - REFER TO DRAWING MC101 FOR CONTINUATION. REFER TO

DETAIL 2 ON DRAWING M-506 AND ARCHITECTURAL, CIVIL AND STRUCUTRAL DRAWINGS.

12 3/4" LPG TO BOILER BURNER/IGNITER - REFER TO DETAIL 2 ON DRAWING MP506.

13 BOILER SAFETY RELIEF VALVE. CONTRACTOR SHALL VERIFY CONNECTION SIZES WITH APPROVED

EQUIPMENT SHOP DRAWINGS. REFER TO SCHEDULES AND DETAIL 8 ON DRAWING MP503 FOR

ADDITIONAL DETAILS.

14 REFER TO DRAWING MP604 FOR ADDITIONAL LPG PIPING DETAILS.

15 4" CTPD DA TANK BYPASS. REFER TO DRAWING MP603 FOR ADDITIONAL DETAILS.

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MJ601, MJ602, MJ603 & MJ604 FOR PHASING INFORMATION.

4. REFER TO DRAWINGS M-701, M-702, M-703 AND M-704 FOR EQUIPMENT SCHEDULES.

5. CONTRACTOR SHALL SUBMIT A DETAILED LOCKOUT/TAGOUT PROCEDURE TO THE VA A

MINIMUM OF 4 WORKING DAYS PRIOR TO PERFORMING ANY WORK ON ANY LIVE STEAM

OR STEAM CONDENSATE SYSTEM.

6. ALL VALVES MUST BE ACCESSIBLE FROM A WALKABLE SURFACE.